CN105839546B - A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure - Google Patents

A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure Download PDF

Info

Publication number
CN105839546B
CN105839546B CN201610381238.2A CN201610381238A CN105839546B CN 105839546 B CN105839546 B CN 105839546B CN 201610381238 A CN201610381238 A CN 201610381238A CN 105839546 B CN105839546 B CN 105839546B
Authority
CN
China
Prior art keywords
steel pipe
semicircle
arch
anchor ear
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610381238.2A
Other languages
Chinese (zh)
Other versions
CN105839546A (en
Inventor
岳文军
武亚超
程波
宋大成
王栋
张鹏勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Engineering Co Ltd Of Middle Public Office Of Friendship Four 5th
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
Engineering Co Ltd Of Middle Public Office Of Friendship Four 5th
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering Co Ltd Of Middle Public Office Of Friendship Four 5th, CCCC Fourth Highway Engineering Co Ltd filed Critical Engineering Co Ltd Of Middle Public Office Of Friendship Four 5th
Priority to CN201610381238.2A priority Critical patent/CN105839546B/en
Publication of CN105839546A publication Critical patent/CN105839546A/en
Application granted granted Critical
Publication of CN105839546B publication Critical patent/CN105839546B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Inclined cable-stayed technology more particularly to a kind of steel pipe arch bridge arch rib buckling and hanging mounting structure present invention is mainly used for CFST Arch Bridge main arch rib free cantilever erection.Steel pipe arch bridge main arch steel pipe is provided with anchor ear system, anchor ear system includes two symmetrical semicircle anchor ear units, semicircle anchor ear unit is arranged on upper strata arch rib, semicircle wrapper sheet directly wraps up main arch steel pipe, semicircle wrapper sheet both sides set connecting plate to be bolted two semicircle anchor ears, pin hole is set on connecting plate, and anchor case is connected by pin hole with anchor ear by axis pin, and button lashed cable rope is anchored in anchor case.Installation exercise is simple and convenient, the installation of the interim button point of completion steel pipe arch bridge that can be time saving and energy saving, and avoids and the constructing operations such as lifting lug are welded on main arch rib, reduces residual stress that welding generates etc. and generates the influences such as unbalanced stress to main arch.Have many advantages, such as that reasonable in design, to be conducive to structure safety and stability, easy to operate and construction cost relatively low.

Description

A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure
Technical field
Present invention is mainly used for the Inclined cable-stayed technologies more particularly to one kind of CFST Arch Bridge main arch rib free cantilever erection Steel pipe arch bridge arch rib buckling and hanging mounting structure.
Background technology
With the constantly bringing forth new ideas of span bridge construction technology, the continuous improvement of environmental requirement, across reservoir, navigation river The Large Span Bridges such as stream, precipitous valley are constantly used, and CFST Arch Bridge is exactly wherein to fit to select one of bridge type;Using nothing Stent cantilever button is hung in installation, complicated, construction more, weight super large the steel pipe arch bridges in segment work progress, in main arch rib The form detained temporarily in Inclined cable-stayed system a little plays large effect to the operation in work progress.
The technology of steel tube arch rib segment Inclined cable-stayed mainly has the direct cluster of steel wire rope, welds on main arch steel pipe and hang at present Ear formula carries out welding and completes cantilever installation.It is higher that the construction of steel wire rope direct binding method can generate steel cable sliding security risk, Welded on main arch steel pipe the lifting lug method construction welding structures such as lifting lug and ribbed stiffener main arch rib is caused welding damage, deformation compared with Greatly, dismantle complex.
The content of the invention
The purpose of invention:In order to provide a kind of effect better steel pipe arch bridge arch rib buckling and hanging mounting structure, specific purposes are shown in Multiple substantial technological effects of part are embodied.
In order to reach as above purpose, the present invention adopts the following technical scheme that:
A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure, which is characterized in that steel pipe arch bridge main arch steel pipe is provided with anchor ear system System, anchor ear system include two symmetrical semicircle anchor ear units, and semicircle anchor ear unit is arranged on upper strata arch rib, and semicircle wrapper sheet is direct Main arch steel pipe is wrapped up, semicircle wrapper sheet both sides set connecting plate to be bolted two semicircle anchor ears, and pin is set on connecting plate Anchor case is connected by keyhole, pin hole with anchor ear by axis pin, and button lashed cable rope is anchored in anchor case.
Further technical solution is the present invention, filled rubber gasket between the semicircle wrapper sheet and main arch steel pipe.
Of the invention further technical solution is, three semicircle ribbed stiffeners are set on the semicircle wrapper sheet.
Further technical solution of the invention is that the connecting plate is provided with reinforcing plate with semicircle wrapper sheet junction and is mended By force.
Further technical solution of the invention is, stiffening ring is provided on the outside of the pin hole and carries out reinforcement.
Further technical solution of the invention is, comprising contact platform on the main arch steel pipe, contacts recessed comprising contacting on platform Slot, comprising contact projection on semicircle wrapper sheet, contacting groove and contact projection can dock and fix main arch steel pipe.
Further technical solution of the invention is, comprising clamp groove on the semicircle wrapper sheet, energy in the clamp groove Heat-preservation cotton is clamped, heat-preservation cotton is coated on main arch steel pipe between being distributed in more than one anchor ear system.
Using the present invention of as above technical solution, had the advantages that compared with the prior art:Structure design of the present invention Simply similar to the principle of the anchor ear method of pier stud bent cap construction, structure stress is calculated clearly, rationally, by adjusting anchor case with embracing The articulated position of hoop is deformed arch rib during can hanging arch rib erection to avoid button, and constructing operation only carries out installation exercise It is simple and convenient, the installation of the interim button point of completion steel pipe arch bridge that can be time saving and energy saving, and avoid and welded on main arch rib The constructing operations such as lifting lug reduce residual stress that welding generates etc. and generate the influences such as unbalanced stress to main arch.It is set with structure Meter rationally, be conducive to structure safety and stability, the advantages that easy to operate and construction cost is relatively low.
Description of the drawings
In order to further illustrate the present invention, it is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is monoblock type button point structural texture figure;
Fig. 2 is each unit part drawing;
Fig. 3 is one of main arch steel pipe embodiment;
Fig. 4 can place one of implementation structure of insulation construction for side;
Wherein:1 semicircle wrapper sheet, 2 semicircle ribbed stiffeners, 3 connecting plates, 3-1 connecting plates, 4-1 reinforcing plates, 5 stiffening rings, 6 /Vs Plate, 7 anchor casees, 8 axis pins;9. main arch steel pipe;10. contact platform;11. contact groove;12. clamp groove.
Specific embodiment
The embodiment of the present invention is illustrated below in conjunction with the accompanying drawings, embodiment is not construed as limiting the invention:
A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure, which is characterized in that steel pipe arch bridge main arch steel pipe is provided with anchor ear system System, anchor ear system include two symmetrical semicircle anchor ear units, and semicircle anchor ear unit is arranged on upper strata arch rib, and semicircle wrapper sheet is direct Main arch steel pipe is wrapped up, semicircle wrapper sheet both sides set connecting plate to be bolted two semicircle anchor ears, and pin is set on connecting plate Anchor case is connected by keyhole, pin hole with anchor ear by axis pin, and button lashed cable rope is anchored in anchor case.The technical solution at this place is played Essence technique effect and its realize process be as follows:Structure design of the present invention is simply constructed with the anchor ear method of pier stud bent cap Principle it is similar, structure stress calculates clearly, rationally, by adjusting the articulated position of anchor case and anchor ear, can hang peace to avoid button Arch rib is deformed during dress arch rib, constructing operation only carries out that installation exercise is simple and convenient, completion that can be time saving and energy saving The installation of the interim button point of steel pipe arch bridge, and avoid and the constructing operations such as lifting lug are welded on main arch rib, reduce welding production Raw residual stress etc. generates the influences such as unbalanced stress to main arch.With it is reasonable in design, be conducive to structure safety and stability, behaviour Make the advantages that simple and construction cost is relatively low.
The present invention changes interim suspension centre structural arrangement form in the free cantilever erection construction of present CFST Arch Bridge segment, Security risk when avoiding LFM signal is higher, welding is to the risk of main arch steel pipe damage, solves tearing open after arch rib closure The problems such as division operation is complicated is a kind of monoblock type button point of steel pipe arch bridge arch rib buckling and hanging installation.
As a further improvement, steel pipe arch bridge main arch steel pipe sets two symmetrical semicircle anchor ear units, semicircle anchor ear Unit is arranged on upper strata arch rib, and semicircle anchor ear directly wraps up main arch steel pipe for semicircle wrapper sheet, three semicircles are set on semicircle wrapper sheet Ribbed stiffener, semicircle wrapper sheet both sides set connecting plate to be bolted two semicircle anchor ears, and connecting plate is set with semicircle wrapper sheet Reinforcing plate carries out reinforcement, sets pin hole on connecting plate, anchor case is connected with anchor ear by axis pin, and button lashed cable rope is anchored in anchor case It is interior.
Button point construction operation content is as follows:Semicircle anchor ear unit, axis pin and anchor case are made of factory's overall processing, are checked and accepted Main arch steel pipe is mounted on after qualification, two panels semicircle anchor ear unit is connected by screw bolts, and installation anchor case is connected with anchor ear using axis pin, Each component installation is complete check it is errorless after start lifting operation and carry out button hang construction;Existing steel pipe arch bridge has been captured to detain temporarily a little The aspect such as dismounting is complicated, the welding procedure operating time is longer, and safety coefficient is relatively low and security risk is higher the problem of.
With reference to Fig. 3, as a further improvement, comprising contact platform on the main arch steel pipe, contact recessed comprising contacting on platform Slot, comprising contact projection on semicircle wrapper sheet, contacting groove and contact projection can dock and fix main arch steel pipe.The technology at this place The technique effect and its realization process for the essence that scheme is played are as follows:It is smooth compared to original main arch steel pipe outside Structure, this place contact groove and contact projection after improving and can dock and fix main arch steel pipe, therefore fixed more firm, Bu Huifa It is raw to slide and install unsteady situation.
Clamp groove is included on the semicircle wrapper sheet, heat-preservation cotton can be clamped in the clamp groove, heat-preservation cotton is distributed in one Main arch steel pipe is coated between a Yi Shang anchor ear system.The technique effect for the essence that the technical solution at this place is played and its realization Process is as follows:It can not replace compared to original heat-preservation cotton, the structure that can not be coated rapidly, using the structure at this place, directly will Heat-preservation cotton is clamped in clamp groove, it becomes possible to and heat-preservation cotton to be installed rapidly, while heat-preservation cotton is replaced, installation is rapid, Adjustability is stronger.There is certain thickness structure with reference to the contact platform of top so that one layer is also included between heat-preservation cotton and pipeline Air layer so that heat-preservation cotton can be hanging, becomes from inside to outside as the structure of pipeline, air layer and heat-preservation cotton so that heat preservation effect Fruit is more preferable.
It should be noted that Yi Shang structure can not only be used for installing common pipe, it can also be used to fixed and install Transport pipeline so that better heat preservation.
In a creative way, each effect is individually present more than, moreover it is possible to the combination of the above results is completed with a nested structure.
It is clear that the technique effect that more than structure is realized is realized, discounting for additional technical solution, this patent title is also Can be a kind of heat preserving method and structure.It is not shown in figure part details.
It should be noted that multiple schemes that this patent provides include the basic scheme of itself, independently of each other, not mutually It restricts, but it can also be mutually combined in the case where there is no conflict, reach multiple effects and realize jointly.
Basic principle, main feature and the advantages of the present invention of the present invention has been shown and described above.The technology of this field Personnel should be recognized that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this hairs Bright principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these variations It is both fallen with improving in claimed scope.

Claims (6)

1. a kind of steel pipe arch bridge arch rib buckling and hanging mounting structure, which is characterized in that steel pipe arch bridge main arch steel pipe is provided with anchor ear system, Anchor ear system includes two symmetrical semicircle anchor ear units, and semicircle anchor ear unit is arranged on upper strata arch rib, and semicircle wrapper sheet directly wraps Main arch steel pipe is wrapped up in, semicircle wrapper sheet both sides set connecting plate to be bolted two semicircle anchor ears, pin is set on connecting plate Anchor case is connected by hole, pin hole with anchor ear by axis pin, and button lashed cable rope is anchored in anchor case;Clamping is included on the semicircle wrapper sheet Groove, heat-preservation cotton can be clamped in the clamp groove, and heat-preservation cotton coats main arch steel pipe between being distributed in more than one anchor ear system; Directly heat-preservation cotton is clamped in clamp groove, it becomes possible to heat-preservation cotton be installed rapidly, while heat-preservation cotton is replaced, installed Rapidly, adjustability is stronger;So that one layer of air layer also being included between heat-preservation cotton and pipeline so that heat-preservation cotton can be hanging, into To be pipeline, air layer and the structure of heat-preservation cotton from inside to outside so that better heat preservation.
2. a kind of steel pipe arch bridge arch rib buckling and hanging mounting structure as described in claim 1, which is characterized in that the semicircle wrapper sheet and Filled rubber gasket between main arch steel pipe.
3. a kind of steel pipe arch bridge arch rib buckling and hanging mounting structure as described in claim 1, which is characterized in that on the semicircle wrapper sheet Three semicircle ribbed stiffeners are set.
A kind of 4. steel pipe arch bridge arch rib buckling and hanging mounting structure as described in claim 1, which is characterized in that the connecting plate and half Circle wrapper sheet junction is provided with reinforcing plate and carries out reinforcement.
5. a kind of steel pipe arch bridge arch rib buckling and hanging mounting structure as described in claim 1, which is characterized in that on the outside of the pin hole It is provided with stiffening ring and carries out reinforcement.
6. a kind of steel pipe arch bridge arch rib buckling and hanging mounting structure as described in claim 1, which is characterized in that on the main arch steel pipe Comprising contact platform, contact on platform comprising groove is contacted, include contact projection on semicircle wrapper sheet, contact groove and contact projection can It docks and fixes main arch steel pipe.
CN201610381238.2A 2016-06-01 2016-06-01 A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure Active CN105839546B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610381238.2A CN105839546B (en) 2016-06-01 2016-06-01 A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610381238.2A CN105839546B (en) 2016-06-01 2016-06-01 A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure

Publications (2)

Publication Number Publication Date
CN105839546A CN105839546A (en) 2016-08-10
CN105839546B true CN105839546B (en) 2018-05-25

Family

ID=56596027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610381238.2A Active CN105839546B (en) 2016-06-01 2016-06-01 A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure

Country Status (1)

Country Link
CN (1) CN105839546B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638266A (en) * 2016-12-21 2017-05-10 广州大学 Concrete filled steel tube arch bridge arch rib hoisting buckle and hoisting method
CN107806018B (en) * 2017-10-31 2019-01-22 信阳师范学院 For repairing the rapidly-assembled small span arch bridge and construction technology of rush construction
CN107841955A (en) * 2017-12-25 2018-03-27 中铁二局第五工程有限公司 A kind of steel pipe arch bridge knotted rope hookup and connecting method
CN108867399A (en) * 2018-08-24 2018-11-23 中国建筑土木建设有限公司 Anchoring ring, pier shaft anchor ear drop system and its construction method
CN110042766A (en) * 2019-05-27 2019-07-23 广西大学 A kind of CFST Arch Bridge insulation film construction method
CN112627051A (en) * 2021-01-13 2021-04-09 中铁工程设计咨询集团有限公司 Bridge construction traction end buckling cable anchoring device and buckling cable anchoring method thereof
CN113389222B (en) * 2021-05-21 2023-01-20 中交三航局第二工程有限公司 Suspension tunnel structure
CN113756195B (en) * 2021-08-31 2023-01-31 中铁七局集团有限公司 Hollow pier top solid section construction device and method
CN113863168B (en) * 2021-10-11 2023-03-31 中国市政工程西南设计研究总院有限公司 Suspender replacing device for anchor head on bundling concrete-filled steel tube arch bridge

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203202515U (en) * 2013-02-20 2013-09-18 无锡新凌管道设备有限公司 Efficient insulated pipe bracket

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5146344Y2 (en) * 1972-10-28 1976-11-09
CN1330829C (en) * 2004-03-24 2007-08-08 大连理工大学 Integrated hoisting method and special slings for steel pipe concrete flexible cable arch bridge
CN1851137A (en) * 2006-04-27 2006-10-25 中铁一局集团有限公司 Gate-type crane semiarch integral-hoisting steel-pipe arch process
CN102367650A (en) * 2011-08-05 2012-03-07 中铁一局集团厦门建设工程有限公司 Construction method of steel pipe arch bridge
CN205711771U (en) * 2016-06-01 2016-11-23 中交四公局第五工程有限公司 A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203202515U (en) * 2013-02-20 2013-09-18 无锡新凌管道设备有限公司 Efficient insulated pipe bracket

Also Published As

Publication number Publication date
CN105839546A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN105839546B (en) A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure
CN206521197U (en) A kind of adjustable balance hoisting beam
CN105108708B (en) Crane disassembling process
CN105350442A (en) Arching method for stiff skeleton concrete arch bridge
CN205711771U (en) A kind of steel pipe arch bridge arch rib buckling and hanging mounting structure
CN101660295B (en) Hoisting method of arch bridge arch rib or beam body along bridge direction
CN102877682B (en) Anticorrosion device of thermal power chimney
CN104532753A (en) Lifting device suitable for lifting and installing suspension bridge stiffening girders
CN105780659A (en) Lifting appliance special for erection of large-tonnage steel box beam segment in non-stayed cable area of cable-stayed bridge
CN104583496B (en) Without chord member purlin unit's method and built-up type node bridge
CN105951574A (en) Steel beam segment, continuous combined beam bridge and construction method of continuous combined beam bridge
CN206054916U (en) A kind of fixed trustship rack device of new pipe laying barge SLAY
CN101942923A (en) Auxiliary pole fixing base
CN202850569U (en) A connecting flange for principal concrete-filled steel tube members of an ultra-high long-span tower
CN205838364U (en) Movable crane track
CN203983878U (en) Branch cable laying apparatu
CN206128606U (en) Platform is used in extra -large -size polygon coal bunker crowd's tied in a bundle cone steel coal scuttle installation
CN103010925B (en) Bundling and hoisting method of loop reactor
CN204372335U (en) A kind of pipeline fixing device
CN208024947U (en) A kind of self-tipping type lowering equipment
CN103629438B (en) Based on the built-up type transition running line cage of bridge running line under cable
CN209601929U (en) A kind of suspender for wind power flange and tower welding group pair
CN203868518U (en) Dedicated spring balancing support for steam pipeline
CN203820360U (en) Lifting appliance for installing existing railway sound barrier plate
CN206693063U (en) A kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant