CN201473171U - Moving and lifting dual-purpose hanging device of cableway device - Google Patents
Moving and lifting dual-purpose hanging device of cableway device Download PDFInfo
- Publication number
- CN201473171U CN201473171U CN2009201721219U CN200920172121U CN201473171U CN 201473171 U CN201473171 U CN 201473171U CN 2009201721219 U CN2009201721219 U CN 2009201721219U CN 200920172121 U CN200920172121 U CN 200920172121U CN 201473171 U CN201473171 U CN 201473171U
- Authority
- CN
- China
- Prior art keywords
- horizontal connecting
- fixed pulley
- hoist rope
- hoist
- hanging board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a moving and lifting dual-purpose hanging device of a cableway device, which belongs to a lifting and transporting device and is characterized in that the dual-purpose hanging device mainly comprises a hoist rope, a guide wheel, a movable pulley, a hoist hanging rack, a fixed pulley, a rope clip, a pin shaft and a hook, wherein the hoist hanging rack is formed by arranging the fixed pulley, a front left hanging plate and a back left hanging plate in the left shaft holes of two strip-shaped horizontal connecting plates arranged front and back and arranging the guide wheel, a front right hanging plate and a back right hanging plate in the right shaft holes, the fixed pulley is arranged under the middle section of the two horizontal connecting plates arranged front and back, one end of the hoist rope is introduced in from the upper part of the guide wheel, is moved around the lower part of the fixed pulley and then is penetrated into the fixed pulley from the upper part, the end of the hoist rope is fixed on a close hoist rope section by the rope clip after being led out from the lower part by being moved around the fixed pulley, the other end of the hoist rope is connected with an additionally arranged hoist winch, and the movable pulley is connected with a lifting hook. Under the action of traction and the hoist rope, the utility model has two functions of transportation and lifting, saves labor and time and is safe.
Description
Technical field
The utility model belongs to overhead hoist, especially relates to a kind of erecting by overhang of aerial cableway.
Background technology
The support on installation, the especially ropeway line of aerial rope way equipment and the installation of equipment at present all causes great difficulty because topography-geomorphology is precipitous, the fabricating yard is too narrow; Generally all be to adopt autogyro to carry out equipment hoisting abroad, and that China does not also possess at present the condition of this respect and experience and cost of installation is too high, the existing aerial cableway field engineering of China also rests on the 80s and 90s, the orthodox method of " upright mast draws cable rope; hang the pulley reeve and advance winch " is often being used in the installation of each support and equipment in the past, the configuration of a large amount of human resources and worker's facility, repeat the installing/dismounting work of mast, increased the work work capacity, increased the waste of human and material resources, directly influence construction production safety and construction speed, adopted afterwards and set up interim cableway, came pipe-hanging hook or equipment, and drew sport car with traction steel rope of cable and transport with ropeway carrying-rope and special-purpose cantilevered sport car, but still hang support and equipment with bottle gouard moved by hands, still influence construction speed and have potential safety hazard.
Summary of the invention
The purpose of this utility model be a kind of aerial cableway proposed move, lift dual-purpose erecting by overhang, utilize ropeway carrying-rope, trailing cable and the special-purpose transportation mobile transportation function that sport car had of interim cableway, increase hoisting function, not only easy to use, save a large amount of manpower and materials, cost-cutting, and safe and reliable, guarantee construction speed.
The purpose of this utility model is achieved like this, a kind of aerial cableway move, lift dual-purpose erecting by overhang, it is characterized in that: the moving of this aerial cableway, the dual-purpose erecting by overhang of lifting mainly are made up of hoist rope, track adjusting wheel, movable pulley, lifting hanger, fixed pulley, wire clips, bearing pin and suspension hook; The lifting hanger is the left side at the horizontal connecting plate of two block length bar shapeds of front and back setting, offer left axis hole and right axis hole on the right-hand member section respectively symmetrically, with bearing pin or screw rod the left hanging board of fixed pulley and front and back two block length bar shapeds is installed in the left axis hole of the horizontal connecting plate that is provided with in front and back, and make fixed pulley between the horizontal connecting plate in front and back, the right hanging board of track adjusting wheel and front and back two block length bar shapeds is installed and is made track adjusting wheel between the horizontal connecting plate in front and back with bearing pin or screw rod in the right axis hole of the horizontal connecting plate that is provided with in front and back, upper shaft hole spuds in respectively on the upper end section of each left hanging board and each right hanging board, during use, in upper shaft hole, install bearing pin or bolt, this lifting hanger is connected with special-purpose transportation sport car; The middle pars infrasegmentalis of two horizontal connecting plates that front and back are provided with is made the arc section of indent, below the stage casing of two horizontal connecting plates that are provided with in front and back movable pulley is set, one end of hoist rope is introduced by the top of guide wheel, penetrate fixed pulley from the top again after walking around the lower circumference groove of movable pulley downwards, after walking around fixed pulley and drawing from the bottom, this end section of hoist rope is fixed with wire clips and close hoist rope section, the other end of hoist rope links to each other with the hoisting winding that other establishes, the suspension hook below connection on the movable pulley is positioned at it; During work, the aerial cableway of as ready is hung on the suspension hook after with the suspender belt binding, start the hoisting winding of establishing in addition, hoist rope drives movable pulley and rises, make suspension hook sling aerial cableway and hang over special use and transport on the sport car, at this moment, start rack winch and hoisting winding and synchronize them work simultaneously; After equipment is drawn to assigned address, stop rack winch and hoisting winding simultaneously, single then startup hoisting winding puts equipment to ground, stops; As wanting hanging device in place, as long as start and the counter-rotating winch just can be installed equipment hoisting is in place, just possessed transportation, lifted two kinds of functions, saving of work and time is safety again.
The aerial cableway that the utility model proposed move, lift dual-purpose erecting by overhang, rational in infrastructure, increase hoisting function, not only easy to use, save a large amount of manpower and materials, cost-cutting, and safe and reliable guarantees construction speed.
Now in conjunction with the accompanying drawings and embodiments the moving of aerial cableway that the utility model proposes, the dual-purpose erecting by overhang of lifting are described further.
Description of drawings
Fig. 1 is that the master of the moving of the aerial cableway that proposes of the utility model, the dual-purpose erecting by overhang of lifting looks scheme drawing.
Fig. 2 is a part 4 among Fig. 1: the scheme drawing of lifting hanger.
Among Fig. 1, Fig. 2: 1, hoist rope 2, track adjusting wheel 3, movable pulley 4, lifting hanger 5, fixed pulley 6, wire clips 7, right hanging board 8, suspension hook 9, left hanging board 10, horizontal connecting plate 11, bearing pin
The specific embodiment
From Fig. 1, Fig. 2 as can be seen: a kind of aerial cableway move, lift dual-purpose erecting by overhang, it is characterized in that: the moving of this aerial cableway, the dual-purpose erecting by overhang of lifting mainly are made up of hoist rope 1, track adjusting wheel 2, movable pulley 3, lifting hanger 4, fixed pulley 5, wire clips 6 and suspension hook 8; Lifting hanger 4 is mainly by horizontal connecting plate 10, left side hanging board 9, right hanging board 7 and bearing pin 11 are formed, the left side of the horizontal connecting plate 10 of two block length bar shapeds that is provided with in front and back, offer left axis hole and right axis hole on the right-hand member section respectively symmetrically, with bearing pin 11 or screw rod the left hanging board 9 of fixed pulley 5 and front and back two block length bar shapeds is installed in the left axis hole of the horizontal connecting plate 10 that is provided with in front and back, and make fixed pulley 5 between the horizontal connecting plate 10 of front and back setting, in the right axis hole of the horizontal connecting plate 10 that is provided with in front and back also with the right hanging board 7 of bearing pin 11 or screw rod installation track adjusting wheel 2 and front and back two block length bar shapeds and make track adjusting wheel 2 between the horizontal connecting plate 10 in front and back, upper shaft hole spuds in respectively on the upper end section of each left hanging board 9 and each right hanging board 7, during use, in upper shaft hole, install bearing pin or bolt, this lifting hanger 4 is connected with special-purpose transportation sport car; The middle pars infrasegmentalis of two horizontal connecting plates 10 that front and back are provided with is made the arc section of indent, below the stage casing of two horizontal connecting plates 10 that are provided with in front and back movable pulley 3 is set, the left end of hoist rope 1 is introduced by the top of guide wheel 2, penetrate fixed pulley 5 again from the top after walking around the lower circumference groove of movable pulley 3 downwards, after walking around fixed pulley 5 and drawing from the bottom, the left end section of hoist rope 1 is fixed with wire clips 6 and close hoist rope section, the right-hand member of hoist rope 1 links to each other with the hoisting winding that other establishes, the suspension hook 8 below connection on the movable pulley 3 is positioned at it; During work, the aerial cableway of as ready is hung on the suspension hook 8 after with the suspender belt binding, start the hoisting winding of establishing in addition, hoist rope 1 drives movable pulley 3 and rises, make suspension hook 8 sling aerial cableway and hang over special use and transport on the sport car, at this moment, start rack winch and hoisting winding and synchronize them work simultaneously; After equipment is drawn to assigned address, stop rack winch and hoisting winding simultaneously, single then startup hoisting winding puts equipment to ground, stops; As wanting hanging device in place, as long as start and the counter-rotating winch just can be installed equipment hoisting is in place, just possessed transportation, lifted two kinds of functions, saving of work and time is safety again.
Claims (1)
- An aerial cableway move, lift dual-purpose erecting by overhang, it is characterized in that:The dual-purpose erecting by overhang that moves, lifts of a, this aerial cableway mainly is made up of hoist rope (1), track adjusting wheel (2), movable pulley (3), lifting hanger (4), fixed pulley (5), wire clips (6) and suspension hook (8);B, lifting hanger (4) is mainly by horizontal connecting plate (10), left side hanging board (9), right hanging board (7) and bearing pin (11) are formed, the left side of the horizontal connecting plates of two block length bar shapeds (10) that are provided with in front and back, offer left axis hole and right axis hole on the right-hand member section respectively symmetrically, with bearing pin (11) or screw rod the left hanging board (9) of fixed pulley (5) and front and back two block length bar shapeds is installed in the left axis hole of the horizontal connecting plate (10) that is provided with in front and back, and fixed pulley (5) is positioned between the horizontal connecting plate (10) of front and back setting, also use bearing pin (11) or screw rod that the right hanging board (7) of track adjusting wheel (2) and front and back two block length bar shapeds is installed in the right axis hole of the horizontal connecting plate (10) that is provided with in front and back and track adjusting wheel (2) is positioned between the horizontal connecting plates in front and back (10), upper shaft hole spuds in respectively on the upper end section of each left hanging board (9) and each right hanging board (7);C, the middle pars infrasegmentalis of two horizontal connecting plates (10) that front and back are provided with is made the arc section of indent, the below in the stage casing of the two horizontal connecting plates (10) that are provided with in front and back is provided with movable pulley (3), the left end of hoist rope (1) is introduced by the top of guide wheel (2), penetrate fixed pulley (5) again from the top after walking around the lower circumference groove of movable pulley (3) downwards, after walking around fixed pulley (5) and drawing from the bottom, the left end section of hoist rope (1) is fixed with wire clips (6) and close hoist rope section, the right-hand member of hoist rope (1) links to each other with the hoisting winding that other establishes, and goes up at movable pulley (3) to connect the suspension hook (8) that is positioned at its below.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201721219U CN201473171U (en) | 2009-05-15 | 2009-05-15 | Moving and lifting dual-purpose hanging device of cableway device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201721219U CN201473171U (en) | 2009-05-15 | 2009-05-15 | Moving and lifting dual-purpose hanging device of cableway device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201473171U true CN201473171U (en) | 2010-05-19 |
Family
ID=42409415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201721219U Expired - Fee Related CN201473171U (en) | 2009-05-15 | 2009-05-15 | Moving and lifting dual-purpose hanging device of cableway device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201473171U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836109A (en) * | 2017-03-14 | 2017-06-13 | 辽宁华三建设工程技术有限公司 | A kind of hanging building foot guard repairing treatment suspension platform device |
CN107600427A (en) * | 2017-09-22 | 2018-01-19 | 襄阳宏伟航空器有限责任公司 | A kind of unmanned plane airdrop platform |
-
2009
- 2009-05-15 CN CN2009201721219U patent/CN201473171U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836109A (en) * | 2017-03-14 | 2017-06-13 | 辽宁华三建设工程技术有限公司 | A kind of hanging building foot guard repairing treatment suspension platform device |
CN106836109B (en) * | 2017-03-14 | 2022-07-05 | 辽宁华三建设工程技术有限公司 | Suspended platform device for protecting, repairing and processing bottom of suspended building |
CN107600427A (en) * | 2017-09-22 | 2018-01-19 | 襄阳宏伟航空器有限责任公司 | A kind of unmanned plane airdrop platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201377184Y (en) | Ultra-long roofing contour plate vertical lifting transporting device | |
CN201458517U (en) | End horizontal pull type rail tank car hanger | |
CN205387439U (en) | Mast hoisting accessory | |
CN202754713U (en) | Hoisting portal frame | |
CN202245708U (en) | Automatic gripping and moving device for concrete pipe pile cover mold | |
CN204281061U (en) | A kind of can the combined sling of automatic releasing hook | |
CN201473171U (en) | Moving and lifting dual-purpose hanging device of cableway device | |
CN201713229U (en) | Steel box girder cable-loaded crane for suspension bridge construction | |
CN202808173U (en) | Lifting device special for lateral columns | |
CN203033638U (en) | Lifting device for hoisting slewing support rings of excavator | |
CN202390116U (en) | High-intensity small-tonnage hoist | |
CN202717497U (en) | Lifting device of prefabricated composite floor slab | |
CN203033677U (en) | Crane for finished products | |
CN105645275A (en) | Cable hoisting crane and construction method thereof | |
CN105329766A (en) | Automatic balance type lifting beam | |
CN206985581U (en) | A kind of chain block for preventing hoisting-chain from skidding | |
CN206288881U (en) | A kind of tower crane counter-jib dumping device | |
CN201762053U (en) | Simple automatic derrick | |
CN209367692U (en) | It is a kind of to rise gantry type two-way lifter device certainly | |
CN203976242U (en) | A kind of generator unit stator associating hanging apparatus | |
CN209836818U (en) | Large-tonnage cable saddle gliding and mounting system for ultra-long large-inclination-angle tunnel anchor | |
CN205906936U (en) | Glass curtain wall hoisting construction system | |
CN201212004Y (en) | Wheel center spreader | |
CN214653086U (en) | Single-beam crane capable of weakening swinging of lifting hook | |
CN205634685U (en) | Cable crane hoist |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100519 Termination date: 20160515 |