CN206693063U - A kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system - Google Patents

A kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system Download PDF

Info

Publication number
CN206693063U
CN206693063U CN201720389231.5U CN201720389231U CN206693063U CN 206693063 U CN206693063 U CN 206693063U CN 201720389231 U CN201720389231 U CN 201720389231U CN 206693063 U CN206693063 U CN 206693063U
Authority
CN
China
Prior art keywords
rope
head
suspension bridge
load bearing
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720389231.5U
Other languages
Chinese (zh)
Inventor
张明闪
王凤存
马建磊
李源
徐财进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHEC Second Engineering Co Ltd
Original Assignee
CCCC SHEC Second Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Second Engineering Co Ltd filed Critical CCCC SHEC Second Engineering Co Ltd
Priority to CN201720389231.5U priority Critical patent/CN206693063U/en
Application granted granted Critical
Publication of CN206693063U publication Critical patent/CN206693063U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of galvanized wire for suspension bridge of head-rope series-mode frame and hangs load bearing system, and there is anchor system suspension bridge two sides, and multiple tower top deflecting rollers are equipped with the Sarasota of two sides, includes the head-rope of more head and the tail connections.The utility model load bearing ropes of cable crane uses serial arrangement, by root haulage cable during construction, anchoring temporarily, after all head-rope drawings, series connection is connected into using rope card, overcomes drawing difficult, and is avoided because of one of point fracture, the overall phenomenon that all will appear from collapse, improves security.By installing clamping plate so that every head-rope independent stressed.

Description

A kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system
Technical field
The utility model belongs to cable crane technical field of construction, and in particular to a kind of suspension bridge of head-rope series-mode frame Cable crane load bearing system.
Background technology
With the development of construction technology, application of the cable crane in suspension bridge construction is more and more, the across footpath of cable crane Across footpath with suspension bridge is increasing.The anchorage system and Sarasota system that galvanized wire for suspension bridge is hung are existing suspension bridge body junction Structure, force request can be met, and the head-rope of cable crane is cable crane unique load-carrying members in the air, cable crane sport car will Load-carrying carrys out fallback on head-rope and moved, and the load for playing hanging object is assigned on head-rope by sport car.Getting over based on cable crane across footpath Greatly, the higher situation of requirement to Lifting Capacity, it is necessary to which the radical of the diameter and increase head-rope that increase head-rope is held with reaching The force request restricted again.Erection and regulation of the structure type of each head-rope to load-bearing are most important.
And head-rope, when using parallel-connection structure, every head-rope uses independent steel wire rope, is independent of each other between head-rope, It can set up by root and be anchored by root, and single wire rope can be replaced, security is higher.But if every rope Regulation is highly inconsistent, it will and cause every head-rope discontinuity, situations such as sport car deflection, local pressure is excessive occur, Threat will be formed to construction safety, while influences construction quality.When head-rope uses cascaded structure, rope can be considered as elongated Structure, particularly on large-span suspension bridge, if rope is long, drawing will be very difficult, and if one of point fracture, The overall phenomenon that all will appear from collapse, security are relatively low.
Utility model content
The purpose of this utility model is to overcome prior art head-rope to connect, and not only drawing is difficult, and if wherein one Individual point fracture, entirety all will appear from the phenomenon of collapse, and security is relatively low, and be easily caused every rope regulation height using parallel-connection structure Spend inconsistent, it will make every head-rope discontinuity, situations such as sport car deflection, local pressure is excessive problem occur.
Therefore, the utility model, which provides a kind of galvanized wire for suspension bridge of head-rope series-mode frame, hangs load bearing system, suspension cable There is anchor system bridge two sides, and multiple tower top deflecting rollers, the galvanized wire for suspension bridge of head-rope series-mode frame are equipped with the Sarasota of two sides Hanging load bearing system includes the head-rope of more head and the tail connections;
The anchor system includes the anchor plate band that polylith be arranged in parallel, two pieces of anchors of anchor system both sides described in two sides Gu being equipped with grappling gyroscope wheel on steel plate strip, remaining anchor plate band is at interval of a setting grappling gyroscope wheel, first head-rope Both ends respectively around corresponding to tower top deflecting roller on corresponding grappling gyroscope wheel and two sides Sarasota on the anchor system of suspension bridge two sides, The fag end of remaining head-rope is sequentially connected the tower top deflecting roller of two sides Sarasota after being connected with the tail of rope of previous head-rope, afterwards should The tail of rope of head-rope bypasses corresponding grappling gyroscope wheel, and more head-ropes connect according to this in order, the tail of rope of last root head-rope around It is connected after crossing corresponding grappling gyroscope wheel with the fag end of first head-rope.
Clamping plate is provided between the tower top deflecting roller of the anchor system and Sarasota, the clamping plate is vertical with head-rope, and with it is every Root head-rope connects.
Fixed between the head-rope by card of restricting.
The anchor plate band is provided with pin shaft hole, and the grappling gyroscope wheel passes through the bearing pin and anchor plate in pin shaft hole Band connection.
The head-rope is even number root.
The beneficial effects of the utility model are:
The utility model load bearing ropes of cable crane uses serial arrangement, by root haulage cable during construction, anchoring temporarily, After all head-rope drawings, series connection is connected into using rope card, overcomes drawing difficult, and avoid because of one of point Fracture, the overall phenomenon that all will appear from collapse, improves security.By installing clamping plate so that every head-rope independent stressed.
Simultaneously avoid using parallel-connection structure be easily caused every rope regulation it is highly inconsistent, make the every stress of head-rope 1 not Uniformly, there is situations such as sport car deflection, local pressure is excessive problem.
It is described in further details below in conjunction with accompanying drawing.
Brief description of the drawings
Fig. 1 is horizontal layout schematic diagram of the present utility model.
In figure:1st, head-rope;1-1, first head-rope;1-2, last root head-rope;2nd, rope card;3rd, grappling gyroscope wheel;4th, press from both sides Plate;5th, tower top deflecting roller;6th, cable crane sport car.
Embodiment
Embodiment 1:
Present embodiments provide a kind of galvanized wire for suspension bridge of head-rope series-mode frame and hang load bearing system, suspension bridge two sides have Anchor system, multiple tower top deflecting rollers 5 is equipped with the Sarasota of two sides, the galvanized wire for suspension bridge of head-rope series-mode frame hangs load-bearing system System includes the head-rope 1 of more head and the tail connections;
The anchor system includes the anchor plate band that polylith be arranged in parallel, two pieces of anchors of anchor system both sides described in two sides Gu being equipped with grappling gyroscope wheel 3 on steel plate strip, remaining anchor plate band sets grappling gyroscope wheel 3, first load-bearing at interval of one Rope 1-1 both ends bypass on the anchor system of suspension bridge two sides and correspond to tower top on corresponding grappling gyroscope wheel 3 and two sides Sarasota respectively Deflecting roller 5, the fag end of remaining head-rope 1 is sequentially connected two sides Sarasota tower top after being connected with the tail of rope of previous head-rope 1 turn To wheel 5, the tail of rope of the head-rope 1 is around corresponding grappling gyroscope wheel 3 afterwards, and more head-ropes 1 connect according to this in order, last root Head-rope 1-2 tail of rope is connected after bypassing corresponding grappling gyroscope wheel 3 with first head-rope 1-1 fag end.
The utility model load bearing ropes of cable crane 1 uses serial arrangement, by root haulage cable, jury anchor during construction Gu after all head-ropes 1 pull, series connection is connected into using rope card 2, overcomes drawing difficult, and avoid because wherein One point fracture, the overall phenomenon that all will appear from collapse, improves security.By installing clamping plate 4 so that every head-rope 1 Independent stressed.
Embodiment 2:
A kind of suspension cable of head-rope series-mode frame as shown in Figure 1 is present embodiments provided on the basis of embodiment 1 Bridge cable crane load bearing system, clamping plate 4, the clamping plate 4 and head-rope are provided between the tower top deflecting roller 5 of the anchor system and Sarasota 1 is vertical, and is connected with every head-rope 1.
By installing clamping plate 4 so that the every independent stressed of head-rope 1.
During anchorage construction, the tower top deflecting roller in the pre-buried anchor system of head-rope 1, grappling gyroscope wheel 3 and cable crane cable saddle 5。
Installed using trailer system, load bearing ropes of cable crane 1 is set up by root, draw first head-rope 1-1 fag end by one end Across tower top deflecting roller 5 to other end, after grappling gyroscope wheel 3, after adjusting first head-rope 1-1 sag, first is held Rope 1-1 both ends are fixed temporarily again.Repeat above step and set up remaining head-rope 1 successively,
Then by the connection of fag end use rope card 2 of first head-rope 1-1 tail of rope and second head-rope 1, connect according to this The fag end of remaining head-rope 1, finally first head-rope 1-1 fag end is connected with Mo Gen head-ropes 1-2 tail of rope, formed comprehensively Series connection.
Cable crane sport car 6 is installed on head-rope 1, then applies the 20% of cable crane rated load to cable crane sport car 6, So that the comprehensive stress of the series connection of head-rope 1 of whole load bearing system.In this case, clamping plate 4 is installed so that every rope is independent Stress.
In the present embodiment, the anchor plate band is provided with pin shaft hole, and the grappling gyroscope wheel 3 is by pin shaft hole Bearing pin and anchor plate band connection.The head-rope 1 is even number root.It is easy to first head-rope 1-1 fag end and Mo Gen head-ropes 1-2 tail of rope connection.
More head-ropes 1 of the utility model 2 connect into series connection using rope card, overcome drawing difficult, and avoid because One of point fracture, the overall phenomenon that all will appear from collapse, improves security.By installing clamping plate 4 so that every load-bearing Restrict 1 independent stressed.Material is simple, rope stress is synchronous, with high safety, reliable, stress when solving the use of load bearing ropes of cable crane 1 The problem of uneven.
The part and the well-known components and common structure of the structure category industry or conventional that above example does not describe in detail Means, do not describe one by one here.
Exemplified as above is only for example, not forming to the scope of protection of the utility model to of the present utility model Limitation, it is every to be belonged to the same or analogous design of the utility model within protection scope of the present invention.

Claims (5)

1. a kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system, there are anchor system, two sides rope in suspension bridge two sides Multiple tower top deflecting rollers are equipped with tower(5), it is characterised in that:The galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system Include the head-rope of more head and the tail connections(1);
The anchor system includes the anchor plate band that polylith be arranged in parallel, two blocks of anchoring steel of anchor system both sides described in two sides Grappling gyroscope wheel is equipped with strip(3), remaining anchor plate band is at interval of a setting grappling gyroscope wheel(3), first load-bearing Rope(1-1)Both ends respectively around corresponding grappling gyroscope wheel on the anchor system of suspension bridge two sides(3)It is and corresponding on the Sarasota of two sides Tower top deflecting roller(5), remaining head-rope(1)Fag end and previous head-rope(1)Tail of rope connection after be sequentially connected two sides rope The tower top deflecting roller of tower(5), the head-rope afterwards(1)Tail of rope bypass corresponding grappling gyroscope wheel(3), more head-ropes(1) Connect according to this in order, last root head-rope(1-2)Tail of rope bypass corresponding grappling gyroscope wheel(3)Afterwards with first head-rope(1- 1)Fag end connection.
2. a kind of galvanized wire for suspension bridge of head-rope series-mode frame according to claim 1 hangs load bearing system, its feature exists In:The tower top deflecting roller of the anchor system and Sarasota(5)Between be provided with clamping plate(4), the clamping plate(4)With head-rope(1)Vertically, And with every head-rope(1)Connection.
3. a kind of galvanized wire for suspension bridge of head-rope series-mode frame according to claim 1 hangs load bearing system, its feature exists In:The head-rope(1)Between pass through restrict card(2)It is fixed.
4. a kind of galvanized wire for suspension bridge of head-rope series-mode frame according to claim 1 hangs load bearing system, its feature exists In:The anchor plate band is provided with pin shaft hole, the grappling gyroscope wheel(3)Pass through the bearing pin in pin shaft hole and anchor plate band Connection.
5. a kind of galvanized wire for suspension bridge of head-rope series-mode frame according to claim 1 hangs load bearing system, its feature exists In:The head-rope(1)For even number root.
CN201720389231.5U 2017-04-14 2017-04-14 A kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system Active CN206693063U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720389231.5U CN206693063U (en) 2017-04-14 2017-04-14 A kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720389231.5U CN206693063U (en) 2017-04-14 2017-04-14 A kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system

Publications (1)

Publication Number Publication Date
CN206693063U true CN206693063U (en) 2017-12-01

Family

ID=60444391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720389231.5U Active CN206693063U (en) 2017-04-14 2017-04-14 A kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system

Country Status (1)

Country Link
CN (1) CN206693063U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221639A (en) * 2018-03-08 2018-06-29 中交武汉港湾工程设计研究院有限公司 A kind of three-tower suspension bridge erection of main beam constructing structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221639A (en) * 2018-03-08 2018-06-29 中交武汉港湾工程设计研究院有限公司 A kind of three-tower suspension bridge erection of main beam constructing structure
CN108221639B (en) * 2018-03-08 2024-05-24 中交武汉港湾工程设计研究院有限公司 Three tower suspension bridge girder installation construction structures

Similar Documents

Publication Publication Date Title
CN206521197U (en) A kind of adjustable balance hoisting beam
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN206706584U (en) Pier arch rib in the asymmetric button lashed cable cable system installation Multi-arch bridge of middle pier
CN203377546U (en) High speed railway spanning construction apparatus
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN106013812B (en) A kind of two-way monolayer cable net structure without support high-altitude overhead cable construction method
CN105621280B (en) The apparatus and method for mounting and dismounting crane arm
CN102425261B (en) Large-span multiunit tensile membrane structure and installation construction method thereof
CN104631329A (en) Method for adjusting overall line shape of continuous catwalk of suspension bridge
CN103883129A (en) Method for installing steel structure roof beams
CN106848938A (en) Cable testing bridge hanging installation method under a kind of High Altitude Platform
CN106758860A (en) A kind of across cable walking cord clip handling erecting device and method
CN101660295A (en) Hoisting method of arch bridge arch rib or beam body along bridge direction and used cable balance wheel
CN206693063U (en) A kind of galvanized wire for suspension bridge of head-rope series-mode frame hangs load bearing system
CN206693031U (en) A kind of large-span suspension bridge cable crane load bearing system of head-rope parallel structure
CN106120573B (en) Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN209779465U (en) main tower erects cable-stay bridge's string cable construction system that changes
CN104452594A (en) Multi-support cable guide method cable replacement device
CN107176548A (en) A kind of cable crane overhead traveling crane closed circulation trailer system and traction method
CN106758855A (en) Circular arc pier cap construction arch support component and circular arc pier cap construction method
CN107673239B (en) Cable crane tower self-balancing system and installation method thereof
CN109083395A (en) A kind of Excitations for Long Span Suspension operating platform and its erection method
CN109113354B (en) Whole-course cableway type windproof real-time pulled cable wind system and construction method thereof
CN104085832A (en) Flexible component lifting device and lifting method thereof
CN206986723U (en) A kind of anchor of load bearing ropes of cable crane parallel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant