CN201047059Y - Suspension structure of rope-suspension bridge and rope clip thereof - Google Patents

Suspension structure of rope-suspension bridge and rope clip thereof Download PDF

Info

Publication number
CN201047059Y
CN201047059Y CNU2007200795589U CN200720079558U CN201047059Y CN 201047059 Y CN201047059 Y CN 201047059Y CN U2007200795589 U CNU2007200795589 U CN U2007200795589U CN 200720079558 U CN200720079558 U CN 200720079558U CN 201047059 Y CN201047059 Y CN 201047059Y
Authority
CN
China
Prior art keywords
cord clip
cable clamp
cable
suspended
suspension bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200795589U
Other languages
Chinese (zh)
Inventor
黄安明
王安顺
赵鹏贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Tianyuan Mechanical Engineering Co.,Ltd.
Original Assignee
SICHUAN TIANYUAN MECHANICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN TIANYUAN MECHANICAL ENGINEERING Co Ltd filed Critical SICHUAN TIANYUAN MECHANICAL ENGINEERING Co Ltd
Priority to CNU2007200795589U priority Critical patent/CN201047059Y/en
Application granted granted Critical
Publication of CN201047059Y publication Critical patent/CN201047059Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a suspended structure and a cable clamp of a suspension bridge, wherein, the cable clamp of the suspension bridge is a bisection structure of a circular ring, and two semi circular rings are connected into a whole through bolts and an external periphery of the semi circular ring is provided with rotational grooves; the suspended structure of the suspension bridge comprises a main cable, the cable clamp which is clamped on the main cable, and a suspended cable which is suspended on the cable clamp and which bestrides in the rotational grooves of the cable clamp. The utility model has the advantages that as suspended steel ropes bestride in the grooves of the cable clamp, the gravity of a bridge plate and load on the bridge plate is transferred to the main cable while bolts of the cable clamp only bear the clamping force of the cable clamp to supporting steel ropes without bearing the gravity any more. So the utility model can greatly decrease requirements to materials, reduce the cost and at the same time, the cable clamp has long service life for small bearing force and is hard to be damaged, so the safety of bridges can be improved.

Description

The suspended structure of suspension bridge and cord clip thereof
Technical field
The utility model relates to suspension bridge, especially its suspended structure and cord clip thereof.
Background technology
Referring to Fig. 1, Fig. 2: the suspended structure of suspension bridge is, the lower end of hoist cable 30 connects bridge plate, and the upper end hangs on the cord clip 10, and cord clip 10 is clamped on the main rope 50.Existing cord clip 10 is annulus and divides the half hitch structure, and two semi-rings are connected to integral body by bolt 20, extends a hanger 40 on the outer peripheral face of semi-ring under it, and hoist cable 30 hangs on the hanger 40.Its problem is: the gravity of all load is all born by cord clip bolt 20 on bridge plate and the bridge plate, so it is high to its requirement of strength, need make with high-strength material, cost height not only, and dangerous, and cord clip is in case after installing, just inconvenience is changed, bolt 20 uses under heavy duty, and the screw thread fatiguability becomes major safety risks.
The utility model content
The purpose of this utility model is for solving the problems of the technologies described above, a kind of suspension bridge suspended structure and cord clip thereof rational in infrastructure, safe in utilization, with low cost being provided.
The technical solution of the utility model is:
A kind of suspension bridge cord clip is annulus and divides the half hitch structure, and two semi-rings are connected to integral body by bolt, and the outer peripheral face of described semi-ring has circumferential recess.
A kind of suspension bridge suspended structure has main rope, hoist cable, cord clip, and described cord clip is clamped on the main rope, and described hoist cable hangs on the described cord clip; Described cord clip adopts above-mentioned cord clip, and described hoist cable straddles in the circumferential recess of this cord clip.
Useful technique effect of the present utility model is: straddle in the groove of cord clip owing to hang cable wire, the gravity of all load is all by cord clip and pass to main rope by cord clip and bear on bridge plate and the bridge plate, the cord clip bolt no longer bears this gravity, only bears the chucking power of cord clip to carrier cable.Thereby, can reduce its requirement greatly to material, reduce cost.Simultaneously, cord clip is because of stressed little, and is not fragile, long service life, the safety that can improve bridge.
Description of drawings
Fig. 1 is existing suspension bridge suspended structure and cord clip structure chart thereof
Fig. 2 is the lateral view of Fig. 1
Fig. 3 is this suspension bridge suspended structure and cord clip structure chart thereof
Fig. 4 is the lateral view of Fig. 3
The specific embodiment
Referring to Fig. 3, Fig. 4: this suspension bridge cord clip 1 is annulus and divides the half hitch structure, and two semi-rings are connected to integral body by bolt 2, and the outer peripheral face of semi-ring has circumferential recess 3.This suspension bridge suspended structure has main rope 4, hoist cable 5, cord clip 1, and cord clip 1 is clamped on the main rope 4, and hoist cable 5 hangs on the described cord clip 1, and hoist cable 5 straddles in the circumferential recess 3 of this cord clip 1.
The using method of cord clip 1 is clamped in cord clip 1 on the main rope 4, and hoist cable 5 straddles in the circumferential recess 3 of cord clip 1.
Above-mentioned suspended structure, the gravity of all load is all by cord clip 1 and pass to main rope 4 by cord clip 1 and bear on bridge plate and the bridge plate, and cord clip bolt 2 no longer bears this gravity, only bear the chucking power of 1 pair of main rope 4 of cord clip, thereby, can reduce its requirement greatly to material, reduce cost.Simultaneously, cord clip 1 is because of stressed little, and is not fragile, long service life, the safety that can improve bridge.

Claims (2)

1. suspension bridge cord clip, for annulus divides the half hitch structure, two semi-rings are connected to integral body by bolt; It is characterized in that: on the outer peripheral face of described semi-ring circumferential recess is arranged.
2. a suspension bridge suspended structure has main rope, hoist cable, cord clip, and described cord clip is clamped on the main rope, and described hoist cable hangs on the described cord clip; It is characterized in that: described cord clip adopts the described cord clip of claim 1, and described hoist cable straddles in the circumferential recess of this cord clip.
CNU2007200795589U 2007-05-15 2007-05-15 Suspension structure of rope-suspension bridge and rope clip thereof Expired - Fee Related CN201047059Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200795589U CN201047059Y (en) 2007-05-15 2007-05-15 Suspension structure of rope-suspension bridge and rope clip thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200795589U CN201047059Y (en) 2007-05-15 2007-05-15 Suspension structure of rope-suspension bridge and rope clip thereof

Publications (1)

Publication Number Publication Date
CN201047059Y true CN201047059Y (en) 2008-04-16

Family

ID=39299635

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200795589U Expired - Fee Related CN201047059Y (en) 2007-05-15 2007-05-15 Suspension structure of rope-suspension bridge and rope clip thereof

Country Status (1)

Country Link
CN (1) CN201047059Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101941052A (en) * 2010-09-17 2011-01-12 四川天元机械工程股份有限公司 Casting method of pin-jointed cable clamp for lifting lug of suspension bridge
CN102071651A (en) * 2010-12-15 2011-05-25 江苏法尔胜新日制铁缆索有限公司 Sling replacement method for suspension bridge
CN102409611A (en) * 2011-08-22 2012-04-11 四川省交通运输厅公路规划勘察设计研究院 Cable clamp for suspending oblique sling of suspension bridge with middle cable plane
CN103088755A (en) * 2013-02-02 2013-05-08 四川天元机械工程股份有限公司 Suspension bridge anti-skidding cable clamp
CN106988220A (en) * 2017-03-13 2017-07-28 中交第四公路工程局有限公司 Tower structure and the method excessively of a kind of continous way suspension bridge cat road head-rope
CN111691297A (en) * 2020-04-30 2020-09-22 武汉船用机械有限责任公司 Double main cable clamp
CN114892522A (en) * 2022-05-17 2022-08-12 柳州欧维姆机械股份有限公司 Self-adaptive large-span space cable suspension bridge sling

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101941052A (en) * 2010-09-17 2011-01-12 四川天元机械工程股份有限公司 Casting method of pin-jointed cable clamp for lifting lug of suspension bridge
CN101941052B (en) * 2010-09-17 2012-10-17 四川天元机械工程股份有限公司 Casting method of pin-jointed cable clamp for lifting lug of suspension bridge
CN102071651A (en) * 2010-12-15 2011-05-25 江苏法尔胜新日制铁缆索有限公司 Sling replacement method for suspension bridge
CN102071651B (en) * 2010-12-15 2012-06-27 江苏法尔胜新日制铁缆索有限公司 Sling replacement method for suspension bridge
CN102409611A (en) * 2011-08-22 2012-04-11 四川省交通运输厅公路规划勘察设计研究院 Cable clamp for suspending oblique sling of suspension bridge with middle cable plane
CN103088755A (en) * 2013-02-02 2013-05-08 四川天元机械工程股份有限公司 Suspension bridge anti-skidding cable clamp
CN106988220A (en) * 2017-03-13 2017-07-28 中交第四公路工程局有限公司 Tower structure and the method excessively of a kind of continous way suspension bridge cat road head-rope
CN111691297A (en) * 2020-04-30 2020-09-22 武汉船用机械有限责任公司 Double main cable clamp
CN111691297B (en) * 2020-04-30 2022-08-23 武汉船用机械有限责任公司 Double main cable clamp
CN114892522A (en) * 2022-05-17 2022-08-12 柳州欧维姆机械股份有限公司 Self-adaptive large-span space cable suspension bridge sling
CN114892522B (en) * 2022-05-17 2024-02-13 柳州欧维姆机械股份有限公司 Self-adaptive large-span space cable suspension bridge sling

Similar Documents

Publication Publication Date Title
CN201047059Y (en) Suspension structure of rope-suspension bridge and rope clip thereof
CN203428736U (en) Electrode hoisting fixture of electric melting furnace
CN203095401U (en) Clasp type rolling-over hoisting tail lug fixture
CN202107425U (en) Oil drum sling
CN203033638U (en) Lifting device for hoisting slewing support rings of excavator
CN204575309U (en) A kind of Large Crankshaft bending fatigue testing device
CN201758338U (en) Motor stator lifting fixture
CN201376858Y (en) Guide tool for dry-quenching enclosed lifting wire rope replacement
CN205023604U (en) It hangs wire rope installation and uses reel frock heavily to hang ship gram order
CN204737596U (en) Hoist anti -falling lifting hook
CN205422583U (en) Lifting hook, hang assembly and hang hoisting accessory
CN204873428U (en) Wear -resisting channel -section steel hoist cable instrument
CN103286706A (en) Movable plate clamp
CN203343935U (en) Movable plate clamp
CN203006739U (en) Tire overturning rigging
CN204727439U (en) A kind of special-shaped lifting device of crane
CN202082343U (en) Steel wire rope termination wedge lock combination device
CN201864464U (en) Lifting hook capable of unhooking automatically
CN202429868U (en) Novel hoisting and positioning device for prefabricated member
CN201530668U (en) Protection device for hook of hoist
CN201619944U (en) Sling instrument
CN201605090U (en) Conjoined suspension clamp
CN203568632U (en) Tail rope suspension device for skip bucket
CN203295025U (en) Clamping tool for hoisting single H beam
CN204778474U (en) Hoist is with having surpassed device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SICHUAN TIANYUAN MACHINERY ENGINEERING JOINT-STOCK

Free format text: FORMER NAME: SICHUAN TIANYUAN MACHINERY ENGINEERING LIMITED LIABILITY COMPANY

CP03 Change of name, title or address

Address after: No. three, 20 South Mount Lu Road, Sichuan, Deyang Province, China: 618000

Patentee after: Sichuan Tianyuan Mechanical Engineering Co.,Ltd.

Address before: No. 20, South Mount Lu Road, Sichuan, Deyang: 618000

Patentee before: Sichuan Tianyuan Mechanical Engineering Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080416

Termination date: 20130515