CN101942923A CN 201010276814 CN201010276814A CN101942923A CN 101942923 A CN101942923 A CN 101942923A CN 201010276814 CN201010276814 CN 201010276814 CN 201010276814 A CN201010276814 A CN 201010276814A CN 101942923 A CN101942923 A CN 101942923A
Authority
CN
China
Prior art keywords
auxiliary pole
base plate
base
iron tower
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010276814
Other languages
Chinese (zh)
Inventor
王光祥
景文川
吴开贤
黄剑波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Original Assignee
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Electric Power Transmission & Transformation Construction Co Ltd filed Critical Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority to CN 201010276814 priority Critical patent/CN101942923A/en
Publication of CN101942923A publication Critical patent/CN101942923A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses an auxiliary pole fixing base, and belongs to an auxiliary device for transmission tower group erection. A baseplate is welded with two parallel support plates between which a rotating shaft for fixing the auxiliary pole base is arranged; and two fixing hooks used for fixing to crossarm angle steel of an iron tower are arranged under the baseplate. The auxiliary pole fixing base has the characteristics of simple structure, convenient use, safety, reliability and the like.

Description

Auxiliary pole firm banking
Technical field
The present invention relates to assist in the construction of transmission line of electricity group the tower servicing unit, particularly iron tower vertical construction the member that installs and fixes of pole.
Background technology
The iron tower group adopts the method for the long cross-arm of auxiliary pole lifting comparatively extensive immediately, but auxiliary pole bottom is still lack of standardization with the fixed form of iron tower cross-arm, and operation is convenient inadequately, and has certain potential safety hazard.
Summary of the invention
The purpose of this invention is to provide a kind of simple in structure, convenient and practical, safe and reliable auxiliary pole firm banking.
The object of the present invention is achieved like this: a kind of auxiliary pole firm banking, be welded with two gripper shoes that be arranged in parallel on the base plate, the fix rotating shaft of auxiliary pole base of one usefulness is installed between two gripper shoes, and the base plate bottom is provided with two as the stay hook that fixes with iron tower cross-arm angle steel.
Above-mentioned two stay hooks all pass bar hole on the base plate from bottom to top after fixed by nut on base plate.
All be welded with reinforcing rib on above-mentioned two gripper shoes.
Have on the above-mentioned base plate with iron tower cross-arm angle steel on the circular screwhole that matches of preformed hole.
The invention has the beneficial effects as follows: simple in structure, convenient and practical, safe and reliable, have good application prospects.
Description of drawings
Fig. 1, Fig. 2, Fig. 3 are respectively front view of the present invention, left view and vertical view.
The specific embodiment
Fig. 1, Fig. 2 and Fig. 3 illustrate, and be welded with on the base plate 1 the fix rotating shaft 6 of auxiliary pole base of a usefulness is installed between two gripper shoe that be arranged in parallel 2, two gripper shoes, and base plate 1 bottom is provided with two as the stay hook 4 that fixes with iron tower cross-arm angle steel 7.Two stay hooks 4 all pass bar hole 1b on the base plate 1 from bottom to top after nut 5 is fixed on the base plate 1.All be welded with reinforcing rib 3 on two gripper shoes 2.Have on the base plate 1 with iron tower cross-arm angle steel on the circular screwhole 1a that matches of preformed hole.
During construction, utilize auxiliary herringbone pole to do 7 and support lifting: because indivedual tangent towers (as ZC27106, ZJC27101 tower) outside cross-arm is long, heavier, carry is installed comparatively difficulty, for guaranteeing lifting safety, hanging piece is lifted so must set up the support of auxiliary herringbone pole do at stage casing cross-arm loam cake.Auxiliary pole is selected the above specification of Φ 150mm*10*1000m for use, the auxiliary pole preformed hole place of cross-arm loam cake during the pole base is installed on, and the pole top links to each other with main pole top by oppositely strengthening backguy (Φ 13mm wire rope).

Claims (4)

1. auxiliary pole firm banking, it is characterized in that: be welded with two gripper shoes that be arranged in parallel (2) on the base plate (1), the fix rotating shaft (6) of auxiliary pole base of one usefulness is installed between two gripper shoes, and base plate (1) bottom is provided with two as the stay hook (4) that fixes with iron tower cross-arm angle steel (7).
2. according to the described auxiliary pole firm banking of claim 1, it is characterized in that: described two stay hooks (4) pass from bottom to top all that base plate (1) is gone up bar hole (1b) after fixed by nut on base plate (1).
3. according to claim 1 or 2 described auxiliary pole firm bankings, it is characterized in that: all be welded with reinforcing rib (3) on described two gripper shoes (2).
4. according to the described auxiliary pole firm banking of claim 3, it is characterized in that: have on the described base plate (1) with iron tower cross-arm angle steel on the circular screwhole (1a) that matches of preformed hole.
CN 201010276814 2010-09-09 2010-09-09 Auxiliary pole fixing base Pending CN101942923A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010276814 CN101942923A (en) 2010-09-09 2010-09-09 Auxiliary pole fixing base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010276814 CN101942923A (en) 2010-09-09 2010-09-09 Auxiliary pole fixing base

Publications (1)

Publication Number Publication Date
CN101942923A true CN101942923A (en) 2011-01-12

Family

ID=43435107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010276814 Pending CN101942923A (en) 2010-09-09 2010-09-09 Auxiliary pole fixing base

Country Status (1)

Country Link
CN (1) CN101942923A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619377A (en) * 2012-04-13 2012-08-01 四川电力送变电建设公司 Improved auxiliary holding pole fixing base
CN104100124A (en) * 2014-07-23 2014-10-15 国家电网公司 Holding pole base connecting and fixing device
CN104120911A (en) * 2014-08-05 2014-10-29 国家电网公司 Electric pole installation cart adjustable in angle
CN105401780A (en) * 2015-11-27 2016-03-16 浙江省送变电工程公司 General herringbone derrick base

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2178955Y (en) * 1993-10-13 1994-10-05 成都市玻璃钢制品厂 Multipurpose rush-repair bar
CN2412137Y (en) * 1999-12-15 2000-12-27 高健民 Multipurpose T-shape support
CN101205049A (en) * 2007-11-26 2008-06-25 中煤第三建设公司机电安装工程处 Mine using great steel derrick lifting special tool
JP2008196152A (en) * 2007-02-09 2008-08-28 Chugoku Electric Power Co Inc:The Implement and method for erecting panzer mast
CN201266808Y (en) * 2008-09-03 2009-07-01 福建省莆田电业局 Tool for replacing V-string porcelain bottle of multi-loop line tangent tower with electrified
CN201408947Y (en) * 2009-02-24 2010-02-17 山西省电力公司临汾供电分公司 Transmission line high-altitude maintenance ladder
CN201778531U (en) * 2010-09-09 2011-03-30 四川电力送变电建设公司 Fixing base of auxiliary embraced bar

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2178955Y (en) * 1993-10-13 1994-10-05 成都市玻璃钢制品厂 Multipurpose rush-repair bar
CN2412137Y (en) * 1999-12-15 2000-12-27 高健民 Multipurpose T-shape support
JP2008196152A (en) * 2007-02-09 2008-08-28 Chugoku Electric Power Co Inc:The Implement and method for erecting panzer mast
CN101205049A (en) * 2007-11-26 2008-06-25 中煤第三建设公司机电安装工程处 Mine using great steel derrick lifting special tool
CN201266808Y (en) * 2008-09-03 2009-07-01 福建省莆田电业局 Tool for replacing V-string porcelain bottle of multi-loop line tangent tower with electrified
CN201408947Y (en) * 2009-02-24 2010-02-17 山西省电力公司临汾供电分公司 Transmission line high-altitude maintenance ladder
CN201778531U (en) * 2010-09-09 2011-03-30 四川电力送变电建设公司 Fixing base of auxiliary embraced bar

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619377A (en) * 2012-04-13 2012-08-01 四川电力送变电建设公司 Improved auxiliary holding pole fixing base
CN102619377B (en) * 2012-04-13 2014-05-07 四川电力送变电建设公司 Improved auxiliary holding pole fixing base
CN104100124A (en) * 2014-07-23 2014-10-15 国家电网公司 Holding pole base connecting and fixing device
CN104100124B (en) * 2014-07-23 2016-05-11 国家电网公司 A kind of holding pole base is connected and fixed device
CN104120911A (en) * 2014-08-05 2014-10-29 国家电网公司 Electric pole installation cart adjustable in angle
CN105401780A (en) * 2015-11-27 2016-03-16 浙江省送变电工程公司 General herringbone derrick base

Similar Documents

Publication Publication Date Title
CN204607396U (en) A kind of stator core suspender
CN204324676U (en) Anchor ear lifting device
CN201778531U (en) Fixing base of auxiliary embraced bar
CN101942923A (en) Auxiliary pole fixing base
CN205653091U (en) Many davits tower crane
CN102661057B (en) Power angle tower pull leg main material changing method and special main material clamp
CN201626764U (en) Coke oven fire door hanger
CN202963967U (en) Hydraulic screw nut installing device for rudder horn
CN102704828A (en) Multifunctional hook ladder
CN206422456U (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN102619377B (en) Improved auxiliary holding pole fixing base
CN202509842U (en) Improved auxiliary derrick fixing base
CN204675726U (en) Purlin lifting auxiliary device
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN107069533A (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN203571610U (en) Multifunctional vertical rod for construction
CN202829361U (en) Small-size hoisting machine
CN201756422U (en) Two-head-suspension tower crane
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN201466565U (en) Wire lifting device of vehicle with insulating boom
CN204237468U (en) A kind of arm tower crane
CN202594608U (en) Turnover device for large-size wind generating set rack
CN202483238U (en) Device for anchoring steel column by steel wires
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN202231352U (en) Reversed pulley fixing frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110112