CN105951537A - Rib column distributed turnout foundation structure of middle-low speed magnetic levitation low-arranged line - Google Patents

Rib column distributed turnout foundation structure of middle-low speed magnetic levitation low-arranged line Download PDF

Info

Publication number
CN105951537A
CN105951537A CN201610284837.2A CN201610284837A CN105951537A CN 105951537 A CN105951537 A CN 105951537A CN 201610284837 A CN201610284837 A CN 201610284837A CN 105951537 A CN105951537 A CN 105951537A
Authority
CN
China
Prior art keywords
reinforced concrete
turnout
concrete
low
rib column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610284837.2A
Other languages
Chinese (zh)
Other versions
CN105951537B (en
Inventor
郭建湖
姜鹰
李小和
赵新益
姚洪锡
李巍
王勇刚
杨辉建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610284837.2A priority Critical patent/CN105951537B/en
Publication of CN105951537A publication Critical patent/CN105951537A/en
Priority to PCT/CN2017/077334 priority patent/WO2017185905A1/en
Application granted granted Critical
Publication of CN105951537B publication Critical patent/CN105951537B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/08Deep or vertical foundation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Abstract

The invention discloses a rib column distributed turnout foundation structure for a middle-low speed magnetic levitation low-arranged line. The rib column distributed turnout foundation structure for the middle-low speed magnetic levitation low-arranged line comprises turnout zone foundation treatment reinforced concrete rafts, reinforced concrete turnout beam bar-type rib column foundations, reinforced concrete cast-in place piles, steel plates and embedded bolts. The turnout zone foundation treatment reinforced concrete rafts are arranged horizontally, and the multiple reinforced concrete cast-in place piles are arranged at the bottom end faces of the turnout zone foundation treatment reinforced concrete rafts; the reinforced concrete cast-in place piles penetrate a soft stratum to extend into a bearing stratum, to decrease the deformation of turnout beams in the rotation process. The rib column distributed turnout foundation structure for the middle-low speed magnetic levitation low-arranged line ensures that the turnout beams are not deformed greatly in the rotation process due to inadequate foundation stiffness, and meets the requirements for foundation strength and stability by the turnout beams.

Description

It is a kind of that medium-and low-speed maglev is low puts circuit rib post distributing track switch base structure
Technical field
The invention belongs to that medium-and low-speed maglev traffic engineering is low puts line area, more particularly, to one Medium-and low-speed maglev is low puts circuit rib post distributing track switch base structure.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, current both domestic and external studies into The most less, the circuit minority especially of operation is opened in the whole world.The most only in March, 2005, Japan built Middle low speed magnetic suspension railway comercial operation line-the East Hillside Line of opening and in June, 2014 Korea S open-minded Middle low speed magnetic suspension railway business operating line.And the middle low speed magnetic suspension traffic of China only has state at present Anti-University of Science and Technology test wire, Green City Mountain test wire, Tangshan experiment line, but do not put into effect, and all Based on elevated structure, the rarely seen research about rolling stock section's switch area basis and application.
In wheel rail high speed railway, in rolling stock section, train lane change is realized by switch machine, and train is at a high speed By time relatively big to the impact of track switch, generally make track switch be arranged in soil rigidity during design relatively uniform Position is to reduce the impact to track switch as far as possible, thus reduces maintenance.It is different from wheel track railway switch, Middle low speed magnetic suspension is owing to taking the special mode embracing rail operation, and turnout junction girder is passed through in magnetic-levitation train lane change The low circuit support rail beam drop-over of putting connected after unitary rotation certain angle and with it realizes.Compared to wheel track Railway, turnout junction girder realize rotating to its undertake pressure, draw, the basis of the complicated loads such as curved, torsion will Asking higher, turnout junction girder rotates and easily makes turnout junction girder infrastructure produce inhomogeneous deformation, affects time serious The comfortableness of magnetic-levitation train and normal lane change.
Summary of the invention
For disadvantages described above or the Improvement requirement of prior art, the invention provides a kind of medium-and low-speed maglev Low putting circuit rib post distributing track switch base structure, this structure should meet turnout junction girder in rotation process Because foundation insufficient rigidity produces excessive deformation, to meet, magnetic floating traffic engineering truck section is low does not puts circuit The intensity on turnout junction girder basis, long-time stability requirement, turnout junction girder to be met basis is low simultaneously puts circuit It is strong that foundation treatment mode can ensure that rigidity and sedimentation meet requirement, good economy performance and construction quality controllability.
For achieving the above object, it is proposed, according to the invention, provide that a kind of medium-and low-speed maglev is low puts circuit track switch Base structure, it is characterised in that include switch area basement process Reinforced Concrete Raft plate, reinforced concrete Soil turnout junction girder bar shaped rib column foundation, reinforced concrete bored pile, steel plate and pre-embedded bolt, wherein,
Described switch area basement process Reinforced Concrete Raft plate level is arranged, and its bottom face arranges many institutes State reinforced concrete bored pile, its top end face is fixedly installed multiple described armored concrete track switch Beam bar shaped rib column foundation, described armored concrete turnout junction girder bar shaped rib column foundation, reinforced concrete drilling Bored concrete pile and Reinforced Concrete Raft plate collectively form rigidity load-carrying construction, to undertake the pressure of turnout junction girder transmission Power, pulling force, moment of flexure and moment of torsion;
Described reinforced concrete bored pile stretches into supporting course, to reduce track switch after soft stratum Beam deformation in rotation process;
The quantity of described steel plate is multiple, and each steel plate is solid by multiple described pre-embedded bolts respectively Dingan County is contained in the top of an armored concrete turnout junction girder bar shaped rib column foundation, for connecting turnout beam.
Preferably, described transition section structure includes two blocks of switch area basement process Reinforced Concrete Raft plates, And the middle reinforced concrete that this two blocks of switch area basement process Reinforced Concrete Raft plates are linked together Soil valve plate, the thickness of described middle armored concrete valve plate is less than each described switch area basement process steel The thickness of reinforced concrete raft plate, and the bottom face of described middle armored concrete valve plate downwardly extended Middle reinforced concrete bored pile, its top end face is provided with armored concrete turnout junction girder bar shaped rib post Basis, the top end face of described armored concrete turnout junction girder bar shaped rib column foundation is connected by pre-embedded bolt to be had Steel plate.
Preferably, middle reinforced concrete bored pile on described middle armored concrete valve plate The reinforced concrete drilling perfusion that length is not more than on described switch area basement process Reinforced Concrete Raft plate The length of stake.
In general, by the contemplated above technical scheme of the present invention compared with prior art, it is possible to Obtain following beneficial effect:
(1) the armored concrete turnout junction girder bar shaped rib column foundation bottom ground of the present invention uses intensity and whole The reinforced concrete bored pile that body is good+Reinforced Concrete Raft plate structure is reinforced, reinforced concrete drill Between hole pouring pile, Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation, rigidity is even Connect, in order to undertake turnout junction girder transmission pressure, draw, the Complicated Loads such as curved, torsion, bar shaped rib base for post simultaneously The size of plinth and arrangement of reinforcement rotate according to turnout junction girder, slide and the requirement of load etc. determines, pile foundation Stretch into reliable supporting course through soft stratum, it is ensured that turnout junction girder in rotation process not because of foundation Insufficient rigidity produces excessive deformation, meets the turnout junction girder requirement to underlying strength Yu stability.
(2) present invention uses reinforced concrete bored pile to reinforce with Reinforced Concrete Raft plate, according to Pressure that top turnout junction girder bar shaped rib column foundation is born, draw, the difference condition of curved, torsion etc. can under Portion's Reinforced Concrete Raft plate carries out the design of subregion thickness and arranges build joint disconnection simultaneously in suitable position, And be adjusted the stake of the reinforced concrete bored pile of its underpart is long, the most both can ensure that rigidity Meet requirement with sedimentation, reduce settlement difference and temperature stress, and compare whole employing same thickness Reinforced Concrete Raft plate and the long reinforced concrete bored pile economy of same stake are more preferable.
Accompanying drawing explanation
Fig. 1 is the schematic longitudinal section of the present invention;
Fig. 2 is the structural representation of the present invention;
Fig. 3 is the structure chart that in the present invention, pre-embedded bolt is arranged on turnout junction girder bar shaped rib column foundation.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing And embodiment, the present invention is further elaborated.Should be appreciated that described herein specifically Embodiment only in order to explain the present invention, is not intended to limit the present invention.Additionally, it is disclosed below Just may be used as long as technical characteristic involved in each embodiment of the present invention does not constitutes conflict each other To be mutually combined.
With reference to Fig. 1~Fig. 3, a kind of medium-and low-speed maglev is low puts circuit rib post distributing track switch base structure, It is characterized in that, including switch area basement process Reinforced Concrete Raft plate 2, armored concrete turnout junction girder bar Shape rib column foundation 1, reinforced concrete bored pile 3, steel plate and pre-embedded bolt 4, wherein,
Described switch area basement process Reinforced Concrete Raft plate 2 is horizontally disposed with, and its bottom face arranges many Described reinforced concrete bored pile 3, its top end face is fixedly installed multiple described reinforced concrete dirt road Trouble beam bar shaped rib column foundation 1, described armored concrete turnout junction girder bar shaped rib column foundation 1, armored concrete Cast-in-situ bored pile 3 and Reinforced Concrete Raft plate 2 collectively form rigidity load-carrying construction, to undertake turnout junction girder Pressure, pulling force, moment of flexure and the moment of torsion of transmission;
Described reinforced concrete bored pile 3 stretches into supporting course 6 after soft stratum 5, to reduce Turnout junction girder deformation in rotation process;
The quantity of described steel plate is multiple, and each steel plate is respectively by multiple described pre-embedded bolts 4 It is fixedly mounted on the top of an armored concrete turnout junction girder bar shaped rib column foundation 1, for connecting turnout Beam.
Further, described transition section structure includes two blocks of switch area basement process Reinforced Concrete Raft plates 2, And the middle reinforcing bar that these two blocks of switch area basement process Reinforced Concrete Raft plates 2 link together is mixed Solidifying soil valve plate, the thickness of described middle armored concrete valve plate is less than each described switch area basement process The thickness of Reinforced Concrete Raft plate 2, and the bottom face of described middle armored concrete valve plate is to downward Stretching and have middle reinforced concrete bored pile 3, its top end face is provided with armored concrete turnout junction girder bar shaped Rib column foundation 1, the top end face of described armored concrete turnout junction girder bar shaped rib column foundation 1 passes through pre-embedded bolt 4 connections have steel plate.
Further, the middle reinforced concrete bored pile 3 on described middle armored concrete valve plate Length be not more than the reinforced concrete drilling on described switch area basement process Reinforced Concrete Raft plate 2 The length of bored concrete pile 3.
This structure reinforcing bars concrete turnout junction girder bar shaped rib column foundation 1 bottom ground uses intensity and globality Good reinforced concrete bored pile 3 is reinforced with Reinforced Concrete Raft plate 2, reinforced concrete drilling Use between bored concrete pile 3, Reinforced Concrete Raft plate 2, armored concrete turnout junction girder bar shaped rib column foundation 1 Be rigidly connected, in order to undertake turnout junction girder transmission pressure, draw, the Complicated Loads such as curved, torsion, bar shaped simultaneously The size of rib column foundation 1 and arrangement of reinforcement rotate according to turnout junction girder, slide and the requirement of load etc. comes really Fixed, reinforced concrete bored pile 3 stretches into reliable supporting course 6 through soft stratum 5, it is ensured that track switch Beam does not produces excessive deformation because of foundation insufficient rigidity in rotation process, meets turnout junction girder to basis The requirement of stabilized soil pavement.Secondly, the low circuit ground of putting of turnout junction girder uses reinforced concrete drilling to fill Note stake 3 is reinforced with Reinforced Concrete Raft plate 2, is born according to top turnout junction girder bar shaped rib column foundation 1 Pressure, draw, that the difference condition of curved, torsion etc. can carry out subregion to lower rebar concrete raft plate 2 is thick Degree design arranges build joint simultaneously and disconnects in suitable position, and the reinforced concrete drilling to its underpart The stake of bored concrete pile 3 is long to be adjusted, and the most both can ensure that rigidity and sedimentation meet requirement, has reduced sedimentation Difference and temperature stress, and compare and all use the Reinforced Concrete Raft plates of same thickness and same stake long Reinforced concrete bored pile economy more preferable.
Its specific implementation process is as follows:
(1) place is carried out compacting leveling, construction switch area reinforced concrete bored pile and reinforcing bar Concrete raft plate, reinforced concrete bored pile reinforcing bar is connected with raft plate cast, cuts reinforced concrete Earth boring auger hole pouring pile top concrete, retains the reinforcing bar being connected with raft plate.
(2) colligation raft slab muscle, pours assembling reinforcement concrete turnout junction girder bar shaped before raft board concrete The reinforcing bar of rib column foundation, and formwork erection pours to the above certain altitude in strip footing bottom surface, arranges simultaneously and executes Work seam ensures its bonding strength, and avoids secondary to be cast at raft plate and bar shaped rib column foundation contact surface Form unfavorable structural plane
(3) pre-embedded bolt, pours strip footing concrete, treats switch area Reinforced Concrete Raft plate, bar After shape rib column foundation reaches requirement of strength, form removal.
(4) turnout junction girder lifting is carried out,.
As it will be easily appreciated by one skilled in the art that and the foregoing is only presently preferred embodiments of the present invention, Not in order to limit the present invention, all made within the spirit and principles in the present invention any amendment, etc. With replacement and improvement etc., should be included within the scope of the present invention.

Claims (3)

1. a medium-and low-speed maglev is low puts circuit rib post distributing track switch base structure, it is characterised in that Including switch area basement process Reinforced Concrete Raft plate, armored concrete turnout junction girder bar shaped rib column foundation, Reinforced concrete bored pile, steel plate and pre-embedded bolt, wherein,
Described switch area basement process Reinforced Concrete Raft plate level is arranged, and its bottom face arranges many institutes State reinforced concrete bored pile, its top end face is fixedly installed multiple described armored concrete track switch Beam bar shaped rib column foundation, described armored concrete turnout junction girder bar shaped rib column foundation, reinforced concrete drilling Bored concrete pile and Reinforced Concrete Raft plate collectively form rigidity load-carrying construction, to undertake the pressure of turnout junction girder transmission Power, pulling force, moment of flexure and moment of torsion;
Described reinforced concrete bored pile stretches into supporting course, to reduce track switch after soft stratum Beam deformation in rotation process;
The quantity of described steel plate is multiple, and each steel plate is solid by multiple described pre-embedded bolts respectively Dingan County is contained in the top of an armored concrete turnout junction girder bar shaped rib column foundation, for connecting turnout beam.
It is the most according to claim 1 that a kind of medium-and low-speed maglev is low puts circuit rib post distributing railroad turnout base Plinth structure, it is characterised in that described track switch base structure includes that two blocks of switch area basement process reinforcing bars mix Solidifying soil raft plate, and these two blocks of switch area basement process Reinforced Concrete Raft plates are linked together Between armored concrete valve plate, the thickness of described middle armored concrete valve plate be less than each described switch area The thickness of basement process Reinforced Concrete Raft plate, and the bottom face of described middle armored concrete valve plate Arranging reinforced concrete bored pile, its top end face is provided with armored concrete turnout junction girder bar shaped rib post Basis, the top end face of described armored concrete turnout junction girder bar shaped rib column foundation is connected by pre-embedded bolt to be had Steel plate.
It is the most according to claim 1 that a kind of medium-and low-speed maglev is low puts circuit rib post distributing railroad turnout base Plinth structure, it is characterised in that the middle reinforced concrete drilling on described middle armored concrete valve plate The length of bored concrete pile is not more than the armored concrete on described switch area basement process Reinforced Concrete Raft plate The length of cast-in-situ bored pile.
CN201610284837.2A 2016-04-29 2016-04-29 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure Active CN105951537B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610284837.2A CN105951537B (en) 2016-04-29 2016-04-29 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure
PCT/CN2017/077334 WO2017185905A1 (en) 2016-04-29 2017-03-20 Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610284837.2A CN105951537B (en) 2016-04-29 2016-04-29 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure

Publications (2)

Publication Number Publication Date
CN105951537A true CN105951537A (en) 2016-09-21
CN105951537B CN105951537B (en) 2017-10-03

Family

ID=56913130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610284837.2A Active CN105951537B (en) 2016-04-29 2016-04-29 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure

Country Status (2)

Country Link
CN (1) CN105951537B (en)
WO (1) WO2017185905A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017185905A1 (en) * 2016-04-29 2017-11-02 中铁第四勘察设计院集团有限公司 Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line
CN110258221A (en) * 2019-06-24 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of box frame roadbed

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108459154B (en) * 2018-05-16 2023-11-03 山东省公路桥梁建设有限公司 Concrete wet joint test bed with constraint function and test method
CN114753401B (en) * 2022-04-08 2023-05-26 中铁十九局集团第五工程有限公司 Construction method for tunnel bottom karst cave treatment
CN115506362B (en) * 2022-09-02 2023-07-25 中国建筑第二工程局有限公司 Mucky soil deep and shallow foundation pit supporting structure and construction method thereof
CN115478553A (en) * 2022-09-23 2022-12-16 中国五冶集团有限公司 Raft plate pours shaping and uses support frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005273296A (en) * 2004-03-25 2005-10-06 Geotop Corp Foundation structure
CN1876970A (en) * 2005-06-10 2006-12-13 李仁平 Long and short piles square units combination type combined pile foundation
JP4445341B2 (en) * 2004-08-04 2010-04-07 中村物産有限会社 Building foundation and its construction method
CN201713742U (en) * 2010-05-14 2011-01-19 中铁第一勘察设计院集团有限公司 Buried type continuous pile-board structure
CN202595756U (en) * 2012-03-31 2012-12-12 上海市电力公司 Piled raft foundation structure of narrow-base power transmission tower
CN203795451U (en) * 2014-02-19 2014-08-27 中铁第四勘察设计院集团有限公司 Strengthening and reinforcing structure for defect precast driven pile foundation
CN104480810A (en) * 2014-12-11 2015-04-01 中铁第四勘察设计院集团有限公司 Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205617160U (en) * 2016-04-29 2016-10-05 中铁第四勘察设计院集团有限公司 Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation
CN105951537B (en) * 2016-04-29 2017-10-03 中铁第四勘察设计院集团有限公司 A kind of medium-and low-speed maglev is low to put circuit rib post distributing track switch foundation structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005273296A (en) * 2004-03-25 2005-10-06 Geotop Corp Foundation structure
JP4445341B2 (en) * 2004-08-04 2010-04-07 中村物産有限会社 Building foundation and its construction method
CN1876970A (en) * 2005-06-10 2006-12-13 李仁平 Long and short piles square units combination type combined pile foundation
CN201713742U (en) * 2010-05-14 2011-01-19 中铁第一勘察设计院集团有限公司 Buried type continuous pile-board structure
CN202595756U (en) * 2012-03-31 2012-12-12 上海市电力公司 Piled raft foundation structure of narrow-base power transmission tower
CN203795451U (en) * 2014-02-19 2014-08-27 中铁第四勘察设计院集团有限公司 Strengthening and reinforcing structure for defect precast driven pile foundation
CN104480810A (en) * 2014-12-11 2015-04-01 中铁第四勘察设计院集团有限公司 Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017185905A1 (en) * 2016-04-29 2017-11-02 中铁第四勘察设计院集团有限公司 Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line
CN110258221A (en) * 2019-06-24 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of box frame roadbed

Also Published As

Publication number Publication date
WO2017185905A1 (en) 2017-11-02
CN105951537B (en) 2017-10-03

Similar Documents

Publication Publication Date Title
CN105951537A (en) Rib column distributed turnout foundation structure of middle-low speed magnetic levitation low-arranged line
CN105887587A (en) Turnout zone and non-turnout zone transition section structure for medium and low-speed magnetic levitation low implantation line
CN106168053A (en) Y shape pillar is used to be combined the structure at design large span deep buried metro station with uplift pile
CN106049201A (en) Medium and low speed maglev traffic engineering low line solid bearing-trail beam structure and construction method thereof
CN105672144B (en) A kind of medium-small span bridges are reinforced with spelling wide structure and its construction method
CN105133493B (en) Embedded track structure suitable for middle-span and small-span bridge and construction method
CN206157496U (en) Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling
CN205557205U (en) Low circuit switch area NOT AND switch area changeover portion structure of putting of moderate -low speed magnetic levitation
CN205617160U (en) Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation
CN206157489U (en) Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation framing type support rail girder construction
CN106283938B (en) The compound framing type support rail girder construction of medium-and low-speed maglev two-wire excavation location pile foundation
CN205893830U (en) Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering
CN205259051U (en) Railway existing line large -span crossbeam system of making somebody a mere figurehead
CN208184752U (en) The bottom stab ilization system in rich water soft stratum heavy haul railway tunnel
CN208650092U (en) A kind of peg board retaining wall with steel reinforced concrete rib
CN206127756U (en) Moderate -low speed magnetic levitation traffic engineering double -line excavation location detached pier column type support rail girder construction
CN206219896U (en) Medium-and low-speed maglev traffic engineering two-wire excavation location pile foundation joist type support rail girder construction
CN206157494U (en) Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction
CN206157486U (en) Moderate -low speed magnetic levitation traffic engineering single line excavation location pile foundation combined type support rail girder construction
CN206157480U (en) Moderate -low speed magnetic levitation traffic engineering double -line excavation location pile foundation combined type support rail girder construction
CN204780566U (en) Eliminate either end of a bridge and jump bridge ground connection segment structure of car
CN206157495U (en) Moderate -low speed magnetic levitation double -line compound framing type support rail girder construction of location pile foundation of filling
CN206127737U (en) Moderate -low speed magnetic levitation traffic engineering single line excavation location detached pier column type support rail girder construction
CN206127757U (en) Moderate -low speed magnetic levitation single line location detached pier column type support rail roof beam transition section structure that fills
CN206157476U (en) Compound framing type support rail girder construction of moderate -low speed magnetic levitation double -line excavation location pile foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant