CN201330377Y - Suspension rope towing device - Google Patents

Suspension rope towing device Download PDF

Info

Publication number
CN201330377Y
CN201330377Y CNU200820303432XU CN200820303432U CN201330377Y CN 201330377 Y CN201330377 Y CN 201330377Y CN U200820303432X U CNU200820303432X U CN U200820303432XU CN 200820303432 U CN200820303432 U CN 200820303432U CN 201330377 Y CN201330377 Y CN 201330377Y
Authority
CN
China
Prior art keywords
hoist cable
jack
suspension rope
rope
interim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820303432XU
Other languages
Chinese (zh)
Inventor
王太普
杨光华
樊永波
张熙平
李忠贤
杨茂军
王骞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU BRIDGE ENGINEERING Co
Original Assignee
GUIZHOU BRIDGE ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU BRIDGE ENGINEERING Co filed Critical GUIZHOU BRIDGE ENGINEERING Co
Priority to CNU200820303432XU priority Critical patent/CN201330377Y/en
Application granted granted Critical
Publication of CN201330377Y publication Critical patent/CN201330377Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a suspension rope towing device, which comprises a temporary rope clamp (2) which is arranged on a main cable (1), and is characterized in that the temporary rope clamp (2) is connected with a jack (8) through a suspension rope (3), and the jack (8) is fixedly connected with a main truss (6) through a supporting beam (7). The temporary rope lamp is installed on the main cable, and the temporary suspension rope is lowered down to a bracket at the upper chord member on the main truss, so that the jack is towed to approach the upper chord member to the suspension rope anchor, and the permanent suspension rope is connected with the suspension point. The suspension rope towing device has the advantages of simple structure and convenient operation.

Description

The hoist cable draw-gear
Technical field
The utility model relates to a kind of hoist cable draw-gear, especially for the hoist cable draw-gear with the extremely permanent hoist cable position of the traction of the suspension centre on the main couple.
Background technology
Suspension bridge main couple and a slice main transverse frame by the installation of bridge floor loop wheel machine after, suspension centre place at this main couple connects the hoist cable anchor head, because main couple and the main transverse frame of present stage are in cantilever position, and hoist cable is in unstress state, hoisting point position is lower than the hoist cable anchor head, so need an interim trailer system with the height of the traction of the suspension centre on the main couple to permanent hoist cable.
Summary of the invention
The purpose of this utility model is: provide a kind of simple in structure, easy to operate hoist cable draw-gear, to overcome the deficiencies in the prior art.
The utility model is to constitute like this: structure comprises the interim cord clip that is arranged on the main push-towing rope, and interim cord clip is connected with jack by interim hoist cable, and jack is fixedlyed connected with main couple by joist.
Joist is connected with anchor head by the stretch-draw rod iron, and anchor head is connected with interim hoist cable.
The utility model is installed interim cord clip on main push-towing rope, and transfers interim hoist cable to the carriage at main couple upper chord place, the traction jack gradually with the upper chord suspension centre near the hoist cable anchor head, permanent hoist cable is connected with suspension centre.The utlity model has simple in structure, easy to operate advantage.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model;
Accompanying drawing 2 is an A-A sectional view in the accompanying drawing 1.
The specific embodiment
Embodiment of the present utility model: as shown in Figure 1, fix interim cord clip 2 on main push-towing rope 1, interim cord clip 2 adopts ears plate form, and interim cord clip 2 is connected with jack 8 by interim hoist cable 3, and jack 8 is connected with main couple 6 by joist 7 again.Concrete structure can be, joist 7 is connected with anchor head 4 by stretch-draw rod iron 5, and anchor head 4 is fixedlyed connected with interim hoist cable 3, is joist 7 in stretch-draw rod iron 5 bottoms, joist 7 is installed on the soffit of main couple 6 upper chords, is lined with rubber pad with main couple 6 upper chord position contacting.Be fixed with permanent hoist cable 9 on the main push-towing rope 1.
Stressedly evenly to adopt two cover draw-gears in order drawing, when carrying out towage, to guarantee that two jack strokes under every cover draw-gear are synchronous, gradually with the upper chord suspension centre near the hoist cable anchor head, permanent hoist cable 9 is connected with suspension centre.

Claims (2)

1. hoist cable draw-gear, structure comprises the interim cord clip (2) that is arranged on the main push-towing rope (1), it is characterized in that: interim cord clip (2) is connected with jack (8) by interim hoist cable (3), and jack (8) passes through joist (7) fixedlys connected with main couple (6).
2. hoist cable draw-gear according to claim 1 is characterized in that: joist (7) is connected with anchor head (4) by stretch-draw rod iron (5), and anchor head (4) is connected with interim hoist cable (3).
CNU200820303432XU 2008-12-17 2008-12-17 Suspension rope towing device Expired - Fee Related CN201330377Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820303432XU CN201330377Y (en) 2008-12-17 2008-12-17 Suspension rope towing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820303432XU CN201330377Y (en) 2008-12-17 2008-12-17 Suspension rope towing device

Publications (1)

Publication Number Publication Date
CN201330377Y true CN201330377Y (en) 2009-10-21

Family

ID=41223754

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820303432XU Expired - Fee Related CN201330377Y (en) 2008-12-17 2008-12-17 Suspension rope towing device

Country Status (1)

Country Link
CN (1) CN201330377Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776841A (en) * 2012-08-02 2012-11-14 贵州桥梁建设集团有限责任公司 Long-span steel truss suspension bridge jointing method and device
CN103225265A (en) * 2013-04-19 2013-07-31 林同棪国际工程咨询(中国)有限公司 Sidewise stretch-pull device for adjusting cable force of cable
CN106758860A (en) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 A kind of across cable walking cord clip handling erecting device and method
CN108625289A (en) * 2018-04-24 2018-10-09 中铁大桥勘测设计院集团有限公司 A kind of stringer and erection method suitable for stiffening girder of suspension bridge
TWI724864B (en) * 2020-04-14 2021-04-11 佳彧機械工程有限公司 Anti-tilt fixing device for cantilever working vehicle and fixing method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776841A (en) * 2012-08-02 2012-11-14 贵州桥梁建设集团有限责任公司 Long-span steel truss suspension bridge jointing method and device
CN103225265A (en) * 2013-04-19 2013-07-31 林同棪国际工程咨询(中国)有限公司 Sidewise stretch-pull device for adjusting cable force of cable
CN103225265B (en) * 2013-04-19 2015-12-09 林同棪国际工程咨询(中国)有限公司 Cable force regulates side direction tensioning equipment
CN106758860A (en) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 A kind of across cable walking cord clip handling erecting device and method
CN106758860B (en) * 2017-03-13 2019-01-25 中交四公局第六工程有限公司 Across the cable walking cord clip handling mounting device of one kind and method
CN108625289A (en) * 2018-04-24 2018-10-09 中铁大桥勘测设计院集团有限公司 A kind of stringer and erection method suitable for stiffening girder of suspension bridge
TWI724864B (en) * 2020-04-14 2021-04-11 佳彧機械工程有限公司 Anti-tilt fixing device for cantilever working vehicle and fixing method thereof

Similar Documents

Publication Publication Date Title
CN201301179Y (en) Crawler crane self-dismounting device
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN209584873U (en) The double interim rope self-balancing push mode suspension bridge sling replacing underpinning devices of straddle-type
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN201330377Y (en) Suspension rope towing device
CN201635020U (en) Bridge floor dismantling crane for large and medium concrete bridges
CN102444086A (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN102733615B (en) Unsymmetrical integral lifting construction method
CN103790114A (en) Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof
CN201801319U (en) Crane for pipe pile production
CN204298743U (en) Rope traction and the all-hydraulic deck unit erection gantry of lifting
CN202245831U (en) Boom raising device of super-lift mast of crane
CN105645275A (en) Cable hoisting crane and construction method thereof
CN203998746U (en) Portable suspension installation
CN111056455B (en) Concrete pouring positioning equipment for iron tower base of communication base station
CN201634333U (en) Super-altitude gantry crane
CN201952742U (en) Suspension bridge cable changing device
CN210886965U (en) Integrated anchoring device for lifting hanging basket
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN219508376U (en) Device for erecting super-long and super-heavy stay cable
CN202787087U (en) Hook-shaped cable saddle and support structure of track cable
CN201756422U (en) Two-head-suspension tower crane
CN101693501A (en) Deck unit erection gantry for hoisting by large deflection angle
CN205653068U (en) Reinforcement type gantry crane
CN202864771U (en) Hoisting system for glass curtain wall construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091021

Termination date: 20171217