CN110144784A - The town road and its construction method constructed based on prestressed concrete plate stake - Google Patents

The town road and its construction method constructed based on prestressed concrete plate stake Download PDF

Info

Publication number
CN110144784A
CN110144784A CN201910510680.4A CN201910510680A CN110144784A CN 110144784 A CN110144784 A CN 110144784A CN 201910510680 A CN201910510680 A CN 201910510680A CN 110144784 A CN110144784 A CN 110144784A
Authority
CN
China
Prior art keywords
piling
groove profile
road
concrete sheet
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910510680.4A
Other languages
Chinese (zh)
Inventor
黄建华
王蕴晨
杨鹿鸣
陈月香
鲍锋
李宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian University of Technology
Original Assignee
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian University of Technology filed Critical Fujian University of Technology
Priority to CN201910510680.4A priority Critical patent/CN110144784A/en
Publication of CN110144784A publication Critical patent/CN110144784A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/006Foundations for pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • E02D5/105Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete of prestressed concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of town road constructed based on prestressed concrete plate stake and its construction methods, the groove profile concrete sheet-piling including being inserted in parallel into both sides of the road vertically, joggle between adjacent groove profile concrete sheet-piling;The side wall of groove profile concrete sheet-piling is equipped with bolt hole, elongated tension reinforcing steel bar anchor pole is equipped in the bolt hole of corresponding groove profile concrete sheet-piling, location nut is arranged on tension reinforcing steel bar anchor pole, location nut is arranged inside and outside groove profile concrete sheet-piling, limits to the relative position of groove profile concrete sheet-piling;The back-filling in layers soil body between groove profile concrete sheet-piling, compacted fill road bed are laid with concrete or bituminous pavement as motor road.The present invention can be effectively reinforcing road bed, reduces subgrade and pavement sedimentation and deformation, replaces the construction technology of the roadbed slope setting of traditional conventional municipal road.Construction method of the present invention can effectively reduce road construction occupied area, improve the efficiency of road construction, reduce road construction cost.

Description

The town road and its construction method constructed based on prestressed concrete plate stake
Technical field
The present invention relates to technical field of road construction more particularly to a kind of municipal administrations constructed based on prestressed concrete plate stake Road construction method.
Background technique
According to existing roadbed form, technology characteristics and technical method studies have shown that most of town road roadbed work Journey all has the biggish slope of occupied area and with slope support method.As China's economy develops rapidly, urbanization process Accelerate, city space is increasingly crowded, and Urban Land Price is high, and the usable area of newly-built town road is caused extremely to have Limit.If continuing that the occupied area and construction cost of road will be significantly greatly increased using slope and slope retaining roadbed, reducing road has Imitate width.And under the repeated action of vehicular load, excessive displacement deformation is easy to produce with the roadbed that slope is reinforced, causes road Face differential settlement causes pavement of road irregularity, influences the daily passage of vehicle.Therefore, it is necessary to take more effective city Political affairs road construction measure increases town road and uses width, and effectively control the road of operation phase to reduce road land seizure ratio The Differential settlement deformation of base slope sliding displacement and road surface.
Summary of the invention
The object of the present invention is to provide a kind of municipal road construction methods constructed based on prestressed concrete plate stake, it is intended to Prestressed concrete plate stake is applied to town road slope retaining and subgrade engineering, the effectively conventional slope construction work of substitution Skill reduces road occupied area, saves urban land resource.
To achieve the above object, the technical scheme is that a kind of municipal administration constructed based on prestressed concrete plate stake Road, the groove profile concrete sheet-piling including being inserted in parallel into both sides of the road vertically, joggle between adjacent groove profile concrete sheet-piling;Groove profile is mixed The side wall of concrete board stake is equipped with several bolts hole, is equipped with elongated tension reinforcing steel bar anchor in the bolt hole of corresponding groove profile concrete sheet-piling Bar is arranged with location nut on tension reinforcing steel bar anchor pole, and location nut is arranged inside and outside groove profile concrete sheet-piling, mixed to groove profile The relative position of concrete board stake is limited;Riveting has crown beam at the top of groove profile concrete sheet-piling, and crown beam is mixed equipped with groove profile is anchored into The loading plate of concrete board stake has poured concrete road surface as walking or non-motor vehicle road on loading plate;Groove profile concrete slab The back-filling in layers soil body between stake is laid with TGXG or geotextiles between soil layer, compacted fill road bed be laid with concrete or Bituminous pavement is as motor road.
Further, the side wall of the groove profile concrete sheet-piling is additionally provided with drainage hole, and draining outer end of hole connects city planting ductwork.
Further, the tension reinforcing steel bar anchor pole can be replaced prestress anchorage cable.
Further, railing, the green plant that plantation can climb on the outside of railing are equipped on the outside of the concrete road surface.
A kind of construction method for the town road constructed based on prestressed concrete plate stake, comprising the following steps:
Step 1 is made groove profile concrete sheet-piling by design requirement, and reserves drainage hole and bolt on groove profile concrete sheet-piling top Hole, it is spare;
Step 2, by planning and designing in two sides unwrapping wire to be repaired roads;
Ground is inserted into projected depth along construction line in the lower part of the groove profile concrete sheet-piling of production by step 3;
Step 4 passes through elongated tension reinforcing steel bar anchor pole in the bolt hole of corresponding groove profile concrete sheet-piling, and in tension reinforcing steel bar anchor pole On be arranged positioning bolt groove profile concrete sheet-piling limited;
Step 5, in groove profile concrete sheet-piling top anchor reinforcing bar and formwork, the elongated crown beam of primary concreting and held in mold Support plate;
Step 6, the back-filling in layers soil body between groove profile concrete sheet-piling, and TGXG or geotextiles are laid between figure layer, backfill Road foundation is used as after rammed earth;
Step 7 is laid with concrete or asphalt roads road surface in the backfill roadbed upper surface that compacting meets town road requirement, makees For motor road;
Step 8, casting concrete road surface is used as walking and non-motorized lane on loading plate, and on the outside of concrete road surface Railing is set.
The beneficial effects of the present invention are: the present invention, which buries prestressed concrete plate stake, is listed in roadbed two sides, and fit through It inserts to drawing reinforcing bar (anchor cable) to be anchored two sides sheet pile, effectively reinforcing road bed side slope and deformation can be reduced, replace tradition conventional municipal Road foundation slope construction technology.In addition, relative to traditional conventional municipal road foundation slope setting technique, construction party of the present invention Method can effectively reduce road construction and run the land seizure area of service stage, improve the efficiency of road construction, reduce road Road construction cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for the town road constructed based on prestressed concrete plate stake;
Fig. 2 is the longitudinal section view for the town road constructed based on prestressed concrete plate stake;
Fig. 3 is the structural schematic diagram of groove profile concrete sheet-piling.
Specific embodiment
Below in conjunction with attached drawing, technical scheme in the embodiment of the invention is clearly and completely described.
As shown in Figure 1-3, a kind of town road constructed based on prestressed concrete plate stake, including be inserted in parallel into vertically The groove profile concrete sheet-piling 1 of road two sides, 1 joggle of adjacent groove profile concrete sheet-piling;If the side wall of groove profile concrete sheet-piling 1 is equipped with Bolt stem hole 2, the bolt hole 2 of corresponding groove profile concrete sheet-piling 1 is interior to be equipped with elongated tension reinforcing steel bar anchor pole or prestress anchorage cable 3, Location nut 4 is arranged on tension reinforcing steel bar anchor pole or prestress anchorage cable 3, location nut 4 is arranged inside and outside groove profile concrete sheet-piling 1 Two sides limit the relative position of groove profile concrete sheet-piling 1;Riveting has crown beam 5, crown beam 5 at the top of groove profile concrete sheet-piling 1 It is equipped with the loading plate 10 for anchoring into groove profile concrete sheet-piling 1, concrete road surface 11 has been poured on loading plate 10 and has been used as walking or non- Motor road;1 back-filling in layers soil body 6 of groove profile concrete sheet-piling is laid with TGXG or geotextiles between soil layer, is tamping Fill subgrade surface is laid with concrete or bituminous pavement 7 is used as motor road.The side wall of the groove profile concrete sheet-piling 1 is also set There is drainage hole 9,9 outer end of drainage hole connects city planting ductwork.Railing 8 is equipped on the outside of the concrete road surface, plantation can on the outside of railing 8 The green plant of climbing.
The construction method of the above-mentioned town road constructed based on prestressed concrete plate stake, as shown in Fig. 2, including following step It is rapid:
Step 1 is made groove profile concrete sheet-piling by design requirement, and reserves drainage hole and bolt on groove profile concrete sheet-piling top Hole, it is spare;
Step 2, by planning and designing in two sides unwrapping wire to be repaired roads;
Ground is inserted into projected depth along construction line in the lower part of the groove profile concrete sheet-piling of production by step 3;
Step 4 passes through elongated tension reinforcing steel bar anchor pole (prestress anchorage cable) in the bolt hole of corresponding groove profile concrete sheet-piling, and Positioning bolt is arranged on tension reinforcing steel bar anchor pole (prestress anchorage cable) to limit groove profile concrete sheet-piling;
Step 5, the formwork at the top of groove profile concrete sheet-piling pour elongated crown beam and carrying concrete slab, crown beam and pass through reinforcing bar Anchor connection sheet pile;
Step 6, the back-filling in layers soil between groove profile concrete sheet-piling, and installation TGXG or geotextiles can be laid in banketing, Road foundation is used as after backfilling rammed earth;
Step 7 is laid with concrete or asphalt roads road surface in the backfill roadbed upper surface that compacting meets town road requirement, mentions For municipal driving demand;
Step 8, two sides sheet pile top crown beam upper surface can pour loading plate and used as walking and non-motorized lane, and add The facilities such as security guardrail and landscape fence also plant the green plant that can be climbed on the outside of guardrail.
Prestressed concrete plate stake is listed in roadbed two sides by the present invention, and interspersed be anchored to drawing reinforcing bar (cable wire) is cooperated to fix Effectively reinforcing road bed side slope, the traditional conventional municipal road foundation slope of substitution construction technology, backfill can be arranged in two sides sheet pile Middle setting TGXG and geotextiles etc. reduce subgrade and pavement sedimentation and deformation.Accordingly, with respect to traditional conventional municipal road foundation Construction technology is arranged in slope, and construction method of the present invention can effectively reduce road construction and run the town road soil of validity period Area occupied improves road construction and service efficiency, reduces town road construction cost.
Described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, belongs to the scope of the present invention.

Claims (5)

1. a kind of town road constructed based on prestressed concrete plate stake, which is characterized in that including being inserted in parallel into road vertically The groove profile concrete sheet-piling of two sides, joggle between adjacent groove profile concrete sheet-piling;The side wall of groove profile concrete sheet-piling is equipped with several spiral shells Keyhole, the bolt hole of corresponding groove profile concrete sheet-piling is interior to be equipped with elongated tension reinforcing steel bar anchor pole, is arranged on tension reinforcing steel bar anchor pole Location nut, location nut are arranged inside and outside groove profile concrete sheet-piling, carry out to the relative position of groove profile concrete sheet-piling Limit;Riveting has crown beam at the top of groove profile concrete sheet-piling, and crown beam is equipped with the loading plate for anchoring into groove profile concrete sheet-piling, loading plate On poured concrete road surface as walking or non-motor vehicle road;The back-filling in layers soil body between groove profile concrete sheet-piling, between soil layer TGXG or geotextiles are laid with, compacted fill road bed is equipped with concrete or bituminous pavement as motor road.
2. a kind of town road constructed based on prestressed concrete plate stake as described in claim 1, which is characterized in that described The side wall of groove profile concrete sheet-piling is additionally provided with drainage hole, and draining outer end of hole connects city planting ductwork.
3. a kind of town road constructed based on prestressed concrete plate stake as described in claim 1, which is characterized in that described Tension reinforcing steel bar anchor pole can be replaced prestress anchorage cable.
4. a kind of town road constructed based on prestressed concrete plate stake stated such as claim 1, which is characterized in that described mixed Railing, the green plant that plantation can climb on the outside of railing are equipped on the outside of solidifying soil surface.
5. a kind of construction method for the town road constructed based on prestressed concrete plate stake, which is characterized in that including following step It is rapid:
Step 1 is made groove profile concrete sheet-piling by design requirement, and reserves drainage hole and bolt on groove profile concrete sheet-piling top Hole, it is spare;
Step 2, by planning and designing in two sides unwrapping wire to be repaired roads;
Ground is inserted into projected depth along construction line in the lower part of the groove profile concrete sheet-piling of production by step 3;
Step 4 passes through elongated tension reinforcing steel bar anchor pole in the bolt hole of corresponding groove profile concrete sheet-piling, and in tension reinforcing steel bar anchor pole On be arranged positioning bolt groove profile concrete sheet-piling limited;
Step 5, in groove profile concrete sheet-piling top anchor reinforcing bar and formwork, the elongated crown beam of primary concreting and held in mold Support plate;
Step 6, the back-filling in layers soil body between groove profile concrete sheet-piling, and TGXG or geotextiles are laid between figure layer, backfill Road foundation is used as after rammed earth;
Step 7 is laid with concrete or asphalt roads road surface in the backfill roadbed upper surface that compacting meets town road requirement, makees For motor road;
Step 8, casting concrete road surface is used as walking and non-motorized lane on loading plate, and on the outside of concrete road surface Railing is set.
CN201910510680.4A 2019-06-13 2019-06-13 The town road and its construction method constructed based on prestressed concrete plate stake Pending CN110144784A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910510680.4A CN110144784A (en) 2019-06-13 2019-06-13 The town road and its construction method constructed based on prestressed concrete plate stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910510680.4A CN110144784A (en) 2019-06-13 2019-06-13 The town road and its construction method constructed based on prestressed concrete plate stake

Publications (1)

Publication Number Publication Date
CN110144784A true CN110144784A (en) 2019-08-20

Family

ID=67591129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910510680.4A Pending CN110144784A (en) 2019-06-13 2019-06-13 The town road and its construction method constructed based on prestressed concrete plate stake

Country Status (1)

Country Link
CN (1) CN110144784A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670436A (en) * 2019-09-26 2020-01-10 华蓝设计(集团)有限公司 Structure for preventing urban road subgrade from non-uniform settlement and construction method thereof
CN114032721A (en) * 2021-11-29 2022-02-11 杭州光华路桥工程有限公司 Asphalt pavement composite structure and construction method thereof

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821060A (en) * 2014-03-06 2014-05-28 河海大学 Construction method of conventional expressway soft foundation treating technology
CN204174614U (en) * 2014-06-23 2015-02-25 谈维汉 Flap shape pretensioning prestressed concrete pile
CN204325837U (en) * 2014-01-28 2015-05-13 中铁二院工程集团有限责任公司 Basement rock covers the high roadbed reclamation lateral restraint reinforcing construction of soft foundation
CN105887804A (en) * 2016-05-26 2016-08-24 福建工程学院 High-strength prestressed concrete channel plate pile
CN205501750U (en) * 2016-04-07 2016-08-24 重庆市勘测院 Supporting structure of be used for pavement to widen transformation
CN106013054A (en) * 2016-07-13 2016-10-12 福建省大地管桩有限公司 Ecological prestress concrete plate pile and construction method thereof
CN107059856A (en) * 2017-06-10 2017-08-18 福建省闽工科技发展有限公司 The ecology stake of pretensioning prestressed concrete porous hollow and its construction method
CN206844120U (en) * 2017-02-20 2018-01-05 广东华固工程有限公司 It is a kind of be adapted to adjacent foundation pits supporting to draw anchor cable structure
CN207277108U (en) * 2017-10-09 2018-04-27 安徽省新路建设工程集团有限责任公司 Vertical type is without slope light ecological embankment structure
CN108330764A (en) * 2018-04-12 2018-07-27 浙江大学城市学院 Shallow-layer cures Piled Embankments and construction method
CN108560349A (en) * 2018-06-14 2018-09-21 中国电建集团成都勘测设计研究院有限公司 The high embankment retaining structure in soft clay area
CN208430398U (en) * 2017-09-04 2019-01-25 浙江大学城市学院 A kind of prestressing force is to pull-type Reinforced Embankment structure
CN109487748A (en) * 2018-06-02 2019-03-19 深圳市深水水务咨询有限公司 Nearby Structure depth riverbed quaywall supporting construction and construction method
CN208733406U (en) * 2018-06-20 2019-04-12 杭州江润科技有限公司 Light road bank prefabricated board connection fastening structure
CN210163739U (en) * 2019-06-13 2020-03-20 福建工程学院 Town road constructed based on prestressed concrete sheet piles

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204325837U (en) * 2014-01-28 2015-05-13 中铁二院工程集团有限责任公司 Basement rock covers the high roadbed reclamation lateral restraint reinforcing construction of soft foundation
CN103821060A (en) * 2014-03-06 2014-05-28 河海大学 Construction method of conventional expressway soft foundation treating technology
CN204174614U (en) * 2014-06-23 2015-02-25 谈维汉 Flap shape pretensioning prestressed concrete pile
CN205501750U (en) * 2016-04-07 2016-08-24 重庆市勘测院 Supporting structure of be used for pavement to widen transformation
CN105887804A (en) * 2016-05-26 2016-08-24 福建工程学院 High-strength prestressed concrete channel plate pile
CN106013054A (en) * 2016-07-13 2016-10-12 福建省大地管桩有限公司 Ecological prestress concrete plate pile and construction method thereof
CN206844120U (en) * 2017-02-20 2018-01-05 广东华固工程有限公司 It is a kind of be adapted to adjacent foundation pits supporting to draw anchor cable structure
CN107059856A (en) * 2017-06-10 2017-08-18 福建省闽工科技发展有限公司 The ecology stake of pretensioning prestressed concrete porous hollow and its construction method
CN208430398U (en) * 2017-09-04 2019-01-25 浙江大学城市学院 A kind of prestressing force is to pull-type Reinforced Embankment structure
CN207277108U (en) * 2017-10-09 2018-04-27 安徽省新路建设工程集团有限责任公司 Vertical type is without slope light ecological embankment structure
CN108330764A (en) * 2018-04-12 2018-07-27 浙江大学城市学院 Shallow-layer cures Piled Embankments and construction method
CN109487748A (en) * 2018-06-02 2019-03-19 深圳市深水水务咨询有限公司 Nearby Structure depth riverbed quaywall supporting construction and construction method
CN108560349A (en) * 2018-06-14 2018-09-21 中国电建集团成都勘测设计研究院有限公司 The high embankment retaining structure in soft clay area
CN208733406U (en) * 2018-06-20 2019-04-12 杭州江润科技有限公司 Light road bank prefabricated board connection fastening structure
CN210163739U (en) * 2019-06-13 2020-03-20 福建工程学院 Town road constructed based on prestressed concrete sheet piles

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670436A (en) * 2019-09-26 2020-01-10 华蓝设计(集团)有限公司 Structure for preventing urban road subgrade from non-uniform settlement and construction method thereof
CN114032721A (en) * 2021-11-29 2022-02-11 杭州光华路桥工程有限公司 Asphalt pavement composite structure and construction method thereof
CN114032721B (en) * 2021-11-29 2022-12-27 杭州光华路桥工程有限公司 Asphalt pavement composite structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN107059667A (en) Door shape assembled armored concrete box culvert and its construction method
CN109403170B (en) Steep slope road and construction method thereof
CN106192646A (en) Vcehicular tunnel car-driving shock-absorbing denoising structure and construction method thereof
CN109750571B (en) Road collapse emergency and permanent retaining integrated structure and construction method
CN106567410A (en) New construction method of municipal road inspection well
CN111305027B (en) Rapid repairing construction method and repairing structure for subsidence of karst area pavement
CN210194361U (en) Splicing structure for widening new and old roadbeds on road
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN110144784A (en) The town road and its construction method constructed based on prestressed concrete plate stake
CN201411713Y (en) Manhole of various kinds of pipe networks for urban roads having hole mouth reinforcing mechanism
CN109577121A (en) A kind of assembled self-balancing channel design system and its rapid constructing method
CN210163739U (en) Town road constructed based on prestressed concrete sheet piles
CN103225512A (en) Construction method for making prestressed back for box-culvert jacking
CN216712852U (en) Central separation strip steel cylinder concrete guardrail for mountain highway
CN109750567A (en) Expressway extension structure and expressway extension method
CN113863353A (en) Three-way high-strength bolt joint of assembled pile plate structure roadbed and construction method thereof
CN113308957A (en) Construction method of retaining wall light soil wide-spliced embankment
CN107858886B (en) Viaduct foundation peripheral ground road and construction method thereof
CN114922017B (en) Newly-built cantilever type retaining wall-existing stake board wall roadbed group wide integrated configuration
CN114482118B (en) Method for realizing embankment width by existing-newly-built combined cantilever retaining wall
CN112195952B (en) Soft foundation hangar and connecting road connecting structure and construction method
CN216689000U (en) Culvert type combined bridge abutment
CN216712993U (en) Pile plate structure adopting steel cylinder-concrete combined connecting piece
CN217758142U (en) Structure is widened to half pin-connected panel road bed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination