CN103088755A - Suspension bridge anti-skidding cable clamp - Google Patents

Suspension bridge anti-skidding cable clamp Download PDF

Info

Publication number
CN103088755A
CN103088755A CN2013100405022A CN201310040502A CN103088755A CN 103088755 A CN103088755 A CN 103088755A CN 2013100405022 A CN2013100405022 A CN 2013100405022A CN 201310040502 A CN201310040502 A CN 201310040502A CN 103088755 A CN103088755 A CN 103088755A
Authority
CN
China
Prior art keywords
hemizonid
antiskid
ring body
cord clip
suspension bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100405022A
Other languages
Chinese (zh)
Inventor
唐明
赵鹏贤
陈龙
丁敏
李泽锐
杨芙蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN TIANYUAN MECHANICAL ENGINEERING CO LTD
Original Assignee
SICHUAN TIANYUAN MECHANICAL ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN TIANYUAN MECHANICAL ENGINEERING CO LTD filed Critical SICHUAN TIANYUAN MECHANICAL ENGINEERING CO LTD
Priority to CN2013100405022A priority Critical patent/CN103088755A/en
Publication of CN103088755A publication Critical patent/CN103088755A/en
Pending legal-status Critical Current

Links

Images

Abstract

A suspension bridge anti-skidding cable clamp comprises a first half ring body and a second half ring body, wherein the first ring body and the second half ring body are matched with each other from left to right or from top to bottom. Two ends of an annual outline of the first half ring body are provided with connecting steps and two ends of an annual outline of the second half ring body are provided with connecting steps, and the connecting steps of the first half ring body and the second half ring body are provided with a plurality of bolt holes which correspond to each other. The first half ring body and the second half ring body are connected with each other through high-intensity bolts. Anti-skidding structures are respectively arranged on the inner wall surfaces of the first half ring body and the second half ring body and each anti-skidding structure is at least one anti-skidding groove or at least one anti-skidding protruding tooth. After the anti-skidding structures are installed on a main cable, locking friction between the cable clamp and the main cable is greatly increased, the cable clamp is prevented from skidding on the main cable, and therefore installation reliability of the cable clamp on the main cable improved and a suspension bridge is safe. In addition, the suspension bridge anti-skidding cable clamp can effectively reduce level of manufacture difficulty, decrease manufacture materials, control manufacture cost, benefit installation operation on the main cable, relieve labor intensity of workers and is good in practicability, safe and reliable.

Description

Suspension bridge antiskid cord clip
Technical field
The present invention relates to the cord clip of suspension bridge, specifically a kind of suspension bridge antiskid cord clip.
Background technology
In the structure of suspension bridge, cord clip is the connector between main push-towing rope and hoist cable, passes to main push-towing rope as static load and dynamic load with bridge floor, is important primary structure member.The linearity of setting up due to main push-towing rope is parabola or outstanding line, make the angle between main push-towing rope and hoist cable can't form the right angle, like this, the pulling force of hoist cable also just can't form vertical with horizontal component, can not balance, the horizontal component of hoist cable can be by the linear dispersed of cord clip along main push-towing rope, thereby cause cord clip to produce the trend that glides along main cable linear, affects suspension bridge safety.For this reason, traditional solution is, the cord clip of two hemizonids is locked by high-strength bolt, utilizes frictional force between locking cord clip and main push-towing rope to overcome the horizontal component of downslide.The method not only requires high-strength bolt to have high coupling mechanism force, and require the structural strength of cord clip enough high, to adapt to high-intensity coupling mechanism force, this just causes the manufacture difficulty of cord clip to increase, materials being fabricated increases, thereby the manufacturing cost of whole cord clip is raise; In addition, the method makes cord clip fitting operation difficulty, and labor strength is heavy, and security reliability is poor.
Summary of the invention
The object of the invention is to: for above-mentioned the deficiencies in the prior art, provide a kind of simple in structure, easy to manufacture, low cost of manufacture, fitting operation convenient, with main push-towing rope reliable lock, safe suspension bridge antiskid cord clip.
the technical solution used in the present invention is: a kind of suspension bridge antiskid cord clip, comprise a left side, the right or up, under the first hemizonid and the second hemizonid that are combined together, the first hemizonid be connected the circular contour two ends of hemizonid and be provided with the connection step, the first hemizonid be connected the connection step of hemizonid and be provided with the bolt hole of a plurality of mutual correspondences, the first hemizonid and the second hemizonid link together by high-strength bolt, the internal face of described the first hemizonid and the second hemizonid is respectively equipped with the antiskid structure, this antiskid structure is at least one antiskid groove or at least one antiskid double wedge.
Described antiskid double wedge is arc shape, is fixed on the internal face of the first hemizonid and the second hemizonid in the mode of inlaying or weld.Or described antiskid double wedge is arc shape, antiskid double wedge and the first hemizonid and the second hemizonid one-shot forming.
The cross section center line extension line of described antiskid double wedge is vertical with the cord clip axis or tilt.
Described antiskid groove is arc shape, and the cross section center line extension line of antiskid groove is vertical with the cord clip axis or tilt.
The bottom of described cord clip is provided with downward extended engaging lug, has pin-and-hole on engaging lug, and engaging lug connects hoist cable by bearing pin.
The top of described cord clip is provided with the groove that rides that connects hoist cable.
The invention has the beneficial effects as follows: by the antiskid structure of groove or double wedge is set at the cord clip internal face, make be arranged on main push-towing rope after, and the locking frictional force between main push-towing rope can increase greatly, prevent from making cord clip slippage on main push-towing rope because of the horizontal component of hoist cable, improve the installation reliability of cord clip on main push-towing rope, ensure suspension bridge safety; In addition, by the setting of antiskid structure, can effectively reduce the manufacture difficulty of cord clip, reduce materials being fabricated, control manufacturing cost, convenient fitting operation on main push-towing rope alleviates labor strength, and practical, security reliability is high.
Description of drawings
The present invention is further illustrated below in conjunction with accompanying drawing.
Fig. 1 is a kind of structural representation of the present invention.
Fig. 2 is another kind of structural representation of the present invention.
Code name implication in figure: the 1-the first hemizonid; The 2-the second hemizonid; 3-high-strength bolt; 4-engaging lug; 5-pin-and-hole; 6-ride groove; 7-antiskid structure.
The specific embodiment
Embodiment 1
Referring to Fig. 1: the present invention includes with left and right the first hemizonid 1 that is combined together and the second hemizonid 2, the first hemizonid 1 be connected the circular contour two ends of hemizonid 2 and be provided with the connection step, the first hemizonid 1 be connected the connection step of hemizonid 2 and be provided with the bolt hole of a plurality of mutual correspondences, the first hemizonid 1 and the second hemizonid 2 link together by many high-strength bolts 3, are equipped with packing ring and nut on high-strength bolt 3.The first hemizonid 1 be connected the lower end of hemizonid 2 and connect the step place and be provided with respectively engaging lug 4 to downward-extension, engaging lug 4 is provided with on engaging lug 4 as the pin-and-hole 5 of wearing bearing pin as connecting hoist cable.Internal face at the first hemizonid 1 and the second hemizonid 2 is processed with antiskid structure 7 in the mode of cutting fluting respectively, this antiskid structure 7 is twice antiskid groove, per pass antiskid groove is arc shape, the cross section of antiskid groove (along the axis direction of cord clip) center line extension line is vertical with the cord clip axis, forms the right angle angle.
Embodiment 2
Referring to Fig. 2: the present invention includes with left and right the first hemizonid 1 that is combined together and the second hemizonid 2, the first hemizonid 1 be connected the circular contour two ends of hemizonid 2 and be provided with the connection step, the first hemizonid 1 be connected the connection step of hemizonid 2 and be provided with the bolt hole of a plurality of mutual correspondences, the first hemizonid 1 and the second hemizonid 2 link together by many high-strength bolts 3, are equipped with packing ring and nut on high-strength bolt 3.Be provided with the multiple tracks corresponding groove 6 that rides mutually at the outer wall first half of the first hemizonid 1 and the second hemizonid 2, each road rides the inclination that groove 6 forms certain angles, rides groove 6 as connecting hoist cable.Internal face at the first hemizonid 1 and the second hemizonid 2 is processed with antiskid structure 7 in the mode of cutting fluting respectively, this antiskid structure 7 is four road antiskid grooves, per pass antiskid groove is arc shape, the cross section of antiskid groove (along the axis direction of cord clip) center line extension line and cord clip axis tilt, and form the acute angle angle.
Embodiment 3
The present invention includes with upper and lower the first hemizonid that is combined together and the second hemizonid, the first hemizonid and the second hemizonid are respectively with cast molding, the first hemizonid be connected the circular contour two ends of hemizonid and be provided with the connection step, the first hemizonid be connected the connection step of hemizonid and be provided with the bolt hole of a plurality of mutual correspondences, the first hemizonid and the second hemizonid link together by many high-strength bolts, are equipped with packing ring and nut on high-strength bolt.Being provided with multiple tracks on the outer wall of the first hemizonid has the groove that rides at certain angle of inclination, rides groove as connecting hoist cable.Internal face at the first hemizonid and the second hemizonid is respectively equipped with and the first hemizonid and the one-time formed antiskid structure of the second hemizonid, this antiskid structure is three road antiskid double wedges, per pass antiskid double wedge is arc shape, the cross section of antiskid double wedge (along the axis direction of cord clip) center line extension line and cord clip axis tilt, and form the acute angle angle.
Embodiment 4
The present invention includes with upper and lower the first hemizonid that is combined together and the second hemizonid, the first hemizonid be connected the circular contour two ends of hemizonid and be provided with the connection step, the first hemizonid be connected the connection step of hemizonid and be provided with the bolt hole of a plurality of mutual correspondences, the first hemizonid and the second hemizonid link together by many high-strength bolts, are equipped with packing ring and nut on high-strength bolt.Be provided with the engaging lug to downward-extension in the bottom of the second hemizonid, engaging lug is provided with on engaging lug as the pin-and-hole of wearing bearing pin as connecting hoist cable.Internal face at the first hemizonid and the second hemizonid is provided with the antiskid structure with welding manner (or fluting mosaic mode) respectively, this antiskid structure is twice antiskid double wedge, per pass antiskid double wedge is arc shape, the cross section of antiskid double wedge (along the axis direction of cord clip) center line extension line is vertical with the cord clip axis, forms the right angle angle.
Above embodiment is four better concrete technical schemes of the present invention, and they are only made the present invention of work and clearly demonstrate, and the present invention are not done the restriction of protection domain; Except above-mentioned four embodiment, the published technical characterictic according to the present invention, can also be combined into more concrete technical scheme in the situation that need not to pay creative work, in view of above-mentioned four embodiment have clearly demonstrated content of the present invention, other concrete technical scheme is no longer done and is given unnecessary details.

Claims (7)

1. suspension bridge antiskid cord clip, comprise a left side, the right or up, under the first hemizonid (1) and the second hemizonid (2) that are combined together, the first hemizonid (1) be connected the circular contour two ends of hemizonid (2) and be provided with the connection step, the first hemizonid (1) be connected the connection step of hemizonid (2) and be provided with the bolt hole of a plurality of mutual correspondences, the first hemizonid (1) and the second hemizonid (2) link together by high-strength bolt (3), it is characterized in that: the internal face of described the first hemizonid (1) and the second hemizonid (2) is respectively equipped with antiskid structure (7), this antiskid structure (7) is at least one antiskid groove or at least one antiskid double wedge.
2. suspension bridge antiskid cord clip according to claim 1, it is characterized in that: described antiskid double wedge is arc shape, is fixed on the internal face of the first hemizonid (1) and the second hemizonid (2) in the mode of inlaying or weld.
3. suspension bridge antiskid cord clip according to claim 1, it is characterized in that: described antiskid double wedge is arc shape, antiskid double wedge and the first hemizonid (1) and the second hemizonid (2) one-shot forming.
4. according to claim 1 and 2 or 3 described suspension bridge antiskid cord clips is characterized in that: the cross section center line extension line of described antiskid double wedge is vertical with the cord clip axis or tilt.
5. suspension bridge antiskid cord clip according to claim 1, it is characterized in that: described antiskid groove is arc shape, the cross section center line extension line of antiskid groove is vertical with the cord clip axis or tilt.
6. suspension bridge antiskid cord clip according to claim 1, it is characterized in that: the bottom of described cord clip is provided with downward extended engaging lug (4), has pin-and-hole (5) on engaging lug (4), and engaging lug (4) connects hoist cable by bearing pin.
7. suspension bridge antiskid cord clip according to claim 1 is characterized in that: the top of described cord clip be provided with connect hoist cable ride groove (6).
CN2013100405022A 2013-02-02 2013-02-02 Suspension bridge anti-skidding cable clamp Pending CN103088755A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100405022A CN103088755A (en) 2013-02-02 2013-02-02 Suspension bridge anti-skidding cable clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100405022A CN103088755A (en) 2013-02-02 2013-02-02 Suspension bridge anti-skidding cable clamp

Publications (1)

Publication Number Publication Date
CN103088755A true CN103088755A (en) 2013-05-08

Family

ID=48201846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100405022A Pending CN103088755A (en) 2013-02-02 2013-02-02 Suspension bridge anti-skidding cable clamp

Country Status (1)

Country Link
CN (1) CN103088755A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105041969A (en) * 2015-07-09 2015-11-11 安徽省力通稀土钢缆有限公司 Steel strand row-shaped composite clamping device
KR101676749B1 (en) * 2016-03-18 2016-11-17 주식회사 성화씨앤비 Band apparatus for main cable of suspension bridge
CN106400981A (en) * 2016-09-30 2017-02-15 上海建筑设计研究院有限公司 Cable clamp
CN107165050A (en) * 2017-06-29 2017-09-15 中铁大桥科学研究院有限公司 A kind of cord clip of suspension bridge screw rod axle power construction method
CN107217595A (en) * 2017-07-03 2017-09-29 德阳天元重工股份有限公司 A kind of all welded type cord clip
CN109487689A (en) * 2018-10-12 2019-03-19 西南交通大学 A kind of Split pin direct type cable cord clip
CN111894302A (en) * 2020-08-17 2020-11-06 哈尔滨工业大学 Cable dismantling device and method
CN111979914A (en) * 2020-08-24 2020-11-24 郑州大学 Efficient anti-sliding cable clip
CN113931066A (en) * 2021-11-03 2022-01-14 中交一公局重庆万州高速公路有限公司 Cable clamp structure
CN114016404A (en) * 2021-11-03 2022-02-08 武汉船用机械有限责任公司 Main cable clamp

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11323824A (en) * 1998-05-08 1999-11-26 Shinko Kosen Kogyo Kk Cable joint metal fixture of suspension structure
FR2825389A1 (en) * 2001-05-29 2002-12-06 Baudin Chateauneuf Structure, especially suspension bridge, with suspension cables, has cables inside extruded sleeves and collars with anti-slip projections
CN201047059Y (en) * 2007-05-15 2008-04-16 四川天元机械工程有限责任公司 Suspension structure of rope-suspension bridge and rope clip thereof
CN102409611A (en) * 2011-08-22 2012-04-11 四川省交通运输厅公路规划勘察设计研究院 Cable clamp for suspending oblique sling of suspension bridge with middle cable plane
CN203174504U (en) * 2013-02-02 2013-09-04 四川天元机械工程股份有限公司 Anti-slip cord clip for suspension bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11323824A (en) * 1998-05-08 1999-11-26 Shinko Kosen Kogyo Kk Cable joint metal fixture of suspension structure
FR2825389A1 (en) * 2001-05-29 2002-12-06 Baudin Chateauneuf Structure, especially suspension bridge, with suspension cables, has cables inside extruded sleeves and collars with anti-slip projections
CN201047059Y (en) * 2007-05-15 2008-04-16 四川天元机械工程有限责任公司 Suspension structure of rope-suspension bridge and rope clip thereof
CN102409611A (en) * 2011-08-22 2012-04-11 四川省交通运输厅公路规划勘察设计研究院 Cable clamp for suspending oblique sling of suspension bridge with middle cable plane
CN203174504U (en) * 2013-02-02 2013-09-04 四川天元机械工程股份有限公司 Anti-slip cord clip for suspension bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
叶觉明: "三塔悬索桥主缆系施工应用技术问题分析和探讨", 《桥梁建设》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105041969A (en) * 2015-07-09 2015-11-11 安徽省力通稀土钢缆有限公司 Steel strand row-shaped composite clamping device
KR101676749B1 (en) * 2016-03-18 2016-11-17 주식회사 성화씨앤비 Band apparatus for main cable of suspension bridge
CN106400981A (en) * 2016-09-30 2017-02-15 上海建筑设计研究院有限公司 Cable clamp
CN107165050A (en) * 2017-06-29 2017-09-15 中铁大桥科学研究院有限公司 A kind of cord clip of suspension bridge screw rod axle power construction method
CN107165050B (en) * 2017-06-29 2019-01-04 中铁大桥科学研究院有限公司 A kind of cord clip of suspension bridge screw rod axle power construction method
CN107217595A (en) * 2017-07-03 2017-09-29 德阳天元重工股份有限公司 A kind of all welded type cord clip
CN109487689A (en) * 2018-10-12 2019-03-19 西南交通大学 A kind of Split pin direct type cable cord clip
CN111894302A (en) * 2020-08-17 2020-11-06 哈尔滨工业大学 Cable dismantling device and method
CN111979914A (en) * 2020-08-24 2020-11-24 郑州大学 Efficient anti-sliding cable clip
CN113931066A (en) * 2021-11-03 2022-01-14 中交一公局重庆万州高速公路有限公司 Cable clamp structure
CN114016404A (en) * 2021-11-03 2022-02-08 武汉船用机械有限责任公司 Main cable clamp

Similar Documents

Publication Publication Date Title
CN103088755A (en) Suspension bridge anti-skidding cable clamp
CN203174504U (en) Anti-slip cord clip for suspension bridge
CN204151681U (en) Suspension bridge pin joint formula cord clip
CN102381640B (en) Dismountable truss arm structure and truss-arm-type crane
CN204112221U (en) The box-like cord clip of a kind of soldering group
CN202969271U (en) Pin-connected rope clip
CN208831890U (en) A kind of high-strength anti-seismic suspension and support
CN102409611A (en) Cable clamp for suspending oblique sling of suspension bridge with middle cable plane
CN207111150U (en) A kind of supporting coal mine underworkings device
CN105525566A (en) Bridge main cable saddle with self-returning function
CN102767139A (en) Combined clip of double main cables of suspension bridge
CN202644404U (en) Combined rope clip of suspension bridge
CN208605733U (en) A kind of fire safe type antidetonation suspension and support
CN205187705U (en) Standard festival tenon and main chord member connection structure
CN105398914A (en) Counterweight guide system with solid counterweight guide rails
CN206721691U (en) A kind of fastening structure of I-steel and beret truss
CN203033686U (en) Standard section connection sleeve of tower crane
CN203346793U (en) Suspension bridge cable clamp
CN103303831B (en) Rope Locking device
CN205530014U (en) Connection piece
CN201934579U (en) Two-way connector for chain ring of chain
CN207030731U (en) A kind of more cabin piping lane adjustable horizontal boom hoistings
CN106592558B (en) A kind of ocean platform hydraulic bolt jacking system
CN219195645U (en) Stay cable structure for cable-stayed bridge
CN204001301U (en) A kind of fixed structure of Glass Rib

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130508