CN206438402U - A kind of suspension bridge sling replacing system - Google Patents

A kind of suspension bridge sling replacing system Download PDF

Info

Publication number
CN206438402U
CN206438402U CN201621281008.0U CN201621281008U CN206438402U CN 206438402 U CN206438402 U CN 206438402U CN 201621281008 U CN201621281008 U CN 201621281008U CN 206438402 U CN206438402 U CN 206438402U
Authority
CN
China
Prior art keywords
sling
rollers
suspension bridge
cable
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621281008.0U
Other languages
Chinese (zh)
Inventor
王戒躁
陈志敏
李伟
国洪光
江湧
谢翔
石恒
张军
彭泽伟
刘健
赵文圣
丁运波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Wuhan Bridge Special Technology Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Wuhan Bridge Special Technology Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, Wuhan Bridge Special Technology Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201621281008.0U priority Critical patent/CN206438402U/en
Application granted granted Critical
Publication of CN206438402U publication Critical patent/CN206438402U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开一种悬索桥吊索更换系统,用于更换悬索桥吊索,涉及悬索桥吊索更换技术领域,该系统包括:索夹;安装于所述索夹上的拖轮,所述拖轮包括底座和若干滚轮,所述滚轮安装于所述底座上,若干所述滚轮沿弧形路径并列形成弧形的牵引路径;设于所述索夹上方的吊具,所述吊具用于起吊所述吊索在所述索夹和所述牵引路径之间转换;两卷扬机,所述卷扬机通过钢丝绳与分别设于所述吊索两端部的锚头相连。本实用新型能够在较低的起吊高度下,快速、便捷的更换吊索。

The utility model discloses a cable replacement system for a suspension bridge, which is used for replacing the cable of a suspension bridge, and relates to the technical field of cable replacement for a suspension bridge. a plurality of rollers, the rollers are installed on the base, and a plurality of the rollers are arranged side by side along an arc-shaped path to form an arc-shaped traction path; a sling above the cable clamp is used for lifting the sling The cable is converted between the cable clip and the traction path; two hoisting machines, the hoisting machines are connected to the anchor heads respectively arranged at the two ends of the sling through steel wire ropes. The utility model can quickly and conveniently replace the sling at a lower lifting height.

Description

一种悬索桥吊索更换系统A Suspension Bridge Cable Replacement System

技术领域technical field

本实用新型涉及悬索桥吊索更换技术领域,具体涉及一种悬索桥吊索更换系统。The utility model relates to the technical field of suspension bridge suspension cable replacement, in particular to a suspension bridge suspension cable replacement system.

背景技术Background technique

悬索桥,指的是通过索塔悬挂并锚固于两岸(或桥两端)的缆索(或钢链)作为上部结构主要承重构件的桥梁。其缆索几何形状由力的平衡条件决定,一般接近抛物线。从缆索垂下许多吊索,把桥面吊住。在长期的使用过程中,悬索桥吊索会出现各种各样的病害,主要包括:(1)上、下锚头锈蚀;(2)锚固松动、失效、滑丝;(3)吊索内钢丝锈蚀或疲劳断丝;(4)吊索防护套破损老化、开裂、破损;(5)吊索轴线偏位,短吊索受剪;(6)吊索钢绞线或钢丝受力不均匀。由于悬索桥吊索存在这些病害,使得桥梁的安全存在严重的安全隐患们需要对悬索桥吊索进行更换。Suspension bridge refers to a bridge in which cables (or steel chains) are suspended by towers and anchored to both banks (or both ends of the bridge) as the main load-bearing members of the superstructure. Its cable geometry is determined by the balance of forces and is generally close to a parabola. Many slings hang from the cables to hang the bridge deck. During the long-term use, various diseases will appear in the suspension bridge suspension cables, mainly including: (1) corrosion of the upper and lower anchor heads; (2) anchor loosening, failure, slipping wire; (3) inner wire Corrosion or fatigue broken wires; (4) damage, aging, cracking, and damage to the sling protective sleeve; (5) the axis of the sling is deviated, and the short sling is sheared; (6) the force on the sling steel strand or steel wire is uneven. Due to these defects in the suspension bridge suspension cables, there are serious safety hazards in the safety of the bridge. It is necessary to replace the suspension bridge suspension cables.

现有技术中悬索桥拆除吊索的方法是解除下锚头约束后,利用起吊设备从索夹顶部直接将钢丝绳吊索从索夹正上方向上吊装出主缆的高度,起吊设备的起吊高度需大于主缆索夹高度的两倍。由于大跨度悬索桥主塔高度高,塔柱附近处钢丝绳吊索长度较长,一般的桥面吊装机写的起吊高度要求都不能满足如此高的施工要求。In the prior art, the method for removing the sling from the suspension bridge is to lift the steel wire rope sling from the top of the cable clamp directly to the height of the main cable by using the lifting device after releasing the constraint of the lower anchor head. The lifting height of the lifting device needs to be More than twice the height of the main cable clamp. Due to the high height of the main tower of the long-span suspension bridge and the length of the wire rope sling near the tower column is long, the lifting height requirements written by general bridge deck hoisting machines cannot meet such high construction requirements.

实用新型内容Utility model content

针对现有技术中存在的缺陷,本实用新型的目的在于提供一种悬索桥吊索更换系统,能够在较低的起吊高度下,快速、便捷的更换吊索。Aiming at the defects existing in the prior art, the purpose of this utility model is to provide a suspension bridge suspension cable replacement system, which can quickly and conveniently replace suspension cables at a relatively low lifting height.

为达到以上目的,本实用新型采取的技术方案是:For achieving above object, the technical scheme that the utility model takes is:

一种悬索桥吊索更换系统,用于更换悬索桥吊索,包括:A suspension bridge cable replacement system for replacing suspension bridge cables, comprising:

索夹;cable clip;

安装于所述索夹上的拖轮,所述拖轮包括底座和若干滚轮,所述滚轮安装于所述底座上,若干所述滚轮沿弧形路径并列形成弧形的牵引路径;A tug wheel installed on the cable clip, the tug wheel includes a base and a plurality of rollers, the rollers are installed on the base, and a plurality of the rollers are arranged side by side along an arc-shaped path to form an arc-shaped traction path;

设于所述索夹上方的吊具,所述吊具用于起吊所述吊索在所述索夹和所述牵引路径之间转换;a sling disposed above the cable clip, the sling is used to hoist the sling to switch between the cable clip and the traction path;

两卷扬机,所述卷扬机通过钢丝绳与分别设于所述吊索两端部的锚头相连。Two hoisting machines, the hoisting machines are connected to the anchor heads respectively arranged at the two ends of the sling through steel wire ropes.

在上述技术方案的基础上,所述底座包括两半圆形的侧板,两侧板平行相对设置,若干滚轮设于两所述侧板之间,且若干所述滚轮沿所述侧板的弧形边缘依次间隔设置。On the basis of the above technical solution, the base includes two semicircular side plates, the two side plates are arranged parallel and opposite each other, a number of rollers are arranged between the two side plates, and some of the rollers are arranged along the sides of the side plates. The arc edges are set at intervals in sequence.

在上述技术方案的基础上,所述滚轮包括滚子和滚轴,所述滚轴的两端分别安装于两所述侧板上,所述滚子套设所述滚轴上,所述滚子表面设有弧形凹面,若干所述滚子凹面形成所述牵引路径。On the basis of the above technical solution, the rollers include rollers and rollers, the two ends of the rollers are respectively installed on the two side plates, the rollers are sheathed on the rollers, and the rollers The subsurface is provided with an arc-shaped concave surface, and several of the roller concave surfaces form the traction path.

在上述技术方案的基础上,所述侧板的底部两端设有耳板,所述耳板上设有定位孔。On the basis of the above technical solution, ear plates are provided at both ends of the bottom of the side plate, and positioning holes are provided on the ear plates.

在上述技术方案的基础上,两所述侧板之间设有连接两所述侧板的第一加强板。On the basis of the above technical solution, a first reinforcing plate connecting the two side plates is provided between the two side plates.

在上述技术方案的基础上,所述侧板的一侧面上设有两第二加强板,两第二加强板垂直于所述侧板的底部相对设置。On the basis of the above technical solution, two second reinforcing plates are arranged on one side of the side plate, and the two second reinforcing plates are perpendicular to the bottom of the side plate and are oppositely arranged.

在上述技术方案的基础上,所述吊具上设有用于和所述吊索上的中点标识对应使用的对中标识。On the basis of the above technical solution, the sling is provided with a centering mark corresponding to the midpoint mark on the sling.

与现有技术相比,本实用新型的优点在于:Compared with the prior art, the utility model has the advantages of:

本实用新型的种悬索桥吊索更换系统,适用于更换吊索长度比较长,而起吊设备的起吊高度不满足施工要求的情况下对吊索进行更换,至需要将吊索转移至拖轮上,使用卷扬机来拖动吊索在拖轮上移动,吊索的安装和拆除都比较方便,且能够解决吊装设备起吊高度不足的问题,具有安装方便、倒运便捷、造价低廉和功效高的优点。The suspension bridge sling replacement system of the utility model is suitable for replacing the sling when the length of the sling is relatively long and the lifting height of the lifting equipment does not meet the construction requirements. The winch is used to drag the sling to move on the tugboat. The installation and removal of the sling is relatively convenient, and it can solve the problem of insufficient lifting height of the hoisting equipment. It has the advantages of convenient installation, convenient transportation, low cost and high efficiency.

附图说明Description of drawings

图1为本发明实施例的使用状态图;Fig. 1 is the use state chart of the embodiment of the present invention;

图2为本发明实施例中拖轮的结构示意图;Fig. 2 is the structural representation of tugboat in the embodiment of the present invention;

图3为本发明实施例中拖轮的侧视图;Fig. 3 is the side view of tugboat in the embodiment of the present invention;

图4为本发明实施例中滚轮的结构示意图;Fig. 4 is the structural representation of roller in the embodiment of the present invention;

图5为本发明实施例中旧吊索转移后的结构示意图;Fig. 5 is the schematic diagram of the structure after the transfer of the old sling in the embodiment of the present invention;

图6为本发明实施例中旧吊索移动过程中的结构示意图;Fig. 6 is the structural representation in the moving process of old sling in the embodiment of the present invention;

图7为本发明实施例中旧吊索移动结束后的结构示意图;Fig. 7 is the schematic diagram of the structure after the old sling moves in the embodiment of the present invention;

图8为本发明实施例中新吊索移动开始的结构示意图;Fig. 8 is a structural schematic diagram of the start of the movement of the new sling in the embodiment of the present invention;

图9为本发明实施例中新吊索至转换位置时的结构示意图;Fig. 9 is a schematic diagram of the structure of the new sling in the embodiment of the present invention when it is in the conversion position;

图10为本发明实施例中新吊索转换位置后的结构示意图;Fig. 10 is a schematic diagram of the structure of the new sling in the embodiment of the present invention after switching positions;

图11为本发明实施例中新吊索转安装到位固定后的结构示意图。Fig. 11 is a schematic diagram of the structure of the new sling in the embodiment of the present invention after it has been installed in place and fixed.

图中:1-索夹,2-拖轮,20-底座,21-滚轮,22-侧板,23-滚子,24-滚轴,25-牵引路径,26-耳板,27-第一加强板,28-第二加强板,3-吊具,30-对中标识,4-锚头,5-吊索,50-中点标识。In the figure: 1-cable clamp, 2-tug wheel, 20-base, 21-roller, 22-side plate, 23-roller, 24-roller, 25-traction path, 26-lug plate, 27-first reinforcement Plate, 28-second reinforcing plate, 3-sling, 30-centering mark, 4-anchor head, 5-sling, 50-midpoint mark.

具体实施方式detailed description

以下结合附图及实施例对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing and embodiment the utility model is described in further detail.

参见图1至图4所示,本实用新型实施例提供一种悬索桥吊索更换系统,用于更换悬索桥吊索5,包括:Referring to Fig. 1 to Fig. 4, the embodiment of the present invention provides a suspension bridge suspension cable replacement system, which is used to replace the suspension bridge suspension cable 5, including:

索夹1,锁夹1上跨设有若干的吊索5,若其中的吊索5损坏,需要对其进行更换;There are several slings 5 straddled on the cable clip 1 and the lock clip 1, and if any of the slings 5 is damaged, it needs to be replaced;

安装于索夹1上的拖轮2,拖轮2包括底座20和若干滚轮21,滚轮21安装于底座上,若干滚轮21沿弧形路径并列形成弧形的牵引路径25,更换前的旧吊索需要从牵引路径25移出,更换后的新吊索需要从牵引路径移入锁夹1上;使得吊索移出或者移入的时候,不会与锁夹1表面发生摩擦,破坏锁夹1,且牵引路径25为弧形的,使得吊索移动过程中不会卡顿,吊索移动需要的牵引力较小。The tugboat 2 installed on the cable clamp 1, the tugboat 2 includes a base 20 and a number of rollers 21, the rollers 21 are installed on the base, a number of rollers 21 are arranged side by side along an arc-shaped path to form an arc-shaped traction path 25, the old sling before replacement needs Move out from the traction path 25, and the new sling after replacement needs to be moved into the lock clip 1 from the traction path; It is arc-shaped, so that there will be no jamming during the movement of the sling, and the traction force required for the movement of the sling is small.

底座20包括两半圆形的侧板22,两侧板平行相对设置,若干滚轮21设于两侧板22之间,且若干滚轮21沿侧板22的弧形边缘依次间隔设置。侧板22的底部两端设有耳板26,耳板26上设有定位孔。侧板22的底部通过螺栓固定在索夹1上,在安装过程中,侧板22底部两端的耳板26能够限定底座20的安装位置,快速方便的安装底座20。滚轮21包括滚子23和滚轴24,滚轴24的两端分别安装于两侧板22上,滚子23套设滚轴24上,滚子23表面设有弧形凹面,若干滚子凹面形成牵引路径25,保证吊索滑动过程中不会偏离拖轮2,从拖轮2滑移出去。两侧板22之间设有连接两侧板22的第一加强板27。侧板22的一侧面上设有两第二加强板28,两第二加强板289垂直于侧板22的底部相对设置。吊索5的滑移过程中,通过滚子转动能够减小拖轮2与吊索之间的摩擦力,由于吊索的重量比较大,设置加强板能够增加拖轮2的结构强度,同时也减小了拖轮2的体积。The base 20 includes two semicircular side plates 22 , the two side plates are arranged parallel to each other, a plurality of rollers 21 are arranged between the two side plates 22 , and the plurality of rollers 21 are arranged at intervals along the arc edges of the side plates 22 . Both ends of the bottom of the side plate 22 are provided with ear plates 26, and the ear plates 26 are provided with positioning holes. The bottom of the side plate 22 is fixed on the cable clamp 1 by bolts. During the installation process, the ear plates 26 at both ends of the bottom of the side plate 22 can define the installation position of the base 20, and the base 20 can be installed quickly and conveniently. Roller 21 comprises roller 23 and roller 24, and the two ends of roller 24 are installed on the two side boards 22 respectively, and roller 23 is sleeved on the roller 24, and roller 23 surface is provided with arc-shaped concave surface, and several roller concave surfaces The traction path 25 is formed to ensure that the sling will not deviate from the tugboat 2 during the sliding process and slip out from the tugboat 2. A first reinforcement board 27 connecting the two side boards 22 is disposed between the two side boards 22 . Two second reinforcement boards 28 are disposed on one side of the side board 22 , and two second reinforcement boards 289 are perpendicular to the bottom of the side board 22 and opposite to each other. During the sliding process of the sling 5, the friction between the tugboat 2 and the sling can be reduced by the rotation of the rollers. Since the weight of the sling is relatively large, the setting of the reinforcement plate can increase the structural strength of the tugboat 2 and reduce the friction force between the tugboat 2 and the sling. The volume of the tugboat 2 is increased.

参见图9和图10所示,设于索夹1上方的吊具3,吊具3用于起吊吊索5,且吊具3上设有与吊索上中点标志50对应的对中标识30;在新吊索移入时,可通过新吊索的中点标识50与对中标识30对应,而停止移动新吊索。有效避免了盲目的移动吊索,使得吊索能够快速准确的安装到位,加快施工效果。Referring to Fig. 9 and Fig. 10, the sling 3 arranged above the cable clamp 1 is used for hoisting the sling 5, and the sling 3 is provided with a centering mark corresponding to the midpoint mark 50 on the sling 30; when the new sling moves in, the midpoint mark 50 of the new sling corresponds to the centering mark 30, and the movement of the new sling is stopped. It effectively avoids blindly moving the sling, so that the sling can be quickly and accurately installed in place, and the construction effect is accelerated.

两卷扬机,卷扬机通过钢丝绳与分别设于吊索5两端部的锚头4相连,一台卷扬机做牵引,另一台卷扬机用作保险。Two winches, winches link to each other by wire rope and are respectively located at the anchor head 4 that is located at sling 5 two ends, and a winch is done traction, and another winch is used as insurance.

参照图5至图11所示,提供一种更换悬索桥吊索的方法,具体步骤如下:Referring to Figures 5 to 11, a method for replacing suspension bridge suspension cables is provided, and the specific steps are as follows:

参见图5所示,使用吊具3将旧吊索从锁夹4上吊到拖轮2的牵引路径25上,并使旧吊索跨设在拖轮2上;Referring to Fig. 5, use the spreader 3 to hang the old sling from the lock clip 4 to the traction path 25 of the tugboat 2, and make the old sling straddle the tugboat 2;

参见图6所示,其中一卷扬机从旧吊索的一端收卷旧吊索,卷扬机的收卷方向为向桥内侧方向收卷,参见图7所述,随卷扬机的收卷,旧吊索在牵引路径25上移动,直至旧吊索另一端的锚头移出拖轮2,且在锚头移出拖轮2之前在锚头上包裹橡胶垫,防止锚头与拖轮2的牵引路径25发生碰撞;当锚头完全移出拖轮2后,旧吊索另一端的钢丝绳跨设在拖轮2的牵引路径25上,通过旧吊索另一端的钢丝绳将吊索下放至桥面,完成旧吊索的收卷;Referring to Fig. 6, one of the winches winds up the old sling from one end of the old sling, and the winding direction of the hoist is to wind up the inner side of the bridge. See Fig. 7, with the winding of the hoist, the old sling is Move on the traction path 25 until the anchor head at the other end of the old sling moves out of the tugboat 2, and wrap rubber pads on the anchor head before the anchor head moves out of the tugboat 2 to prevent the anchor head from colliding with the traction path 25 of the tugboat 2; when the anchor After the head is completely removed from the tugboat 2, the steel wire rope at the other end of the old sling is straddled on the traction path 25 of the tugboat 2, and the sling is lowered to the bridge deck through the steel wire rope at the other end of the old sling to complete the winding of the old sling;

参见图8所示,将新吊索一端的锚头牵引至新吊索的更换位置,一卷扬机通过钢丝绳连接锚头,钢丝绳跨设在拖轮2的牵引路径25上,卷扬机收卷钢丝绳带动新吊索移动,卷扬机的收卷方向为向桥外侧方向收卷,将新吊索上提至拖轮2的牵引路径25上,卷扬机持续收卷钢丝绳,且新吊索一端的锚头移动至拖轮2之前在锚头上包裹橡胶垫,直至新吊索到达安装位置,参见图9所示,安装位置处钢丝绳的中点标识与吊具的对中标识位置相对;Referring to Fig. 8, the anchor head at one end of the new sling is towed to the replacement position of the new sling, a hoist is connected to the anchor head through a wire rope, and the wire rope is straddled on the traction path 25 of the tugboat 2, and the hoist winds the wire rope to drive the new sling. The cable moves, and the winding direction of the hoist is toward the outside of the bridge. The new sling is lifted up to the traction path 25 of the tugboat 2. The hoist continues to wind the wire rope, and the anchor head at one end of the new sling moves to the front of the tugboat 2. Wrap the rubber pad on the anchor head until the new sling reaches the installation position, as shown in Figure 9, the midpoint mark of the wire rope at the installation position is opposite to the centering mark position of the sling;

参见图10和图11所示,使用吊具将新吊索从拖轮2的牵引路径25吊起下放至锁夹4上,并使新吊索跨设在锁夹4上,并对新吊索进行固定。在使用安装过程中,可以重复上面的步骤,吊起新吊索到拖轮2的牵引路径25上进行移动微调后,再下放至锁夹4上。Referring to Fig. 10 and Fig. 11, use a sling to lift the new sling from the traction path 25 of the tugboat 2 to the lock clip 4, and make the new sling straddle the lock clip 4, and install the new sling to fix. In the installation process, the above steps can be repeated, and the new sling is hoisted to the traction path 25 of the tugboat 2 for fine-tuning, and then lowered to the lock clip 4.

使用吊具将旧吊索上吊至拖轮2上,通过卷扬机收卷旧吊索,相比较更换旧吊索时吊具的起吊高度,本实用新型中吊具的起吊高度只需要稍微高于拖轮2即可,起吊高度较低且对吊具要求也不高,卷扬机收卷旧吊索,在拖轮上滑移,旧吊索与拖轮之间的摩擦力较小,具有省时省力的优点。Use the sling to hoist the old sling to the tugboat 2, and wind the old sling through the winch. Compared with the lifting height of the sling when the old sling is replaced, the lifting height of the sling in the utility model only needs to be slightly higher than the tugboat 2 That is, the lifting height is low and the requirements for the spreader are not high. The winch winds up the old sling and slides on the tugboat. The friction between the old sling and the tugboat is small, which has the advantages of saving time and effort.

先使用卷扬机将新吊索上提到拖轮2上,在拖轮2上滑移到位后,再通过吊具将拖轮转移到锁夹4上,此过程中,吊具的起吊高度依然很低,相对于现有技术中的吊具直接吊装到锁夹上来说,本实用新型的施工效率更高。First use the hoist to lift the new sling onto the tugboat 2, and then slide the tugboat 2 into place, and then transfer the tugboat to the lock clip 4 through the spreader. During this process, the lifting height of the spreader is still very low, relatively Compared with the hoisting tool in the prior art, which is directly hoisted on the lock clip, the construction efficiency of the utility model is higher.

本实用新型不局限于上述实施方式,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本实用新型的保护范围之内。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。The utility model is not limited to the above-mentioned embodiments. For those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made. within the scope of the new protection. The content not described in detail in this specification belongs to the prior art known to those skilled in the art.

Claims (7)

1.一种悬索桥吊索更换系统,用于更换悬索桥吊索(5),其特征在于,包括:1. A suspension bridge sling replacement system, used to replace the suspension bridge sling (5), is characterized in that, comprising: 索夹(1);cable clip (1); 安装于所述索夹(1)上的拖轮(2),所述拖轮(2)包括底座(20)和若干滚轮(21),所述滚轮(21)安装于所述底座上,若干所述滚轮(21)沿弧形路径并列形成弧形的牵引路径(25);The tug (2) installed on the cable clamp (1), the tug (2) includes a base (20) and some rollers (21), the rollers (21) are installed on the base, several of the The rollers (21) are juxtaposed along the arc path to form an arc traction path (25); 设于所述索夹(1)上方的吊具(3),所述吊具(3)用于起吊所述吊索(5)在所述索夹(1)和所述牵引路径(25)之间转换;The sling (3) arranged above the cable clamp (1), the sling (3) is used to hoist the sling (5) between the cable clamp (1) and the traction path (25) Convert between; 两卷扬机,所述卷扬机通过钢丝绳与分别设于所述吊索(5)两端部的锚头(4)相连。Two hoisting machines, the hoisting machines are connected to the anchor heads (4) respectively arranged at the two ends of the sling (5) through steel wire ropes. 2.如权利要求1所述的悬索桥吊索更换系统,其特征在于:所述底座(20)包括两半圆形的侧板(22),两侧板平行相对设置,若干滚轮(21)设于两所述侧板(22)之间,且若干所述滚轮(21)沿所述侧板(22)的弧形边缘依次间隔设置。2. The suspension bridge suspension cable replacement system as claimed in claim 1, characterized in that: said base (20) comprises two semicircular side plates (22), the two side plates are parallel and oppositely arranged, and several rollers (21) are arranged Between the two side plates (22), several of the rollers (21) are sequentially arranged at intervals along the arc edge of the side plates (22). 3.如权利要求2所述的悬索桥吊索更换系统,其特征在于:所述滚轮(21)包括滚子(23)和滚轴(24),所述滚轴(24)的两端分别安装于两所述侧板(22)上,所述滚子(23)套设所述滚轴(24)上,所述滚子(23)表面设有弧形凹面,若干所述滚子凹面形成所述牵引路径(25)。3. The suspension bridge suspension cable replacement system according to claim 2, characterized in that: the roller (21) comprises a roller (23) and a roller (24), and the two ends of the roller (24) are respectively installed On the two side plates (22), the rollers (23) are sheathed on the roller shafts (24), and the surfaces of the rollers (23) are provided with arc-shaped concave surfaces, and several of the roller concave surfaces form The traction path (25). 4.如权利要求2所述的悬索桥吊索更换系统,其特征在于:所述侧板(22)的底部两端设有耳板(26),所述耳板(26)上设有定位孔。4. The suspension bridge suspension cable replacement system according to claim 2, characterized in that: ear plates (26) are provided at both ends of the bottom of the side plate (22), and positioning holes are provided on the ear plates (26) . 5.如权利要求2所述的悬索桥吊索更换系统,其特征在于:两所述侧板(22)之间设有连接两所述侧板(22)的第一加强板(27)。5. The suspension bridge suspension cable replacement system according to claim 2, characterized in that: a first reinforcing plate (27) connecting the two side plates (22) is provided between the two side plates (22). 6.如权利要求2所述的悬索桥吊索更换系统,其特征在于:所述侧板(22)的一侧面上设有两第二加强板(28),两第二加强板(28)垂直于所述侧板(22)的底部相对设置。6. The suspension bridge suspension cable replacement system according to claim 2, characterized in that: two second reinforcing plates (28) are arranged on one side of the side plate (22), and the two second reinforcing plates (28) are perpendicular to each other. It is oppositely arranged on the bottom of the side plate (22). 7.如权利要求1所述的悬索桥吊索更换系统,其特征在于:所述吊具(3)上设有用于和所述吊索(5)上的中点标识(50)对应使用的对中标识(30)。7. The suspension bridge sling replacement system according to claim 1, characterized in that: said spreader (3) is provided with a corresponding pair for use with the midpoint mark (50) on said sling (5) Middle mark (30).
CN201621281008.0U 2016-11-25 2016-11-25 A kind of suspension bridge sling replacing system Withdrawn - After Issue CN206438402U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621281008.0U CN206438402U (en) 2016-11-25 2016-11-25 A kind of suspension bridge sling replacing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621281008.0U CN206438402U (en) 2016-11-25 2016-11-25 A kind of suspension bridge sling replacing system

Publications (1)

Publication Number Publication Date
CN206438402U true CN206438402U (en) 2017-08-25

Family

ID=59644624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621281008.0U Withdrawn - After Issue CN206438402U (en) 2016-11-25 2016-11-25 A kind of suspension bridge sling replacing system

Country Status (1)

Country Link
CN (1) CN206438402U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480822A (en) * 2016-11-25 2017-03-08 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480822A (en) * 2016-11-25 2017-03-08 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge
CN106480822B (en) * 2016-11-25 2018-07-06 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method for replacing sling of suspension bridge

Similar Documents

Publication Publication Date Title
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN100537348C (en) An integral construction and hoisting method of an offshore platform and its special crane
CN207244454U (en) Superelevation tower main cable saddle Lift-on/Lift-off System
CN209397501U (en) Deck crane
CN105858435A (en) Technology for hoisting strip-shaped inclined steel structures in place through single crane
CN204251168U (en) First-rope Unsteady Car Replacement System for Multi-rope Friction Wheel Hoist
CN205555874U (en) Engineering is with loading and unloading anchor clamps
CN109944166B (en) Ultra-long large-dip-angle tunnel anchor large-tonnage cable saddle sliding and mounting system and operation method
CN105645275B (en) Cable hoist and its construction method
CN104632088A (en) Petroleum drilling machine tower-shaped derrick sleeving mounting method
CN106480822B (en) A kind of suspension bridge sling replacing system and the method for replacing sling of suspension bridge
CN103147404B (en) System and method for hanging stay cable at tower end of height limiting cable-stayed bridge
CN200967927Y (en) Rope-suspension bridge multi-span ropeway girder conveyer
WO2019196660A1 (en) Integral bridge deck crane for central cable plane steel box girder
CN117266026A (en) A method for hoisting central buckle clamps of suspension bridges
CN206438402U (en) A kind of suspension bridge sling replacing system
CN101863423B (en) Steel box beam cable carrying lifter for construction of suspension bridge
CN107161879B (en) Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN206956561U (en) A kind of truss combined deck unit erection gantry walking mechanism
CN105883614B (en) The method that single device unbalance loading lifts gantry crane girder
CN201171147Y (en) Clamp for vertically mounting ultra-high layer cable
CN204456157U (en) A kind of major diameter combination cable system for open caisson foundation location
CN204040598U (en) The two rocker pole of a kind of remote control hydraulic
CN206783147U (en) A kind of power wire protection device for bridge crane
CN202214681U (en) Suspension Bridge Suspender Replacement Device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170825

Effective date of abandoning: 20180706

AV01 Patent right actively abandoned