CN205501750U - Supporting structure of be used for pavement to widen transformation - Google Patents
Supporting structure of be used for pavement to widen transformation Download PDFInfo
- Publication number
- CN205501750U CN205501750U CN201620282723.XU CN201620282723U CN205501750U CN 205501750 U CN205501750 U CN 205501750U CN 201620282723 U CN201620282723 U CN 201620282723U CN 205501750 U CN205501750 U CN 205501750U
- Authority
- CN
- China
- Prior art keywords
- existing
- footpath
- walk slab
- side walk
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a supporting structure of be used for pavement to widen transformation, includes existing slope and sets up the existing pavement on existing slope, its characterized in that: bearing structure supports stake, many straining beams, polylith side walk slab, many concrete sleeper beams by many and mats formation the layer and forms, the utility model discloses an useful technological effect is: can be used for the transformation of widening on existing pavement, the engineering degree of difficulty is low, and area is few, and construction convenience destroys lessly to peripheral facility.
Description
Technical field
This utility model relates to a kind of footpath Widening Technique, particularly relates to a kind of supporting construction for footpath widening and improving.
Background technology
Along with the development in city, urban population increases the most day by day, and the burden of urban transportation facility is the heaviest, one of them more significant problem is exactly that due to design-build relatively early, road width is narrower for many old footpath, its traffic capacity is the most delayed, it would be highly desirable to widening and improving;Prior art is when carrying out widening and improving to old footpath, and the typically outside at existing roadbed side slope arranges new side slope to form new roadbed, then structure of sidewalk of mating formation on new roadbed, thus realizes widening existing footpath.
Aforesaid prior art is used to carry out footpath when widening, there are the following problems: 1) owing to needs arrange new side slope in the outside of existing roadbed side slope, needing to carry out backfilling to be formed new roadbed with the substantial amounts of cubic metre of earth and stone, meanwhile, to newly filling out roadbed, to carry out the difficulty of compacting operation the biggest;2) settlement difference easily occurs between new-old concrete bond, cause the footpath after widening and improving that crack occurs, there is potential safety hazard;3) prior art newly sets roadbed due to needs, and floor space is relatively big, and at present, each metropolitan urban land is the most nervous, and the application causing prior art is the most limited.
Utility model content
For the problem in background technology, the utility model proposes a kind of supporting construction for footpath widening and improving, including existing roadbed side slope and the existing footpath being arranged on existing roadbed side slope, it is improved by: described supporting construction is made up of a plurality of supporting stake, a plurality of straining beam, polylith side walk slab, a plurality of concrete sleeper beam and pave-load layer;
It is provided with mounting groove on described existing roadbed side slope, mounting groove is positioned at the outer side edges edge of existing footpath, the trend of mounting groove is mated with the trend of existing footpath, and described sleeper beam is arranged in mounting groove, and the outside of sleeper beam upper surface is provided with the step surface mated with side walk slab;Described supporting stake is arranged at the outside of existing roadbed side slope, and a plurality of supporting stake moves towards single-row layout along existing footpath, and the upper surface of supporting stake is provided with groove;The two ends of described straining beam are respectively arranged in the groove on adjacent two supporting stakes, and the upper surface of straining beam flushes with the upper surface of supporting stake;The outer end of described side walk slab is arranged on the upper surface of supporting stake, and straining beam is covered by side walk slab, and the inner of side walk slab is arranged on described step surface, and the upper surface of side walk slab flushes with the bed course of existing footpath;Described pave-load layer covers on side walk slab upper surface, and the upper surface of pave-load layer flushes with the upper surface of existing footpath.
After using this utility model, need not arrange new side slope, floor space is less, widely applicable, and this utility model directly utilizes existing roadbed side slope and supporting stake to build side walk slab, engineering excavation amount and backfill amount are the least, and are not related to Subgrade Compaction problem.
Preferably, described side walk slab and straining beam all use concrete cast in situs, and the reinforcing bar in straining beam stretches in side walk slab.
Preferably, between described side walk slab and described bed course, it is provided with flexible gap, in flexible gap, is filled with Colophonium loose hemp fiber.
Preferably, the outer side edges of described side walk slab upper surface, along being provided with guardrail, is connected by dowel between guardrail lower end and side walk slab.
Advantageous Effects of the present utility model is: can be used for the widening and improving of existing footpath, engineering difficulty is low, and floor space is few, easy construction, destroys less to peripheral facility.
Accompanying drawing explanation
Fig. 1, structure section schematic diagram of the present utility model;
In figure, the title corresponding to each labelling is respectively as follows: supporting stake 1, straining beam 2, side walk slab 3, concrete sleeper beam 4, pave-load layer 5, existing roadbed side slope 6, bed course 7, guardrail 8.
Detailed description of the invention
A kind of supporting construction for footpath widening and improving, including existing roadbed side slope 6 and the existing footpath being arranged on existing roadbed side slope 6, it is improved by: described supporting construction is made up of a plurality of supporting stake 1, a plurality of straining beam 2, polylith side walk slab 3, a plurality of concrete sleeper beam 4 and pave-load layer 5;
It is provided with mounting groove on described existing roadbed side slope 6, mounting groove is positioned at the outer side edges edge of existing footpath, the trend of mounting groove is mated with the trend of existing footpath, and described sleeper beam 4 is arranged in mounting groove, and the outside of sleeper beam 4 upper surface is provided with the step surface mated with side walk slab 3;Described supporting stake 1 is arranged at the outside of existing roadbed side slope 6, and a plurality of supporting stake 1 is along the single-row layout of moving towards of existing footpath, and the upper surface of supporting stake 1 is provided with groove;The two ends of described straining beam 2 are respectively arranged in the groove on adjacent two supporting stakes 1, and the upper surface of straining beam 2 flushes with the upper surface of supporting stake 1;The outer end of described side walk slab 3 is arranged on the upper surface of supporting stake 1, and straining beam 2 is covered by side walk slab 3, and the inner of side walk slab 3 is arranged on described step surface, and the upper surface of side walk slab 3 flushes with the bed course 7 of existing footpath;Described pave-load layer 5 covers on side walk slab 3 upper surface, and the upper surface of pave-load layer 5 flushes with the upper surface of existing footpath.
Further, described side walk slab 3 and straining beam 2 all use concrete cast in situs, and the reinforcing bar in straining beam 2 stretches in side walk slab 3.
Further, between described side walk slab 3 and described bed course 7, it is provided with flexible gap, in flexible gap, is filled with Colophonium loose hemp fiber.
Further, the outer side edges of described side walk slab 3 upper surface is along being provided with guardrail 8, and guardrail 8 lower end is connected by dowel between side walk slab 3.
Claims (4)
1. the supporting construction for footpath widening and improving, including existing roadbed side slope (6) and the existing footpath that is arranged on existing roadbed side slope (6), it is characterised in that: described supporting construction is made up of a plurality of supporting stake (1), a plurality of straining beam (2), polylith side walk slab (3), a plurality of concrete sleeper beam (4) and pave-load layer (5);
It is provided with mounting groove on described existing roadbed side slope (6), mounting groove is positioned at the outer side edges edge of existing footpath, the trend of mounting groove is mated with the trend of existing footpath, described sleeper beam (4) is arranged in mounting groove, and the outside of sleeper beam (4) upper surface is provided with the step surface mated with side walk slab (3);Described supporting stake (1) is arranged at the outside of existing roadbed side slope (6), and a plurality of supporting stake (1) is provided with groove along the single-row layout of moving towards of existing footpath, the upper surface of supporting stake (1);The two ends of described straining beam (2) are respectively arranged in the groove on adjacent two supporting stakes (1), and the upper surface of straining beam (2) flushes with the upper surface of supporting stake (1);The outer end of described side walk slab (3) is arranged on the upper surface of supporting stake (1), straining beam (2) is covered by side walk slab (3), the inner of side walk slab (3) is arranged on described step surface, and the upper surface of side walk slab (3) flushes with the bed course (7) of existing footpath;Described pave-load layer (5) covers on side walk slab (3) upper surface, and the upper surface of pave-load layer (5) flushes with the upper surface of existing footpath.
Supporting construction for footpath widening and improving the most according to claim 1, it is characterised in that: described side walk slab (3) and straining beam (2) all use concrete cast in situs, and the reinforcing bar in straining beam (2) stretches in side walk slab (3).
Supporting construction for footpath widening and improving the most according to claim 1 and 2, it is characterised in that: it is provided with flexible gap between described side walk slab (3) and described bed course (7), in flexible gap, is filled with Colophonium loose hemp fiber.
Supporting construction for footpath widening and improving the most according to claim 2, it is characterised in that: the outer side edges of described side walk slab (3) upper surface, along being provided with guardrail (8), is connected by dowel between guardrail (8) lower end with side walk slab (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620282723.XU CN205501750U (en) | 2016-04-07 | 2016-04-07 | Supporting structure of be used for pavement to widen transformation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620282723.XU CN205501750U (en) | 2016-04-07 | 2016-04-07 | Supporting structure of be used for pavement to widen transformation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205501750U true CN205501750U (en) | 2016-08-24 |
Family
ID=56736103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620282723.XU Active CN205501750U (en) | 2016-04-07 | 2016-04-07 | Supporting structure of be used for pavement to widen transformation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205501750U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592364A (en) * | 2016-12-02 | 2017-04-26 | 北京仁创生态环保科技股份公司 | Pedestrian walkway paving method |
CN106835880A (en) * | 2017-01-23 | 2017-06-13 | 安徽省交通规划设计研究总院股份有限公司 | Highway lateral support type peg board formula is without earth roadbed |
CN110144784A (en) * | 2019-06-13 | 2019-08-20 | 福建工程学院 | The town road and its construction method constructed based on prestressed concrete plate stake |
CN111827034A (en) * | 2020-07-28 | 2020-10-27 | 中铁二院工程集团有限责任公司 | Wide integrative structure of consolidating of existing highway transformation engineering group |
-
2016
- 2016-04-07 CN CN201620282723.XU patent/CN205501750U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592364A (en) * | 2016-12-02 | 2017-04-26 | 北京仁创生态环保科技股份公司 | Pedestrian walkway paving method |
CN106835880A (en) * | 2017-01-23 | 2017-06-13 | 安徽省交通规划设计研究总院股份有限公司 | Highway lateral support type peg board formula is without earth roadbed |
CN110144784A (en) * | 2019-06-13 | 2019-08-20 | 福建工程学院 | The town road and its construction method constructed based on prestressed concrete plate stake |
CN111827034A (en) * | 2020-07-28 | 2020-10-27 | 中铁二院工程集团有限责任公司 | Wide integrative structure of consolidating of existing highway transformation engineering group |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203174453U (en) | Light-mass embankment structure for managing bump at bridge head | |
CN205501750U (en) | Supporting structure of be used for pavement to widen transformation | |
CN102352590B (en) | Method for splicing highfill roadbed by adopting pile-sheet retaining wall | |
CN106192646B (en) | Vcehicular tunnel car-driving shock-absorbing denoising structure and its construction method | |
CN103334357B (en) | Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method | |
CN204401444U (en) | A kind of high embankment filled soil end of the bridge anti-settling structure | |
CN202787044U (en) | Longitudinal crack treatment structure for bituminous concrete pavement | |
CN107022938A (en) | Precast concrete road system and construction method | |
KR101076029B1 (en) | Replacing Method of Old Train Track using Twin-Block Type Train Track | |
CN104358196B (en) | Highway open to traffic Embankment Subsidence disposes the construction method of structure | |
CN104328730B (en) | The construction method of embedded reinforcement bitumen layer transformation cement concrete pavement | |
CN103046446A (en) | Treatment structure at joint part of reconstruction and extension project of highway | |
CN110670436A (en) | Structure for preventing urban road subgrade from non-uniform settlement and construction method thereof | |
CN203334154U (en) | Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct | |
CN105803922A (en) | High embankment filling bridgehead sedimentation preventing structure | |
CN110067166A (en) | A kind of antidetonation road structure and its construction method | |
CN104278604B (en) | Speedway shape of a saddle pioneer road process for constructing | |
CN203034328U (en) | Joint part treatment structure of reconstruction and extension project of expressway | |
KR101440028B1 (en) | Underground tunnel structure crossing rail way, and Constructing Method thereof | |
CN105178130A (en) | Composite pavement structure for urban down-traversing pavement and construction method | |
CN111809470A (en) | Structure and method for preventing cracks of road base layer and road subbase layer | |
RU2394959C1 (en) | Road surface structure | |
CN103866788B (en) | A kind of method of pillar abutment scarp slope barricadeization transformation | |
CN203795260U (en) | New roadbed and old roadbed combined road structure | |
CN206127789U (en) | Structure of making an uproar falls in highway tunnel driving damping |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |