CN106758860A - A kind of across cable walking cord clip handling erecting device and method - Google Patents

A kind of across cable walking cord clip handling erecting device and method Download PDF

Info

Publication number
CN106758860A
CN106758860A CN201710149056.7A CN201710149056A CN106758860A CN 106758860 A CN106758860 A CN 106758860A CN 201710149056 A CN201710149056 A CN 201710149056A CN 106758860 A CN106758860 A CN 106758860A
Authority
CN
China
Prior art keywords
cord clip
handling
erecting device
stands
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710149056.7A
Other languages
Chinese (zh)
Other versions
CN106758860B (en
Inventor
庞庆
王志强
钱育强
周战涛
杨浩
孙存良
单晓东
刘帅帅
蔡悬
王鹏
孙凯
刘安政
王浩
胡茳
李磊
张森
罗勇华
王海亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co ltd
Original Assignee
Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd, CCCC Fourth Highway Engineering Co Ltd filed Critical Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd
Priority to CN201710149056.7A priority Critical patent/CN106758860B/en
Publication of CN106758860A publication Critical patent/CN106758860A/en
Application granted granted Critical
Publication of CN106758860B publication Critical patent/CN106758860B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of across cable walking cord clip handling erecting device and method, device include two supports of inverted U that are vertically arranged and being parallel to each other, and each support includes a back timber, and back timber two ends connect a montant respectively;Connected by a bearing bar between the back timber middle part of two stands, two chain blocks are hung on bearing bar;Two cylinder wheels are provided between two stands, every montant is provided with an antifriction wheel;When cord clip is installed in handling, cord clip is suspended on main push-towing rope with loop wheel machine first, upper and lower two half portion of cord clip is kept a determining deviation and connected temporarily by fining twisted steel;Across cable walking cord clip handling erecting device across cable walking on main push-towing rope is crossed, cord clip is suspended in midair by two chain blocks to cord clip top, then run to specified location installation.

Description

A kind of across cable walking cord clip handling erecting device and method
Technical field
The invention belongs to cord clip of suspension bridge handling installation Technology field, and in particular to one kind is directly across in suspension bridge master Handling cord clip runs to the equipment and construction method that design attitude is installed on cable.
Background technology
In Suspension bridge structure, installing Cable-clamp on main push-towing rope, for connecting main push-towing rope and hoist cable, be undertake bridge deck deadweight and The important primary structure member of mobile load.At present, the installation of cord clip of suspension bridge generally carries out handling installation, it is necessary to make using cable crane overhead traveling crane Make special overhead traveling crane, and the cable for overhead traveling crane walking is set up above main push-towing rope.There is problems with this method:
1st, make cable crane overhead traveling crane, set up overhead traveling crane walking cable, cause construction cost to increase;
2nd, need the long period to debug before the operation of cable crane overhead traveling crane, cause the engineering time to extend;
3rd, during cable crane overhead traveling crane handling cord clip, by cord clip two parts separate handling, during transport cord clip two parts away from Overhead traveling crane centroidal distance, easy unbalance loading;Two parts are closed up into installation again after being transported to design attitude, more long, complex procedures are taken;
4th, cable crane overhead traveling crane handling cord clip is walked in main push-towing rope overhead, there is certain potential safety hazard.
The problem above that cord clip is present is installed for the handling of cable crane overhead traveling crane, in the urgent need to cord clip is installed in a kind of new handling Equipment and construction method.
The content of the invention
Equipment and construction method are installed the purpose of the present invention is to propose to a kind of across the cable walking cord clip handling of suspension bridge, in suspension cable During bridge cord clip handling installation, the installing Cable-clamp time can be shortened, construction consumptive material is reduced, improved working security.
For achieving the above object, a kind of across cable walking cord clip handling erecting device is provided first, it is characterised in that:
The support of inverted U that is vertically arranged including two and being parallel to each other, each support includes a back timber, back timber two ends point A montant is not connected;It is connected by a bearing bar vertical with back timber between the back timber middle part of two stands, is hanged on the bearing bar Hang two chain blocks;Two cylinder wheels are provided between two stands, the rotating shaft of each cylinder wheel is vertical with the montant of two stands, and The two montants connection relative with two stands respectively of its two ends;Cylinder wheel lower section is located on every montant and is provided with an antifriction wheel, institute The rotating shaft for stating antifriction wheel is parallel with montant.
For achieving the above object, also provide a kind of using above-mentioned across cable walking cord clip handling erecting device handling installation The method of cord clip, it is characterised in that:
(1) the cord clip bolt that will connect upper and lower two half portion of cord clip in suspension bridge king-tower bottom is unloaded, big using two length In the fining twisted steel of main push-towing rope diameter is interspersed in the screw of the upper and lower two half portions the same side of cord clip, the diameter of fining twisted steel is less than The internal diameter of cord clip screw, nut of the external diameter more than cord clip screw internal diameter is installed at the two ends of fining twisted steel;Keep cord clip another Side opening and A/F are more than main push-towing rope diameter;
(2) both sides of the cord clip first half are hung with a loop wheel machine, cord clip is hung near the main push-towing rope of tower top, and by rope Be enclosed within cord clip on main push-towing rope by folder open side, and then cord clip open side is also connected with two fining twisted steels, and connected mode is with another Side;Crane hook is unclamped to be suspended on main push-towing rope under Gravitative Loads by cord clip;
(3) across cable walking cord clip handling erecting device is lifted on main push-towing rope with loop wheel machine;By two cylinder wheels across in master On cable, using across the cable walking cord clip handling erecting device of tower top hoist engine pull rope reverse drawing, draw it and walked on main push-towing rope, walk Stop after directly over to cord clip;Cord clip is hung using two chain blocks on across cable walking cord clip handling erecting device bearing bar Top half both sides are simultaneously lifted up, and cord clip is separated with main push-towing rope, in vacant state;
(4) control across cable walking cord clip handling that equipment carrying cord clip is installed by hoist engine and run to cord clip design and installation position Put, stop walking, two chain block decentralization cord clips of control allow cord clip to be suspended on main push-towing rope;
(5) control two chain blocks to hang cord clip lower half both sides again to be lifted up, make cord clip lower half both sides and upper half Portion both sides notch closes up, and fining twisted steel is displaced with cord clip bolt, and upper and lower two half portion of cord clip is connected;Release pulls calabash Reed, installs equipment and returns to tower top handling and install next cord clip by across the cable walking cord clip handling of elevator machine travel.
The present invention has advantages below compared with prior art:
(1) it is cost-effective:Cord clip handling of the invention is installed equipment and is directly walked on main rope of suspension bridge, thus with it is existing Method is compared, and can save the consumption of cable crane overhead traveling crane manufacturing cost and overhead traveling crane walking cable.
(2) duration is shortened:Cord clip is divided into two parts handling by existing cable crane overhead traveling crane, to design attitude recombinant peace Dress, takes more long;The present invention is walked using chain block handling the whole series cord clip on main push-towing rope, directly will after running to design attitude Cord clip leveling is tightened, simple to operate, and handling and installation rate are fast, substantially increase efficiency of construction.
(3) construction safety:Present invention handling entirety cord clip walking on main push-towing rope, is not influenceed by unbalance loading, eliminates safety hidden Suffer from, improve working security.
Brief description of the drawings
It is across cable walking cord clip handling erecting device side view of the invention shown in Fig. 1;
It is across cable walking cord clip handling erecting device front view of the invention shown in Fig. 2;
It is side view of across the cable walking cord clip handling erecting device on main push-towing rope shown in Fig. 3;
It is front view of across the cable walking cord clip handling erecting device on main push-towing rope shown in Fig. 4;
It is structural representation that the upper and lower two half portions side of cord clip is connected by fining twisted steel shown in Fig. 5;
It is the view being suspended on cord clip with loop wheel machine on main push-towing rope shown in Fig. 6;
It is view that across cable walking cord clip handling erecting device is lifted on main push-towing rope shown in Fig. 7;
It is view of across the cable walking cord clip handling erecting device walking to cord clip top handling cord clip shown in Fig. 8;
It is view that cord clip is installed on main push-towing rope shown in Fig. 9;
It is across cable walking cord clip handling erecting device is returned after installing Cable-clamp view shown in Figure 10.
Specific embodiment
As shown in Figure 1 and Figure 2, across the cable walking cord clip handling erecting device of one kind that the present invention is provided, including two vertically set The support 1 of the inverted U put and be parallel to each other, each support includes a back timber 111, and back timber two ends connect a montant 112 respectively;Two It is connected by a bearing bar 2 vertical with back timber 111 between the back timber middle part of support 1, hanging two on the bearing bar 2 pulls Cucurbit 3;Two cylinder wheels 4 are provided between two stands 1, the rotating shaft 5 of each cylinder wheel 4 is vertical with the montant 112 of two stands, and rolling Two relative with two stands respectively montants 112 of cylinder wheel rotating shaft 5 two ends are connected;Cylinder wheel lower section is located on every montant 112 to be provided with One antifriction wheel 6, the rotating shaft of the antifriction wheel 6 is parallel with montant.
It is view of across the cable walking cord clip handling erecting device on main push-towing rope 7, across cable row shown in Fig. 3, Fig. 4 Ropedancing bucket fortune erecting device across on main push-towing rope 7, and is walked by two cylinder wheels 4 on main push-towing rope.
Before across cable walking cord clip handling erecting device is used for cord clip handling installation, cord clip is suspended on by loop wheel machine first Position on main push-towing rope near tower top, then by cord clip of being sling above across cable walking cord clip handling erecting device to cord clip, and transport It is sent to the installing Cable-clamp position specified on main push-towing rope.When handling cord clip is gone to, to walk to directly over cord clip, it is necessary to its front rolling Cylinder wheel crosses cord clip, due to the width of the width more than main push-towing rope of cord clip both sides, now needs across cable walking cord clip handling to install dress The width put between two stands can cross cord clip more than cord clip width;When carrying cord clip walking is played, now load is heavier, is It is in stable condition when keeping load to walk, the spacing reduced between two stands is at this moment needed again, so that the friction pulley clamping of both sides Main push-towing rope both sides with keep stabilization.To meet the demand, it is desirable to which the spacing between two stands can be adjusted flexibly.The present invention passes through In the following manner realizes above-mentioned requirements:
The activity of the bearing bar 2 is interspersed on the back timber 111 of two stands 1, the two ends of bearing bar 2 extend to the outer of two back timbers Side, and bearing bar stop nut 8 is installed in load-bearing boom end;The activity of rotating shaft 5 of the cylinder wheel 4 is interspersed in two stands relative Two montants on, rotating shaft two ends extend to the outside of two montants, and install rotating shaft stop nut at rotating shaft two ends.When need adjust During spacing between whole two stands, by the stop nut for outwardly or inwardly rotating bearing bar and cylinder wheel rotating shaft two ends, you can Realize the spacing adjustment of two stands 1.
Further, it is stable to ensure the overall structure of across cable walking cord clip handling erecting device, can also be by the two of two stands It is connected by the locking pull bar 9 vertical with montant between the lower end of the relative montant 112 of root.The locking pull bar 9 activity is interspersed Between two relative montant lower ends of two stands, locking pull bar two ends extend to the outside of two montants, at locking pull bar two ends Pull bar stop nut is installed.During spacing between two stands are adjusted, the stop nut at locking pull bar two ends and bearing bar and rolling The stop nut synchronous adjustment at cylinder wheel rotating shaft two ends.
During using above-mentioned across cable walking cord clip handling erecting device handling cord clip, specific method is as follows:
(1) as shown in figure 5, suspension bridge king-tower bottom will connect cord clip about 10 the cord clip bolt of two half portions unload, profit It is interspersed in the screw of the upper and lower two half portions the same side of cord clip more than the steel of finish rolling screw thread 11 of main push-towing rope diameter with two length, finish rolling spiral shell The diameter of line steel installs spiral shell of the external diameter more than cord clip screw internal diameter less than the internal diameter of cord clip screw at the two ends of fining twisted steel It is female;Keep another side opening of cord clip and A/F is more than main push-towing rope diameter;
(2) as shown in fig. 6, hanging the both sides of the cord clip first half with a loop wheel machine, cord clip 10 is hung to the main push-towing rope 7 near tower top Near;And cord clip 10 is enclosed within main push-towing rope 7 by cord clip open side, then cord clip open side is also connected with two fining twisted steels Connect, the same opposite side of connected mode;Crane hook is unclamped to be suspended under Gravitative Loads on main push-towing rope 7 by cord clip 10;
(3) as shown in fig. 7, across cable walking cord clip handling erecting device is lifted on main push-towing rope 7 with loop wheel machine, by two rollers Wheel 4 across on main push-towing rope 7, using across the cable walking cord clip handling erecting device of the reverse drawing of tower top hoist engine pull rope 12, draw its Walked on main push-towing rope 7;As shown in figure 8, across cable walking cord clip handling erecting device stops after running to directly over cord clip 10, using across Two chain blocks 3 on cable walking cord clip handling erecting device bearing bar 2 hang the top half both sides of cord clip 10 and carry upwards Rise, cord clip 10 is separated with main push-towing rope 7, the cord clip first half, lower half do not contact with main push-towing rope, in vacant state;
(4) control across cable walking cord clip handling that equipment carrying cord clip 10 is installed by hoist engine pull rope 12 and run to cord clip Design and installation position, stops walking, and two chain blocks 3 are transferred cord clip 10, allow cord clip to be suspended on main push-towing rope 7;Now cord clip is Hung on main push-towing rope by the first half, lower half is suspended on first half lower section by fining twisted steel.
(5) as shown in figure 9, control two chain blocks hang 3 live the lower half both sides of cord clip 10 be lifted up, make cord clip lower half Both sides close up with first half both sides notch, and fining twisted steel is displaced with cord clip bolt 13, by cord clip two half portions connection about 10 It is fixed, complete a handling for cord clip and install.As shown in Figure 10, chain block 3 is unclamped, across cable walking cord clip handling is adjusted again Spacing between erecting device two stands 1 increases, and it is crossed cord clip, under returning to tower top handling and installation by elevator machine travel One cord clip.
In the state of shown in above-mentioned Fig. 7, across cable walking cord clip handling erecting device, when handling cord clip 10 is gone in zero load Walk to directly over cord clip, it is necessary to its front cylinder wheel 4 crosses cord clip, due to the width of the width more than main push-towing rope of cord clip both sides, Now needing the width between across cable walking cord clip handling erecting device two stands 1 can cross cord clip more than cord clip width;Fig. 8 In the state of shown, when carrying cord clip walking is played, now load is heavier, to keep in stable condition during load walking, at this moment again The spacing reduced between two stands 1 is needed, so that the friction pulley 6 of both sides is clamped in main push-towing rope both sides to keep stabilization.
It is adjustable to realize the spacing between two stands, can wear the bearing bar activity of across cable walking cord clip handling erecting device It is inserted on the back timber of two stands, bearing bar two ends extend to the outside of two back timbers, and are provided with bearing bar limit in load-bearing boom end Position nut;The rotating shaft activity of cylinder wheel is set to be interspersed on two relative montants of two stands, its two ends extends to the outer of two montants Side, and rotating shaft stop nut is installed.Its two stands will first be adjusted after across cable walking cord clip handling erecting device is lifted on main push-towing rope Between spacing more than the width between cord clip both sides, during walking unloaded so as to across cable walking cord clip handling erecting device, before it Can be across cord clip;When across cable walking cord clip handling erecting device is run to directly over cord clip, then between shrinking between two stands Away from, and inwardly tighten the stop nut at bearing bar and cylinder wheel rotating shaft two ends, antifriction wheel is clamped in main push-towing rope both sides, so as to across When cable walking cord clip handling erecting device carries cord clip walking, can keep balancing and stablize.
To ensure the overall structure stabilization of across cable walking cord clip handling erecting device, and ensure across cable walking safety, may be used also By the lock vertical with montant between two lower ends of relative montant of across cable walking cord clip handling erecting device two stands Bar connection is strained at, locking pull bar activity is interspersed between two relative montant lower ends of two stands, locking pull bar two ends extend To the outside of two montants, and pull bar stop nut is installed at locking pull bar two ends;To lifting across cable walking cord clip handling on main push-towing rope During erecting device, two locking pull bars are first pulled down, after across cable walking cord clip handling erecting device is lifted on main push-towing rope, then installation locking Pull bar;During spacing between across the cable walking cord clip handling erecting device two stands of adjustment, the stop nut at locking pull bar two ends and Bearing bar and cylinder wheel rotating shaft synchronous adjustment.

Claims (6)

1. across the cable walking cord clip handling erecting device of one kind, it is characterised in that:U that is vertically arranged including two and being parallel to each other The support of type, each support includes a back timber, and back timber two ends connect a montant respectively;Pass through one between the back timber middle part of two stands The bearing bar vertical with back timber is connected, and two chain blocks are hung on the bearing bar;Two cylinder wheels are provided between two stands, The rotating shaft of each cylinder wheel is vertical with the montant of two stands, and the two montants connection relative with two stands respectively of its two ends;Every Cylinder wheel lower section is located on montant and is provided with an antifriction wheel, the rotating shaft of the antifriction wheel is parallel with montant.
2. across cable walking cord clip handling erecting device according to claim 1, it is characterised in that:The bearing bar activity is worn It is inserted on the back timber of two stands, bearing bar two ends extend to the outside of two back timbers, and are provided with bearing bar limit in load-bearing boom end Position nut;The rotating shaft activity of the cylinder wheel is interspersed on two relative montants of two stands, and its two ends extends to two montants Outside, and rotating shaft stop nut is installed.
3. across cable walking cord clip handling erecting device according to claim 2, it is characterised in that:Two of two stands are relative Montant lower end between be connected by the locking pull bar vertical with montant;It is relative that the locking pull bar activity is interspersed in two stands Two montant lower ends between, locking pull bar two ends extend to the outside of two montants, and are provided with pull bar at locking pull bar two ends Stop nut.
4. across the cable walking cord clip handling installation method of one kind, dress is installed using across the cable walking cord clip handling described in claim 1 Putting carries out cord clip handling installation, it is characterised in that:
(1) the cord clip bolt that will connect upper and lower two half portion of cord clip in suspension bridge king-tower bottom is unloaded, using two length more than master The fining twisted steel of cable diameter is interspersed in the screw of the upper and lower two half portions the same side of cord clip, and the diameter of fining twisted steel is less than cord clip The internal diameter of screw, nut of the external diameter more than cord clip screw internal diameter is installed at the two ends of fining twisted steel;Cord clip opposite side is kept to open Mouthful and A/F be more than main push-towing rope diameter;
(2) both sides of the cord clip first half are hung with a loop wheel machine, cord clip is hung near the main push-towing rope of tower top, and opened by cord clip Be enclosed within cord clip on main push-towing rope by mouth side, then cord clip open side is also connected with two fining twisted steels, the same opposite side of connected mode; Crane hook is unclamped to be suspended on main push-towing rope under Gravitative Loads by cord clip;
(3) across cable walking cord clip handling erecting device is lifted on main push-towing rope with loop wheel machine;By two cylinder wheels across on main push-towing rope, Using across the cable walking cord clip handling erecting device of tower top hoist engine pull rope reverse drawing, draw it and walked on main push-towing rope, run to rope Stop after directly over folder;Cord clip upper half is hung using two chain blocks on across cable walking cord clip handling erecting device bearing bar Part both sides are simultaneously lifted up, and cord clip is separated with main push-towing rope, in vacant state;
(4) control across cable walking cord clip handling that equipment carrying cord clip is installed by hoist engine and run to cord clip design and installation position, Stop walking, two chain block decentralization cord clips of control allow cord clip to be suspended on main push-towing rope;
(5) control two chain blocks to hang cord clip lower half both sides again to be lifted up, make cord clip lower half both sides and the first half two Side channel mouthful closes up, and fining twisted steel is displaced with cord clip bolt, and upper and lower two half portion of cord clip is connected;Unclamp chain block, Equipment is installed by across the cable walking cord clip handling of elevator machine travel to return to tower top handling and next cord clip is installed.
5. across cable walking cord clip handling installation method according to claim 4, it is characterised in that:Across the cable walking cord clip The bearing bar activity of handling erecting device is interspersed on the back timber of two stands, and bearing bar two ends extend to the outside of two back timbers, and Bearing bar stop nut is installed in load-bearing boom end;The rotating shaft activity of the cylinder wheel is interspersed in two stands relative two and erects On bar, its two ends extends to the outside of two montants, and installs rotating shaft stop nut;Across cable walking cord clip handling erecting device is hung After being attached on main push-towing rope, the spacing between its two stands is first adjusted more than the width between cord clip both sides, so as to across cable walking cord clip During the zero load walking of handling erecting device, its front can be across cord clip;Across cable walking cord clip handling erecting device is running to cord clip just During top, then the spacing between two stands is shunk, and inwardly tighten the stop nut at bearing bar and cylinder wheel rotating shaft two ends, make to prevent Friction pulley is clamped in main push-towing rope both sides, so as to across cable walking cord clip handling erecting device carry cord clip walk when, can keep balance with Stabilization.
6. across cable walking cord clip handling installation method according to claim 5, it is characterised in that:Across the cable walking cord clip It is connected by the locking pull bar vertical with montant between two lower ends of relative montant of handling erecting device two stands, it is described Locking pull bar activity is interspersed between two relative montant lower ends of two stands, and locking pull bar two ends extend to the outer of two montants Side, and pull bar stop nut is installed at locking pull bar two ends;During to lifting across cable walking cord clip handling erecting device on main push-towing rope, Two locking pull bars are first pulled down, after across cable walking cord clip handling erecting device is lifted on main push-towing rope, then installation locking pull bar;Adjustment across During width between cable walking cord clip handling erecting device two stands, the stop nut and bearing bar and roller at locking pull bar two ends The stop nut synchronous adjustment at wheel rotating shaft two ends.
CN201710149056.7A 2017-03-13 2017-03-13 Across the cable walking cord clip handling mounting device of one kind and method Expired - Fee Related CN106758860B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710149056.7A CN106758860B (en) 2017-03-13 2017-03-13 Across the cable walking cord clip handling mounting device of one kind and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710149056.7A CN106758860B (en) 2017-03-13 2017-03-13 Across the cable walking cord clip handling mounting device of one kind and method

Publications (2)

Publication Number Publication Date
CN106758860A true CN106758860A (en) 2017-05-31
CN106758860B CN106758860B (en) 2019-01-25

Family

ID=58962683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710149056.7A Expired - Fee Related CN106758860B (en) 2017-03-13 2017-03-13 Across the cable walking cord clip handling mounting device of one kind and method

Country Status (1)

Country Link
CN (1) CN106758860B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642049A (en) * 2017-08-23 2018-01-30 柳州欧维姆机械股份有限公司 A kind of device and its installation method changed for main rope of suspension bridge cord clip
CN109338888A (en) * 2018-11-12 2019-02-15 中国十七冶集团有限公司 A kind of main rope of suspension bridge pre-tightens cable device and application method
CN110562396A (en) * 2019-10-10 2019-12-13 中船黄埔文冲船舶有限公司 Accommodation ladder winding and unwinding devices
CN113565002A (en) * 2021-06-30 2021-10-29 中国船舶重工集团应急预警与救援装备股份有限公司 Fastening and adjusting device for main cable of cross-tensioned steel rope
CN113848054A (en) * 2021-11-30 2021-12-28 中国能源建设集团山西电力建设有限公司 Method for testing load-bearing performance of chain block

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4981024U (en) * 1972-10-28 1974-07-13
CN101173501A (en) * 2007-11-26 2008-05-07 中铁大桥局集团第七工程有限公司 Cable jam-packed machine and its jamming method
CN201330377Y (en) * 2008-12-17 2009-10-21 贵州省桥梁工程总公司 Suspension rope towing device
CN204112221U (en) * 2014-10-22 2015-01-21 德阳天元重工有限公司 The box-like cord clip of a kind of soldering group
CN106480822A (en) * 2016-11-25 2017-03-08 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge
CN206667058U (en) * 2017-03-13 2017-11-24 中交第四公路工程局有限公司 A kind of across cable walking cord clip handling erecting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4981024U (en) * 1972-10-28 1974-07-13
CN101173501A (en) * 2007-11-26 2008-05-07 中铁大桥局集团第七工程有限公司 Cable jam-packed machine and its jamming method
CN201330377Y (en) * 2008-12-17 2009-10-21 贵州省桥梁工程总公司 Suspension rope towing device
CN204112221U (en) * 2014-10-22 2015-01-21 德阳天元重工有限公司 The box-like cord clip of a kind of soldering group
CN106480822A (en) * 2016-11-25 2017-03-08 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge
CN206667058U (en) * 2017-03-13 2017-11-24 中交第四公路工程局有限公司 A kind of across cable walking cord clip handling erecting device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642049A (en) * 2017-08-23 2018-01-30 柳州欧维姆机械股份有限公司 A kind of device and its installation method changed for main rope of suspension bridge cord clip
CN107642049B (en) * 2017-08-23 2023-07-07 柳州欧维姆机械股份有限公司 Device for replacing main cable clamp of suspension bridge and installation method of device
CN109338888A (en) * 2018-11-12 2019-02-15 中国十七冶集团有限公司 A kind of main rope of suspension bridge pre-tightens cable device and application method
CN110562396A (en) * 2019-10-10 2019-12-13 中船黄埔文冲船舶有限公司 Accommodation ladder winding and unwinding devices
CN110562396B (en) * 2019-10-10 2021-10-22 中船黄埔文冲船舶有限公司 Accommodation ladder winding and unwinding devices
CN113565002A (en) * 2021-06-30 2021-10-29 中国船舶重工集团应急预警与救援装备股份有限公司 Fastening and adjusting device for main cable of cross-tensioned steel rope
CN113848054A (en) * 2021-11-30 2021-12-28 中国能源建设集团山西电力建设有限公司 Method for testing load-bearing performance of chain block

Also Published As

Publication number Publication date
CN106758860B (en) 2019-01-25

Similar Documents

Publication Publication Date Title
CN106758860A (en) A kind of across cable walking cord clip handling erecting device and method
CN105645248B (en) A kind of steel reinforcement cage lifting device and method
CN101446066B (en) Erection method of stiffening girder of suspension bridge and device thereof
CN106988227A (en) A kind of suspension bridge steel truss girder rotary body device and construction method
CN107344697A (en) Cable boom hoisting
CN106976797A (en) Three suspension centres turn round suspender
CN203128099U (en) Slipping type pipeline lifting device
CN201325826Y (en) Rock anchor beam hoisting device for underground power house
CN103145049B (en) Inclined shaft material transporting system
CN105645275B (en) Cable hoist and its construction method
CN206667058U (en) A kind of across cable walking cord clip handling erecting device
CN209194361U (en) A kind of fixed structure of suspension cable bridge section lifting hoisting platform
CN203513086U (en) Special lifting appliance for long-bundle-shaped material
CN110409803A (en) Dismantle the hanging method of hydraulic mould lifting device center drum circle
CN206693031U (en) A kind of large-span suspension bridge cable crane load bearing system of head-rope parallel structure
CN205114823U (en) Supplementary instrument that lifts by crane that head sheave or leading wheel were used
CN212358007U (en) Tie bar pocket hanging device without temporary cross beam
CN207090834U (en) Cable boom hoisting
CN109322251A (en) A kind of fixed structure and fixing means of suspension cable bridge section lifting hoisting platform
CN107311048A (en) Cable crane
CN211769762U (en) Concrete box girder steel reinforcement cage integral hoisting device
CN108059088B (en) Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine
CN201473171U (en) Moving and lifting dual-purpose hanging device of cableway device
CN201212004Y (en) Wheel center spreader
CN207738303U (en) A kind of generator unit stator lifting steering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180410

Address after: 301700 Tianjin city Wuqing District Fuyuan Road on the north side of business headquarters building 10 layer B11

Applicant after: THE SIXTH ENGINEERING CO., LTD. OF CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd.

Address before: 100022 Chaoyang District, Jianguo Road, No. 91, golden center, block A, floor 27, Beijing

Applicant before: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd.

Applicant before: THE SIXTH ENGINEERING CO., LTD. OF CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190125