CN105951537A - Rib column distributed turnout foundation structure of middle-low speed magnetic levitation low-arranged line - Google Patents
Rib column distributed turnout foundation structure of middle-low speed magnetic levitation low-arranged line Download PDFInfo
- Publication number
- CN105951537A CN105951537A CN201610284837.2A CN201610284837A CN105951537A CN 105951537 A CN105951537 A CN 105951537A CN 201610284837 A CN201610284837 A CN 201610284837A CN 105951537 A CN105951537 A CN 105951537A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- turnout
- concrete
- low
- rib column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
- E01B2/006—Deep foundation of tracks
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/08—Deep or vertical foundation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Abstract
The invention discloses a rib column distributed turnout foundation structure for a middle-low speed magnetic levitation low-arranged line. The rib column distributed turnout foundation structure for the middle-low speed magnetic levitation low-arranged line comprises turnout zone foundation treatment reinforced concrete rafts, reinforced concrete turnout beam bar-type rib column foundations, reinforced concrete cast-in place piles, steel plates and embedded bolts. The turnout zone foundation treatment reinforced concrete rafts are arranged horizontally, and the multiple reinforced concrete cast-in place piles are arranged at the bottom end faces of the turnout zone foundation treatment reinforced concrete rafts; the reinforced concrete cast-in place piles penetrate a soft stratum to extend into a bearing stratum, to decrease the deformation of turnout beams in the rotation process. The rib column distributed turnout foundation structure for the middle-low speed magnetic levitation low-arranged line ensures that the turnout beams are not deformed greatly in the rotation process due to inadequate foundation stiffness, and meets the requirements for foundation strength and stability by the turnout beams.
Description
Technical field
The invention belongs to that medium-and low-speed maglev traffic engineering is low puts line area, more particularly, to one
Medium-and low-speed maglev is low puts circuit rib post distributing track switch base structure.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, current both domestic and external studies into
The most less, the circuit minority especially of operation is opened in the whole world.The most only in March, 2005, Japan built
Middle low speed magnetic suspension railway comercial operation line-the East Hillside Line of opening and in June, 2014 Korea S open-minded
Middle low speed magnetic suspension railway business operating line.And the middle low speed magnetic suspension traffic of China only has state at present
Anti-University of Science and Technology test wire, Green City Mountain test wire, Tangshan experiment line, but do not put into effect, and all
Based on elevated structure, the rarely seen research about rolling stock section's switch area basis and application.
In wheel rail high speed railway, in rolling stock section, train lane change is realized by switch machine, and train is at a high speed
By time relatively big to the impact of track switch, generally make track switch be arranged in soil rigidity during design relatively uniform
Position is to reduce the impact to track switch as far as possible, thus reduces maintenance.It is different from wheel track railway switch,
Middle low speed magnetic suspension is owing to taking the special mode embracing rail operation, and turnout junction girder is passed through in magnetic-levitation train lane change
The low circuit support rail beam drop-over of putting connected after unitary rotation certain angle and with it realizes.Compared to wheel track
Railway, turnout junction girder realize rotating to its undertake pressure, draw, the basis of the complicated loads such as curved, torsion will
Asking higher, turnout junction girder rotates and easily makes turnout junction girder infrastructure produce inhomogeneous deformation, affects time serious
The comfortableness of magnetic-levitation train and normal lane change.
Summary of the invention
For disadvantages described above or the Improvement requirement of prior art, the invention provides a kind of medium-and low-speed maglev
Low putting circuit rib post distributing track switch base structure, this structure should meet turnout junction girder in rotation process
Because foundation insufficient rigidity produces excessive deformation, to meet, magnetic floating traffic engineering truck section is low does not puts circuit
The intensity on turnout junction girder basis, long-time stability requirement, turnout junction girder to be met basis is low simultaneously puts circuit
It is strong that foundation treatment mode can ensure that rigidity and sedimentation meet requirement, good economy performance and construction quality controllability.
For achieving the above object, it is proposed, according to the invention, provide that a kind of medium-and low-speed maglev is low puts circuit track switch
Base structure, it is characterised in that include switch area basement process Reinforced Concrete Raft plate, reinforced concrete
Soil turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile, steel plate and pre-embedded bolt, wherein,
Described switch area basement process Reinforced Concrete Raft plate level is arranged, and its bottom face arranges many institutes
State reinforced concrete bored pile, its top end face is fixedly installed multiple described armored concrete track switch
Beam bar shaped rib column foundation, described armored concrete turnout junction girder bar shaped rib column foundation, reinforced concrete drilling
Bored concrete pile and Reinforced Concrete Raft plate collectively form rigidity load-carrying construction, to undertake the pressure of turnout junction girder transmission
Power, pulling force, moment of flexure and moment of torsion;
Described reinforced concrete bored pile stretches into supporting course, to reduce track switch after soft stratum
Beam deformation in rotation process;
The quantity of described steel plate is multiple, and each steel plate is solid by multiple described pre-embedded bolts respectively
Dingan County is contained in the top of an armored concrete turnout junction girder bar shaped rib column foundation, for connecting turnout beam.
Preferably, described transition section structure includes two blocks of switch area basement process Reinforced Concrete Raft plates,
And the middle reinforced concrete that this two blocks of switch area basement process Reinforced Concrete Raft plates are linked together
Soil valve plate, the thickness of described middle armored concrete valve plate is less than each described switch area basement process steel
The thickness of reinforced concrete raft plate, and the bottom face of described middle armored concrete valve plate downwardly extended
Middle reinforced concrete bored pile, its top end face is provided with armored concrete turnout junction girder bar shaped rib post
Basis, the top end face of described armored concrete turnout junction girder bar shaped rib column foundation is connected by pre-embedded bolt to be had
Steel plate.
Preferably, middle reinforced concrete bored pile on described middle armored concrete valve plate
The reinforced concrete drilling perfusion that length is not more than on described switch area basement process Reinforced Concrete Raft plate
The length of stake.
In general, by the contemplated above technical scheme of the present invention compared with prior art, it is possible to
Obtain following beneficial effect:
(1) the armored concrete turnout junction girder bar shaped rib column foundation bottom ground of the present invention uses intensity and whole
The reinforced concrete bored pile that body is good+Reinforced Concrete Raft plate structure is reinforced, reinforced concrete drill
Between hole pouring pile, Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation, rigidity is even
Connect, in order to undertake turnout junction girder transmission pressure, draw, the Complicated Loads such as curved, torsion, bar shaped rib base for post simultaneously
The size of plinth and arrangement of reinforcement rotate according to turnout junction girder, slide and the requirement of load etc. determines, pile foundation
Stretch into reliable supporting course through soft stratum, it is ensured that turnout junction girder in rotation process not because of foundation
Insufficient rigidity produces excessive deformation, meets the turnout junction girder requirement to underlying strength Yu stability.
(2) present invention uses reinforced concrete bored pile to reinforce with Reinforced Concrete Raft plate, according to
Pressure that top turnout junction girder bar shaped rib column foundation is born, draw, the difference condition of curved, torsion etc. can under
Portion's Reinforced Concrete Raft plate carries out the design of subregion thickness and arranges build joint disconnection simultaneously in suitable position,
And be adjusted the stake of the reinforced concrete bored pile of its underpart is long, the most both can ensure that rigidity
Meet requirement with sedimentation, reduce settlement difference and temperature stress, and compare whole employing same thickness
Reinforced Concrete Raft plate and the long reinforced concrete bored pile economy of same stake are more preferable.
Accompanying drawing explanation
Fig. 1 is the schematic longitudinal section of the present invention;
Fig. 2 is the structural representation of the present invention;
Fig. 3 is the structure chart that in the present invention, pre-embedded bolt is arranged on turnout junction girder bar shaped rib column foundation.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing
And embodiment, the present invention is further elaborated.Should be appreciated that described herein specifically
Embodiment only in order to explain the present invention, is not intended to limit the present invention.Additionally, it is disclosed below
Just may be used as long as technical characteristic involved in each embodiment of the present invention does not constitutes conflict each other
To be mutually combined.
With reference to Fig. 1~Fig. 3, a kind of medium-and low-speed maglev is low puts circuit rib post distributing track switch base structure,
It is characterized in that, including switch area basement process Reinforced Concrete Raft plate 2, armored concrete turnout junction girder bar
Shape rib column foundation 1, reinforced concrete bored pile 3, steel plate and pre-embedded bolt 4, wherein,
Described switch area basement process Reinforced Concrete Raft plate 2 is horizontally disposed with, and its bottom face arranges many
Described reinforced concrete bored pile 3, its top end face is fixedly installed multiple described reinforced concrete dirt road
Trouble beam bar shaped rib column foundation 1, described armored concrete turnout junction girder bar shaped rib column foundation 1, armored concrete
Cast-in-situ bored pile 3 and Reinforced Concrete Raft plate 2 collectively form rigidity load-carrying construction, to undertake turnout junction girder
Pressure, pulling force, moment of flexure and the moment of torsion of transmission;
Described reinforced concrete bored pile 3 stretches into supporting course 6 after soft stratum 5, to reduce
Turnout junction girder deformation in rotation process;
The quantity of described steel plate is multiple, and each steel plate is respectively by multiple described pre-embedded bolts 4
It is fixedly mounted on the top of an armored concrete turnout junction girder bar shaped rib column foundation 1, for connecting turnout
Beam.
Further, described transition section structure includes two blocks of switch area basement process Reinforced Concrete Raft plates 2,
And the middle reinforcing bar that these two blocks of switch area basement process Reinforced Concrete Raft plates 2 link together is mixed
Solidifying soil valve plate, the thickness of described middle armored concrete valve plate is less than each described switch area basement process
The thickness of Reinforced Concrete Raft plate 2, and the bottom face of described middle armored concrete valve plate is to downward
Stretching and have middle reinforced concrete bored pile 3, its top end face is provided with armored concrete turnout junction girder bar shaped
Rib column foundation 1, the top end face of described armored concrete turnout junction girder bar shaped rib column foundation 1 passes through pre-embedded bolt
4 connections have steel plate.
Further, the middle reinforced concrete bored pile 3 on described middle armored concrete valve plate
Length be not more than the reinforced concrete drilling on described switch area basement process Reinforced Concrete Raft plate 2
The length of bored concrete pile 3.
This structure reinforcing bars concrete turnout junction girder bar shaped rib column foundation 1 bottom ground uses intensity and globality
Good reinforced concrete bored pile 3 is reinforced with Reinforced Concrete Raft plate 2, reinforced concrete drilling
Use between bored concrete pile 3, Reinforced Concrete Raft plate 2, armored concrete turnout junction girder bar shaped rib column foundation 1
Be rigidly connected, in order to undertake turnout junction girder transmission pressure, draw, the Complicated Loads such as curved, torsion, bar shaped simultaneously
The size of rib column foundation 1 and arrangement of reinforcement rotate according to turnout junction girder, slide and the requirement of load etc. comes really
Fixed, reinforced concrete bored pile 3 stretches into reliable supporting course 6 through soft stratum 5, it is ensured that track switch
Beam does not produces excessive deformation because of foundation insufficient rigidity in rotation process, meets turnout junction girder to basis
The requirement of stabilized soil pavement.Secondly, the low circuit ground of putting of turnout junction girder uses reinforced concrete drilling to fill
Note stake 3 is reinforced with Reinforced Concrete Raft plate 2, is born according to top turnout junction girder bar shaped rib column foundation 1
Pressure, draw, that the difference condition of curved, torsion etc. can carry out subregion to lower rebar concrete raft plate 2 is thick
Degree design arranges build joint simultaneously and disconnects in suitable position, and the reinforced concrete drilling to its underpart
The stake of bored concrete pile 3 is long to be adjusted, and the most both can ensure that rigidity and sedimentation meet requirement, has reduced sedimentation
Difference and temperature stress, and compare and all use the Reinforced Concrete Raft plates of same thickness and same stake long
Reinforced concrete bored pile economy more preferable.
Its specific implementation process is as follows:
(1) place is carried out compacting leveling, construction switch area reinforced concrete bored pile and reinforcing bar
Concrete raft plate, reinforced concrete bored pile reinforcing bar is connected with raft plate cast, cuts reinforced concrete
Earth boring auger hole pouring pile top concrete, retains the reinforcing bar being connected with raft plate.
(2) colligation raft slab muscle, pours assembling reinforcement concrete turnout junction girder bar shaped before raft board concrete
The reinforcing bar of rib column foundation, and formwork erection pours to the above certain altitude in strip footing bottom surface, arranges simultaneously and executes
Work seam ensures its bonding strength, and avoids secondary to be cast at raft plate and bar shaped rib column foundation contact surface
Form unfavorable structural plane
(3) pre-embedded bolt, pours strip footing concrete, treats switch area Reinforced Concrete Raft plate, bar
After shape rib column foundation reaches requirement of strength, form removal.
(4) turnout junction girder lifting is carried out,.
As it will be easily appreciated by one skilled in the art that and the foregoing is only presently preferred embodiments of the present invention,
Not in order to limit the present invention, all made within the spirit and principles in the present invention any amendment, etc.
With replacement and improvement etc., should be included within the scope of the present invention.
Claims (3)
1. a medium-and low-speed maglev is low puts circuit rib post distributing track switch base structure, it is characterised in that
Including switch area basement process Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation,
Reinforced concrete bored pile, steel plate and pre-embedded bolt, wherein,
Described switch area basement process Reinforced Concrete Raft plate level is arranged, and its bottom face arranges many institutes
State reinforced concrete bored pile, its top end face is fixedly installed multiple described armored concrete track switch
Beam bar shaped rib column foundation, described armored concrete turnout junction girder bar shaped rib column foundation, reinforced concrete drilling
Bored concrete pile and Reinforced Concrete Raft plate collectively form rigidity load-carrying construction, to undertake the pressure of turnout junction girder transmission
Power, pulling force, moment of flexure and moment of torsion;
Described reinforced concrete bored pile stretches into supporting course, to reduce track switch after soft stratum
Beam deformation in rotation process;
The quantity of described steel plate is multiple, and each steel plate is solid by multiple described pre-embedded bolts respectively
Dingan County is contained in the top of an armored concrete turnout junction girder bar shaped rib column foundation, for connecting turnout beam.
It is the most according to claim 1 that a kind of medium-and low-speed maglev is low puts circuit rib post distributing railroad turnout base
Plinth structure, it is characterised in that described track switch base structure includes that two blocks of switch area basement process reinforcing bars mix
Solidifying soil raft plate, and these two blocks of switch area basement process Reinforced Concrete Raft plates are linked together
Between armored concrete valve plate, the thickness of described middle armored concrete valve plate be less than each described switch area
The thickness of basement process Reinforced Concrete Raft plate, and the bottom face of described middle armored concrete valve plate
Arranging reinforced concrete bored pile, its top end face is provided with armored concrete turnout junction girder bar shaped rib post
Basis, the top end face of described armored concrete turnout junction girder bar shaped rib column foundation is connected by pre-embedded bolt to be had
Steel plate.
It is the most according to claim 1 that a kind of medium-and low-speed maglev is low puts circuit rib post distributing railroad turnout base
Plinth structure, it is characterised in that the middle reinforced concrete drilling on described middle armored concrete valve plate
The length of bored concrete pile is not more than the armored concrete on described switch area basement process Reinforced Concrete Raft plate
The length of cast-in-situ bored pile.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610284837.2A CN105951537B (en) | 2016-04-29 | 2016-04-29 | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure |
PCT/CN2017/077334 WO2017185905A1 (en) | 2016-04-29 | 2017-03-20 | Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610284837.2A CN105951537B (en) | 2016-04-29 | 2016-04-29 | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105951537A true CN105951537A (en) | 2016-09-21 |
CN105951537B CN105951537B (en) | 2017-10-03 |
Family
ID=56913130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610284837.2A Active CN105951537B (en) | 2016-04-29 | 2016-04-29 | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105951537B (en) |
WO (1) | WO2017185905A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017185905A1 (en) * | 2016-04-29 | 2017-11-02 | 中铁第四勘察设计院集团有限公司 | Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line |
CN110258221A (en) * | 2019-06-24 | 2019-09-20 | 中铁第四勘察设计院集团有限公司 | A kind of box frame roadbed |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108459154B (en) * | 2018-05-16 | 2023-11-03 | 山东省公路桥梁建设有限公司 | Concrete wet joint test bed with constraint function and test method |
CN114753401B (en) * | 2022-04-08 | 2023-05-26 | 中铁十九局集团第五工程有限公司 | Construction method for tunnel bottom karst cave treatment |
CN115506362B (en) * | 2022-09-02 | 2023-07-25 | 中国建筑第二工程局有限公司 | Mucky soil deep and shallow foundation pit supporting structure and construction method thereof |
CN115478553A (en) * | 2022-09-23 | 2022-12-16 | 中国五冶集团有限公司 | Raft plate pours shaping and uses support frame |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005273296A (en) * | 2004-03-25 | 2005-10-06 | Geotop Corp | Foundation structure |
CN1876970A (en) * | 2005-06-10 | 2006-12-13 | 李仁平 | Long and short piles square units combination type combined pile foundation |
JP4445341B2 (en) * | 2004-08-04 | 2010-04-07 | 中村物産有限会社 | Building foundation and its construction method |
CN201713742U (en) * | 2010-05-14 | 2011-01-19 | 中铁第一勘察设计院集团有限公司 | Buried type continuous pile-board structure |
CN202595756U (en) * | 2012-03-31 | 2012-12-12 | 上海市电力公司 | Piled raft foundation structure of narrow-base power transmission tower |
CN203795451U (en) * | 2014-02-19 | 2014-08-27 | 中铁第四勘察设计院集团有限公司 | Strengthening and reinforcing structure for defect precast driven pile foundation |
CN104480810A (en) * | 2014-12-11 | 2015-04-01 | 中铁第四勘察设计院集团有限公司 | Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205617160U (en) * | 2016-04-29 | 2016-10-05 | 中铁第四勘察设计院集团有限公司 | Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation |
CN105951537B (en) * | 2016-04-29 | 2017-10-03 | 中铁第四勘察设计院集团有限公司 | A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure |
-
2016
- 2016-04-29 CN CN201610284837.2A patent/CN105951537B/en active Active
-
2017
- 2017-03-20 WO PCT/CN2017/077334 patent/WO2017185905A1/en active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005273296A (en) * | 2004-03-25 | 2005-10-06 | Geotop Corp | Foundation structure |
JP4445341B2 (en) * | 2004-08-04 | 2010-04-07 | 中村物産有限会社 | Building foundation and its construction method |
CN1876970A (en) * | 2005-06-10 | 2006-12-13 | 李仁平 | Long and short piles square units combination type combined pile foundation |
CN201713742U (en) * | 2010-05-14 | 2011-01-19 | 中铁第一勘察设计院集团有限公司 | Buried type continuous pile-board structure |
CN202595756U (en) * | 2012-03-31 | 2012-12-12 | 上海市电力公司 | Piled raft foundation structure of narrow-base power transmission tower |
CN203795451U (en) * | 2014-02-19 | 2014-08-27 | 中铁第四勘察设计院集团有限公司 | Strengthening and reinforcing structure for defect precast driven pile foundation |
CN104480810A (en) * | 2014-12-11 | 2015-04-01 | 中铁第四勘察设计院集团有限公司 | Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017185905A1 (en) * | 2016-04-29 | 2017-11-02 | 中铁第四勘察设计院集团有限公司 | Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line |
CN110258221A (en) * | 2019-06-24 | 2019-09-20 | 中铁第四勘察设计院集团有限公司 | A kind of box frame roadbed |
Also Published As
Publication number | Publication date |
---|---|
WO2017185905A1 (en) | 2017-11-02 |
CN105951537B (en) | 2017-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105951537A (en) | Rib column distributed turnout foundation structure of middle-low speed magnetic levitation low-arranged line | |
CN105887587A (en) | Turnout zone and non-turnout zone transition section structure for medium and low-speed magnetic levitation low implantation line | |
CN106168053A (en) | Y shape pillar is used to be combined the structure at design large span deep buried metro station with uplift pile | |
CN106049201A (en) | Medium and low speed maglev traffic engineering low line solid bearing-trail beam structure and construction method thereof | |
CN105672144B (en) | A kind of medium-small span bridges are reinforced with spelling wide structure and its construction method | |
CN105133493B (en) | Embedded track structure suitable for middle-span and small-span bridge and construction method | |
CN206157496U (en) | Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling | |
CN205557205U (en) | Low circuit switch area NOT AND switch area changeover portion structure of putting of moderate -low speed magnetic levitation | |
CN205617160U (en) | Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation | |
CN206157489U (en) | Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation framing type support rail girder construction | |
CN106283938B (en) | The compound framing type support rail girder construction of medium-and low-speed maglev two-wire excavation location pile foundation | |
CN205893830U (en) | Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering | |
CN205259051U (en) | Railway existing line large -span crossbeam system of making somebody a mere figurehead | |
CN208184752U (en) | The bottom stab ilization system in rich water soft stratum heavy haul railway tunnel | |
CN208650092U (en) | A kind of peg board retaining wall with steel reinforced concrete rib | |
CN206127756U (en) | Moderate -low speed magnetic levitation traffic engineering double -line excavation location detached pier column type support rail girder construction | |
CN206219896U (en) | Medium-and low-speed maglev traffic engineering two-wire excavation location pile foundation joist type support rail girder construction | |
CN206157494U (en) | Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction | |
CN206157486U (en) | Moderate -low speed magnetic levitation traffic engineering single line excavation location pile foundation combined type support rail girder construction | |
CN206157480U (en) | Moderate -low speed magnetic levitation traffic engineering double -line excavation location pile foundation combined type support rail girder construction | |
CN204780566U (en) | Eliminate either end of a bridge and jump bridge ground connection segment structure of car | |
CN206157495U (en) | Moderate -low speed magnetic levitation double -line compound framing type support rail girder construction of location pile foundation of filling | |
CN206127737U (en) | Moderate -low speed magnetic levitation traffic engineering single line excavation location detached pier column type support rail girder construction | |
CN206127757U (en) | Moderate -low speed magnetic levitation single line location detached pier column type support rail roof beam transition section structure that fills | |
CN206157476U (en) | Compound framing type support rail girder construction of moderate -low speed magnetic levitation double -line excavation location pile foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |