CN105133493B - Embedded track structure suitable for middle-span and small-span bridge and construction method - Google Patents

Embedded track structure suitable for middle-span and small-span bridge and construction method Download PDF

Info

Publication number
CN105133493B
CN105133493B CN201510632858.4A CN201510632858A CN105133493B CN 105133493 B CN105133493 B CN 105133493B CN 201510632858 A CN201510632858 A CN 201510632858A CN 105133493 B CN105133493 B CN 105133493B
Authority
CN
China
Prior art keywords
rail support
support groove
bridge
embedded
connecting elements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510632858.4A
Other languages
Chinese (zh)
Other versions
CN105133493A (en
Inventor
焦洪林
罗炯
杨刚
杨强
刘光胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Xinzhu Transportation Technology Co ltd
Original Assignee
Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xinzhu Road and Bridge Machinery Co Ltd filed Critical Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority to CN201510632858.4A priority Critical patent/CN105133493B/en
Publication of CN105133493A publication Critical patent/CN105133493A/en
Application granted granted Critical
Publication of CN105133493B publication Critical patent/CN105133493B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an embedded track structure suitable for a middle-span and small-span bridge. The embedded track structure comprises a bridge top plate, a bridge deck cast-in-place layer, a connecting element, a reinforced concrete base, two track bearing grooves and two groove type tracks, wherein the bridge deck cast-in-place layer is cast on the bridge top plate; each groove type track is arranged in the corresponding track bearing groove in an embedded manner; the two track bearing grooves are embedded into the reinforced concrete base in parallel in the longitudinal direction; the reinforced concrete base is arranged on the bridge deck cast-in-place layer; the bridge deck cast-in-place layer and the reinforced concrete base are connected into a whole through the connecting element. The embedded track structure has the benefits as follows: by adopting the embedded track structure, the vibration reduction and noise reduction effects are good; the structure is simple, the self weight is light, structural requirements of a city bridge are reduced, the construction cost is reduced and city quick construction requirements are met; the connecting element adopts a rigid connection mode, so that the whole stability of the track structure on the bridge is improved.

Description

A kind of embedded tracks structure of suitable medium and small span bridge and construction method
Technical field
The present invention relates to a kind of track structure, particularly a kind of embedded tracks structure of suitable medium and small span bridge, with And the construction method of embedded tracks structure, it is suitable for medium and small span bridge occasion, belongs to technical field of rail traffic.
Background technology
Modern tram circuit typically can be all navigated within urban district, or near resident.Therefore, wanting in terms of environmental protection Ask high, need strict control noise and vibration, this requires that track structure there should be good vibration and noise reducing performance.Also, due to Big is affected on urban transportation when building track circuit in city, will be made in designed path track structure simple as far as possible, and be fitted Rapid construction is closed so as to shorten construction period.
Traditional Ballast track is big because of its maintenance amount, and easily causes rock ballast to splash in train travelling process, particularly Security incident is easily caused when running in city.And there is the secondary dead load of deadweight and bridge in traditional ballastless track structure Greatly, the shortcomings of structural requirement of bridge and construction costs are high, construction requirement is high, construction speed is slow, it is impossible to meet fast in city The requirement of speed construction.
And either traditional Ballast track, or traditional non-fragment orbit, using fastener type track, its vibration and noise reducing Effect on driving birds is not good, can not meet the requirement for being met in terms of environmental protection very well.
The content of the invention
The present invention goal of the invention be:For above-mentioned problem, there is provided a kind of suitable medium and small span bridge it is embedding Enter formula track structure and construction method, simple structure, construction requirement are low, construction is fast, and damping noise reduction performance is good.
The first technical scheme that the present invention is adopted:
A kind of embedded tracks structure of suitable medium and small span bridge, including bridge top board, bridge floor in-situ layer, connection structure Part, reinforced concrete footing, rail support groove and grooved track, the bridge floor in-situ layer are cast on bridge top board, the grooved rail Road and rail support groove have two respectively, and the formula that is respectively embedded into per grooved track described in root is arranged in a rail support groove, is held described in two Track slot is embedded in reinforced concrete footing along longitudinal direction in parallel to each other, and the reinforced concrete footing is arranged on bridge floor in-situ layer It is upper and bridge floor in-situ layer and reinforced concrete footing are connected into integral by connecting elements.
Preferably, rail support groove bottom both sides evagination forms " convex " type structure, or it is recessed " recessed " type structure. " convex " type or " recessed " type structure can effectively limit rail support groove displacement vertically and transversely.
Preferably, the rail support groove is prefabricated concrete rail support groove or steel rail support groove.Rail support groove adopts prefabricated side Formula is first carried out, and is embedded in reinforced concrete footing at the construction field (site), is reduced the secondary dead load of bridge, is reduced bridge Structural requirement, reduce the construction costs of bridge.
When the rail support groove is prefabricated concrete rail support groove, the connecting elements is had concurrently using horizontal or vertical or both Mode it is pre-buried;During vertical pre-buried connecting elements, its upper end is embedded in reinforced concrete footing, and it is cast-in-place that lower end is embedded in bridge floor In layer;During the pre-buried connecting elements of level, its one end is embedded in rail support groove, and the other end is embedded in reinforced concrete footing.
When the rail support groove is cast-in-place concrete rail support groove, the connecting elements lower end is embedded in bridge floor in-situ layer, Upper end is embedded in reinforced concrete footing.
Second technical scheme that the present invention is adopted:
A kind of embedded tracks structure of suitable medium and small span bridge, including bridge top board, bridge floor in-situ layer, connection structure Part, reinforced concrete footing, rail support groove and grooved track, the bridge floor in-situ layer are cast on bridge top board, the grooved rail Road and rail support groove have two respectively, are prefabricated steel rail support groove per grooved track described in root and are respectively embedded into formula and are arranged on one In rail support groove, two rail support grooves in parallel to each other along longitudinal direction is embedded be arranged on bridge floor in-situ layer in and bottom directly and bridge Beam top plate contact, the connecting elements will be rail support groove and the connection of bridge top board integral.
In the technical program, steel rail support groove is supported directly on bridge top board, reduces the structure of embedded tracks Highly, make right of way both be adapted to tramcar operation, be adapted to road vehicle operation again, realize that right of way is shared.
Preferably, the rail support groove both sides are also respectively arranged to strengthen the rivet of anchoring, the connecting elements lower end It is embedded in bridge top board, upper end is welded with rivet or rail support groove.Rivet arrangement can further strengthen rail support groove and bridge top Anchorage effect between plate.
Above-mentioned two technical scheme is carried out further preferably, the groove inner bottom surface continuous laying resilient sleeper-bearing of the rail support groove It is afterwards that grooved track is placed on it, then grooved track is fixed with remaining space in Macromolecular pouring material filling slot.
Above-mentioned two technical scheme is carried out further preferably, the connecting elements is "door" type reinforcing bar or " 7 " steel bar Or bar shaped reinforcing bar.Aforementioned three kinds of structures are simply illustrated, and connecting elements can also have many kinds.
Above-mentioned two technical scheme is carried out further preferably, the reinforced concrete footing is longitudinally adopted along grooved track Continuously or discontinuously structure.On the premise of grooved track fastness is ensured, reinforced concrete footing can also adopt intermittent configuration, Depending on spacing distance is according to actual conditions, the benefit for so arranging can be suitably to reduce material consumption, reduce the system of track Cause this.
Present invention also offers two kinds of construction methods.
The first construction method is corresponding with the first technical scheme, comprises the following steps:
Step A, sets up rail control network, and carries out the survey of medium and small span bridge embedded tracks Construction control as benchmark Amount;
Step B, goes out the line of ink marker on base angle point bullet according to rail control network surveying and locating, carries out the connection of bridge floor in-situ layer Component is constructed, then cast-in-place bridge floor in-situ layer;
Step C, the construction on bridge floor in-situ layer are embedded into the framework of steel reinforcement inside reinforced concrete footing;
Step D, grooved track is installed in prefabricated rail support groove, pours into a mould Macromolecular pouring material again and locked after accurate adjustment Rail;
Step E then by the rail support groove for assembling lift in place, accurate adjustment again after coarse adjustment;
Rail support groove is fixed by step F, mounting seat template, cast-in-situ steel reinforced concrete base.
If preferably, when rail support groove is precast concrete rail support groove, being D, E, F order;If rail support groove is prefabricated steel tank During structure, prefabrication step D and step F exchange sequence are F, E, D order.
Second construction method is corresponding with second technical scheme, comprises the following steps:
Step A, in bridge top board rail support groove to be installed the pre-buried connecting elements in position both sides;
Step B, the design attitude being lifted into rail support groove on bridge top board, mix up position, and by connecting elements and support rail Groove is fixedly connected;
Step C, grooved track is installed in rail support groove, pouring into a mould Macromolecular pouring material after accurate adjustment again carries out lock rail;
Step D, installs bridge floor in-situ layer template, cast-in-place bridge floor in-situ layer.
Preferably, connecting elements is specifically welded with the rivet of rail support groove both sides.
In sum, as a result of above-mentioned technical proposal, the invention has the beneficial effects as follows:
1st, the advantage of embedded tracks structure is combined, effect of vibration and noise reduction is good;
2nd, using continuous supporting way, reduce the stripping loss of rail;
3rd, comparing tradition has the tiny fragments of stone, coal, etc., ballastless track structure to compare, and simple structure, from heavy and light, reduces the structure of Urban Bridge Require, reduce the construction costs of bridge, and meet the requirement of city rapid construction;
4th, connecting elements adopts rigid connection, increased the resistance to overturning of bridge deck track structure.
Description of the drawings
Fig. 1 is the cross-sectional view of the embodiment of the present invention 1.
Fig. 2 is the cross-sectional view of the embodiment of the present invention 2.
Fig. 3 is the cross-sectional view of the embodiment of the present invention 3.
Fig. 4 is the cross-sectional view of the embodiment of the present invention 4.
Fig. 5 is the cross-sectional view of the embodiment of the present invention 5.
Fig. 6 is the attachment structure enlarged drawing in embodiment 1,2 between rail and rail support groove.
Mark in figure:1 is bridge floor in-situ layer, and 2 is connecting elements, and 3 is reinforced concrete footing, and 4 is rail support groove, and 5 are height Molecule castable, 6 is groove-shape rail, and 7 is resilient sleeper-bearing, and 8 is floor.
Specific embodiment
Below in conjunction with the accompanying drawings, the present invention is described in detail.
Embodiment 1:
As a shown in Figure 6, a kind of embedded tracks structure of suitable medium and small span bridge, existing including bridge top board, bridge floor Layer 1, connecting elements 2, reinforced concrete footing 3, rail support groove 4 and grooved track 6 is poured, the bridge floor in-situ layer 1 is cast in bridge On top board, the grooved track 6 and rail support groove 4 have two respectively, are respectively embedded into formula per grooved track described in root 6 and are arranged on one In rail support groove 4, two rail support grooves 4 are embedded in reinforced concrete footing 3 along longitudinal direction in parallel to each other, the reinforced concrete Native base 3 is arranged on bridge floor in-situ layer 1 and is connected into bridge floor in-situ layer 1 and reinforced concrete footing 3 by connecting elements 2 It is overall.
4 bottom both sides evagination of the rail support groove forms " convex " type structure.
The rail support groove 4 is prefabricated concrete rail support groove.
The connecting elements 2 is pre-buried using vertical mode, and its upper end is embedded in reinforced concrete footing 3, and lower end is pre-buried In bridge floor in-situ layer 1.
Will be grooved track 6 placed on it after the groove inner bottom surface continuous laying resilient sleeper-bearing 7 of the rail support groove 4, then use high score In 5 filling slot of sub- castable, grooved track 6 is fixed by remaining space.
The connecting elements 2 is "door" type reinforcing bar or " 7 " steel bar or bar shaped reinforcing bar.Aforementioned three kinds of structures are simply illustrated, Connecting elements can also have many kinds.
The reinforced concrete footing 3 is along 6 longitudinal direction of grooved track using continuously or discontinuously structure.
Embodiment 2:
As shown in Figure 2,6, a kind of embedded tracks structure of suitable medium and small span bridge, existing including bridge top board, bridge floor Layer 1, connecting elements 2, reinforced concrete footing 3, rail support groove 4 and grooved track 6 is poured, the bridge floor in-situ layer 1 is cast in bridge On top board, the grooved track 6 and rail support groove 4 have two respectively, are respectively embedded into formula per grooved track described in root 6 and are arranged on one In rail support groove 4, two rail support grooves 4 are embedded in reinforced concrete footing 3 along longitudinal direction in parallel to each other, the reinforced concrete Native base 3 is arranged on bridge floor in-situ layer 1 and is connected into bridge floor in-situ layer 1 and reinforced concrete footing 3 by connecting elements 2 It is overall.
4 bottom both sides evagination of the rail support groove forms " convex " type structure.
The rail support groove 4 is prefabricated concrete rail support groove.
The connecting elements 2 is pre-buried using vertical mode, and its upper end is embedded in reinforced concrete footing 3, and lower end is pre-buried In bridge floor in-situ layer 1;During the pre-buried connecting elements 2 of level, its one end is embedded in rail support groove 4, and the other end is embedded in reinforcing bar and mixes In solidifying soil base 3.
Will be grooved track 6 placed on it after the groove inner bottom surface continuous laying resilient sleeper-bearing 7 of the rail support groove 4, then use high score In 5 filling slot of sub- castable, grooved track 6 is fixed by remaining space.
The connecting elements 2 is "door" type reinforcing bar or " 7 " steel bar or bar shaped reinforcing bar.Aforementioned three kinds of structures are simply illustrated, Connecting elements can also have many kinds.
The reinforced concrete footing 3 is along 6 longitudinal direction of grooved track using continuously or discontinuously structure.
Embodiment 3:
As shown in figure 3, a kind of embedded tracks structure of suitable medium and small span bridge, cast-in-place including bridge top board, bridge floor Layer 1, connecting elements 2, reinforced concrete footing 3, rail support groove 4 and grooved track 6, the bridge floor in-situ layer 1 are cast in bridge top On plate, the grooved track 6 and rail support groove 4 have two respectively, and the formula that is respectively embedded into per grooved track described in root 6 is arranged on one and holds In track slot 4, two rail support grooves 4 are embedded in reinforced concrete footing 3 along longitudinal direction in parallel to each other, the armored concrete Base 3 is arranged on bridge floor in-situ layer 1 and is connected into bridge floor in-situ layer 1 and reinforced concrete footing 3 by connecting elements 2 whole Body.
The rail support groove 4 is prefabricated concrete rail support groove.
The connecting elements 2 is pre-buried by the way of both vertical and horizontals have concurrently;During vertical pre-buried connecting elements 2, its Upper end is embedded in reinforced concrete footing 3, and lower end is embedded in bridge floor in-situ layer 1;During the pre-buried connecting elements 2 of level, one End is embedded in rail support groove 4, and the other end is embedded in reinforced concrete footing 3.
Will be grooved track 6 placed on it after the groove inner bottom surface continuous laying resilient sleeper-bearing 7 of the rail support groove 4, then use high score In 5 filling slot of sub- castable, grooved track 6 is fixed by remaining space.
The connecting elements 2 is "door" type reinforcing bar or " 7 " steel bar or bar shaped reinforcing bar.Aforementioned three kinds of structures are simply illustrated, Connecting elements can also have many kinds.
The reinforced concrete footing 3 is along 6 longitudinal direction of grooved track using continuously or discontinuously structure.
Embodiment 4:
As shown in figure 4, a kind of embedded tracks structure of suitable medium and small span bridge, cast-in-place including bridge top board, bridge floor Layer 1, connecting elements 2, reinforced concrete footing 3, rail support groove 4 and grooved track 6, the bridge floor in-situ layer 1 are cast in bridge top On plate, the grooved track 6 and rail support groove 4 have two respectively, and the formula that is respectively embedded into per grooved track described in root 6 is arranged on one and holds In track slot 4, two rail support grooves 4 are embedded in reinforced concrete footing 3 along longitudinal direction in parallel to each other, the armored concrete Base 3 is arranged on bridge floor in-situ layer 1 and is connected into bridge floor in-situ layer 1 and reinforced concrete footing 3 by connecting elements 2 whole Body.
The rail support groove 4 is cast-in-place concrete rail support groove.
2 lower end of the connecting elements is embedded in bridge floor in-situ layer 1, and upper end is embedded in reinforced concrete footing 3.
Will be grooved track 6 placed on it after the groove inner bottom surface continuous laying resilient sleeper-bearing 7 of the rail support groove 4, then use high score In 5 filling slot of sub- castable, grooved track 6 is fixed by remaining space.
The connecting elements 2 is "door" type reinforcing bar or " 7 " steel bar or bar shaped reinforcing bar.Aforementioned three kinds of structures are simply illustrated, Connecting elements can also have many kinds.
The reinforced concrete footing 3 is along 6 longitudinal direction of grooved track using continuously or discontinuously structure.
Embodiment 5:
As shown in figure 5, a kind of embedded tracks structure of suitable medium and small span bridge, cast-in-place including bridge top board, bridge floor Layer 1, connecting elements 2, reinforced concrete footing 3, rail support groove 4 and grooved track 6, the bridge floor in-situ layer 1 are cast in bridge top On plate, the grooved track 6 and rail support groove 4 have two respectively, per grooved track described in root 6 for prefabricated steel rail support groove and divide Not embedded to be arranged in a rail support groove 4, two rail support grooves 4 are arranged on bridge floor now along longitudinally embedded in parallel to each other In pouring layer 1 and bottom directly with bridge top plate contact, the connecting elements 2 will rail support groove 4 and bridge top board connection it is integral.
4 both sides of the rail support groove are also respectively arranged to strengthen the rivet 8 of anchoring, and 2 lower end of the connecting elements is embedded in In bridge top board, upper end is welded with rivet 8.
Will be grooved track 6 placed on it after the groove inner bottom surface continuous laying resilient sleeper-bearing 7 of the rail support groove 4, then use high score In 5 filling slot of sub- castable, grooved track 6 is fixed by remaining space.
The connecting elements 2 is "door" type reinforcing bar or " 7 " steel bar or bar shaped reinforcing bar.Aforementioned three kinds of structures are simply illustrated, Connecting elements can also have many kinds.
The reinforced concrete footing 3 is along 6 longitudinal direction of grooved track using continuously or discontinuously structure.
Can also mat formation again on reinforced concrete footing 3 one layer of pitch.
Embodiment 6:
This construction method is corresponding with the technical scheme of embodiment 1,2,4, comprises the following steps:
Step A, sets up rail control network, and carries out the survey of medium and small span bridge embedded tracks Construction control as benchmark Amount;
Step B, goes out the line of ink marker on base angle point bullet according to rail control network surveying and locating, carries out the connection of bridge floor in-situ layer Component is constructed, then cast-in-place bridge floor in-situ layer;
Step C, the construction on bridge floor in-situ layer are embedded into the framework of steel reinforcement inside reinforced concrete footing;
Step D, grooved track is installed in prefabricated rail support groove, pours into a mould Macromolecular pouring material again and locked after accurate adjustment Rail;
Step E then by the rail support groove for assembling lift in place, accurate adjustment again after coarse adjustment;
Rail support groove is fixed by step F, mounting seat template, cast-in-situ steel reinforced concrete base.
If rail support groove is precast concrete rail support groove, it is D, E, F order;If rail support groove is pre-manufactured steel slot structure, in advance Step D processed and step F exchange sequence, are F, E, D order.
Embodiment 7:
This construction method is corresponding with the technical scheme of embodiment 5, comprises the following steps:
Step A, in bridge top board rail support groove to be installed the pre-buried connecting elements in position both sides;
Step B, the design attitude being lifted into rail support groove on bridge top board, mix up position, and by connecting elements and support rail Groove is fixedly connected;
Step C, grooved track is installed in rail support groove, pouring into a mould Macromolecular pouring material after accurate adjustment again carries out lock rail;
Step D, installs bridge floor in-situ layer template, cast-in-place bridge floor in-situ layer.
Connecting elements is specifically welded with the rivet of rail support groove both sides.

Claims (4)

1. a kind of construction method of embedded tracks structure, including bridge top board, bridge floor in-situ layer(1), connecting elements(2), steel Reinforced concrete base(3), rail support groove(4)And grooved track(6), the bridge floor in-situ layer(1)It is cast on bridge top board, it is described Grooved track(6)And rail support groove(4)There are two respectively, per grooved track described in root(6)The formula of being respectively embedded into is arranged on a support rail Groove(4)It is interior, two rail support grooves(4)It is embedded into reinforced concrete footing along longitudinal direction in parallel to each other(3)In, the reinforcing bar is mixed Solidifying soil base(3)It is arranged on bridge floor in-situ layer(1)Above and by connecting elements(2)By bridge floor in-situ layer(1)And armored concrete Base(3)Connection is integral, it is characterised in that comprise the following steps:
Step A, sets up rail control network, and carries out medium and small span bridge embedded tracks Control Survey for Construction as benchmark;
Step B, goes out the line of ink marker on base angle point bullet according to rail control network surveying and locating, carries out the connecting elements of bridge floor in-situ layer Construct, then cast-in-place bridge floor in-situ layer;
Step C, the construction on bridge floor in-situ layer are embedded into the framework of steel reinforcement inside reinforced concrete footing;
Step D, grooved track is installed in prefabricated rail support groove, and pouring into a mould Macromolecular pouring material after accurate adjustment again carries out lock rail;
Step E then by the rail support groove for assembling lift in place, accurate adjustment again after coarse adjustment;
Rail support groove is fixed by step F, mounting seat template, cast-in-situ steel reinforced concrete base.
2. the construction method of a kind of embedded tracks structure according to claim 1, it is characterised in that:If rail support groove is pre- During concrete rail support groove processed, it is D, E, F order;If rail support groove is pre-manufactured steel slot structure, prefabrication step D and step F exchange suitable Sequence, is F, E, D order.
3. a kind of construction method of embedded tracks structure, including bridge top board, bridge floor in-situ layer(1), connecting elements(2), steel Reinforced concrete base(3), rail support groove(4)And grooved track(6), the bridge floor in-situ layer(1)It is cast on bridge top board, it is described Grooved track(6)And rail support groove(4)There are two respectively, per grooved track described in root(6)For prefabricated steel rail support groove and respectively It is embedded to be arranged on a rail support groove(4)It is interior, two rail support grooves(4)Edge longitudinal direction is embedded in parallel to each other is arranged on bridge floor In-situ layer(1)In and bottom directly with bridge top plate contact, the connecting elements(2)By rail support groove(4)Connect with bridge top board It is integral, it is characterised in that:
Step A, in bridge top board rail support groove to be installed the pre-buried connecting elements in position both sides;
Step B, the design attitude being lifted into rail support groove on bridge top board, mix up position, and connecting elements is solid with rail support groove It is fixed to connect;
Step C, grooved track is installed in rail support groove, pouring into a mould Macromolecular pouring material after accurate adjustment again carries out lock rail;
Step D, installs bridge floor in-situ layer template, cast-in-place bridge floor in-situ layer.
4. the construction method of a kind of embedded tracks structure according to claim 3, it is characterised in that:Connecting elements is concrete Weld with the rivet of rail support groove both sides.
CN201510632858.4A 2015-09-30 2015-09-30 Embedded track structure suitable for middle-span and small-span bridge and construction method Active CN105133493B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510632858.4A CN105133493B (en) 2015-09-30 2015-09-30 Embedded track structure suitable for middle-span and small-span bridge and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510632858.4A CN105133493B (en) 2015-09-30 2015-09-30 Embedded track structure suitable for middle-span and small-span bridge and construction method

Publications (2)

Publication Number Publication Date
CN105133493A CN105133493A (en) 2015-12-09
CN105133493B true CN105133493B (en) 2017-03-22

Family

ID=54719043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510632858.4A Active CN105133493B (en) 2015-09-30 2015-09-30 Embedded track structure suitable for middle-span and small-span bridge and construction method

Country Status (1)

Country Link
CN (1) CN105133493B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507094A (en) * 2015-12-18 2016-04-20 成都市新筑路桥机械股份有限公司 Embedded rail replacing method
CN105568795B (en) * 2015-12-18 2017-05-10 成都市新筑路桥机械股份有限公司 Method for repairing polymer composite for embedded track
CN105421163B (en) * 2015-12-29 2017-01-11 成都市新筑路桥机械股份有限公司 Multistage damping embedded track system
CN109706802A (en) * 2019-01-31 2019-05-03 中铁磁浮交通投资建设有限公司 A kind of magnetic levitation track traffic building-brick type support rail beam and its construction method
CN110029530A (en) * 2019-04-02 2019-07-19 成都市新筑路桥机械股份有限公司 A kind of novel track system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1026320A1 (en) * 1999-02-08 2000-08-09 Hochtief Aktiengesellschaft Method for building a ballastless track
DE19837950C2 (en) * 1997-09-18 2001-06-13 Pfleiderer Infrastrukturt Gmbh Process for producing a slab track for rail-bound traffic and device for carrying out the process
CN101838967A (en) * 2009-12-30 2010-09-22 中铁八局集团有限公司 Construction technology of ballast bed of bridge double-block ballastless track
CN102251446A (en) * 2011-04-19 2011-11-23 铁道第三勘察设计院集团有限公司 Accurate track plate adjustment quantity determining method for three-dimensional continuous track system
CN104532690A (en) * 2014-12-18 2015-04-22 成都市新筑路桥机械股份有限公司 Method for prefabricating and constructing separated rail structure
CN205012221U (en) * 2015-09-30 2016-02-03 成都市新筑路桥机械股份有限公司 Embedded track structure that is fit for medium and small span bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19837950C2 (en) * 1997-09-18 2001-06-13 Pfleiderer Infrastrukturt Gmbh Process for producing a slab track for rail-bound traffic and device for carrying out the process
EP1026320A1 (en) * 1999-02-08 2000-08-09 Hochtief Aktiengesellschaft Method for building a ballastless track
CN101838967A (en) * 2009-12-30 2010-09-22 中铁八局集团有限公司 Construction technology of ballast bed of bridge double-block ballastless track
CN102251446A (en) * 2011-04-19 2011-11-23 铁道第三勘察设计院集团有限公司 Accurate track plate adjustment quantity determining method for three-dimensional continuous track system
CN104532690A (en) * 2014-12-18 2015-04-22 成都市新筑路桥机械股份有限公司 Method for prefabricating and constructing separated rail structure
CN205012221U (en) * 2015-09-30 2016-02-03 成都市新筑路桥机械股份有限公司 Embedded track structure that is fit for medium and small span bridge

Also Published As

Publication number Publication date
CN105133493A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105133493B (en) Embedded track structure suitable for middle-span and small-span bridge and construction method
CN102926299B (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN1916277A (en) Track base without broken stones, and building method
CN109853381B (en) Transitional structure for preventing bridge head from jumping and construction method thereof
CN105951537B (en) A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure
CN110258221A (en) A kind of box frame roadbed
CN102277880A (en) Large-sized box jacking control construction method capable of enhancing accuracy
CN106400636A (en) Control method for multilayer road soft soil roadbed differential settlement
KR100603901B1 (en) Girder bridge construction make use of a part existing girder and that execution method
CN111502347A (en) Three-layer single-column assembled elevated station for rail transit
CN210239246U (en) Wide flat beam type assembled concrete canopy for railway platform
KR100454405B1 (en) Method for changing steel bridge of supporting rail into concreat bridge
CN107905084B (en) RPC steel truss combined bridge deck and continuous beam bridge
CN202000234U (en) Tray type U-shaped reinforced subgrade structure
CN202610659U (en) Subway turnout area plate-type ballastless track composite structure
CN205012221U (en) Embedded track structure that is fit for medium and small span bridge
CN111502348A (en) Three-layer double-column assembly type elevated station for rail transit
CN208830061U (en) A kind of assembled non-fragment orbit cell board and fragment-free track slab
CN110359375A (en) The construction method of precast segment girder precast field under a kind of bridge
CN202081383U (en) Temporary support used in construction striding over existing line bridge
CN211772757U (en) Seamless anti-bumping structure for middle-small span simply-supported highway bridge end part
CN209584730U (en) A kind of steel reinforced concrete pile slab structure for not interrupting below railway in operation
CN103437252B (en) A kind of track bed structure and construction method thereof
CN106758886A (en) A kind of method of the existing bridges and culverts structure of new dismounting
CN112796232A (en) Reinforced structure for existing railway underpass frame bridge construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190809

Address after: 225000 Room 103, 4 Blocks, Wankejin Street, East Stumiao Road, Yangzhou City, Jiangsu Province

Patentee after: Jiangsu Huadong culture and technology Financing Leasing Co.,Ltd.

Address before: 611430 Xinjin Industrial Park, Sichuan, Chengdu

Patentee before: CHENGDU XINZHU ROAD & BRIDGE MACHINERY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221207

Address after: 611430 Xinjin Industrial Park, Xinjin District, Chengdu, Sichuan

Patentee after: CHENGDU XINZHU ROAD & BRIDGE MACHINERY Co.,Ltd.

Address before: 225000 room 103, Wanke golden street, East Road, Szeto temple, Yangzhou, Jiangsu, 103

Patentee before: Jiangsu Huadong culture and technology Financing Leasing Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240115

Address after: 611400 No. 799, hope road, Wujin street, Xinjin District, Chengdu, Sichuan (Industrial Park)

Patentee after: Chengdu Xinzhu Transportation Technology Co.,Ltd.

Address before: 611430 Xinjin Industrial Park, Xinjin District, Chengdu, Sichuan

Patentee before: CHENGDU XINZHU ROAD & BRIDGE MACHINERY Co.,Ltd.