CN203546614U - Suspension bridge main cable erecting device - Google Patents

Suspension bridge main cable erecting device Download PDF

Info

Publication number
CN203546614U
CN203546614U CN201320676831.1U CN201320676831U CN203546614U CN 203546614 U CN203546614 U CN 203546614U CN 201320676831 U CN201320676831 U CN 201320676831U CN 203546614 U CN203546614 U CN 203546614U
Authority
CN
China
Prior art keywords
main cable
supporting seat
suspension bridge
support roller
carrier wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320676831.1U
Other languages
Chinese (zh)
Inventor
汪成龙
党彦锋
刘立中
胡才春
杨传辉
张国浩
吴少志
贾雷刚
汪龙军
陈沿松
周亚军
李向阳
尚龙
姚亚
章欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC SHEC Fourth Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201320676831.1U priority Critical patent/CN203546614U/en
Application granted granted Critical
Publication of CN203546614U publication Critical patent/CN203546614U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a suspension bridge main cable erecting device which comprises a supporting frame, a carrier wheel supporting seat, a carrier wheel and a main cable rope arranged on the carrier wheel. The supporting frame comprises a supporting table provided with a limiting hole. The lower end face of the carrier wheel supporting seat is connected with a supporting rod with the lower end penetrating through the limiting hole. A spring is arranged between the carrier wheel supporting seat and the supporting table, wherein the supporting rod is sleeved with the spring. By the adoption of the structure, the suspension bridge main cable erecting device has the following advantages that through stretching and retraction of the spring, the carrier wheel supporting seat is driven to move vertically so that the main cable rope can be adapted to different heights; the phenomena that threads of the main cable rope are scattered and package winding belts are broken at the two sides of the top of a tower are reduced.

Description

A kind of main rope of suspension bridge stringer
Technical field
The utility model relates to a kind of main rope of suspension bridge stringer.
Background technology
Main cable strand, in when traction, when standing, has different height at tower top saddle's position, when adapting to different height, often occur main cable strand at tower top both sides filoselle, the phenomenons such as band fracture are wrapped.
Utility model content
Technical problem to be solved in the utility model is, for the deficiencies in the prior art, provides a kind of main rope of suspension bridge stringer that makes the differing heights that bracket can adapt to main cable strand.
For solving the problems of the technologies described above, the technical solution of the utility model is: a kind of main rope of suspension bridge stringer, comprise bracing frame, support roller supporting seat, support roller, be arranged on the main cable strand on support roller, described bracing frame comprises brace table, described brace table is provided with spacing hole, on the lower surface of described support roller supporting seat, be connected with support bar, the lower end of described support bar, through described spacing hole, is provided with the spring being enclosed within outside support bar between described support roller supporting seat and brace table.
Described bracing frame also comprises frame bottom bearing, supports side arm, knighthead, and described brace table is arranged on and supports side arm top.
The utility model adopts said structure, has the following advantages: 1, by the flexible of spring, can drive support roller supporting seat to move up and down, make main cable strand can adapt to different height; 2, reduce main cable strand at the filoselle of tower top both sides, the phenomenons such as band fracture are wrapped.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail;
Fig. 1 is structural representation of the present utility model;
Fig. 2 is lateral view of the present utility model;
In Fig. 1~Fig. 2,1, support roller supporting seat; 2, support roller; 3, main cable strand; 4, brace table; 5, support bar; 6, spring; 7, bearing; 8, support side arm; 9, knighthead.
The specific embodiment
A kind of main rope of suspension bridge stringer as shown in Fig. 1~Fig. 2, comprise bracing frame, support roller supporting seat 1, support roller 2, be arranged on the main cable strand 3 on support roller 2, bracing frame comprises brace table 4, brace table 4 is provided with spacing hole, on the lower surface of support roller supporting seat 1, be connected with support bar 5, the lower end of support bar 5, through described spacing hole, is provided with the spring 6 being enclosed within outside support bar 5 between support roller supporting seat 1 and brace table 4.
Bracing frame also comprises frame bottom bearing 7, supports side arm 8, knighthead 9, between knighthead 9 and support side arm 8, is provided with crossbeam, plays a part to strengthen fixing.Brace table 4 is arranged on and supports side arm 8 tops.
In the time of need to reducing the height of main cable strand 3, spring 6 shrinks, and support bar 5 moves downward, and support roller supporting seat 1 moves downward, thereby drives support roller 2 to move downward, and main cable strand moves downward, and has reduced height; In the time of need to improving the height of main cable strand 3, spring 6 stretches, and support bar 5 moves upward, and support roller supporting seat 1 moves upward, thereby drives support roller 2 to move upward, and main cable strand moves upward, and has improved height; Main cable strand 3 of the present utility model can adapt to different height, widely applicable, reduce main cable strand 3 at the filoselle of tower top both sides, the phenomenons such as band fracture are wrapped.
By reference to the accompanying drawings the utility model is exemplarily described above; obviously the utility model specific implementation is not subject to the restrictions described above; as long as the various improvement that adopted the technical solution of the utility model to carry out; or directly apply to other occasion without improvement, all within protection domain of the present utility model.

Claims (2)

1. a main rope of suspension bridge stringer, comprise bracing frame, support roller supporting seat (1), support roller (2), be arranged on the main cable strand (3) on support roller (2), it is characterized in that: described bracing frame comprises brace table (4), described brace table (4) is provided with spacing hole, on the lower surface of described support roller supporting seat (1), be connected with support bar (5), the lower end of described support bar (5), through described spacing hole, is provided with between described support roller supporting seat (1) and brace table (4) and is enclosed within the outer spring (6) of support bar (5).
2. a kind of main rope of suspension bridge stringer according to claim 1, it is characterized in that: described bracing frame also comprises frame bottom bearing (7), supports side arm (8), knighthead (9), described brace table (4) is arranged on and supports side arm (8) top.
CN201320676831.1U 2013-10-30 2013-10-30 Suspension bridge main cable erecting device Expired - Fee Related CN203546614U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320676831.1U CN203546614U (en) 2013-10-30 2013-10-30 Suspension bridge main cable erecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320676831.1U CN203546614U (en) 2013-10-30 2013-10-30 Suspension bridge main cable erecting device

Publications (1)

Publication Number Publication Date
CN203546614U true CN203546614U (en) 2014-04-16

Family

ID=50464751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320676831.1U Expired - Fee Related CN203546614U (en) 2013-10-30 2013-10-30 Suspension bridge main cable erecting device

Country Status (1)

Country Link
CN (1) CN203546614U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652276A (en) * 2015-01-12 2015-05-27 中交第二公路工程局有限公司 Suspension bridge main cable PPWS construction cable strand in-situ erecting method
CN106480822A (en) * 2016-11-25 2017-03-08 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652276A (en) * 2015-01-12 2015-05-27 中交第二公路工程局有限公司 Suspension bridge main cable PPWS construction cable strand in-situ erecting method
CN104652276B (en) * 2015-01-12 2016-09-14 中交第二公路工程局有限公司 A kind of main rope of suspension bridge PPWS construction strand erection method in situ
CN106480822A (en) * 2016-11-25 2017-03-08 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge
CN106480822B (en) * 2016-11-25 2018-07-06 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method for replacing sling of suspension bridge

Similar Documents

Publication Publication Date Title
EP2757064A3 (en) Comb plate-comb plate carrier assembly and combination construction comprising lifting tool and the assembly
CN203546614U (en) Suspension bridge main cable erecting device
CN204083729U (en) Closed coal yard methane transducer lowering or hoisting gear
CN201720840U (en) Drawer type mould rack
CN203285400U (en) Weight box anti-shaking device of pylon type pumping unit
CN204935625U (en) Hand-hydraulic hoistable platform
CN204157463U (en) A kind of feeder of stacked foster fowl equipment
CN202988288U (en) Lifting mechanism of light stacking machine
CN202863870U (en) Liftable paper box
CN202045496U (en) Workpiece assembling device
CN201500874U (en) Axle box assembling device with spring balancer
CN203620314U (en) Driving mechanism for peripheral transmission thickener
CN203127618U (en) Bundle-up straw conveying machine
CN202912437U (en) Paper supporting seat
CN203477814U (en) Screen tensioning device
CN202914652U (en) Transmission and tension device of setting machine stand column chain
CN202967353U (en) Belt conveyor lifting overhaul platform
CN202284129U (en) Lifting mechanism for lifter
CN202539225U (en) Wire inlet device
CN203109547U (en) Installation tool of suspended capacitor tower device
CN202116128U (en) Counter-weight diversion sheave component for elevator
CN202892524U (en) Infusion lifting frame
CN201998664U (en) Constant force tension device of magnetic adsorption writing board
CN202124392U (en) Elevator counter weight block cradle
CN201664357U (en) Brown's frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU

Effective date: 20150730

Owner name: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU

Free format text: FORMER OWNER: CCCCSHEC FOURTH ENGINEERING CO., LTD.

Effective date: 20150730

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150730

Address after: 430048 Wuhan, East Lake District, Hubei Jin Lake Road, No. 11

Patentee after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

Address before: 241009 Anhui province Wuhu Jiujiang City Jiujiang District Innovation Road Economic Development Zone on the west side of the Integrated Service District 1 Building 1 layer

Patentee before: CCCC SHEC FOURTH ENGINEERING Co.,Ltd.

Patentee before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20211030

CF01 Termination of patent right due to non-payment of annual fee