CN107165050B - A kind of cord clip of suspension bridge screw rod axle power construction method - Google Patents

A kind of cord clip of suspension bridge screw rod axle power construction method Download PDF

Info

Publication number
CN107165050B
CN107165050B CN201710514527.XA CN201710514527A CN107165050B CN 107165050 B CN107165050 B CN 107165050B CN 201710514527 A CN201710514527 A CN 201710514527A CN 107165050 B CN107165050 B CN 107165050B
Authority
CN
China
Prior art keywords
screw rod
axle power
construction
design
cord clip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710514527.XA
Other languages
Chinese (zh)
Other versions
CN107165050A (en
Inventor
汪正兴
伊建军
王波
张东波
张宇
荆国强
刘鹏飞
马长飞
王翔
柴小鹏
阮小丽
吴肖波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Yichang Wujiagang bridge construction and Operation Co., Ltd
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Bridge Science Research Institute Ltd
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Bridge Science Research Institute Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, China Railway Bridge Science Research Institute Ltd filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201710514527.XA priority Critical patent/CN107165050B/en
Publication of CN107165050A publication Critical patent/CN107165050A/en
Application granted granted Critical
Publication of CN107165050B publication Critical patent/CN107165050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of cord clip of suspension bridge screw rod axle power construction methods, are related to bridge construction field, the propagation time t including measurement ultrasound unstress state lower edge axial direction in screw rod to be installed0, then manually bolt and nut is tightened using spanner;Using jack by screw stretching to design and construction axle power Fn60%, manually make the nut that screws up with a wrench, unload jack;Test ultrasound is under the current stress state of inside screw along the time t of Propagation1, screw rod Current Temperatures T is measured, the current axle power F of screw rod is calculated according to formula1: current axle power F is calculated according to formula1To design and construction axle power FnWhen the angle, θ that is rotated relative to screw rod of nut, use jack tension screw rod to design and construction axle power Fn110%, and to direction screw on nut angle, θ is screwed, unload jack.The present invention enables to cord clip screw rod axle power to admirably achieve design and construction requirement, and convenient for axle power inspection after construction, cord clip is avoided to slide after mounting, improves the safety that bridge uses.

Description

A kind of cord clip of suspension bridge screw rod axle power construction method
Technical field
The present invention relates to bridge construction fields, and in particular to a kind of cord clip of suspension bridge screw rod axle power construction method.
Background technique
Cord clip of suspension bridge is one of the main member of suspension bridge superstructure, is that cord clip exists in the Major Diseases of use process It is slid on main push-towing rope, the reason is that caused by cord clip screw rod fastening force is insufficient, highway in China bridges and culverts Maintenance specification (2004) 3.3.9 item requires to check " whether the cord clip of suspension bridge sunpender upper end and main rope loosen, shift and damaged ", Highway bridge technique Cord clip sliding is also greater than 10mm in status assessment standard (2011) 7.2.1 item and is considered as serious defect.
It is main first tentatively to be tightened screw rod with long spanner by worker when carrying out cord clip screw rod practice of construction at present, then adopt It is stretched to construction axle power with hydraulic jack, then tightens completion construction with short spanner by worker.
But since the stress for being difficult to control accurately hydraulic jack each tensioning when site operation is consistent, and jack Disposable tensioning will lead to structural stress in place and reassign unevenness;Simultaneously as firmly big when different workers screw up with a wrench Small consistent, torque coefficient difference when nut is tightened is larger, and completion back nut retraction of constructing can also generate biggish stress damage It loses, causes the axle power fastening construction of cord clip screw rod to hardly result in and accurately control;And construct after the completion of, screw rod axle power can not and Shi Jinhang is accurately and efficiently checked, so that cord clip is easy to happen sliding in use, is brought to the normal operation of bridge hidden Suffer from.
Summary of the invention
In view of the deficiencies in the prior art, the purpose of the present invention is to provide a kind of cord clip of suspension bridge screw rod axle powers to apply Work method enables to screw rod axle power different after constructing consistent, slides after avoiding installing Cable-clamp, improves what bridge used Safety.
To achieve the above objectives, the technical solution adopted by the present invention is that:
A kind of cord clip of suspension bridge screw rod axle power construction method, comprising the following steps:
The propagation time t of S1, measurement ultrasound unstress state lower edge axial direction in screw rod to be installed0, bolt and nut is twisted Tightly;
S2, using jack by screw stretching to design and construction axle power Fn50~70%, manually make the spiral shell that screws up with a wrench Mother unloads jack;Test ultrasound is under the current stress state of inside screw along the time t of Propagation1, it is current to measure screw rod Temperature T calculates the current axle power F of screw rod according to formula one1:
F1=k (T) (t1-t0)+b formula one
Wherein, k is with the Monomial coefficient that 1~2 test specimen is demarcated on experimental bench in a collection of screw rod, and k (T) is the temperature of k value Correction term is spent, b is constant term:
S3, current axle power F is calculated according to formula two1To design and construction axle power FnWhen the angle, θ that is rotated relative to screw rod of nut, Use jack tension screw rod to design and construction axle power Fn105~120%, and to screwing direction screw on nut angle, θ, unload Jack;
Wherein, E is the elasticity modulus of nut stem material;H is the screw pitch of screw rod both ends screw thread;π is pi;D is screw rod Nominal diameter;L is clamping length when screw rod fastens.
Based on the above technical solution, further comprising the steps of after the step S3:
Ultrasound is measured under the current stress state of inside screw along the time t of Propagation using ultrasonic testing system2, root The current axle power F of screw rod is calculated according to formula three, determines current axle power F and design and construction axle power FnDifference be less than or equal to 5%Fn
F=k (T-T0)(t2-t0)+b formula three.
It based on the above technical solution, further include following after the current axle power F of screw rod according to the calculating of formula three Step: determine current axle power F and design and construction axle power FnDifference be greater than 5%Fn, repeat step S3.
Based on the above technical solution, in the step S2, using jack by screw stretching to axis of designing and constructing Power Fn60% when, tensioning first is carried out to the screw rod being located among cord clip, tensioning is carried out to the screw rod for being located at two sides again, carried out pair Angle construction.
Based on the above technical solution, the flatness at the screw rod both ends is less than or equal to 0.1mm.
Based on the above technical solution, use jack by screw stretching to axle power of designing and constructing in the step S2 Fn60%.
Based on the above technical solution, jack tension screw rod to design and construction axle power F is used in the step S3n 110%.
Compared with the prior art, the advantages of the present invention are as follows:
(1) cord clip of suspension bridge screw rod axle power construction method of the invention, the present invention first carry out screw rod by ultrasonic tesint Pre- tensioning is twisted with first, and pretensioned pulling force is design and construction axle power Fn50~70%, screw rod can be fixed on current Then position calculates the current axle power F to design and construction axle power F of screw rodnWhen the angle, θ that is rotated relative to screw rod of nut, tensioning spiral shell Bar extremely design and construction axle power Fn110%, and to direction screw on nut angle, θ is screwed, all screw rods are tightened completely, by cord clip Be fixed on main push-towing rope, tensioning and tightening way through the invention, can be avoided one by one by screw rod disposably by tensioning in place when, The axle power of the screw rod of pretensioning before influencing when the screw rod construction of post-stretching, it is accurate that the axle power fastening construction of cord clip screw rod hardly results in Ground control, stretching mode of the invention, which makes the axle power of cord clip screw rod fasten construction, can obtain accurate control, and all After screw rod is installed, not threaded stress difference is less than 5%Fn, distribution is relatively uniform, and then avoids cord clip in use process It is middle to slide, improve the safety that bridge uses.
(2) cord clip of suspension bridge screw rod axle power construction method of the invention is existed after the completion of tensioning using ultrasound detection ultrasound Along the time t of Propagation under the current stress state of inside screw2, the current axle power of inside screw is calculated, due to using this hair Bright method, screw rod are installed rear its internal axle power and FnDifference should be less than 5%Fn, therefore, if working as the interior of front screw The axle power and F in portionnDifference be greater than 5%FnWhen, illustrate in the presence of fault: such as since the quantity of screw rod is excessive, when front screw is in a certain step There is no tensioning in rapid or tighten, can quickly find the process omitted in construction, be remedied convenient for taking timely measure, it is ensured that rope It presss from both sides screw rod axle power and meets design and construction requirement.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of cord clip in the embodiment of the present invention.
In figure: 1- cord clip, 2- screw rod.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and embodiments.
Shown in Figure 1, the embodiment of the present invention provides a kind of cord clip of suspension bridge screw rod axle power construction method, including following step It is rapid:
In the propagation time t of unstress state lower edge axial direction in S1, ultrasonic tesint all screw rods 2 to be installed0, by screw rod 2 nut is tightened.
S2, screw rod 2 is stretched to design and construction axle power F using jackn50~70% (optimal is 60%), use thousand When jin top carries out tensioning to screw rod 2, tensioning first carried out to the screw rod 2 being located among cord clip 1, then to be located at the screw rods 2 of two sides into Row tensioning, is diagonally constructed;Then manually make the nut that screws up with a wrench, unload jack;Test ultrasound inside screw rod 2 when Along the time t of Propagation under preceding stress state1, the current temperature T of measurement screw rod 2, according to calculating 2 current axis of screw rod of formula one Power F1
F1=k (T) (t1-t0)+b formula one
Wherein, k is with the Monomial coefficient that 1~2 test specimen is demarcated on experimental bench in a collection of screw rod 2, and k (T) is the temperature of k value Correction term is spent, b is constant term.
S3, current axle power F is calculated according to formula two1To design and construction axle power FnWhen the angle, θ that is rotated relative to screw rod 2 of nut, Use jack tension screw rod 2 to design and construction axle power Fn105~120% (most preferably 110%), and screwed to direction is screwed Nut angle, θ, unloads jack, and the flatness at 2 both ends of screw rod is less than or equal to 0.1mm.
Wherein, E is the elasticity modulus of 2 material of screw rod, and h is the screw pitch of 2 both ends screw thread of screw rod, and π is pi, and d is screw rod 2 Nominal diameter;L is clamping length when screw rod 2 fastens.
S4, ultrasound is measured using ultrasonic testing system under the current stress state in 2 inside of screw rod along the time of Propagation t2, screw rod 2 current axle power F, current axle power F and design and construction axle power F are calculated according to formula threenDifference be less than or equal to 5%Fn When, screw rod 2 is constructed qualification, current axle power F and design and construction axle power FnDifference be greater than 5%Fn, screw rod 2 construct it is unqualified, check Nuts and bolt it is elastic, apply prestressing force again and to be screwed to construction qualified.
F=k (T-T0)(t2-t0)+b formula three.
The present invention carries out pre- tensioning to screw rod 2 by ultrasonic tesint, first and just twists, and pretensioned pulling force is design and construction Axle power Fn50~70%, screw rod 2 can be fixed on to current position, then calculate screw rod 2 current axle power F1 to design Construct axle power FnWhen the angle, θ that is rotated relative to screw rod 2 of nut, tensioning screw rod 2 to design and construction axle power Fn110%, and to screwing All screw rods 2 are tightened completely, cord clip 1 are fixed on main push-towing rope by direction screw on nut angle, θ, tensioning through the invention and Tightening way, can be avoided one by one by screw rod 2 disposably by tensioning in place when, is first opened before being influenced when the screw rod 2 of post-stretching is constructed The axle power of the screw rod 1 of drawing, the axle power fastening construction of screw rod 2, which hardly results in, accurately to be controlled, and stretching mode of the invention makes spiral shell The axle power fastening construction of bar 2 can obtain accurate control, and stretching mode of the invention is installed all screw rods 2 Afterwards, not threaded 2 stress difference is less than 5%Fn, distribution is relatively uniform, and then cord clip 1 is avoided to slide in use, Improve the safety that bridge uses.
Meanwhile the present invention is after the completion of tensioning, using ultrasound detection ultrasound along axis under the current stress state in 2 inside of screw rod To the time t of propagation2, the current axle power inside screw rod 2 is calculated, due to use method of the invention, after being installed of screw rod 2 Its internal axle power and FnDifference should be less than 5%Fn, therefore, if when the axle power and F of the inside of front screw 2nDifference be greater than 5% FnWhen, illustrate in the presence of fault: such as since the quantity of screw rod 2 is excessive, when front screw 2 without tensioning or is tightened in a certain step Deng can quickly find the process omitted in construction, be remedied convenient for taking timely measure, it is ensured that the axle power of screw rod 2 meets design Construction requirement.
In the following, invention is described in detail by a specific embodiment.
Screw rod 2 in the present embodiment selects the 8.8 grade high-strength screw rods 2 of model M39, total length 950mm, both ends spiral shell The a length of 100mm of line, design and construct axle power FnFor 477KN, clamping length L when screw rod 2 fastens is 800mm.
Specifically includes the following steps:
A, ultrasound is measured under 2 inside unstress state of screw rod to be installed along Propagation using ultrasonic testing system Time t0: 321353.5ns is manually tightened 2 nut of screw rod using spanner.
B, screw rod 2 is stretched to design and construction axle power F using jacknThe 60% of (477KN), i.e. 286.2KN, referring to figure Shown in 1,2 tension sequence of screw rod is first intermediate and then both sides, diagonal to construct, specific order BFGCDHEA.
Manually make the nut that screws up with a wrench, unload jack, using ultrasonic testing system measure ultrasound inside screw rod 2 when Along the time t of Propagation under preceding stress state1: 322177.3ns.
Measuring 2 Current Temperatures T of screw rod is 25 DEG C, and the current axle power F of screw rod 2 is calculated according to formula one1For 244.3KN. The current axis power is 32.7KN less than normal than jack tension power, and the retraction of screw rod 2 causes axle power loss when being lifting jack unloading.
F1=k (T) (t1-t0)+b=244.3KN formula one
Wherein, k be demarcated on experimental bench with 1~2 test specimen in a collection of screw rod 2 when 2 temperature of screw rod is 20 DEG C it is primary Term coefficient is 0.2705, k (T-T0) it is the temperature correction term of k value, it is constant term for 0.2878, b, is 3.9709, in practical survey In examination, k value and b value can be obtained using conventional technical means measurement.
C, current axle power F1(244.3KN) is stretched to design and construction axle power FnNut is rotated relative to screw rod 2 when (477KN) Angle, θ calculates to obtain 70.3 ° according to formula 2.
Wherein, E is the elasticity modulus of 2 material of screw rod, is 210GPa;H is the screw pitch of 2 both ends screw thread of screw rod, is 4mm;π is Pi is 3.14;D is the nominal diameter of screw rod 2, is 39mm;L is clamping length when screw rod 2 fastens, and is 800mm.
D, using jack tension screw rod 2 to design and construction axle power FnThe 110% of (477KN), as 524.7KN, screw Direction screw on nut angle, θ (70.3 °) unloads jack;Using being 322970.42ns when ultrasonic testing system measurement sound, lead to Crossing formula (3) and calculating 2 axle power F of screw rod is 469.1KN, with design and construction axle power Fn(477KN) is compared, and less than normal 1.66%, 5% In range, for qualification.
F=k (T-T0)(t2-t0)+b=469.1KN formula three
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention Within the scope of.The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.

Claims (7)

1. a kind of cord clip of suspension bridge screw rod axle power construction method, which comprises the following steps:
S1, the ultrasonic propagation time t in the interior unstress state lower edge axial direction of screw rod to be installed (2) of measurement0, screw rod (2) nut is twisted Tightly;
S2, screw rod (2) is stretched to design and construction axle power F using jackn50~70%, manually make the nut that screws up with a wrench, Unload jack;Test ultrasound is under the internal current stress state of screw rod (2) along the time t of Propagation1, measure screw rod (2) Current Temperatures T calculates screw rod (2) current axle power F according to formula one1:
F1=k (T) (t1-t0)+b formula one
Wherein, k is with the Monomial coefficient that 1~2 test specimen is demarcated on experimental bench in a collection of screw rod (2), and k (T) is the temperature of k value Correction term, b are constant term:
S3, current axle power F is calculated according to formula two1To design and construction axle power FnWhen the angle, θ that is rotated relative to screw rod (2) of nut, make With jack tension screw rod (2) to design and construction axle power Fn105~120%, and to direction screw on nut angle, θ is screwed, unload Carry jack;
Wherein, E is the elasticity modulus of screw rod (2) material;H is the screw pitch of screw rod (2) both ends screw thread;π is pi;D is screw rod (2) nominal diameter;L is clamping length when screw rod (2) fasten.
2. a kind of cord clip of suspension bridge screw rod axle power construction method as described in claim 1, it is characterised in that: the step S3 it It is further comprising the steps of afterwards:
Ultrasound is measured under the internal current stress state of screw rod (2) along the time t of Propagation using ultrasonic testing system2, according to Formula three calculates screw rod (2) current axle power F, determines current axle power F and design and construction axle power FnDifference be less than or equal to 5%Fn
F=k (T-T0)(t2-t0)+b formula three.
3. a kind of cord clip of suspension bridge screw rod axle power construction method as claimed in claim 2, it is characterised in that: described according to formula It is further comprising the steps of after the current axle power F of three calculating screw rod (2): to determine current axle power F and design and construction axle power FnDifference Greater than 5%Fn, repeat step S3.
4. a kind of cord clip of suspension bridge screw rod axle power construction method as described in claim 1, it is characterised in that: the step S2 In, screw rod (2) is stretched to design and construction axle power F using jackn60% when, first to being located at cord clip (1) intermediate screw rod (2) it carries out tensioning and tensioning is carried out to the screw rod (2) for being located at two sides again, diagonally constructed.
5. a kind of cord clip of suspension bridge screw rod axle power construction method as described in claim 1, it is characterised in that: the screw rod (2) The flatness at both ends is less than or equal to 0.1mm.
6. a kind of cord clip of suspension bridge screw rod axle power construction method as described in claim 1, it is characterised in that: in the step S2 Screw rod (2) is stretched to design and construction axle power F using jackn60%.
7. a kind of cord clip of suspension bridge screw rod axle power construction method as described in claim 1, it is characterised in that: in the step S3 It uses jack tension screw rod (2) to design and construction axle power Fn110%.
CN201710514527.XA 2017-06-29 2017-06-29 A kind of cord clip of suspension bridge screw rod axle power construction method Active CN107165050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710514527.XA CN107165050B (en) 2017-06-29 2017-06-29 A kind of cord clip of suspension bridge screw rod axle power construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710514527.XA CN107165050B (en) 2017-06-29 2017-06-29 A kind of cord clip of suspension bridge screw rod axle power construction method

Publications (2)

Publication Number Publication Date
CN107165050A CN107165050A (en) 2017-09-15
CN107165050B true CN107165050B (en) 2019-01-04

Family

ID=59826424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710514527.XA Active CN107165050B (en) 2017-06-29 2017-06-29 A kind of cord clip of suspension bridge screw rod axle power construction method

Country Status (1)

Country Link
CN (1) CN107165050B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158476B (en) * 2019-05-22 2020-09-15 中铁大桥科学研究院有限公司 Tensioning method for cable clamp screw of suspension bridge
CN110359372B (en) * 2019-07-04 2021-03-02 中铁大桥科学研究院有限公司 Suspension bridge cable clamp screw axial force construction method
CN110374003B (en) * 2019-07-04 2021-04-27 中铁大桥科学研究院有限公司 Suspension bridge cable clamp screw axial force synchronous construction system and use method thereof
CN111623910B (en) * 2020-05-25 2021-08-06 中铁大桥科学研究院有限公司 Suspension bridge cable clamp screw axial force identification method based on ultrasonic echo envelope modeling
CN112227208B (en) * 2020-09-23 2022-03-29 中铁大桥局集团有限公司 Monitoring and forecasting method for construction period and operation period of suspension bridge cable clamp screw
CN112633647A (en) * 2020-12-10 2021-04-09 中铁大桥科学研究院有限公司 Bolt informatization management method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1831246A (en) * 2005-03-11 2006-09-13 柳州欧维姆机械股份有限公司 Cord clip with filling block and method for clamping main cable of suspension bridge by it
GB2466421A (en) * 2007-10-30 2010-06-23 Ihi Infrastructure Systems Co Device and method for rust-preventing of cable supporting bridge
CN103088755A (en) * 2013-02-02 2013-05-08 四川天元机械工程股份有限公司 Suspension bridge anti-skidding cable clamp
CN203346793U (en) * 2013-06-03 2013-12-18 四川天元机械工程股份有限公司 Suspension bridge cable clamp
CN106480822A (en) * 2016-11-25 2017-03-08 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1831246A (en) * 2005-03-11 2006-09-13 柳州欧维姆机械股份有限公司 Cord clip with filling block and method for clamping main cable of suspension bridge by it
GB2466421A (en) * 2007-10-30 2010-06-23 Ihi Infrastructure Systems Co Device and method for rust-preventing of cable supporting bridge
CN103088755A (en) * 2013-02-02 2013-05-08 四川天元机械工程股份有限公司 Suspension bridge anti-skidding cable clamp
CN203346793U (en) * 2013-06-03 2013-12-18 四川天元机械工程股份有限公司 Suspension bridge cable clamp
CN106480822A (en) * 2016-11-25 2017-03-08 中铁大桥局武汉桥梁特种技术有限公司 A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
悬索桥索夹高强螺栓更换关键技术;陈志敏;《黑龙江交通科技》;20170131(第1期);全文

Also Published As

Publication number Publication date
CN107165050A (en) 2017-09-15

Similar Documents

Publication Publication Date Title
CN107165050B (en) A kind of cord clip of suspension bridge screw rod axle power construction method
CN107238460A (en) A kind of torque coefficient of bolt test device and method
CN110514344A (en) A kind of aero-engine bolt pretightening accuracy control method
CN109489882B (en) Cable-stayed bridge cable anchoring and cable force testing device and method for large-size model test
CN202735163U (en) Fixture for testing bolted connection extrusion strength of composite material
CN106932276B (en) Axial tensile test device of cement-based composite material test piece
CN107748031A (en) A kind of cord clip of suspension bridge screw rod axle power detection servicing unit and detection method
US20240012958A1 (en) Approach for characterizing propagation of metallic short cracks and long cracks
CN105527158A (en) Bolt tension test fixture
CN105485125B (en) A kind of bolt and measuring method for surveying pretension elongation
CN109520922B (en) Testing device and testing method for bolt friction coefficient and torque coefficient
CN107271261A (en) A kind of servicing unit of fastener tension test in kind and the method tested with it
CN201223881Y (en) Apparatus for measuring tensioning force of fine rolling screw-thread steel
CN207007399U (en) A kind of torque coefficient of bolt test device
CN105527161A (en) Strength test fixture applicable to studs
CN204389083U (en) A kind of model test suspension cable anchoring and cable tension test device
CN109129579A (en) Fixing piece installation method and device
WO2022237012A1 (en) On-site measurement and debugging system and method for rigid hanging devices of pressure element
CN110359372B (en) Suspension bridge cable clamp screw axial force construction method
CN105890983A (en) Strength test device for hinge bolt of one-arm three-dimensional measurement scriber
CN205024828U (en) Steel draw bar assembly
CN209379690U (en) A kind of novel bridge steel pipe circle correcting device
CN203531409U (en) Tensioner for steel bars
CN202710395U (en) Serial force transmission mechanism for high-temperature enduring creep testing machine
CN2707966Y (en) Resistance increasing high strength pressured anchor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210622

Address after: 103 No. 430034 Hubei Province in Qiaokou District of Wuhan city road construction

Patentee after: CHINA RAILWAY BRIDGE SCIENCE RESEARCH INSTITUTE, Ltd.

Patentee after: China Construction Yichang Wujiagang bridge construction and Operation Co., Ltd

Patentee after: China Zhongtie Major Bridge Engineering Group Co.,Ltd.

Address before: No.103 Jianshe Avenue, Wuhan, Hubei 430034

Patentee before: CHINA RAILWAY BRIDGE SCIENCE RESEARCH INSTITUTE, Ltd.

Patentee before: China Zhongtie Major Bridge Engineering Group Co.,Ltd.