CN205023604U - It hangs wire rope installation and uses reel frock heavily to hang ship gram order - Google Patents

It hangs wire rope installation and uses reel frock heavily to hang ship gram order Download PDF

Info

Publication number
CN205023604U
CN205023604U CN201520703633.9U CN201520703633U CN205023604U CN 205023604 U CN205023604 U CN 205023604U CN 201520703633 U CN201520703633 U CN 201520703633U CN 205023604 U CN205023604 U CN 205023604U
Authority
CN
China
Prior art keywords
backing plate
adjustable brake
wire rope
brake backing
brake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520703633.9U
Other languages
Chinese (zh)
Inventor
张学
周建平
王玺培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201520703633.9U priority Critical patent/CN205023604U/en
Application granted granted Critical
Publication of CN205023604U publication Critical patent/CN205023604U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an it hangs wire rope installation and uses reel frock heavily to hang ship gram order, including roll up a barrel base, variable diameter steel pipe bolt, go up adjustable brake backing plate, the adjustable brake backing plate and the plank that brakes down, book barrel base's upper portion the bolt hole has, supply variable diameter steel pipe bolt pass book barrel base's lower part a plurality of through -holes have, supply last adjustable brake backing plate pass through the bolt parallel with lower adjustable brake backing plate and fix on roll barrel base, the brake plank place last adjustable brake backing plate and down between the adjustable brake backing plate, should brake that adjustable brake backing plate be the fulcrum below the plank, its one end can contact with waiting the lower part of installing a wire rope section of thick bamboo on placing roll barrel base in, other end confession operating personnel rides the ballast and brakes. The utility model discloses can prevent effectively that gram order from hanging the wire rope wound packages and joining in marriage difficulty, wire rope and wear to put that speed control is difficult, the brake personnel operate shortcomings such as danger, have the use universality, easy operation guarantees fail safe nature.

Description

A kind of heavy lift carrier crane steel rope is installed and is used reel frock
Technical field
The utility model relates to the assembling of heavy lift carrier crane steel rope field, specifically a kind of heavy lift carrier crane steel rope installation reel frock.
Background technology
Current heavy lift carrier is built comparatively general, and the crane erection work of such ship type is comparatively complicated, and risk is higher, and preliminary preparation is many, and particularly crane steel rope is thick, heavy, wears that to put installation very difficult, and accident-proneness.
Utility model content
For overcoming above-mentioned difficult point, the utility model provides a kind of heavy lift carrier crane steel rope installation reel frock, can reduce the dead work in early stage, simplify procedures, and reduces crane steel rope installation risk.
Technical solution of the present utility model is as follows:
A kind of heavy lift carrier crane steel rope is installed and is used reel frock, and its feature is, comprises reel base, variable-diameter steel pipe latch, upper adjustable brake backing plate, lower adjustable brake backing plate and brake plank;
On the top of described reel base, there is pin hole, pass for described variable-diameter steel pipe latch, in the bottom at described reel base, there is multiple through hole, be fixed on reel base on lower adjustable brake backing plate by bolt is parallel for described upper adjustable brake backing plate;
Described brake plank is placed between described upper adjustable brake backing plate and lower adjustable brake backing plate, the following adjustable brake backing plate of this brake plank is fulcrum, its one end is placed on reel base, can with the lower contacts of steel wire rope roll to be installed, the other end is ridden ballast brake for operating personal.
The large, medium and small three kinds of specifications of pipe diameter preparation pressed by described variable-diameter steel pipe latch, and the actual size according to steel wire rope roll is matched, and steel wire rope roll and wound roll I can be filled and couple together.
Compared with prior art, the beneficial effects of the utility model are:
1. cost is low, flexible design, and variable-diameter steel pipe latch and adjustable brake backing plate increase applicable range, have the ubiquity of use, infinite loop can use, uses simple to operate, ensure safe reliability.
2. brake operation is simple, and wooden braking vane quality is light, and friction force is large, and is side direction contact steel wire rope roll, and there will not be braking vane because of unbalance stress during brake, the situation that braking vane and steel wire rope roll misplace, safe reliability is high.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of utility model heavy lift carrier crane steel rope installation reel frock.
Fig. 2 is the using state figure of the utility model heavy lift carrier crane steel rope installation reel frock.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described further, but protection domain of the present utility model should not be limited with this.
Refer to Fig. 1, Fig. 1 is the schematic diagram of the utility model heavy lift carrier crane steel rope installation reel frock, as shown in the figure, a kind of heavy lift carrier crane steel rope is installed and is used reel frock, comprises reel base 1, variable-diameter steel pipe latch 2, upper adjustable brake backing plate 3, lower adjustable brake backing plate 5 and brake plank 4; On the top of described reel base 1, there is pin hole, pass for described variable-diameter steel pipe latch 2, in the bottom at described reel base 1, there is multiple through hole, be fixed on reel base 1 on lower adjustable brake backing plate 5 by bolt is parallel for described upper adjustable brake backing plate 3; Described brake plank 4 is placed between described upper adjustable brake backing plate 3 and lower adjustable brake backing plate 5, this brake plank less than 4 adjustable brake backing plate 5 is fulcrum, its one end is placed on reel base 1, can with the lower contacts of steel wire rope roll to be installed, the other end is ridden ballast brake for operating personal.The large, medium and small three kinds of specifications of pipe diameter preparation pressed by described variable-diameter steel pipe latch 2, and the actual size according to steel wire rope roll 6 is matched, and steel wire rope roll and wound roll I can be filled and couple together.Block pressuring plate till upper adjustable brake backing plate 3, prevents brake plank to beat displacement.
Principle of work of the present utility model is the applicability that the polymorphic type steel rope increasing frock by variable-diameter steel pipe latch, adjustable brake backing plate is installed; Reduce brake risk by side direction brake plank, make brake flexibly, effectively.The applicability that the polymorphic type steel rope increasing frock by variable-diameter steel pipe latch, adjustable brake backing plate is installed; Reduce brake risk by side direction brake plank, make brake flexibly, effectively.

Claims (2)

1. a heavy lift carrier crane steel rope is installed and is used reel frock, it is characterized in that, comprise reel base (1), variable-diameter steel pipe latch (2), upper adjustable brake backing plate (3), lower adjustable brake backing plate (5) and brake plank (4);
On the top of described reel base (1), there is pin hole, pass for described variable-diameter steel pipe latch (2), in the bottom at described reel base (1), there is multiple through hole, be fixed on reel base (1) on lower adjustable brake backing plate (5) by bolt is parallel for described upper adjustable brake backing plate (3);
Described brake plank (4) is placed between described upper adjustable brake backing plate (3) and lower adjustable brake backing plate (5), the following adjustable brake backing plate (5) of this brake plank (4) is fulcrum, its one end is placed on reel base (1), can with the lower contacts of steel wire rope roll to be installed, the other end is ridden ballast brake for operating personal.
2. heavy lift carrier crane steel rope installation reel frock according to claim 1, it is characterized in that, described variable-diameter steel pipe latch (2) is by the large, medium and small three kinds of specifications of pipe diameter preparation, actual size according to steel wire rope roll is matched, and steel wire rope roll and wound roll I can be filled and couple together.
CN201520703633.9U 2015-09-11 2015-09-11 It hangs wire rope installation and uses reel frock heavily to hang ship gram order Active CN205023604U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520703633.9U CN205023604U (en) 2015-09-11 2015-09-11 It hangs wire rope installation and uses reel frock heavily to hang ship gram order

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520703633.9U CN205023604U (en) 2015-09-11 2015-09-11 It hangs wire rope installation and uses reel frock heavily to hang ship gram order

Publications (1)

Publication Number Publication Date
CN205023604U true CN205023604U (en) 2016-02-10

Family

ID=55256155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520703633.9U Active CN205023604U (en) 2015-09-11 2015-09-11 It hangs wire rope installation and uses reel frock heavily to hang ship gram order

Country Status (1)

Country Link
CN (1) CN205023604U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429630A (en) * 2016-12-06 2017-02-22 上海腾茸电气有限公司 Cable reel supporting device with braking device
CN108357989A (en) * 2018-04-04 2018-08-03 国网安徽省电力有限公司亳州供电公司 Lift show line device with lever parking brake
CN108482849A (en) * 2018-04-04 2018-09-04 国网安徽省电力有限公司亳州供电公司 Lift show line device with drum-type service brake

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429630A (en) * 2016-12-06 2017-02-22 上海腾茸电气有限公司 Cable reel supporting device with braking device
CN108357989A (en) * 2018-04-04 2018-08-03 国网安徽省电力有限公司亳州供电公司 Lift show line device with lever parking brake
CN108482849A (en) * 2018-04-04 2018-09-04 国网安徽省电力有限公司亳州供电公司 Lift show line device with drum-type service brake
CN108482849B (en) * 2018-04-04 2023-11-24 国网安徽省电力有限公司亳州供电公司 Lifting type exhibition line device with drum type foot brake

Similar Documents

Publication Publication Date Title
CN205023604U (en) It hangs wire rope installation and uses reel frock heavily to hang ship gram order
CN101973484A (en) Self-releasing hook
CN104444790A (en) Special lifting tool for hoisting wheel center of locomotive wheel pair
CN201047059Y (en) Suspension structure of rope-suspension bridge and rope clip thereof
CN204847923U (en) Hoist anti -swing puts device
CN203033695U (en) Novel winch rope guider
CN202465024U (en) Balance hoisting appliance for wind generator nacelle hoisting
CN204434104U (en) A kind of loop wheel machine test under load frock
CN204400519U (en) The two-way loop wheel machine of traction-type
CN201376858Y (en) Guide tool for dry-quenching enclosed lifting wire rope replacement
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN204727438U (en) A kind of crane hanger
CN203486866U (en) Automobile hoisting hydraulic aerial cage balancing device
CN201952101U (en) Special hoisting hook for hoisting submersible pump and hoisting device thereof
CN207358963U (en) A kind of eccentric bushing installation tool for gasification furnace
CN204778474U (en) Hoist is with having surpassed device
CN204852093U (en) Novel brake scotch and overspeed governor
CN204493902U (en) A kind of knot for lifting pipeline
CN204454262U (en) A kind of folding arm suspension hook group
CN205011223U (en) Middle -size and small -size rolling -mill housing installation hoist
CN204040536U (en) Novel stage elevator
CN203497918U (en) Disk lifting tool
CN202379590U (en) Lifting tool for medium-speed diesel engine frames
CN202046794U (en) Special lifting appliance for lifting pillars
CN203558750U (en) Marine variable-frequency electric crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant