CN205259051U - Railway existing line large -span crossbeam system of making somebody a mere figurehead - Google Patents

Railway existing line large -span crossbeam system of making somebody a mere figurehead Download PDF

Info

Publication number
CN205259051U
CN205259051U CN201521077625.4U CN201521077625U CN205259051U CN 205259051 U CN205259051 U CN 205259051U CN 201521077625 U CN201521077625 U CN 201521077625U CN 205259051 U CN205259051 U CN 205259051U
Authority
CN
China
Prior art keywords
railway line
longeron
downgoing
cantilever beam
railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521077625.4U
Other languages
Chinese (zh)
Inventor
王学峰
魏良
赵阳晨
杨利民
冉国建
赵永锋
白昌富
赵会东
贠庭贵
杨庆峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Third Railway Survey and Design Institute Group Corp
Third Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Third Railway Survey and Design Institute Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Third Railway Survey and Design Institute Group Corp filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201521077625.4U priority Critical patent/CN205259051U/en
Application granted granted Critical
Publication of CN205259051U publication Critical patent/CN205259051U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of the construction is advanced on the existing business line bridges and culverts top of railway, for solving the technical problem that the built on stilts system that adopts the conventionality down at complex geological condition can't satisfy construction requirements, provide a railway existing line large -span crossbeam system of making somebody a mere figurehead, four groups that set up in the up -downgoing railway line outside including the symmetry receive anchor and pressurized stake, cantilever beam, big crossbeam, distribution roof beam, longeron and stub, and every group receives anchor and pressurized stake upper portion to set up a cantilever beam, sets up a big crossbeam on the cantilever beam of the up -downgoing railway line left and right sides, and cantilever beam and big horizontal beam supports department set up the rubber pad, set up the longeron along the two major crossbeams of railway line axis direction on, and longeron and crossbeam greatly intersect the position and set up the distribution roof beam, and the stub setting is in central beam's below greatly. Adopt the utility model provides a more complicated at the geological conditions, under the higher condition of ground water level line, at the railway line unable construction manual hole digging pile of department, adopt conventional built on stilts system can't satisfy construction requirements's technical problem.

Description

The built on stilts system of a kind of Existing Railway Line long-span beam
Technical field
The utility model belongs to the existing Business Line bridge pushing technology of railway field, is specifically related to a kind of railway existingLine long-span beam is maked somebody a mere figurehead system.
Background technology
Both in the top construction of wired bridges and culverts, the built on stilts system of circuit generally adopted artificial digging pile, just beam of stake top erection constructionOr the built on stilts system of 3703 composition railway jacking culvert circuit. But in geological conditions more complicated, under the higher condition of phreatic line,Cannot construct at the railway line place supporting pile (artificial digging pile) of longeron, therefore adopts the built on stilts system of this routine to meetConstruction requirement. The built on stilts system that must design a kind of novelty in order to solve this class problem can meet construction requirement.
Summary of the invention
The utility model is to solve under complex geological condition, to adopt conventional built on stilts system cannot meet construction requirementTechnical problem, provides a kind of Existing Railway Line long-span beam to make somebody a mere figurehead system.
The technical solution adopted in the utility model is as follows:
The built on stilts system of a kind of Existing Railway Line long-span beam, comprises and is symmetricly set on four groups of up-downgoing railway line outsideTension pile and be subject to piling, cantilever beam, cross bearer, distribution beam, longeron and stub, every group of tension pile and arranged by piling top one outstandingArm beam, sets up a cross bearer on the cantilever beam of the up-downgoing railway line left and right sides, and cantilever beam and cross bearer bearing place arrange rubberPad, on downline axis direction two cross bearers, set up longeron, under described up-downgoing railway line, respectively set up two longerons, longeron withCross bearer crossover sites arranges distribution beam, between distribution beam and longeron, rubber support is set, and described stub is arranged in cross bearerThe below of portion.
Be arranged on apart from 7 meters, outside, up-downgoing railway line center by piling, tension pile is arranged on apart from up-downgoing railway line11 meters, outside, center.
Be subject to piling and tension pile stake top to be provided with the fulcrum stake reinforcing bar of fan-shaped layout, described fulcrum stake reinforcing bar stretches into cantilever beamIn.
The stake end of described stub, is set to tubaeform.
The beneficial effects of the utility model: adopt the utility model to solve in geological conditions more complicated, level of ground waterUnder the higher condition of line, the artificial digging pile of cannot constructing at railway line place, adopts conventional built on stilts system cannot meet construction and wantsThe technical problem of asking.
Brief description of the drawings
Fig. 1 is plane of the present utility model; Fig. 2 is side view of the present utility model; Fig. 3 be cantilever beam and tension pile andBe subject to the connection diagram of piling; Fig. 4 is the front view of distribution beam; Fig. 5 is the top view of distribution beam; Fig. 6 is the side-looking of distribution beamFigure; Fig. 7 is along line direction distribution beam layout drawing; Fig. 8 is the I-I cutaway view of Fig. 7; Fig. 9 is interim built on stilts system plane.
In figure: 1-tension pile, 2-is subject to piling, 3-cantilever beam, 4-cross bearer, 5-distribution beam, 6-longeron, 7-stub, 8-props upPoint stake reinforcing bar, 9-rubber support, 10-track, 11-I-steel, 12-top steel plate, 13-bottom steel plate, 14-bolt hole, 15-is littleCrossbeam, 16-is built on stilts fulcrum stake temporarily.
Detailed description of the invention
As shown in Figure 1, 2, a kind of Existing Railway Line long-span beam is maked somebody a mere figurehead system, comprises and is symmetricly set on up-downgoing railwayFour groups of tension piles 1 in line outside and be subject to piling 2, cantilever beam 3, cross bearer 4, distribution beam 5, longeron 6 and stub 7, are arranged by piling 2Apart from 7 meters, up-downgoing railway line center outside, tension pile 1 is arranged on apart from 11 meters, outside, up-downgoing railway line center; Every groupTension pile 1 and be subject to piling 2 tops that one cantilever beam 3 is set, sets up a cross bearer on the cantilever beam 3 of the up-downgoing railway line left and right sides4, cantilever beam 3 arranges rubber blanket with cross bearer bearing place, on downline axis direction two cross bearers 4, sets up longeron 6, described onUnder descending railway line, respectively set up two longerons 6, longeron 6 arranges distribution beam 5 with cross bearer 4 crossover sites, distribution beam 5 and longeron 6Between rubber support is set, described stub 7 is arranged on the below at cross bearer 4 middle parts, stable for ensureing stake position, the stake end of stub 7Be set to tubaeform.
Be subject to 1 top of piling 2 and tension pile to be provided with the fulcrum stake reinforcing bar 8 of fan-shaped layout, described fulcrum stake reinforcing bar 8 stretches into outstandingIn arm beam 3.
Specific construction step of the present utility model and points for attention:
1. tension pile and be subject to pressing pile construction
As shown in Figure 1, 2, arrange four groups of supporting piles at 7m outside uplink and downlink track circuit center, 11m place. Every group byTwo pile compositions, far-end is tension pile 1, plays uplift effect; Near-end is for being subject to piling 2, and the stake end is positioned at supporting course, plays resistance to compression and doesWith. Tension pile 1 and be subject to piling 2 all to adopt small-sized diving drill machine boring to ensure Business Line safety and stability, prevents from affecting traffic safety;Tension pile 1 is 1.25m with being subject to piling 2 diameters, because of geological condition complexity, needs to increase mud balance, ensures that pile lining is stable, lower reinforcing barBefore cage, need hole clearly, after lower complete steel reinforcement cage, need to guarantee that steel reinforcement cage stretches to cantilever beam effective length; Concrete perfusion needs the clear stake end floatingSlag and casting concrete face higher than stake at the bottom of design altitude.
2. Cantilever Beam Construction
As shown in Figure 3, it is long that fulcrum stake reinforcing bar 8 stretches into the interior 1m of cantilever beam 3, fulcrum stake reinforcing bar 8 fan-shaped layouts, tension pile 1 HeBe subject to piling 2 pile bodies to stretch into the interior 15cm of cantilever beam 3, make stake and the abundant combination of cantilever beam 3. Cantilever beam 3 assembling reinforcements, note cantilever portionDivide principal rod on top. Cantilever beam 3 adopts C35 concrete, and top pre-buried cross bearer group stopping means, adopts pre-buried Φ15cmPVC pipe degree of depth 50cm, is wearing large horizontal stroke, after 4 rear insertion channel-section steels, in filling concrete pipe, carries out spacing to circuit.
3. large cross beam
Cross bearer 4 adopts just beam of 24mD type, wears quantity and determines according to the stressed fulcrum quantity in top, and prop up and brings large horizontal stroke out into the open at a placeBeam quantity is 2, and prop up and bring cross bearer quantity out into the open at two places is 4. Before circuit built on stilts rear cross bearer 4 liftings temporarily, on cantilever beam 34800 × 300 × 37mm size rubber bearing is placed at cross bearer bearing place, and the effect one of rubber blanket is insulation, stops ruddinessBand; The 2nd, fulcrum provides buffering. After artificial shoveling finishes, utilize hoist engine (excavator) crane to coordinate and wear cross bearer, wornAfter finishing, cross bearer is bundled into entirety, top has distribution beam to connect.
4. cross bearer middle part stub construction
During Business Line is gone slowly, utilize train interval, carry out manual digging pile construction, survey crew is according to track phase in advanceCorresponding stake position is put out in contraposition, and stake footpath is 1.5m, and stake is long is 2m, and it act as and ensures that cross bearer 4 is stable, reduces mid span moment,Ensure that circuit amount of deflection meets Business Line requirement. At the bottom of 7 of stubs, be set to tubaeformly, ensure that stake position is stable, utilize train interval to digStake, the elevation discrepancy in elevation at the bottom of need guarantee height of pile top and track, guarantees the satisfied cross bearer requirement that wears.
5. the making of distribution beam and installation
Distribution beam is made: as shown in Figure 4,5, 6, adopt the laterally welding side by side of 4 32a I-steel, and at its top and the end6mm steel plate welds respectively in portion, and four jiaos of reserved four diameter 14mm holes, for being connected with cross bearer.
The mounting arrangements of distribution beam: as shown in Figure 7,8, after cross bearer installs, distribution beam is lifted to longeron bearingPlace, position and absolute altitude calibration, utilize four bolts that distribution beam and cross bearer are connected to entirety, also strengthens the whole of cross bearer simultaneouslyBody stability, makes it stressed, power transmission is even. In addition, because setting up distribution beam, the absolute altitude of cross bearer can effectively be reduced, therebyIncrease the Business Line flange of rail to cross bearer and risen poorly, in large cross beam, strengthened safety operation space, improved and worn large horizontal strokeSafety beam coefficient.
6. interim built on stilts beam construction
As shown in Figure 9, before cross bearer 4 is installed, first utilize track blockade point temporarily built on stilts to circuit. Specific construction stepRapid: the long stub of two 2m of constructing respectively in cross bearer 4 both sides, set-point along line direction, as interim built on stilts fulcrum stake 16,Interim built on stilts fulcrum stake 16 adopts manually digging hole deposited reinforced concrete pile. Treat that pile concrete reaches design strength, and check markHigh errorless after, after its intensity reaches requirement pile strength, utilize and block point and wear needle beam 15, after wearing needle beam 15 and completingDirectly just beam is placed temporarily in lifting thereon, and just beam and track sleeper interlocking are fixed and arrange after stopping means temporarily, completeCircuit is temporarily built on stilts, manually cuts the earth afterwards along cross bearer 4 axis directions, forms cross bearer installing hole, is convenient to the peace of cross bearer 4Dress.
7. needle beam and longeron construction
Longeron 6 adopts just beam of 24mD type, before longeron 6 liftings, first should adjust pillow distance. Adjust reinforcing by the spacing of 670mmSleeper pitch in scope, and unnecessary sleeper is extracted out. In the sleeper pitch of adjusting, remove part ballast aggregate and penetrate littleCrossbeam, adopts angle steel S7 location, location needle beam. And at needle beam and the rail contact-making surface pad rubber cushion that insulate well, prevent from causing signalShort circuit, last first-class rail fastening. Before longeron 6 liftings, first place rubber support 9 at distribution beam 5 fulcrum places, top. Longeron 6Lifting needs to utilize " skylight point " construction, and the front application contact net of constructing has a power failure and coordinates, and can start longeron 6 and lift after confirmation power failure.Longeron is installed and is adopted artificial truck crane or the railcar of coordinating to carry out. After longeron hoisted in position, connecting plate, bracket and oblique are installed respectivelyOther connected systems such as bar. Fulcrum place buries longeron anti-creep in advance underground, anti-traversing stopping means, and during ensureing to make somebody a mere figurehead, just beam is steady for D typeFixed.

Claims (4)

1. the built on stilts system of Existing Railway Line long-span beam, is characterized in that: comprise and be symmetricly set on up-downgoing railway lineOutside four groups of tension piles (1) and be subject to piling (2), cantilever beam (3), cross bearer (4), distribution beam (5), longeron (6) and stub(7), every group of tension pile (1) and be subject to piling (2) top one cantilever beam (3) to be set, the cantilever beam of the up-downgoing railway line left and right sides(3) on, set up a cross bearer (4), cantilever beam (3) arranges rubber blanket with cross bearer bearing place, and downline axis direction two is large horizontalOn beam (4), set up longeron (6), respectively set up two longerons (6) under described up-downgoing railway line, longeron (6) intersects with cross bearer (4)Position arranges distribution beam (5), between distribution beam (5) and longeron (6), rubber support (9) is set, and described stub (7) is arranged on large horizontal strokeThe below at beam (4) middle part.
2. the built on stilts system of a kind of Existing Railway Line long-span beam according to claim 1, is characterized in that: be subject to piling(2) be arranged on apart from 7 meters, outside, up-downgoing railway line center, tension pile (1) is arranged on apart from outside, up-downgoing railway line center11 meters.
3. the built on stilts system of a kind of Existing Railway Line long-span beam according to claim 1 and 2, is characterized in that: pressurizedStake (2) and tension pile (1) stake top are provided with the fulcrum stake reinforcing bar (8) of fan-shaped layout, and described fulcrum stake reinforcing bar (8) stretches into cantilever beam(3) in.
4. the built on stilts system of a kind of Existing Railway Line long-span beam according to claim 1 and 2, is characterized in that: described inThe stake end of stub (7), is set to tubaeform.
CN201521077625.4U 2015-12-22 2015-12-22 Railway existing line large -span crossbeam system of making somebody a mere figurehead Active CN205259051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521077625.4U CN205259051U (en) 2015-12-22 2015-12-22 Railway existing line large -span crossbeam system of making somebody a mere figurehead

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521077625.4U CN205259051U (en) 2015-12-22 2015-12-22 Railway existing line large -span crossbeam system of making somebody a mere figurehead

Publications (1)

Publication Number Publication Date
CN205259051U true CN205259051U (en) 2016-05-25

Family

ID=56000589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521077625.4U Active CN205259051U (en) 2015-12-22 2015-12-22 Railway existing line large -span crossbeam system of making somebody a mere figurehead

Country Status (1)

Country Link
CN (1) CN205259051U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239896A (en) * 2018-03-21 2018-07-03 中铁二十三局集团第四工程有限公司 Existing railway Disease Treatment of Foundation Base fixed track usage plan constructing structure and construction method
CN110374018A (en) * 2019-06-17 2019-10-25 中铁六局集团呼和浩特铁路建设有限公司 A kind of combined steel cross bearer sets up multispan just beam track strengthening method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239896A (en) * 2018-03-21 2018-07-03 中铁二十三局集团第四工程有限公司 Existing railway Disease Treatment of Foundation Base fixed track usage plan constructing structure and construction method
CN110374018A (en) * 2019-06-17 2019-10-25 中铁六局集团呼和浩特铁路建设有限公司 A kind of combined steel cross bearer sets up multispan just beam track strengthening method

Similar Documents

Publication Publication Date Title
CN106638663B (en) A kind of Subsidence Area high-voltage power transmission tower strengthening of foundation and whole rectification shift method
CN109778721A (en) Synchronization of jacking up bridge top and the bottom structure carries out the method that bridge increases transformation
CN107620261B (en) Based on the horizontal existing railway track reinforcement means for holding formula just beam
CN105951537A (en) Rib column distributed turnout foundation structure of middle-low speed magnetic levitation low-arranged line
CN102797223B (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN103306295A (en) Rigid frame pile supporting and blocking structure
CN205259051U (en) Railway existing line large -span crossbeam system of making somebody a mere figurehead
CN206157496U (en) Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling
CN105908618B (en) A kind of mountable double-deck transition slab at bridge head structure and construction method
CN106283948B (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail girder construction
CN106869198B (en) Method for reinforcing loose soil subsidence space area by using cross beam to reinforce tower foundation
CN110258221A (en) A kind of box frame roadbed
CN206157483U (en) Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail girder construction of filling
CN113373750B (en) Steep slope high-fill-section roadbed structure and construction method thereof
CN206157489U (en) Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation framing type support rail girder construction
CN106283938B (en) The compound framing type support rail girder construction of medium-and low-speed maglev two-wire excavation location pile foundation
CN206157484U (en) Moderate -low speed magnetic levitation traffic engineering single line location supporting beam of pile foundation formula support rail girder construction of filling
CN210174677U (en) Hard crossing for changing electrified railway into moving
CN103437252B (en) A kind of track bed structure and construction method thereof
CN206157495U (en) Moderate -low speed magnetic levitation double -line compound framing type support rail girder construction of location pile foundation of filling
CN206157490U (en) Moderate -low speed magnetic levitation double -line location supporting beam of pile foundation framing type support rail girder construction of filling
CN106283955B (en) Medium-and low-speed maglev traffic engineering single line embankment location pile foundation joist type support rail girder construction
CN106283969B (en) Medium-and low-speed maglev traffic engineering two-wire excavation location independence pier stud type support rail girder construction
CN206219896U (en) Medium-and low-speed maglev traffic engineering two-wire excavation location pile foundation joist type support rail girder construction
CN206157481U (en) Compound framing type support rail roof beam transition section structure of moderate -low speed magnetic levitation double -line excavation location pile foundation