CN106480822A - A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge - Google Patents

A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge Download PDF

Info

Publication number
CN106480822A
CN106480822A CN201611058841.3A CN201611058841A CN106480822A CN 106480822 A CN106480822 A CN 106480822A CN 201611058841 A CN201611058841 A CN 201611058841A CN 106480822 A CN106480822 A CN 106480822A
Authority
CN
China
Prior art keywords
hoist cable
sling
suspension bridge
tugboat
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611058841.3A
Other languages
Chinese (zh)
Other versions
CN106480822B (en
Inventor
王戒躁
陈志敏
李伟
林宁
林一宁
江湧
国洪光
谢翔
石恒
张军
彭泽伟
刘健
赵文圣
张超福
杨先权
丁运波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Wuhan Bridge Special Technology Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Wuhan Bridge Special Technology Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, Wuhan Bridge Special Technology Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201611058841.3A priority Critical patent/CN106480822B/en
Publication of CN106480822A publication Critical patent/CN106480822A/en
Application granted granted Critical
Publication of CN106480822B publication Critical patent/CN106480822B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention discloses a kind of suspension bridge sling replacing system and the method changing sling of suspension bridge, for changing sling of suspension bridge, is related to suspension bridge sling replacing technical field, this system includes:Cord clip;It is installed on the tugboat on described cord clip, described tugboat includes base and some rollers, described roller is installed on described base, arcuately path forms the traction path of arc to some described rollers side by side;Suspender above described cord clip, described suspender is used for lifting by crane described hoist cable to be changed between described cord clip and described traction path;Two hoist engines, described hoist engine is connected with the anchor head being respectively arranged on described hoist cable both ends by steel wire rope.The present invention can quickly, easily change hoist cable under relatively low sling height.

Description

A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge
Technical field
The present invention relates to suspension bridge sling replacing technical field is and in particular to a kind of suspension bridge sling replacing system and replacing The method of sling of suspension bridge.
Background technology
Suspension bridge, the cable (or steel chain) referring to hang by Sarasota and be anchored in two sides (or bridge two ends) is used as top The bridge of the main supporting member of structure.Its cable geometry is determined by the equilibrium condition of power, normally close to parabola.From cable Hang down many hoist cables, and bridge floor is hung.During long-term use, sling of suspension bridge occurs various diseases, main Including:(1) upper and lower anchor head corrosion;(2) anchor loosen, lost efficacy, stripped thread;(3) steel wire corrosion or fatigue breaking in hoist cable;(4) Hoist cable protective jacket breakage is aging, cracking, damaged;(5) hoist cable axis off normal, drop shot rope is cut;(6) hoist cable steel strand wires or steel wire are subject to Power is uneven.Due to sling of suspension bridge there are these diseases so that the serious potential safety hazards of the security presence of bridge need right Sling of suspension bridge is changed.
After the method that hoist cable removed by prior art centre suspension cord bridge is releasing lower anchor head constraint, using lifting appliance from cord clip top Wire rope sling is directly lifted out the height of main push-towing rope directly over cord clip by portion upwards, and the sling height of lifting appliance need to be more than master Cable presss from both sides the twice of height.Because large-span suspension bridge king-tower is highly high, king-post vicinity wire rope sling length is longer, typically The sling height write of bridge floor hoisting machine require all to meet so high construction requirement.
Content of the invention
For defect present in prior art, it is an object of the invention to provide a kind of suspension bridge sling replacing system and The method changing sling of suspension bridge, can quickly, easily change hoist cable under relatively low sling height.
For reaching object above, the present invention adopts the technical scheme that:
A kind of suspension bridge sling replacing system, for changing sling of suspension bridge, including:
Cord clip;
It is installed on the tugboat on described cord clip, described tugboat includes base and some rollers, described roller is installed on described On base, arcuately path forms the traction path of arc to some described rollers side by side;
Suspender above described cord clip, described suspender is used for lifting by crane described hoist cable on described cord clip and described traction road Change between footpath;
Two hoist engines, described hoist engine is connected with the anchor head being respectively arranged on described hoist cable both ends by steel wire rope.
On the basis of technique scheme, described base includes the circular side plate of two halves, and biside plate is oppositely arranged in parallel, Some rollers are located at described in two between side plate, and some described rollers are along the curved edge interval setting successively of described side plate.
On the basis of technique scheme, described roller includes roller and roller bearing, and the two ends of described roller bearing are respectively mounted On side plate described in two, on the sheathed described roller bearing of described roller, described roller surface is provided with arc-shaped concave, and some described rollers are recessed Face forms described traction path.
On the basis of technique scheme, the bottom two ends of described side plate are provided with otic placode, and described otic placode is provided with positioning Hole.
On the basis of technique scheme, described in two, between side plate, it is provided with the first reinforcing plate connecting side plate described in two.
On the basis of technique scheme, the one side of described side plate is provided with two second reinforcing plates, two second reinforcements Plate is oppositely arranged perpendicular to the bottom of described side plate.
On the basis of technique scheme, described suspender is provided with for corresponding making with the middle point identification on described hoist cable Centering identifies.
A kind of method changing sling of suspension bridge, comprises the following steps that:
Using suspender by old hoist cable from the traction path that tugboat hung oneself by locker, and so that old hoist cable is crossed on tugboat;
Wherein one hoist engine winds old hoist cable from one end of old hoist cable, until the anchor head of the old hoist cable other end removes tugboat, By the steel wire rope of the old hoist cable other end, hoist cable is transferred to bridge floor, complete the winding of old hoist cable;
The anchor head of new hoist cable one end is drawn to the replacing position of new hoist cable, a hoist engine connects anchor head by steel wire rope, And steel wire rope is crossed on the traction path of tugboat, new hoist cable is above carried to the traction path of tugboat by hoist engine winding steel wire rope On, hoist engine persistently winds steel wire rope, until new hoist cable reaches installation site;
Using suspender by new hoist cable from the traction path of tugboat sling decentralization to locker, make new hoist cable be crossed on locker On, and new hoist cable is fixed.
On the basis of technique scheme, the winding direction of old hoist cable is direction winding, the receipts of new hoist cable to inside bridge Volume direction is to the winding of bridge lateral direction.
On the basis of technique scheme, the anchor head of old hoist cable and new rope end is enclosed with rubber blanket.
Compared with prior art, it is an advantage of the current invention that:
The kind suspension bridge sling replacing system of the present invention is it is adaptable to change that sling length is long, and the rising of lifting appliance Hang in the case that height is unsatisfactory for construction requirement and hoist cable is changed, to needing hoist cable is transferred on tugboat, using elevator Machine moves dragging hoist cable on tugboat, the installation of hoist cable and remove all more convenient, and can solve the problem that hanging device lifting is high The problem that degree is not enough, has the advantages that easy for installation, to have bad luck convenient, cheap and effect high.
Brief description
Fig. 1 is the use state figure of the embodiment of the present invention;
Fig. 2 is the structural representation of tugboat in the embodiment of the present invention;
Fig. 3 is the side view of tugboat in the embodiment of the present invention;
Fig. 4 is the structural representation of roller in the embodiment of the present invention;
Fig. 5 is the structural representation after old hoist cable transfer in the embodiment of the present invention;
Fig. 6 is the structural representation in old hoist cable moving process in the embodiment of the present invention;
Fig. 7 is the structural representation after old hoist cable mobile end in the embodiment of the present invention;
Fig. 8 is that in the embodiment of the present invention, new hoist cable moves the structural representation starting;
Fig. 9 is for hoist cable new in the embodiment of the present invention to structural representation during dislocation;
Figure 10 is the structural representation after new hoist cable dislocation in the embodiment of the present invention;
Figure 11 is that in the embodiment of the present invention, new hoist cable turns the structural representation being installed in place after fixing.
In figure:1- cord clip, 2- tugboat, 20- base, 21- roller, 22- side plate, 23- roller, 24- roller bearing, 25- draws road Footpath, 26- otic placode, 27- first reinforcing plate, 28- second reinforcing plate, 3- suspender, 30- centering identifies, 4- anchor head, and 5- hoist cable, in 50- Point identification.
Specific embodiment
Below in conjunction with drawings and Examples, the present invention is described in further detail.
Referring to shown in Fig. 1 to Fig. 4, the embodiment of the present invention provides a kind of suspension bridge sling replacing system, for changing suspension cable Bridge crane rope 5, including:
Cord clip 1, locker 1 has some hoist cables 5, if hoist cable therein 5 damages, needs it is changed;
It is installed on the tugboat 2 on cord clip 1, tugboat 2 includes base 20 and some rollers 21, roller 21 is installed on base, Arcuately path forms the traction path 25 of arc to some rollers 21 side by side, and the old hoist cable before replacing needs to move from traction path 25 Go out, the new hoist cable after replacing needs to move into locker 1 from traction path;When making hoist cable removal or move into, Bu Huiyu Locker 1 surface rubs, destroy locker 1, and draw path 25 be arc so that in hoist cable moving process will not interim card, The mobile pull strength needing of hoist cable is less.
Base 20 includes the circular side plate 22 of two halves, and biside plate is oppositely arranged in parallel, and some rollers 21 are located at biside plate 22 Between, and some rollers 21 are along the curved edge interval setting successively of side plate 22.The bottom two ends of side plate 22 are provided with otic placode 26, ear Plate 26 is provided with location hole.The bottom of side plate 22 is bolted on cord clip 1, in installation process, side plate 22 bottom two The otic placode 26 at end can limit the installation site of base 20, quickly and easily mounting seat 20.Roller 21 includes roller 23 and rolling Axle 24, the two ends of roller bearing 24 are respectively arranged on biside plate 22, and on the sheathed roller bearing 24 of roller 23, it is recessed that roller 23 surface is provided with arc Face, some roller concave surfaces form traction path 25 it is ensured that not deviating by tugboat 2 in hoist cable sliding process, slide out from tugboat 2 Go.It is provided with the first reinforcing plate 27 connecting biside plate 22 between biside plate 22.The one side of side plate 22 is provided with two second reinforcements Plate 28, two second reinforcing plates 289 are oppositely arranged perpendicular to the bottom of side plate 22.In the slipping of hoist cable 5, rotated by roller The frictional force between tugboat 2 and hoist cable can be reduced, because the weight ratio of hoist cable is larger, setting reinforcing plate can increase tugboat 2 Structural strength, also reduce the volume of tugboat 2 simultaneously.
Referring to shown in Fig. 9 and Figure 10, located at the suspender 3 of cord clip 1 top, suspender 3 is used for lifting by crane hoist cable 5, and sets on suspender 3 There is centering mark 30 corresponding with halfway mark on hoist cable 50;The middle point identification 50 of new hoist cable when new hoist cable moves into, can be passed through Corresponding with centering mark 30, and stop mobile new hoist cable.Effectively prevent the mobile hoist cable of blindness so that hoist cable can be quickly accurate True is installed in place, and accelerates construction effect.
Two hoist engines, hoist engine is connected with the anchor head 4 being respectively arranged on hoist cable 5 both ends by steel wire rope, a hoist engine Draw, another hoist engine is used as insurance.
With reference to shown in Fig. 5 to Figure 11, providing a kind of method changing sling of suspension bridge, comprise the following steps that:
Shown in Figure 5, using suspender 3 by old hoist cable from the traction path 25 that tugboat 2 hung oneself by locker 4, and make old Hoist cable is crossed on tugboat 2;
Shown in Figure 6, wherein one hoist engine winds old hoist cable from one end of old hoist cable, the winding direction of hoist engine be to Direction winding inside bridge, referring to described in Fig. 7, with the winding of hoist engine, old hoist cable moves on traction path 25, until old hoist cable The anchor head removal tugboat 2 of the other end, and wrapped up rubber blanket on anchor head before anchor head removes tugboat 2, prevent anchor head and tugboat 2 Traction path 25 collide;After anchor head is fully removed tugboat 2, the steel wire rope of the old hoist cable other end is crossed on tugboat 2 On traction path 25, by the steel wire rope of the old hoist cable other end, hoist cable is transferred to bridge floor, complete the winding of old hoist cable;
Shown in Figure 8, the anchor head of new hoist cable one end is drawn to the replacing position of new hoist cable, a hoist engine passes through steel wire Rope connects anchor head, and steel wire rope is crossed on the traction path 25 of tugboat 2, and hoist engine winding steel wire rope drives new hoist cable to move, volume The winding direction raising machine is to the winding of bridge lateral direction, new hoist cable is above carried to the traction path 25 of tugboat 2, hoist engine is lasting Winding steel wire rope, and the anchor head movement of new hoist cable one end wraps up rubber blanket to before tugboat 2 on anchor head, until new hoist cable reaches Installation site, shown in Figure 9, the middle point identification of installed position steel wire rope is relative with the centering home position of suspender;
Referring to shown in Figure 10 and Figure 11, using suspender, new hoist cable is sling decentralization to locker 4 from the traction path 25 of tugboat 2 On, and so that new hoist cable is crossed on locker 4, and new hoist cable is fixed.Using in installation process, can repeat above Step, new hoist cable of slinging moves after fine setting on the traction path 25 of tugboat 2, then transfers to locker 4.
To be hung on old hoist cable on tugboat 2 using suspender, old hoist cable wound by hoist engine, compare replacing old hoist cable when The sling height of suspender, in the present invention, the sling height of suspender only needs to slightly higher than tugboat 2, and sling height is relatively low and right Suspender requires also not high, the hoist engine old hoist cable of winding, sliding on tugboat, and the frictional force between old hoist cable and tugboat is less, tool There have the advantages that to be time saving and energy saving.
First will be mentioned on new hoist cable on tugboat 2 using hoist engine, after sliding puts in place on tugboat 2, then will be dragged by suspender Wheel is transferred on locker 4, and during this, the sling height of suspender is still very low, directly hangs with respect to suspender of the prior art For being attached on locker, the efficiency of construction of the present invention is higher.
The present invention is not limited to above-mentioned embodiment, for those skilled in the art, without departing from On the premise of the principle of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as the protection of the present invention Within the scope of.The content not being described in detail in this specification belongs to prior art known to professional and technical personnel in the field.

Claims (10)

1. a kind of suspension bridge sling replacing system, for changing sling of suspension bridge (5) it is characterised in that including:
Cord clip (1);
It is installed on the tugboat (2) on described cord clip (1), described tugboat (2) includes base (20) and some rollers (21), described rolling Wheel (21) is installed on described base, and arcuately path forms the traction path (25) of arc to some described rollers (21) side by side;
Suspender (3) above described cord clip (1), described suspender (3) is used for lifting by crane described hoist cable (5) in described cord clip (1) Change and described traction path (25) between;
Two hoist engines, described hoist engine is connected with the anchor head (4) being respectively arranged on described hoist cable (5) both ends by steel wire rope.
2. suspension bridge sling replacing system as claimed in claim 1 it is characterised in that:It is circular that described base (20) includes two halves Side plate (22), biside plate is oppositely arranged in parallel, and some rollers (21) are between side plate described in two (22), and some described rollings Wheel (21) is along the curved edge interval setting successively of described side plate (22).
3. suspension bridge sling replacing system as claimed in claim 2 it is characterised in that:Described roller (21) includes roller (23) With roller bearing (24), the two ends of described roller bearing (24) are respectively arranged on side plate described in two (22), and described roller (23) is sheathed described On roller bearing (24), described roller (23) surface is provided with arc-shaped concave, and some described roller concave surfaces form described traction path (25).
4. suspension bridge sling replacing system as claimed in claim 2 it is characterised in that:The bottom two ends of described side plate (22) set There is otic placode (26), described otic placode (26) is provided with location hole.
5. suspension bridge sling replacing system as claimed in claim 2 it is characterised in that:The company of being provided between side plate described in two (22) Connect first reinforcing plate (27) of side plate described in two (22).
6. suspension bridge sling replacing system as claimed in claim 2 it is characterised in that:Set on the one side of described side plate (22) There are two second reinforcing plates (28), two second reinforcing plates (289) are oppositely arranged perpendicular to the bottom of described side plate (22).
7. suspension bridge sling replacing system as claimed in claim 1 it is characterised in that:Described suspender (3) be provided with for Corresponding centering mark (30) using of middle point identification (50) on described hoist cable (5).
8. a kind of replacing sling of suspension bridge based on suspension bridge sling replacing system as described in any one of claim 1~7 Method is it is characterised in that comprise the following steps that:
Using suspender (3) by old hoist cable from the traction path (25) that tugboat (2) hung oneself by locker (4), and make old hoist cable across setting On tugboat (2);
Wherein one hoist engine winds old hoist cable from one end of old hoist cable, until anchor head removal tugboat (2) of the old hoist cable other end, leads to The steel wire rope crossing the old hoist cable other end transfers hoist cable to bridge floor, completes the winding of old hoist cable;
The anchor head of new hoist cable one end is drawn to the replacing position of new hoist cable, a hoist engine connects anchor head by steel wire rope, and steel Cord is crossed on the traction path (25) of tugboat (2), and new hoist cable is above carried to the traction of tugboat (2) by hoist engine winding steel wire rope On path (25), hoist engine persistently winds steel wire rope, until new hoist cable reaches installation site;
Using suspender by new hoist cable from the traction path (25) of tugboat (2) sling decentralization to locker (4), so that new hoist cable is crossed on On locker (4), and new hoist cable is fixed.
9. as claimed in claim 7 change sling of suspension bridge method it is characterised in that:The winding direction of old hoist cable is to bridge The winding of inner side direction, the winding direction of new hoist cable is to the winding of bridge lateral direction.
10. as claimed in claim 7 change sling of suspension bridge method it is characterised in that:Old hoist cable and new rope end Anchor head is enclosed with rubber blanket.
CN201611058841.3A 2016-11-25 2016-11-25 A kind of suspension bridge sling replacing system and the method for replacing sling of suspension bridge Active CN106480822B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611058841.3A CN106480822B (en) 2016-11-25 2016-11-25 A kind of suspension bridge sling replacing system and the method for replacing sling of suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611058841.3A CN106480822B (en) 2016-11-25 2016-11-25 A kind of suspension bridge sling replacing system and the method for replacing sling of suspension bridge

Publications (2)

Publication Number Publication Date
CN106480822A true CN106480822A (en) 2017-03-08
CN106480822B CN106480822B (en) 2018-07-06

Family

ID=58275248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611058841.3A Active CN106480822B (en) 2016-11-25 2016-11-25 A kind of suspension bridge sling replacing system and the method for replacing sling of suspension bridge

Country Status (1)

Country Link
CN (1) CN106480822B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758860A (en) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 A kind of across cable walking cord clip handling erecting device and method
CN107165050A (en) * 2017-06-29 2017-09-15 中铁大桥科学研究院有限公司 A kind of cord clip of suspension bridge screw rod axle power construction method
CN109537476A (en) * 2018-12-10 2019-03-29 河海大学 The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4264996A (en) * 1977-11-14 1981-05-05 Rudolf Baltensperger Suspension-cable support saddle for track-type suspended railway
JPH02167907A (en) * 1988-12-21 1990-06-28 Taisei Corp Method for installing stay cable for cable stayed bridge
KR20090000443A (en) * 2007-06-28 2009-01-07 대림산업 주식회사 Pulley block passing-device for pws cable installation in suspension bridges
CN201678360U (en) * 2010-04-15 2010-12-22 中国石油化工集团公司 Hoist for hoisting equipment
CN201952742U (en) * 2010-12-15 2011-08-31 江苏法尔胜新日制铁缆索有限公司 Suspension bridge cable changing device
CN202047306U (en) * 2010-12-31 2011-11-23 上海浦江缆索股份有限公司 Shaping device for unwinding cable strands
CN203393627U (en) * 2013-07-04 2014-01-15 中交二公局第五工程有限公司 Long cable traction automatic pressure balancing supporting frame
CN203546614U (en) * 2013-10-30 2014-04-16 中交二航局第四工程有限公司 Suspension bridge main cable erecting device
CN206438402U (en) * 2016-11-25 2017-08-25 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4264996A (en) * 1977-11-14 1981-05-05 Rudolf Baltensperger Suspension-cable support saddle for track-type suspended railway
JPH02167907A (en) * 1988-12-21 1990-06-28 Taisei Corp Method for installing stay cable for cable stayed bridge
KR20090000443A (en) * 2007-06-28 2009-01-07 대림산업 주식회사 Pulley block passing-device for pws cable installation in suspension bridges
CN201678360U (en) * 2010-04-15 2010-12-22 中国石油化工集团公司 Hoist for hoisting equipment
CN201952742U (en) * 2010-12-15 2011-08-31 江苏法尔胜新日制铁缆索有限公司 Suspension bridge cable changing device
CN202047306U (en) * 2010-12-31 2011-11-23 上海浦江缆索股份有限公司 Shaping device for unwinding cable strands
CN203393627U (en) * 2013-07-04 2014-01-15 中交二公局第五工程有限公司 Long cable traction automatic pressure balancing supporting frame
CN203546614U (en) * 2013-10-30 2014-04-16 中交二航局第四工程有限公司 Suspension bridge main cable erecting device
CN206438402U (en) * 2016-11-25 2017-08-25 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758860A (en) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 A kind of across cable walking cord clip handling erecting device and method
CN106758860B (en) * 2017-03-13 2019-01-25 中交四公局第六工程有限公司 Across the cable walking cord clip handling mounting device of one kind and method
CN107165050A (en) * 2017-06-29 2017-09-15 中铁大桥科学研究院有限公司 A kind of cord clip of suspension bridge screw rod axle power construction method
CN107165050B (en) * 2017-06-29 2019-01-04 中铁大桥科学研究院有限公司 A kind of cord clip of suspension bridge screw rod axle power construction method
CN109537476A (en) * 2018-12-10 2019-03-29 河海大学 The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device
CN109537476B (en) * 2018-12-10 2024-02-23 河海大学 Pin lug type double-temporary-rope self-balancing pulling type suspension bridge sling replacement underpinning device

Also Published As

Publication number Publication date
CN106480822B (en) 2018-07-06

Similar Documents

Publication Publication Date Title
CN204676869U (en) For the travelling cradle of curtain wall construction
CN102444086A (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN105800490A (en) Method for replacing crane main hook steel wire rope
CN106480822A (en) A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge
CN104167694A (en) Method for laying cable with hemp ropes in vertical shaft of mine
CN204355946U (en) A kind of device lifting large wt pts
CN108516464A (en) A kind of accompanying cable vertical lifting system of wirerope and its construction method
CN109973130B (en) Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand
CN203306916U (en) Large-size wire coil hanger
WO2019196660A1 (en) Integral bridge deck crane for central cable plane steel box girder
CN206438402U (en) A kind of suspension bridge sling replacing system
CN105645275B (en) Cable hoist and its construction method
CN201722053U (en) Hoisting mechanism used for upright column hoisting
CN208249717U (en) A kind of accompanying cable vertical lifting system of wirerope
CN207581193U (en) A kind of rare earth zinc steel strand wires anchor chain type lifts by crane Wire frame
CN202944977U (en) Hoisting tool of cable
CN201907924U (en) Spreading wing-type winding drum lifting device
CN101934994A (en) Building high-altitude vertical hoisting double-guide cable system and assisting method
CN205590168U (en) Overturning lifting device
CN210286441U (en) Heavy object hoisting mechanism capable of preventing hoisting steel wire rope from being broken
CN104652276B (en) A kind of main rope of suspension bridge PPWS construction strand erection method in situ
CN207645607U (en) A kind of anchor winch experiment loading unit
CN108217474B (en) Cable crane system and hoisting method
CN207030724U (en) New dipped type cord fabric hanging device
CN206396635U (en) A kind of assembled device of stayed-cable bridge cantilever and beam section

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lin Yining

Inventor after: Peng Zewei

Inventor after: Liu Jian

Inventor after: Zhao Wensheng

Inventor after: Zhang Chaofu

Inventor after: Yang Xianquan

Inventor after: Ding Yunbo

Inventor after: Wang Jiezao

Inventor after: Chen Zhimin

Inventor after: Li Wei

Inventor after: Jiang Yong

Inventor after: Guo Hongguang

Inventor after: Xie Xiang

Inventor after: Shi Heng

Inventor after: Zhang Jun

Inventor before: Wang Jiezao

Inventor before: Peng Zewei

Inventor before: Liu Jian

Inventor before: Zhao Wensheng

Inventor before: Zhang Chaofu

Inventor before: Yang Xianquan

Inventor before: Ding Yunbo

Inventor before: Chen Zhimin

Inventor before: Li Wei

Inventor before: Lin Yining

Inventor before: Jiang Yong

Inventor before: Guo Hongguang

Inventor before: Xie Xiang

Inventor before: Shi Heng

Inventor before: Zhang Jun

GR01 Patent grant