CN206157494U - Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction - Google Patents

Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction Download PDF

Info

Publication number
CN206157494U
CN206157494U CN201621057106.6U CN201621057106U CN206157494U CN 206157494 U CN206157494 U CN 206157494U CN 201621057106 U CN201621057106 U CN 201621057106U CN 206157494 U CN206157494 U CN 206157494U
Authority
CN
China
Prior art keywords
support rail
pile foundation
bearing structure
reinforced concrete
rail beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621057106.6U
Other languages
Chinese (zh)
Inventor
郭建湖
李小和
赵新益
姜鹰
姚洪锡
李巍
王勇刚
杨辉建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201621057106.6U priority Critical patent/CN206157494U/en
Application granted granted Critical
Publication of CN206157494U publication Critical patent/CN206157494U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)
  • Foundations (AREA)

Abstract

The utility model belongs to the technical field of the low circuit of putting of well low -speed maglev traffic engineering to moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction is disclosed, backfill including pile foundation load bearing structure, reinforced concrete joist, reinforced concrete support rail breast board, reinforced concrete beam structure and support rail roof beam both sides and pack, pile foundation load bearing structure is provided with many, every the equal vertical setting of pile foundation load bearing structure is and every all accept on pile foundation load bearing structure's top reinforced concrete joist, accept on the top of reinforced concrete support rail breast board reinforced concrete beam structure, the other escape canal that is provided with of packing is backfilled to support rail roof beam both sides, the escape canal is kept away from support rail roof beam both sides and is backfilled the one side of packing be provided with draining slope. The utility model discloses low -speed maglev traffic engineering track structure can satisfy the requirement of foundation bed long term stability, durability and construction quality controllability again to support rail roof beam structural distortion and the high requirement of post -construction settlement in can satisfying, and economic nature is better.

Description

Medium-and low-speed maglev traffic engineering single line excavation location pile foundation joist type support rail girder construction
Technical field
The utility model belongs to that middle low speed magnetic suspension traffic engineering is low to put Line technology field, low more particularly, in Fast magnetic floating traffic engineering single line excavation location support rail girder construction pattern.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, and achievement in research both domestic and external is less, the whole world The circuit for opening operation is even more minority.The middle low speed magnetic suspension railway business that only in March, 2005 Japan's construction at present is opened is transported The middle low speed magnetic suspension railway business operating line that line-the East Hillside Line and in June, 2014 Korea open.And the middle low speed of China Magnetic suspension traffic only National University of Defense technology's test wire, Green City Mountain test wire, Tangshan experiment line at present, but do not put into effect Formal circuit, and based on elevated structure, the rarely seen relevant low research put in terms of circuit support rail girder construction and applies.
The outstanding traffic civil engineering part of middle low speed magnetic suspension mainly comprising bridge, it is low put circuit, station and rolling stock section, it is low to put circuit It is made up of roadbed under the section of track, support rail beam and support rail beam, the support rail beam of supporting track is arranged on the roadbed being made up of earth structure On, the operation of middle low speed magnetic suspension train includes suspending, be oriented to, drive and braking being required for what is completed on support rail beam.Magnetic Aerotrain is very high to line construction deformation requirements, because the deformation of structure very little may affect comfortableness even prestige by bus Side of body traffic safety, so the design of support rail beam is particularly significant.
Existing support rail girder construction is applied and exist on circuit problems with middle low speed magnetic suspension traffic low putting:
(1) existing low circuit support rail girder construction of putting is arranged on roadbed earth structure, roadbed earth structure by Filler fills compacting and forms, and compaction quality is wayward, and the later stage is susceptible to deformation, and settlement after construction is difficult to control to.
(2) low circuit support rail girder construction of putting has high demands to the settlement after construction of roadbed and ground, and is routed through the ground in region Matter condition is typically all complicated and changeable, is controlled using conventional support rail beam structure construction difficult quality.
(3) because the low circuit earth structure of putting that filler fills compacting has vulnerability, and construction quality is difficult Control, relatively easily produces differential settlement, causes bedding vertical and horizontal bad stability under support rail beam, so that support rail beam The resistance to overturning of structure is damaged.
The low circuit support rail beam of putting of magnetic suspension is higher to post-construction settlement of subgrade, bedding long-time stability and life requirement, when When circuit is located at foundation stabilization location, the construction period is long to take traditional support rail girder construction pattern to exist, and construction quality is not easily-controllable System, the defect such as whole structural stability is poor and less economical.
Utility model content
For the disadvantages described above or Improvement requirement of prior art, the utility model provides medium-and low-speed maglev traffic engineering list Line excavation location pile foundation joist type support rail girder construction, can avoid the low defect for putting circuit support rail girder construction of tradition, and construction quality is more Be easily controlled, long-time stability more preferably, and during it both meets low speed magnetic suspension traffic engineering track structure to support rail girder construction Deformation and the high requirement of settlement after construction, meet the requirement of bedding long-time stability, durability and construction quality controllability again.
For achieving the above object, the utility model provides medium-and low-speed maglev traffic engineering single line excavation location pile foundation joist Formula support rail girder construction, it is characterised in that including pile foundation bearing structure, reinforced concrete supporting beam, armored concrete support rail beam base plate, Reinforced concrete beam type structure and support rail beam both sides backfill filler, wherein,
The pile foundation bearing structure is provided with many, is vertically arranged per pile foundation bearing structure described in root, and the institute per root Accept the reinforced concrete supporting beam in the top for stating pile foundation bearing structure;
The reinforced concrete supporting beam accepts the armored concrete support rail beam base plate;
The top of the pile foundation bearing structure is embedded in the reinforced concrete supporting beam and just connects with it, the armored concrete support Beam has just connect or has overlapped with the armored concrete support rail beam base plate, the armored concrete support rail beam base plate and the reinforced concrete Native girder structure formed by integrally casting is molded so as to collectively form armored concrete support rail beam;
The reinforced concrete supporting beam both sides are provided with for limiting the armored concrete support rail beam base plate lateral displacement Convex gear platform;
The support rail beam both sides backfill filler is arranged on soft stratum, and by support rail beam both sides backfill filler Gutter is provided with, the gutter is provided with weathering away from the side that the support rail beam both sides backfill filler;
The armored concrete support rail beam base plate is located in support rail beam both sides backfill filler;
Lower end per pile foundation bearing structure described in root is stretched in supporting course through after the soft stratum, with soft stratum When producing sedimentation, the pile foundation bearing structure can bear negative friction, so as to provide stable to reinforcing bar armored concrete support rail beam Bearing capacity, in case support rail beam both sides backfill filler differential settlement reduce armored concrete support rail beam it is vertical, longitudinal direction and Lateral stiffness.
Preferably, the pile foundation bearing structure is cast-in-situ bored pile, reinforced concrete supporting beam and support rail beam base plate just connect or Overlap joint, just connects with pile foundation bearing structure.
Preferably, the pile foundation bearing structure is cast-in-situ bored pile, and joist has just connect or overlapped with support rail beam base plate, with pile foundation Bearing structure just connects.
Preferably, pile foundation bearing structure described in all these is arranged in ranks.
In general, by the contemplated above technical scheme of the utility model compared with prior art, can obtain down Row beneficial effect:
(1) armored concrete support rail beam base plate of the present utility model, reinforced concrete beam type structure adopt reinforced concrete Soil scene one-piece casting, the two composition integral reinforced concrete structure is floated to the magnetic for directly taking on track load and track transmission Train load, then deadweight and upper load are passed to and its rigidly connected pile foundation bearing structure, structural reliability is high.
(2) pile foundation bearing structure of the present utility model is goed deep in supporting course, and when roadbed produces certain sedimentation, pile foundation carries knot Structure can still bear negative friction and provide stronger bearing capacity, it is to avoid because of the wayward inequality for causing of foundation stabilization quality Even impact of the sedimentation to support rail beam vertical and horizontal rigidity, structure vertical cross stiffness and structural reliability it is more excellent.
(3) pile foundation bearing structure control settlement effect of the present utility model preferably, therefore can save cutting bedding ground and add Gu and reduce cutting bedding replacement thickness, need to only meet the requirement of basic replacement thickness, can investment reduction, the reduction of erection time, have Obvious technology and economic advantages.
(4) reinforced concrete supporting beam that pile foundation bearing structure and reinforced concrete floor are arranged, can greatly reduce pile foundation The stress concentration phenomenon of armored concrete support rail beam base plate at bearing structure;Further, since the lateral connection effect of joist, also increases Add the lateral stiffness of structure and the ability of opposing differential settlement deformation, the quantity of transverse pile foundation can have been reduced, reduce investment.
Description of the drawings
Fig. 1 is schematic cross-sectional view of the present utility model;
Fig. 2 is schematic longitudinal section of the present utility model;
Fig. 3 is the plane distribution schematic diagram of the utility model pile foundation bearing structure;
Fig. 4 is the connection diagram that the utility model pile foundation joist has just connect with armored concrete support rail beam base plate.
Fig. 5 is that the utility model pile foundation joist overlaps connection diagram with armored concrete support rail beam base plate.
Fig. 6 is the cross-sectional view of pin in the utility model.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing and enforcement Example, is further elaborated to the utility model.It should be appreciated that specific embodiment described herein is only to explain The utility model, is not used to limit the utility model.Additionally, institute in the utility model disclosed below each embodiment As long as the technical characteristic being related to does not constitute each other conflict and just can be mutually combined.
Reference Fig. 1~Fig. 6, medium-and low-speed maglev traffic engineering single line excavation location pile foundation joist type support rail girder construction, including Pile foundation bearing structure 3, reinforced concrete supporting beam 90, armored concrete support rail beam base plate 2, reinforced concrete beam type structure 1 and hold Beam-and-rail both sides backfill filler 4, wherein,
The pile foundation bearing structure 3 is provided with many, is vertically arranged per pile foundation bearing structure 3 described in root, and per root Accept the reinforced concrete supporting beam 90 in the top of the pile foundation bearing structure 3;
The reinforced concrete supporting beam 90 accepts the armored concrete support rail beam base plate 2;
The top of the pile foundation bearing structure 3 is embedded in the reinforced concrete supporting beam 90 and just connects with it, the reinforced concrete Native joist 90 has just connect or has overlapped with the armored concrete support rail beam base plate 2, the armored concrete support rail beam base plate 2 with it is described Reinforced concrete beam type structure 1 is integrally formed so as to collectively form armored concrete support rail beam 9;
It is provided with the reinforced concrete supporting beam 90 for limiting the lateral displacement of armored concrete support rail beam base plate 2 Convex gear platform 91;
The support rail beam both sides backfill filler 4 is arranged on soft stratum 5, and backfills filler in the support rail beam both sides Gutter 7 is provided with by the of 4, the gutter 7 is provided with weathering 8 away from the side that the support rail beam both sides backfill filler 4;
The armored concrete support rail beam base plate 2 is located in support rail beam both sides backfill filler 4;
Stretch in supporting course 6, with weakness through after the soft stratum 5 lower end per pile foundation bearing structure 3 described in root When stratum 5 produces sedimentation, the pile foundation bearing structure 3 can bear negative friction, so as to carry to reinforcing bar armored concrete support rail beam 9 For stable bearing capacity, in case the differential settlement of support rail beam both sides backfill filler 4 reduces the perpendicular of armored concrete support rail beam 9 To, vertical and horizontal rigidity.
Further, the pile foundation bearing structure 3 is cast-in-situ bored pile, and joist has just connect or overlapped with support rail beam base plate, with stake Base bearing structure just connects.Overlapped using pin in the position of support rail beam internode seam, remaining position adopts and just connects.
The pin 10 includes pre-buried connection reinforcing bar 10.1, pitch hemp cut 10.2 and stainless steel sleeve pipe 10.3, described pre-buried Connection reinforcing bar 10.1 is located in the stainless steel sleeve pipe 10.3 and is fixedly installed between the two the pitch hemp cut 10.2.
The structural shape can in effectively solving the low circuit of putting of low speed magnetic suspension traffic engineering it is tight to post-construction settlement of subgrade requirement Lattice, take traditional cutting excavate replacement thickness it is big caused by engineering is huge, invest big, long in time limit, and backfill filler construction Quality is wayward, the problem of bedding long-time stability and poor durability, so as to improve the low reliability for putting circuit support rail girder construction Degree, reduces engineering risk.
Armored concrete support rail beam 9 of the present utility model adopts reinforced concrete soil scene one-piece casting, to directly take on rail Road load and the magnetic-levitation train load of track transmission, then deadweight and upper load are passed to into the pile foundation bearing structure 3 of lower section, knot Structure reliability is high, can reduce cutting bedding replacement thickness, need to only meet the requirement of basic replacement thickness, can investment reduction, shorten Duration, with obvious technology and economic advantages.
Pile foundation bearing structure 3 adopts cast-in-situ bored pile, transverse direction and longitudinal direction to fill with many reinforced concrete drillings are arranged with Note stake, vertical and horizontal rigidity is big;And pile foundation bearing structure 3 gos deep into supporting course 6, when soft stratum 5 produces sedimentation, pile foundation is carried Knot can still bear negative friction and provide stronger bearing capacity to armored concrete support rail beam base plate 2.
The reinforced concrete supporting beam 90 that pile foundation bearing structure 3 and reinforced concrete floor 2 are arranged, can greatly reduce pile foundation The stress concentration phenomenon of armored concrete support rail beam base plate 2 at bearing structure 3;Further, since the lateral connection effect of joist 90, The lateral stiffness of structure and the ability of opposing differential settlement deformation are also increased, the quantity of transverse pile foundation can be reduced, reduced and throw Money.
The specific making step of the utility model is as follows:
(1) excavating cut slope side slope carries out necessary bedding and changes to fill out to designing at road bed absolute altitude according to design requirement;
(2) subgrade cross section, vertical section direction construction drill bored concrete pile are in reinforced concrete floor bottom surface absolute altitude, i.e., Pile foundation bearing structure 3, drilled pile construction should adopt the construction technology little to filling roadbed disturbance;Reaching in cast-in-situ bored pile will After seeking intensity, by code requirement pile crown, colligation concrete floor and the connection reinforcing bar with stake are amputated;
(3) it is long to joist 90, convex gear platform 91, armored concrete support rail beam base plate 2 and armored concrete according to design section The merogenesis formwork erection of girder structure 1, one-time-concreting shaping, carry out before pouring all kinds of built-in fittings such as pin 10, sleeper pedestal connect reinforcing bar, The positioning of water conservancy diversion rail bearing built-in fitting etc. and installation;
(4) each part concrete reaches and distinguish after design strength form removal, then by armored concrete support rail beam base plate 2 Bedding filler backfill in thickness range, backfill face is made outward-dipping weathering 8, by design requirement top layer waterproof is carried out, and Weathering 8 on gutter 7 and gutter 7 is carried out, that is, is formed one kind and is put circuit list for middle low speed magnetic suspension traffic engineering to be low Line excavation location independence pier stud type support rail girder construction.
As it will be easily appreciated by one skilled in the art that preferred embodiment of the present utility model is the foregoing is only, not To limit the utility model, all any modifications made within spirit of the present utility model and principle, equivalent and change Enter, should be included within protection domain of the present utility model.

Claims (4)

1. medium-and low-speed maglev traffic engineering single line excavation location pile foundation joist type support rail girder construction, it is characterised in that including pile foundation Bearing structure, reinforced concrete supporting beam, armored concrete support rail beam base plate, reinforced concrete beam type structure and support rail beam both sides are returned Filler, wherein,
The pile foundation bearing structure is provided with many, is vertically arranged per pile foundation bearing structure described in root, and per stake described in root Accept the reinforced concrete supporting beam in the top of base bearing structure;
The reinforced concrete supporting beam accepts the armored concrete support rail beam base plate;
Accept the reinforced concrete beam type structure in the top of the armored concrete support rail beam base plate;
The top of the pile foundation bearing structure is embedded in the reinforced concrete supporting beam and just connects with it, the reinforced concrete supporting beam with The armored concrete support rail beam base plate has just connect or has overlapped, the armored concrete support rail beam base plate and the reinforced beam Formula structural integrity pours shaping so as to collectively form armored concrete support rail beam;
The convex for limiting the armored concrete support rail beam base plate lateral displacement is provided with the reinforced concrete supporting beam Gear platform;
The support rail beam both sides backfill filler is arranged on soft stratum, and is arranged by support rail beam both sides backfill filler There is gutter, the gutter is provided with weathering away from the side that the support rail beam both sides backfill filler;
The armored concrete support rail beam base plate is located in support rail beam both sides backfill filler;
Lower end per pile foundation bearing structure described in root is stretched in supporting course through after the soft stratum, to produce in soft stratum During sedimentation, the pile foundation bearing structure can bear negative friction, so as to provide stable holding to reinforcing bar armored concrete support rail beam Power is carried, in case the differential settlement of support rail beam both sides backfill filler reduces vertical, the vertical and horizontal of armored concrete support rail beam Rigidity.
2. pile foundation joist type support rail girder construction in medium-and low-speed maglev traffic engineering single line excavation location according to claim 1, Characterized in that, the pile foundation bearing structure is cast-in-situ bored pile, reinforced concrete supporting beam has just connect or has overlapped with support rail beam base plate, Just connect with pile foundation bearing structure.
3. pile foundation joist type support rail girder construction in medium-and low-speed maglev traffic engineering single line excavation location according to claim 1, Characterized in that, the pile foundation bearing structure is cast-in-situ bored pile, joist has just connect or has overlapped with support rail beam base plate, carries with pile foundation Structure just connects.
4. pile foundation joist type support rail girder construction in medium-and low-speed maglev traffic engineering single line excavation location according to claim 1, Characterized in that, pile foundation bearing structure described in all these is arranged in ranks.
CN201621057106.6U 2016-09-15 2016-09-15 Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction Withdrawn - After Issue CN206157494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621057106.6U CN206157494U (en) 2016-09-15 2016-09-15 Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621057106.6U CN206157494U (en) 2016-09-15 2016-09-15 Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction

Publications (1)

Publication Number Publication Date
CN206157494U true CN206157494U (en) 2017-05-10

Family

ID=58650370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621057106.6U Withdrawn - After Issue CN206157494U (en) 2016-09-15 2016-09-15 Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction

Country Status (1)

Country Link
CN (1) CN206157494U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106283971A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line excavation location pile foundation joist type support rail girder construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106283971A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line excavation location pile foundation joist type support rail girder construction
CN106283971B (en) * 2016-09-15 2017-11-17 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line excavation location pile foundation joist type support rail girder construction

Similar Documents

Publication Publication Date Title
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN206157496U (en) Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling
CN206157489U (en) Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation framing type support rail girder construction
CN206157483U (en) Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail girder construction of filling
CN206157484U (en) Moderate -low speed magnetic levitation traffic engineering single line location supporting beam of pile foundation formula support rail girder construction of filling
CN106283938B (en) The compound framing type support rail girder construction of medium-and low-speed maglev two-wire excavation location pile foundation
CN106283948A (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail girder construction
CN206157495U (en) Moderate -low speed magnetic levitation double -line compound framing type support rail girder construction of location pile foundation of filling
CN206157485U (en) Moderate -low speed magnetic levitation single line excavation location pile foundation combined type support rail roof beam transition section structure
CN106283952B (en) Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail girder construction
CN206157494U (en) Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction
CN106283955B (en) Medium-and low-speed maglev traffic engineering single line embankment location pile foundation joist type support rail girder construction
CN106283949B (en) Medium-and low-speed maglev traffic engineering single line embankment location independence pier stud type support rail girder construction
CN206157486U (en) Moderate -low speed magnetic levitation traffic engineering single line excavation location pile foundation combined type support rail girder construction
CN206127737U (en) Moderate -low speed magnetic levitation traffic engineering single line excavation location detached pier column type support rail girder construction
CN206219896U (en) Medium-and low-speed maglev traffic engineering two-wire excavation location pile foundation joist type support rail girder construction
CN206127756U (en) Moderate -low speed magnetic levitation traffic engineering double -line excavation location detached pier column type support rail girder construction
CN206157476U (en) Compound framing type support rail girder construction of moderate -low speed magnetic levitation double -line excavation location pile foundation
CN206157480U (en) Moderate -low speed magnetic levitation traffic engineering double -line excavation location pile foundation combined type support rail girder construction
CN106283971B (en) Medium-and low-speed maglev traffic engineering single line excavation location pile foundation joist type support rail girder construction
CN206127742U (en) Moderate -low speed magnetic levitation traffic engineering double -line location detached pier column type support rail girder construction of filling
CN206157490U (en) Moderate -low speed magnetic levitation double -line location supporting beam of pile foundation framing type support rail girder construction of filling
CN206127745U (en) Moderate -low speed magnetic levitation traffic engineering single line location detached pier column type support rail girder construction of filling
CN206157478U (en) Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation formula support rail roof beam transition section structure
CN206157477U (en) Moderate -low speed magnetic levitation traffic engineering double -line location pile foundation combined type support rail girder construction of filling

Legal Events

Date Code Title Description