CN206941325U - The newly-built peg board formula roadbed of girder construction system in length and breadth - Google Patents

The newly-built peg board formula roadbed of girder construction system in length and breadth Download PDF

Info

Publication number
CN206941325U
CN206941325U CN201720806768.7U CN201720806768U CN206941325U CN 206941325 U CN206941325 U CN 206941325U CN 201720806768 U CN201720806768 U CN 201720806768U CN 206941325 U CN206941325 U CN 206941325U
Authority
CN
China
Prior art keywords
pile cover
prefabricated
prefabricated subsection
plate
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720806768.7U
Other languages
Chinese (zh)
Inventor
吴平平
朱俊
魏民
王诗青
丁楠
王凯
汪志甜
杨凯
李剑鸾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Transport Consulting and Design Institute Co Ltd
Original Assignee
Anhui Transport Consulting and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Transport Consulting and Design Institute Co Ltd filed Critical Anhui Transport Consulting and Design Institute Co Ltd
Priority to CN201720806768.7U priority Critical patent/CN206941325U/en
Application granted granted Critical
Publication of CN206941325U publication Critical patent/CN206941325U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The newly-built peg board formula roadbed of girder construction system in length and breadth, it is related to highway and builds new technical field, including prefabricated subsection plate, middle cross beam, cast-in-place wet seam between prefabricated subsection, join end floor beam, pile cover, concrete solid-section and prefabricated tubular pile, prefabricated subsection plate is uniformly mutually arranged, middle cross beam is fixedly installed between prefabricated subsection plate transverse direction, cast-in-place wet seam is fixedly installed between prefabricated subsection plate longitudinal direction between prefabricated subsection, described connection end floor beam is fixedly installed on the downside of the horizontal outermost end of prefabricated subsection plate, described pile cover is uniformly and fixedly arranged at the lower position of prefabricated subsection plate, concrete solid-section is respectively fixedly disposed at the lower end of pile cover, described prefabricated tubular pile is fixedly installed on the lower end of concrete solid-section.With good technology and superiority in economy, using beam body system in length and breadth, structural system stress is clear and definite, and top and the bottom structure uses precast construction, and quality is easily controllable, convenient construction.

Description

The newly-built peg board formula roadbed of girder construction system in length and breadth
Technical field:
It the utility model is related to highway and build new technical field, and in particular to the newly-built peg board of girder construction system in length and breadth Formula roadbed.
Background technology:
With the development of present freeway traffic net, many original roads can not meet existing demand, because This domestic many road is faced with the situation for needing to be widened.Conventional highway is spelled in width, and the roadbed for spelling wide portion is often adopted It is filling roadbed construction method, and original roadbed settlement stability, and when spelling wide filled-up ground due to filling construction Between it is limited, it is impossible to ensure its stable settlement, easily produce crack and new and old roadbed linking faulting of slab ends phenomena such as.Along with embankment is constructed Engineering time it is longer, construction is complicated, does not meet industrialized production theory leading now.Therefore it is a kind of strong there is an urgent need to seek Degree is high, and rigidity is big, and good endurance, cost is appropriate, the simple roadbed new construction of construction technology.
Pile slab structure is mainly used in railway territory at present, and what is more early applied is Finland, subsequent Holland, Germany, Britain etc. Country has used pile slab structure on high-speed railway.In the 1990s, the Erman- near Finland Humppila Ninsuo areas, once it was marshland, the Turku-Toijala railway lines of design will be from here by the way that this will be one after building up Speed of service 170km/h requirement, about 400m pile slab structure is employed, top is using Ballast track structure.China It is for the first time complete without the pile slab structure stake and plate that how on track comprehensive experimental section, Sui-Yu Railway uses in Sui-Yu Railway using pile slab structure Full consolidation.
Although pile slab structure at home and abroad has certain research, be currently not it is very ripe, especially in highway Aspect (is mainly used in retaining wall) at present.The newly-built peg board formula roadbed of girder construction system is a brand-new technology in length and breadth, is adopted Realization consolidation is poured jointly with cast-in-place middle cross beam, joins end stake by the use of longeron as main bearing member, central pile pile cover reserved steel bar The pre-buried tetrafluoro steel plate of crown, which is realized, to be slidably connected, and structure safety, top and the bottom component uses prefabricated components, convenient construction, construction Quality advantageously ensures that.Application study is almost empty in terms of the newly-built peg board formula roadbed of girder construction system in length and breadth both at home and abroad at present In vain.
Utility model content:
It is difficult for the processing of above-mentioned Highway Soft Ground Settlement, the problems such as industrialized level is low, and construction costs is high, this Invention provides a kind of newly-built peg board formula roadbed of the system of girder construction in length and breadth.
Technical problem to be solved in the utility model is realized using following technical scheme:
The newly-built peg board formula roadbed of girder construction system in length and breadth, it is characterised in that:Including prefabricated subsection plate, middle cross beam, prefabricated Cast-in-place wet seam, connection end floor beam, pile cover, concrete solid-section and prefabricated tubular pile, described prefabricated subsection plate homogeneous phase between section Mutually arrangement, described middle cross beam are fixedly installed between prefabricated subsection plate transverse direction, and cast-in-place wet seam is consolidated between described prefabricated subsection Surely it is arranged between prefabricated subsection plate longitudinal direction, described connection end floor beam is fixedly installed under the horizontal outermost end of prefabricated subsection plate Side, described pile cover are uniformly and fixedly arranged at the lower position of prefabricated subsection plate, and fixation is set described concrete solid-section respectively Put and be fixedly installed on the lower end of concrete solid-section in the lower end of pile cover, described prefabricated tubular pile.
Described pile cover includes connection end pile cover and middle part pile cover, described connection end pile cover are uniformly and fixedly arranged at prefabricated subsection The outer end side lower part position of plate, described middle part pile cover are uniformly arranged on the middle part lower position of prefabricated subsection plate,
Pre-buried tetrafluoro steel plate is provided with described connection end pile cover and with the bottom junction of prefabricated subsection plate.
The both sides lower position of described prefabricated subsection plate is provided with flange plate thick section.
The upper end of described middle part pile cover is provided with the pile cover embedded bar for extending to outside, described pile cover embedded bar Top is cast in the bottom of middle cross beam.
Described middle cross beam includes middle cross beam pre-erection and the cast-in-place part of middle cross beam, and described pile cover embedded bar is with The cast-in-place part of crossbeam pours together realizes stake beam consolidation, during middle cross beam pre-erection is placed in before being poured in the cast-in-place part of middle cross beam Between portion's pile cover.
The end bay segment end beam bottom pre-embedded steel slab of described prefabricated subsection plate and pre-buried tetrafluoro steel plate shape in connection end pile cover Into being slidably connected.
Prefabricated subsection plate is prefabricated subsection T back plates.
Preferably, the prefabricated subsection T backs thickness of slab 0.2m, rib width 0.7m, deck-molding 0.68m, the long 6m in section;
Preferably, the newly-built peg board formula roadbed of the system of girder construction in length and breadth using 8 across one, the long 52m of full-bridge;
The prefabricated subsection T beam pieces number can be according to the wide adjustment of bridge;
Preferably, the cast-in-place wet wide 1m of seam, thick 0.2m between the prefabricated subsection;
The end floor beam and prefabricated subsection T beams corresponding part are prefabricated together with prefabricated subsection T beams, and remainder is cast-in-place, Join end floor beam and indulge bridge to long 0.3m;
Wherein the middle cross beam is divided into pre-erection and cast-in-place part, and central pile pile cover reserved steel bar pours jointly with cast-in-place middle cross beam Realization consolidation is built, bridge is indulged to long 0.5m, pre-erection high 0.28m, the cast-in-place high 0.4m in part as preferred middle cross beam;
Preferably, the pile cover indulges bridge to long 1m, direction across bridge long 1m, high 0.8m, it is divided into middle pile cover and connection end pile cover, Middle pile cover is applied to central pile, and its interior reserved steel bar pours realization consolidation jointly with cast-in-place middle cross beam, and connection end pile cover crown is pre- The realization of tetrafluoro steel plate is buried to be slidably connected;
Preferably, the concrete solid-section is the cylinder of diameter 0.6, high 2m, as prefabricated tubular pile and pile cover linkage section;
The prefabricated tubular pile is PHC pile tubes, diameter 0.6m, wall thickness 0.11m, is realized and connected by concrete solid-section and pile cover Connect.
The method have the benefit that:
The present invention creates one kind by being improved traditional railway pile slab structure, and the characteristics of combination highway The newly-built peg board formula roadbed of the brand-new system of girder construction in length and breadth, typically applicable across footpath is 6.5~8m, is controlled for foundation deformation tight The location that the soft soil foundation of lattice, the depth of fill are relatively low, are not suitable for constructing a bridge has good technology and superiority in economy, uses Beam body system in length and breadth, structural system stress is clear and definite, and top and the bottom structure uses precast construction, and quality is easily controllable, convenient construction.
The newly-built peg board formula roadbed of girder construction system in length and breadth, using beam body system in length and breadth, structure vertical cross stiffness is relatively strong, both The horizontal loadings such as vertical load, and can adaptive temperature, automobile braking force can be preferably transmitted, with globality is strong, stability is good, hard Gu the advantages that durable, deformation accumulation is slow, be advantageous to high speed traveling, reduce maintenance workload.Central pile pile cover reserves steel Muscle and cast-in-place middle cross beam pour realization consolidation jointly, can operative constraint superstructure displacement, join the pre-buried tetrafluoro of end pile cover crown Steel plate realizes and is slidably connected, can release temperature and automobile braking force to internal force caused by structure.
It need not be banketed between stake, Economization on land, reduce the influence to surrounding environment, be advantageous to the protection of environment;Prefabricated tubular pile, Prefabricated subsection T beams and corresponding crossbeam are prefabricated in factory normalization, rebuild health, are transported to scene, good economy performance, are advantageous to industry Change rapid construction, suitable for popularization and application.
The newly-built peg board formula roadbed of girder construction system is a kind of new structure in length and breadth, and the alternative highway of the structure is reconstructed Or difficulty of being taken over the land for use in grassroot project, construction period is tight, the Traditional foundations scheme without region of properly banketing, and meets country and promotes dress With policy is changed, there is energy-conserving and environment-protective advantage, be building industry developing direction and trend from now on.
Brief description of the drawings:
Fig. 1 is structure general illustration of the present invention;
Fig. 2 is present invention connection end floor beam opening position cross-sectional view;
Fig. 3 is span centre crossbeam opening position cross-sectional view of the present invention;
Sequence number in above-mentioned figure:1- prefabricated subsections plate, 2- middle cross beams, 2a- middle cross beams pre-erection, the cast-in-place portion of 2b- middle cross beams Divide, cast-in-place wet seam, 4- connection end floor beam, 5- connection end pile cover, 6- centres pile cover, 7- concrete solid-section, 8- between 3- prefabricated subsections Prefabricated tubular pile, 9- flange plates thick section, the pre-buried tetrafluoro steel plates of 10-, 11- pile cover embedded bars.
Embodiment:
In order that technological means, creation new feature, reached purpose and effect that the utility model is realized are easy to understand, With reference to being specifically illustrating, the utility model is expanded on further.
As shown in Figure 1, Figure 2 and Figure 3,
The newly-built peg board formula roadbed of girder construction system in length and breadth, including between prefabricated subsection plate 1, middle cross beam 2, prefabricated subsection it is cast-in-place Wet seam 3, connection end floor beam 4, pile cover, concrete solid-section 7 and prefabricated tubular pile 8, prefabricated subsection plate 1 is uniformly mutually arranged, middle horizontal stroke Beam 2 is fixedly installed between the transverse direction of prefabricated subsection plate 1, and it is vertical to be fixedly installed on prefabricated subsection plate 1 for cast-in-place wet seam 3 between prefabricated subsection Between, connection end floor beam 4 is fixedly installed on the downside of the horizontal outermost end of prefabricated subsection plate 1, and pile cover is uniformly and fixedly arranged at pre- The lower position of section plate 1 processed, concrete solid-section 7 are respectively fixedly disposed at the lower end of pile cover, and prefabricated tubular pile 8 is fixedly installed on The lower end of concrete solid-section 7.
Pile cover includes connection end pile cover 5 and middle part pile cover 6, and connection end pile cover 5 is uniformly and fixedly arranged at the outer end of prefabricated subsection plate 1 Side lower part position, middle part pile cover 6 are uniformly arranged on the middle part lower position of prefabricated subsection plate 1, join on end pile cover 5 and with prefabricated section The bottom junction of section plate 1 is provided with pre-buried tetrafluoro steel plate 10.The both sides lower position of prefabricated subsection plate 1 is provided with flange plate and added Thick section 9.The upper end of middle part pile cover 6 is provided with the pile cover embedded bar 11 for extending to outside, and the top of pile cover embedded bar 11 pours In the bottom of middle cross beam 2.
After the completion of substructure, superstructure of constructing, superstructure is spliced by some prefabricated subsection plates 1, prefabricated section Section plate 1 top plate thickness 0.2m, rib width 0.7m, deck-molding 0.68m, standard knot segment length 6m, size is uniformly;Prefabricated subsection plate 1 divides for standard Section, end bay section, standard section are arranged in span centre, connection end floor beam 4, flange plate thick section 9 and end bay section corresponding part one Rise prefabricated, after the completion of prefabricated subsection plate 1 lifts, interior cast-in-place concrete is spaced in two prefabricated subsection plates 1, formed cast-in-place between section Wet seam;Middle cross beam 2 includes middle cross beam pre-erection 2a and the cast-in-place part 2b of middle cross beam, and the middle top of pile cover 6 is provided with pre-buried steel Muscle 11 pours together with the cast-in-place part 2b of middle cross beam and realizes stake beam consolidation, and middle cross beam pre-erection 2a pours in the cast-in-place part of middle cross beam It is placed in before building between middle pile cover 6;The end bay segment end beam bottom pre-embedded steel slab of prefabricated subsection plate 1 is pre- in end pile cover 5 with joining The formation of tetrafluoro steel plate 10 is buried to be slidably connected.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (7)

1. the newly-built peg board formula roadbed of girder construction system in length and breadth, it is characterised in that:Including prefabricated subsection plate, middle cross beam, prefabricated section Intersegmental cast-in-place wet seam, connection end floor beam, pile cover, concrete solid-section and prefabricated tubular pile, described prefabricated subsection plate are uniformly mutual Arrangement, described middle cross beam are fixedly installed between prefabricated subsection plate transverse direction, and cast-in-place wet seam is fixed between described prefabricated subsection It is arranged between prefabricated subsection plate longitudinal direction, described connection end floor beam is fixedly installed under the horizontal outermost end of prefabricated subsection plate Side, described pile cover are uniformly and fixedly arranged at the lower position of prefabricated subsection plate, and fixation is set described concrete solid-section respectively Put and be fixedly installed on the lower end of concrete solid-section in the lower end of pile cover, described prefabricated tubular pile.
2. the newly-built peg board formula roadbed of the system of girder construction in length and breadth according to claim 1, it is characterised in that:Described pile cover The outer end side lower part position of prefabricated subsection plate is uniformly and fixedly arranged at including connection end pile cover and middle part pile cover, described connection end pile cover Put, described middle part pile cover is uniformly arranged on the middle part lower position of prefabricated subsection plate.
3. the newly-built peg board formula roadbed of the system of girder construction in length and breadth according to claim 2, it is characterised in that:Described connection end Pre-buried tetrafluoro steel plate is provided with pile cover and with the bottom junction of prefabricated subsection plate.
4. the newly-built peg board formula roadbed of the system of girder construction in length and breadth according to claim 1,2 or 3, it is characterised in that:It is described The both sides lower position of prefabricated subsection plate be provided with flange plate thick section.
5. the newly-built peg board formula roadbed of the system of girder construction in length and breadth according to claim 2, it is characterised in that:Described middle part The upper end of pile cover is provided with the pile cover embedded bar for extending to outside, and described pile cover embedded bar top is cast in middle cross beam Bottom.
6. the newly-built peg board formula roadbed of the system of girder construction in length and breadth according to claim 5, it is characterised in that:Described middle horizontal stroke Beam includes middle cross beam pre-erection and the cast-in-place part of middle cross beam, and described pile cover embedded bar pours together with the cast-in-place part of middle cross beam Build and realize stake beam consolidation, middle cross beam pre-erection is placed in before being poured in the cast-in-place part of middle cross beam between the pile cover of middle part.
7. the newly-built peg board formula roadbed of the system of girder construction in length and breadth according to claim 2, it is characterised in that:Described is prefabricated The end bay segment end beam bottom pre-embedded steel slab of section plate is formed with pre-buried tetrafluoro steel plate in connection end pile cover and is slidably connected.
CN201720806768.7U 2017-07-05 2017-07-05 The newly-built peg board formula roadbed of girder construction system in length and breadth Active CN206941325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720806768.7U CN206941325U (en) 2017-07-05 2017-07-05 The newly-built peg board formula roadbed of girder construction system in length and breadth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720806768.7U CN206941325U (en) 2017-07-05 2017-07-05 The newly-built peg board formula roadbed of girder construction system in length and breadth

Publications (1)

Publication Number Publication Date
CN206941325U true CN206941325U (en) 2018-01-30

Family

ID=61367892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720806768.7U Active CN206941325U (en) 2017-07-05 2017-07-05 The newly-built peg board formula roadbed of girder construction system in length and breadth

Country Status (1)

Country Link
CN (1) CN206941325U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611948A (en) * 2018-04-24 2018-10-02 西安建筑科技大学 A kind of urban road permeable pavement structure
US20200095744A1 (en) * 2018-09-20 2020-03-26 Admares Group Oy Method for constructing building on water-body
CN111155390A (en) * 2020-01-09 2020-05-15 江苏科技大学 Fabricated road suitable for mudflat stratum and construction method thereof
CN113430938A (en) * 2021-06-16 2021-09-24 中交一公局集团有限公司 Construction method of sheet pile type soil-free foundation
CN114775354A (en) * 2022-05-09 2022-07-22 交通运输部公路科学研究所 Assembled sheet pile composite pavement structure penetrating through permafrost region of Qinghai-Tibet plateau

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611948A (en) * 2018-04-24 2018-10-02 西安建筑科技大学 A kind of urban road permeable pavement structure
US20200095744A1 (en) * 2018-09-20 2020-03-26 Admares Group Oy Method for constructing building on water-body
US10808371B2 (en) * 2018-09-20 2020-10-20 Admares Group Oy Method for constructing building on water-body
CN111155390A (en) * 2020-01-09 2020-05-15 江苏科技大学 Fabricated road suitable for mudflat stratum and construction method thereof
CN113430938A (en) * 2021-06-16 2021-09-24 中交一公局集团有限公司 Construction method of sheet pile type soil-free foundation
CN114775354A (en) * 2022-05-09 2022-07-22 交通运输部公路科学研究所 Assembled sheet pile composite pavement structure penetrating through permafrost region of Qinghai-Tibet plateau

Similar Documents

Publication Publication Date Title
CN206941325U (en) The newly-built peg board formula roadbed of girder construction system in length and breadth
CN102926299B (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN103321118B (en) Bridge road transition section roadbed structure of deep layer yielding ground regions
CN102888815B (en) The pouring construction method of a kind of wide-angle V-type pier and 0# block case beam
CN204000469U (en) A kind of pile formula box road structure
CN106835880A (en) Highway lateral support type peg board formula is without earth roadbed
CN105951537B (en) A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure
CN106978777B (en) A kind of make-shift bridge device
CN107268366A (en) A kind of assembling wallboard, rubble formula are without earth roadbed
CN106049201A (en) Medium and low speed maglev traffic engineering low line solid bearing-trail beam structure and construction method thereof
CN110258221A (en) A kind of box frame roadbed
CN108755284A (en) Reduce the railway bed structure of subgrade settlement deformation to lacing wire material U-type groove
CN106835879A (en) Highway is laterally without support type peg board formula without earth roadbed and its construction method
CN105133493B (en) Embedded track structure suitable for middle-span and small-span bridge and construction method
CN113931212A (en) Road and bridge transition section structure for tramcar and construction method thereof
CN207073045U (en) A kind of prefabricated board wall for being applied to industrialization construction is without earth roadbed
CN105442457B (en) Construction structure and method for extending bridge floor plate bridge filled with fine sand
CN107642010A (en) Medium-and low-speed maglev traffic system straightway support rail beam
CN207073046U (en) A kind of newly-built peg board formula roadbed of the chainless drives formula structural system with bent cap
CN207793771U (en) Middle low speed magnetic suspension traffic engineering is low to set circuit support rail beam
CN208415004U (en) A kind of pair of lacing wire material U-type groove reduces the railway bed structure of subgrade settlement deformation
CN217300589U (en) Reinforcing system of subway shield tunnel underpass operation railway frame bridge
CN107142806A (en) A kind of new reorganization and expansion structure that stopping means is cut with scissors with side
CN110080044A (en) A kind of vertical lattice type prefabricated assembled segment and its assembled high-speed rail roadbed
CN110258223A (en) A kind of armored concrete box frame roadbed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant