CN206157496U - Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling - Google Patents

Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling Download PDF

Info

Publication number
CN206157496U
CN206157496U CN201621058223.4U CN201621058223U CN206157496U CN 206157496 U CN206157496 U CN 206157496U CN 201621058223 U CN201621058223 U CN 201621058223U CN 206157496 U CN206157496 U CN 206157496U
Authority
CN
China
Prior art keywords
support rail
pile foundation
rail beam
bearing structure
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621058223.4U
Other languages
Chinese (zh)
Inventor
郭建湖
李小和
赵新益
姜鹰
姚洪锡
李巍
王勇刚
杨辉建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201621058223.4U priority Critical patent/CN206157496U/en
Application granted granted Critical
Publication of CN206157496U publication Critical patent/CN206157496U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to the technical field of the low circuit of putting of well low -speed maglev traffic engineering to moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling is disclosed, roadbed filler and support rail roof beam both sides are backfilled and are packed under first pile foundation load bearing structure, the compound load bearing structure of supporting beam of pile foundation, reinforced concrete support rail breast board, reinforced concrete beam structure, support rail roof beam, and first pile foundation load bearing structure is provided with many, accept at the top of reinforced concrete support rail breast board reinforced concrete beam structure, support rail roof beam both sides are backfilled to pack and are passed through roadbed filler accepts under the support rail roof beam. The utility model discloses can avoid the low defect of putting circuit support rail girder construction of tradition, long term stability is better, and low -speed maglev traffic engineering track structure satisfied the requirement of foundation bed long term stability, durability and construction quality's controllability again to support rail roof beam structural distortion and post -construction settlement's high requirement during it had both satisfied moreover, and just economic nature is better.

Description

Medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction
Technical field
The utility model belongs to that middle low speed magnetic suspension traffic engineering is low to put Line technology field, low more particularly, in Fast magnetic floating traffic engineering single line embankment location support rail girder construction pattern.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, and achievement in research both domestic and external is less, the whole world The circuit for opening operation is even more minority.The middle low speed magnetic suspension railway business that only in March, 2005 Japan's construction at present is opened is transported The middle low speed magnetic suspension railway business operating line that line-the East Hillside Line and in June, 2014 Korea open.And the middle low speed of China Magnetic suspension traffic only National University of Defense technology's test wire, Green City Mountain test wire, Tangshan experiment line at present, but do not put into effect Formal circuit, and based on elevated structure, the rarely seen relevant low research put in terms of circuit support rail girder construction and applies.
The outstanding traffic civil engineering part of middle low speed magnetic suspension mainly comprising bridge, it is low put circuit, station and rolling stock section, it is low to put circuit It is made up of roadbed under the section of track, support rail beam and support rail beam, the support rail beam of supporting track is arranged on the roadbed being made up of earth structure On, the operation of middle low speed magnetic suspension train includes suspending, be oriented to, drive and braking being required for what is completed on support rail beam.Magnetic Aerotrain is very high to line construction deformation requirements, because the deformation of structure very little may affect comfortableness even prestige by bus Side of body traffic safety, so the design of support rail beam is particularly significant.
Existing support rail girder construction is applied and exist on circuit problems with middle low speed magnetic suspension traffic low putting:
(1) existing low circuit support rail girder construction of putting is arranged on embankment earth structure, embankment earth structure by Filler fills compacting and forms, and compaction quality is wayward, and the later stage is susceptible to deformation, and settlement after construction is difficult to control to.
(2) low circuit support rail girder construction of putting has high demands to the settlement after construction of roadbed and ground, and is routed through the ground in region Matter condition is typically all complicated and changeable, therefore is also needed to while carrying out consolidation process, roadbed filling slope groundwork to ground Area increase is reinforced, cost is high, long in time limit;And basement process belongs to disguised engineering, arranged using conventional reinforced soft soil ground Apply and reinforced, construction quality is wayward.
(3) because the low circuit earth structure of putting that filler fills compacting has vulnerability, and construction quality is difficult Control, relatively easily produces differential settlement, causes bedding vertical and horizontal bad stability under support rail beam, so that support rail beam The resistance to overturning of structure is damaged.
The low circuit support rail beam of putting of magnetic suspension is higher to post-construction settlement of subgrade, bedding long-time stability and life requirement, when When circuit is located at foundation stabilization location, the construction period is long to take traditional support rail girder construction pattern to exist, and construction quality is not easily-controllable System, the defect such as whole structural stability is poor and less economical.
Utility model content
For the disadvantages described above or Improvement requirement of prior art, the utility model provides medium-and low-speed maglev traffic engineering list Line embankment location pile foundation combined type support rail girder construction, can avoid the low defect for putting circuit support rail girder construction of tradition, and construction quality is more Be easily controlled, long-time stability more preferably, and during it both meets low speed magnetic suspension traffic engineering track structure to support rail girder construction Deformation and the high request of settlement after construction, meet the requirement of the controllability of bedding long-time stability, durability and construction quality again, and Economy is more preferably.
For achieving the above object, according to the utility model, there is provided medium-and low-speed maglev traffic engineering single line embankment location stake Base combined type support rail girder construction, it is characterised in that including the first pile foundation bearing structure, pile foundation joist composite bearing structure, reinforcing bar Roadbed filling and support rail beam both sides backfill filler under concrete support rail beam base plate, reinforced concrete beam type structure, support rail beam, its In,
The first pile foundation bearing structure and the pile foundation joist composite bearing structure accept the armored concrete jointly Support rail beam base plate;
The first pile foundation bearing structure is provided with many, is vertically arranged per the first pile foundation bearing structure described in root, and And the armored concrete support rail beam base plate is accepted on the top per the first pile foundation bearing structure described in root, first pile foundation is held Load structure top end is embedded in the armored concrete support rail beam base plate and just connects with it;
Accept the reinforced concrete beam type structure, and two adjacent sections in the top of the armored concrete support rail beam base plate Expansion joint is set between the armored concrete support rail beam base plate;
The pile foundation joist composite bearing structure setting has multiple, and the adjacent two sections armored concrete support rail beam Pile foundation joist composite bearing structure described in one is respectively provided with the expansion joint of base plate, for two blocks of reinforcing bars for supporting this adjacent Concrete support rail beam base plate, each described pile foundation joist composite bearing structure includes that reinforced concrete supporting beam and the second pile foundation are held Structure is carried, and the reinforced concrete supporting beam is accepted on the top per the second pile foundation bearing structure described in root, and the reinforcing bar is mixed Solidifying soil joist accepts the armored concrete support rail beam base plate;
The second pile foundation bearing structure top is embedded in the reinforced concrete supporting beam and just connects with it, except two section reinforced concretes Outside at native base plate expansion joint, remaining position the second pile foundation bearing structure top should still be embedded in reinforced concrete floor and just connect therewith;
The reinforced concrete supporting beam both sides are provided with for limiting the armored concrete support rail beam base plate lateral displacement Convex gear platform;
Accept the reinforced concrete beam type structure, and the reinforcing bar in the top of the armored concrete support rail beam base plate Concrete support rail beam base plate pours shaping with the reinforced concrete beam type structural integrity, holds so as to collectively form armored concrete Beam-and-rail;
Roadbed filling is arranged between shallow layer reinforcement area and the armored concrete support rail beam base plate under the support rail beam, with It is flat for providing construction for the armored concrete support rail beam base plate, reinforced concrete supporting beam and support rail beam both sides backfill filler Platform, and provide lateral support for the pile foundation bearing structure;Wherein, the shallow layer reinforcement area is arranged on the superficial of soft stratum Layer, and under the shallow layer reinforcement area, the support rail beam roadbed filling and the reinforced concrete beam type structure vertical consistency;
The support rail beam both sides backfill filler is accepted by roadbed filling under the support rail beam, and the support rail beam both sides Backfill filler props up the both sides of the armored concrete support rail beam base plate, to play protection to the armored concrete support rail beam base plate Act on and constrain the transverse shifting of the armored concrete support rail beam base plate, and maintenance passage is provided;
Roadbed filling and support rail beam both sides backfill filler collectively form filler filling body under the support rail beam, described to fill out Material filling body both sides are provided with weathering;
Sequentially pass through roadbed filling, the shallow-layer under the support rail beam per the lower end of the first pile foundation bearing structure described in root to add Stretch in supporting course after Gu Qu and the soft stratum, with soft stratum produce sedimentation when, the first pile foundation bearing structure Negative friction can be born, so as to provide stable carrying to armored concrete support rail beam base plate and reinforced concrete beam type structure Power, with the sedimentation reduced because of filler filling body vertical, the vertical and horizontal rigidity of armored concrete support rail beam is produced it is unfavorable Affect.
Preferably, the first pile foundation bearing structure is cast-in-situ bored pile, and reinforced concrete supporting beam is firm with support rail beam base plate Connect or overlap, just connect with pile foundation bearing structure.Overlapped using pin in the position of support rail beam internode seam, remaining position is using firm Connect.
Preferably, the support rail beam both sides backfill the height of filler and the height phase of the armored concrete support rail beam base plate Deng.
Preferably, the first pile foundation bearing structure described in all these is arranged in ranks.
Preferably, roadbed filling, institute under the support rail beam are sequentially passed through per the lower end of the second pile foundation bearing structure described in root State and stretched in supporting course after shallow layer reinforcement area and the soft stratum.
In general, by the contemplated above technical scheme of the utility model compared with prior art, can obtain down Row beneficial effect:
(1) armored concrete support rail beam base plate of the present utility model, reinforced concrete beam type structure adopt reinforced concrete Soil scene one-piece casting, the two composition integral reinforced concrete structure is floated to the magnetic for directly taking on track load and track transmission Train load, then deadweight and upper load are passed to and its rigidly connected first pile foundation bearing structure, structural reliability is high.
(2) the first pile foundation bearing structure of the present utility model is goed deep in supporting course, when embankment produces certain sedimentation, first Base bearing structure can still bear negative friction and provide stronger bearing capacity, it is to avoid because of filling compaction and foundation stabilization quality The wayward differential settlement for causing is vertical to support rail beam, vertical and horizontal rigidity impact, structure vertical cross stiffness and knot Structure reliability is more excellent.
(3) put circuit soft soil zone low, according to embankment stability need necessity is carried out to the superficial layer of soft stratum Reinforcing, its reinforcement depth by embankment stability control, compared to by settle and tradition when stable Two indices are controlled solely For base reinforcing mode, shallow layer reinforcement area reinforcement depth is little, with reference to the first pile foundation bearing structure can effective control roadbed reclamation and Post-construction settlement of subgrade.Non- soft soil zone can more avoid the foundation stabilization work of the wide area produced after embankment slope Journey, and the first pile foundation bearing structure construction quality is more easy to control, can effective control construction quality, investment reduction, the reduction of erection time, tool There are obvious technology and economic advantages.
(4) reinforced concrete supporting beam that pile foundation bearing structure and reinforced concrete floor are arranged, can greatly reduce pile foundation The stress concentration phenomenon of armored concrete support rail beam base plate at bearing structure;Further, since reinforced concrete supporting beam laterally connects Effect is connect, the lateral stiffness of structure and the ability of opposing differential settlement deformation is also increased, the quantity of transverse pile foundation can be reduced, Reduce investment.
(5) adjacent segments armored concrete support rail beam base plate internode shares pile foundation joist composite bearing structure, and adjacent Armored concrete support rail beam base plate between reserve expansion joint, can avoid encorbelmenting impact failure of the section by train load, and reduce The impact of temperature stress and shrinkage and creep.
Description of the drawings
Fig. 1 is schematic longitudinal section of the present utility model;
Fig. 2 is along the profile of I-I line in Fig. 1;
Fig. 3 is along the profile of II-II line in Fig. 1;
Fig. 4 is that the plane distribution of the first pile foundation bearing structure and pile foundation joist composite bearing structure in the utility model is illustrated Figure;
Fig. 5 is the connection diagram of armored concrete support rail beam base plate and the first pile foundation bearing structure in the utility model.
Fig. 6 is that reinforced concrete supporting beam has just connect connection diagram with pile foundation bearing structure in the utility model.
Fig. 7 is that reinforced concrete supporting beam overlaps connection diagram with pile foundation bearing structure in the utility model.
Fig. 8 is the cross-sectional view of pin in the utility model.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing and enforcement Example, is further elaborated to the utility model.It should be appreciated that specific embodiment described herein is only to explain The utility model, is not used to limit the utility model.Additionally, institute in the utility model disclosed below each embodiment As long as the technical characteristic being related to does not constitute each other conflict and just can be mutually combined.
Reference Fig. 1~Fig. 8, medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction, including Roadbed filling 5 under first pile foundation bearing structure 3, armored concrete support rail beam base plate 2, reinforced concrete beam type structure 1, support rail beam Filler 4 is backfilled with support rail beam both sides, wherein,
The first pile foundation bearing structure 3 and the pile foundation joist composite bearing structure 90 accept the reinforced concrete jointly Native support rail beam base plate 2;
The first pile foundation bearing structure 3 is provided with many, is vertically arranged per the first pile foundation bearing structure 3 described in root, And accept the armored concrete support rail beam base plate 2 per the top of the first pile foundation bearing structure 3 described in root, described first The top of base bearing structure 3 is embedded in the armored concrete support rail beam base plate 2 and just connects with it;
Accept the reinforced concrete beam type structure 1, and adjacent two in the top of the armored concrete support rail beam base plate 2 Save and expansion joint is set between the armored concrete support rail beam base plate 2;
The pile foundation joist composite bearing structure 90 is provided with multiple and adjacent two sections armored concrete support rails Pile foundation joist composite bearing structure 90 described in one is respectively provided with the expansion joint of beam base plate 2, for two pieces of institutes for supporting this adjacent Armored concrete support rail beam base plate 2 is stated, each described pile foundation joist composite bearing structure 90 includes reinforced concrete supporting beam 901 With the second pile foundation bearing structure 902, and the reinforced concrete is accepted on the top per the second pile foundation bearing structure 902 described in root Native joist 901, the reinforced concrete supporting beam 901 accepts the armored concrete support rail beam base plate 2;
The top of the second pile foundation bearing structure 902 is embedded in the reinforced concrete supporting beam 901 and just connects with it, except two sections Outside at the expansion joint of reinforced concrete floor 2, the top of remaining position the second pile foundation bearing structure 902 should still be embedded in armored concrete Base plate 2 has just connect therewith;
The both sides of the reinforced concrete supporting beam 901 are provided with horizontal for limiting the armored concrete support rail beam base plate 2 The convex gear platform 91 of displacement;
Accept the reinforced concrete beam type structure 1, and the steel in the top of the armored concrete support rail beam base plate 2 Reinforced concrete support rail beam base plate 2 is molded with the formed by integrally casting of reinforced concrete beam type structure 1, so as to collectively form reinforced concrete Native support rail beam 9;
Under the support rail beam roadbed filling 5 be arranged on shallow layer reinforcement area 6 and the armored concrete support rail beam base plate 2 it Between, for be the armored concrete support rail beam base plate 2, reinforced concrete supporting beam 901 and support rail beam both sides backfill filler 4 carry For operation platform, and lateral support is provided for the pile foundation bearing structure 3;Wherein, the shallow layer reinforcement area 6 is arranged on flabbily The superficial layer of layer 7, and roadbed filling 5 and the reinforced concrete beam type structure under the shallow layer reinforcement area 6, the support rail beam 1 vertical consistency;
The support rail beam both sides backfill filler 4 is accepted by roadbed filling 5 under the support rail beam, and the support rail beam two Side backfill filler 4 props up the both sides of the armored concrete support rail beam base plate 2, with to the armored concrete support rail beam base plate 2 The transverse shifting of the armored concrete support rail beam base plate 2 is shielded and constrained, and maintenance passage is provided;
Roadbed filling 5 and support rail beam both sides backfill filler 4 collectively form filler filling body 10, institute under the support rail beam State the both sides of filler filling body 10 and be provided with weathering 11;
Roadbed filling 5, the shallow-layer under the support rail beam is sequentially passed through per the lower end of the first pile foundation bearing structure 3 described in root Stretch into behind stabilization zone 6 and the soft stratum 7 in supporting course 8, so that when soft stratum 7 produces sedimentation, first pile foundation is held Carrying structure 3 can bear negative friction, so as to provide surely to armored concrete support rail beam base plate 2 and reinforced concrete beam type structure 1 Fixed bearing capacity, to reduce vertical, vertical and horizontal rigidity of the sedimentation to armored concrete support rail beam 9 because of filler filling body 10 The adverse effect of generation.
Further, the first pile foundation bearing structure 3 is cast-in-situ bored pile, and reinforced concrete supporting beam is firm with support rail beam base plate Connect or overlap, just connect with pile foundation bearing structure.Overlapped using pin in the position of support rail beam internode seam, remaining position is using firm Connect.
The pin 12 includes pre-buried connection reinforcing bar 12.1, pitch hemp cut 12.2 and stainless steel sleeve pipe 12.3, described pre-buried Connection reinforcing bar 12.1 is located in the stainless steel sleeve pipe 12.3 and is fixedly installed between the two the pitch hemp cut 12.2.
The height of the support rail beam both sides backfill filler 4 and highly equal, the institute of the armored concrete support rail beam base plate 2 These the described first pile foundation bearing structures 3 having are arranged in ranks.Lower end per the second pile foundation bearing structure 902 described in root is successively Stretch in supporting course 8 after roadbed filling 5, the shallow layer reinforcement area 6 and the soft stratum 7 through under the support rail beam.
The structural shape can in effectively solving the low circuit of putting of low speed magnetic suspension traffic engineering it is tight to post-construction settlement of subgrade requirement Lattice, take that engineering caused by traditional foundation stabilization measure is huge, invest big, long in time limit, and basement process and embankment Construction quality is wayward, the problem of bedding long-time stability and poor durability, so as to improve low circuit support rail girder construction of putting Reliability, reduces the engineering risk of traditional structure pattern.
Armored concrete support rail beam 9 of the present utility model adopts reinforced concrete soil scene one-piece casting, to directly take on rail Road load and the magnetic-levitation train load of track transmission, then deadweight and upper load are passed to and its rigidly connected first pile foundation Bearing structure 3, structural reliability is high, can save the large area stiffening basic ground produced after traditional embankment slope.
First pile foundation bearing structure 3 adopts cast-in-situ bored pile, and transverse direction and longitudinal direction has and is arranged with many reinforced concrete drills Hole pouring pile, vertical and horizontal rigidity is big;And first pile foundation bearing structure 3 go deep into supporting course 8, when soft stratum 7 produces sedimentation, First pile foundation bearing structure 3 can still bear negative friction and provide stronger bearing capacity to armored concrete support rail beam base plate 2.
The reinforced concrete supporting beam 90 that pile foundation bearing structure 3 and reinforced concrete floor 2 are arranged, can greatly reduce pile foundation The stress concentration phenomenon of armored concrete support rail beam base plate 2 at bearing structure 3;Further, since the horizontal stroke of reinforced concrete supporting beam 90 To connection function, the lateral stiffness of structure and the ability of opposing differential settlement deformation are also increased, transverse pile foundation can be reduced Quantity, reduces investment.
The internode of adjacent segments armored concrete support rail beam base plate 2 shares pile foundation joist composite bearing structure, and adjacent Expansion joint is reserved between armored concrete support rail beam base plate, impact failure of the section by train load of encorbelmenting can be avoided, and reduce temperature The impact of degree stress and shrinkage and creep.
It is low put circuit by soft soil zone when, should according to embankment stability need ground superficial layer is carried out it is necessary plus Gu, form shallow layer reinforcement area 6., by embankment stability control, its reinforcement depth should be according to embankment for the reinforcement depth in shallow layer reinforcement area 6 Raising, foundation condition are determined by stability calculation.Compared to traditional single ground when being controlled by sedimentation and stable Two indices For reinforcing mode, the reinforcement depth of shallow layer reinforcement area 6 is little, with reference to the first pile foundation bearing structure 3 can effective control roadbed reclamation and Post-construction settlement of subgrade.By contrast, the new structure foundation stabilization quantity is little, invests little, and more conducively after construction quality and work The control of sedimentation, and save cost and reduction of erection time.
The specific making step of the utility model is as follows:
(1) smooth construction site, according to design requirement necessary shallow layer foundation consolidation process is carried out, and forms shallow layer reinforcement area 6, then placement in layers is required according to embankment and be densified to reinforced concrete floor bottom surface absolute altitude;
(2) irrigate in embankment subgrade cross section, vertical section direction construction drill in reinforced concrete floor bottom surface absolute altitude Stake, i.e. the first pile foundation bearing structure 3, drilled pile construction should be adopted and disturb little construction technology to railway embankment, be existed if necessary Steel pile casting is set in embankment altitude range or draws hole;After cast-in-situ bored pile reaches desired strength, amputate by code requirement Pile crown, colligation concrete floor and the connection reinforcing bar with stake;
(3) formwork erection of platform 91, one-time-concreting shaping, before pouring are kept off to reinforced concrete supporting beam 90, convex according to design attitude Carry out all kinds of built-in fittings such as pin 10 and the positioning with the connection reinforcing bar of pile foundation and install, concrete reaches and removed after design strength Template;
It is (4) long to armored concrete support rail beam base plate 2 and the merogenesis formwork erection of reinforced concrete beam type structure 1 according to design section, One-time-concreting is molded, and the positioning of all kinds of built-in fittings such as sleeper pedestal connection reinforcing bar, water conservancy diversion rail bearing built-in fitting etc. is carried out before pouring With installation;
(5) each part concrete reaches and distinguish after design strength form removal, then by armored concrete support rail beam base plate 2 Bedding filler backfill in thickness range, backfill face is made outward-dipping weathering and carries out top layer waterproof i.e. by design requirement Can.
As it will be easily appreciated by one skilled in the art that preferred embodiment of the present utility model is the foregoing is only, not To limit the utility model, all any modifications made within spirit of the present utility model and principle, equivalent and change Enter, should be included within protection domain of the present utility model.

Claims (7)

1. medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction, it is characterised in that including first Pile foundation bearing structure (3), pile foundation joist composite bearing structure (90), armored concrete support rail beam base plate (2), reinforced beam Roadbed filling (5) and support rail beam both sides backfill filler (4) under formula structure (1), support rail beam, wherein,
The first pile foundation bearing structure (3) and the pile foundation joist composite bearing structure (90) accept the reinforced concrete jointly Native support rail beam base plate (2);
The first pile foundation bearing structure (3) is provided with many, is vertically arranged per the first pile foundation bearing structure (3) described in root, And accept the armored concrete support rail beam base plate (2) per the top of the first pile foundation bearing structure (3) described in root, described The top of one pile foundation bearing structure (3) is embedded in the armored concrete support rail beam base plate (2) and just connects with it;
Accept the reinforced concrete beam type structure (1), and adjacent two in the top of the armored concrete support rail beam base plate (2) Save and expansion joint is set between the armored concrete support rail beam base plate (2);
The pile foundation joist composite bearing structure (90) is provided with multiple and adjacent two sections armored concrete support rail beams Pile foundation joist composite bearing structure (90) described in one is respectively provided with the expansion joint of base plate (2), for two pieces that support this adjacent The armored concrete support rail beam base plate (2), each described pile foundation joist composite bearing structure (90) includes armored concrete Joist (901) and the second pile foundation bearing structure (902), and the top per the second pile foundation bearing structure (902) described in root holds The reinforced concrete supporting beam (901) is connect, the reinforced concrete supporting beam (901) accepts the armored concrete support rail beam base plate (2);
The top of the second pile foundation bearing structure (902) is embedded in the reinforced concrete supporting beam (901) and just connects with it, the steel Reinforced concrete joist (901) has just connect or has overlapped with the armored concrete support rail beam base plate (2);
Reinforced concrete supporting beam (901) both sides are provided with for limiting the armored concrete support rail beam base plate (2) laterally Convex gear platform (91) of displacement;
Accept the reinforced concrete beam type structure (1), and the steel in the top of the armored concrete support rail beam base plate (2) Reinforced concrete support rail beam base plate (2) is molded with reinforced concrete beam type structure (1) formed by integrally casting, so as to collectively form reinforcing bar Concrete support rail beam (9);
Under the support rail beam roadbed filling (5) be arranged on shallow layer reinforcement area (6) and the armored concrete support rail beam base plate (2) it Between, for filling out for the armored concrete support rail beam base plate (2), reinforced concrete supporting beam (901) and support rail beam both sides Material (4) provides operation platform, and provides lateral support for the first pile foundation bearing structure (3);Wherein, the shallow layer reinforcement area (6) be arranged under the superficial layer of soft stratum (7), and the shallow layer reinforcement area (6), the support rail beam roadbed filling (5) and The vertical consistency of the reinforced concrete beam type structure (1);
Support rail beam both sides backfill filler (4) are accepted by roadbed filling (5) under the support rail beam, and the support rail beam two Side backfill filler (4) props up the both sides of the armored concrete support rail beam base plate (2), with to the armored concrete support rail beam bottom Plate (2) shields and constrains the transverse shifting of the armored concrete support rail beam base plate (2), and provides maintenance and lead to Road;
Roadbed filling (5) and support rail beam both sides backfill filler (4) collectively form filler filling body (10) under the support rail beam, Described filler filling body (10) both sides are provided with weathering (11);
Roadbed filling (5), the shallow-layer under the support rail beam are sequentially passed through per the lower end of the first pile foundation bearing structure (3) described in root Stretch into behind stabilization zone (6) and the soft stratum (7) in supporting course (8), with when soft stratum (7) produces sedimentation, described the One pile foundation bearing structure (3) can bear negative friction, so as to armored concrete support rail beam base plate (2) and reinforced concrete beam type Structure (1) provides stable bearing capacity, to reduce because the sedimentation of filler filling body (10) is erected to armored concrete support rail beam (9) To the adverse effect that, vertical and horizontal rigidity is produced.
2. pile foundation combined type support rail girder construction in medium-and low-speed maglev traffic engineering single line embankment location according to claim 1, Characterized in that, the first pile foundation bearing structure (3) is cast-in-situ bored pile, reinforced concrete supporting beam just connects with support rail beam base plate Or overlap joint, just connect with pile foundation bearing structure.
3. pile foundation combined type support rail girder construction in medium-and low-speed maglev traffic engineering single line embankment location according to claim 1, Characterized in that, the position reinforced concrete supporting beam in support rail beam internode seam is overlapped with support rail beam base plate using pin, remaining position Put to adopt and just connect.
4. pile foundation combined type support rail girder construction in medium-and low-speed maglev traffic engineering single line embankment location according to claim 1, Characterized in that, the support rail beam side two backfills the height of filler (4) and the height of the armored concrete support rail beam base plate (2) It is equal.
5. pile foundation combined type support rail girder construction in medium-and low-speed maglev traffic engineering single line embankment location according to claim 1, Characterized in that, the first pile foundation bearing structure (3) described in all these is arranged in ranks.
6. pile foundation combined type support rail girder construction in medium-and low-speed maglev traffic engineering single line embankment location according to claim 1, Characterized in that, sequentially pass through per the lower end of the first pile foundation bearing structure (3) described in root roadbed filling (5) under the support rail beam, Stretch into after the shallow layer reinforcement area (6) and the soft stratum (7) in supporting course (8).
7. pile foundation combined type support rail girder construction in medium-and low-speed maglev traffic engineering single line embankment location according to claim 3, Characterized in that, the pin includes pre-buried connection reinforcing bar, pitch hemp cut and stainless steel sleeve pipe, the pre-buried connection reinforcing bar is located at The pitch hemp cut is set in the stainless steel sleeve pipe and between the two.
CN201621058223.4U 2016-09-15 2016-09-15 Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling Withdrawn - After Issue CN206157496U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621058223.4U CN206157496U (en) 2016-09-15 2016-09-15 Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621058223.4U CN206157496U (en) 2016-09-15 2016-09-15 Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling

Publications (1)

Publication Number Publication Date
CN206157496U true CN206157496U (en) 2017-05-10

Family

ID=58650483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621058223.4U Withdrawn - After Issue CN206157496U (en) 2016-09-15 2016-09-15 Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling

Country Status (1)

Country Link
CN (1) CN206157496U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106283972A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction
CN110004782A (en) * 2019-04-23 2019-07-12 中铁磁浮交通投资建设有限公司 A kind of high-speed magnetic suspension rails traffic resilient support circuit configurations
CN110004781A (en) * 2019-04-23 2019-07-12 中铁磁浮交通投资建设有限公司 A kind of high-speed magnetic suspension rails traffic elasticity circuit configurations

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106283972A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction
CN106283972B (en) * 2016-09-15 2017-10-31 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction
CN110004782A (en) * 2019-04-23 2019-07-12 中铁磁浮交通投资建设有限公司 A kind of high-speed magnetic suspension rails traffic resilient support circuit configurations
CN110004781A (en) * 2019-04-23 2019-07-12 中铁磁浮交通投资建设有限公司 A kind of high-speed magnetic suspension rails traffic elasticity circuit configurations

Similar Documents

Publication Publication Date Title
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN206157496U (en) Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling
CN106283948B (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail girder construction
CN206157483U (en) Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail girder construction of filling
CN206157495U (en) Moderate -low speed magnetic levitation double -line compound framing type support rail girder construction of location pile foundation of filling
CN206157484U (en) Moderate -low speed magnetic levitation traffic engineering single line location supporting beam of pile foundation formula support rail girder construction of filling
CN206127736U (en) Moderate -low speed magnetic levitation double -line compound framing formula support rail roof beam transition section structure of location pile foundation that fills
CN206157485U (en) Moderate -low speed magnetic levitation single line excavation location pile foundation combined type support rail roof beam transition section structure
CN206157489U (en) Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation framing type support rail girder construction
CN206157488U (en) Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail roof beam transition section structure that fills
CN106283955B (en) Medium-and low-speed maglev traffic engineering single line embankment location pile foundation joist type support rail girder construction
CN206157477U (en) Moderate -low speed magnetic levitation traffic engineering double -line location pile foundation combined type support rail girder construction of filling
CN206157490U (en) Moderate -low speed magnetic levitation double -line location supporting beam of pile foundation framing type support rail girder construction of filling
CN206127742U (en) Moderate -low speed magnetic levitation traffic engineering double -line location detached pier column type support rail girder construction of filling
CN206157486U (en) Moderate -low speed magnetic levitation traffic engineering single line excavation location pile foundation combined type support rail girder construction
CN106283949A (en) Medium-and low-speed maglev traffic engineering single line embankment location detached pier pillar support rail girder construction
CN206157480U (en) Moderate -low speed magnetic levitation traffic engineering double -line excavation location pile foundation combined type support rail girder construction
CN206157487U (en) Moderate -low speed magnetic levitation single line location pile foundation combined type support rail roof beam transition section structure that fills
CN206127745U (en) Moderate -low speed magnetic levitation traffic engineering single line location detached pier column type support rail girder construction of filling
CN206157494U (en) Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction
CN206157482U (en) Moderate -low speed magnetic levitation double -line location pile foundation combined type support rail roof beam transition section structure that fills
CN106283968B (en) Medium-and low-speed maglev two-wire embankment location pile foundation is combined framing type support rail girder construction
CN206157481U (en) Compound framing type support rail roof beam transition section structure of moderate -low speed magnetic levitation double -line excavation location pile foundation
CN206157478U (en) Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation formula support rail roof beam transition section structure
CN206219896U (en) Medium-and low-speed maglev traffic engineering two-wire excavation location pile foundation joist type support rail girder construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170510

Effective date of abandoning: 20171031

AV01 Patent right actively abandoned