CN204237468U - A kind of arm tower crane - Google Patents
A kind of arm tower crane Download PDFInfo
- Publication number
- CN204237468U CN204237468U CN201420632257.4U CN201420632257U CN204237468U CN 204237468 U CN204237468 U CN 204237468U CN 201420632257 U CN201420632257 U CN 201420632257U CN 204237468 U CN204237468 U CN 204237468U
- Authority
- CN
- China
- Prior art keywords
- arm
- upper bracket
- crane
- revolution
- tower crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a kind of arm tower crane, it comprises crane arm, the revolution upper bracket linked together by gyration gear ring and revolution undersetting; Crane arm is arranged on revolution upper bracket actively; Crane arm is faced upward the torque arm mechanism of bowing and is connected with one for controlling it by crane arm pull bar; Suspension hook on crane arm is connected with a lifting mechanism carrying out the lifting of weight for controlling hook lifting; Revolution upper bracket is provided with a root post; Be fixedly mounted on revolution upper bracket uprights vertical; Column and at least one are fixed on ground, are connected for the hound of support post with adjusting post squareness.By being arranged on uprights vertical on revolution upper bracket, and balance when keeping arm tower crane hoisting heavy by hound, solve arm tower crane and the problem limited by place width and roof load-carrying capacity is installed on roof; Reduce user to use and purchase cost, what improve single device installs and uses rate simultaneously.
Description
Technical field
The utility model relates to the hoisting device of building field, is specifically related to a kind of arm tower crane.
Background technology
The comformability of existing general arm tower crane to erecting stage condition is single, by generally needing the clump weight of installation tens tons to maintain balance during its hoisting heavy thereon.When being installed on roof and carrying out the dismounting of other goliaths, due to the otherness that the roof of each building builds, at narrow roof, the arm tower crane of about hundred tons of weighing is installed, after needing the load-carrying capacity of first specific building roof to plan, and can install after carrying out a series of special transformation for specific building, which adds use and the purchase cost of user, and single device to install and use rate too low, cause the idle of equipment, the reciprocation cycle production efficiency extending equipment funds is low.
Utility model content
For above-mentioned deficiency of the prior art, the arm tower crane that the utility model provides is by being arranged on revolution upper bracket by uprights vertical, and balance when keeping arm tower crane hoisting heavy by hound, solve arm tower crane and problem by place width and the restriction of roof load-carrying capacity is installed on roof.
In order to reach foregoing invention object, the technical solution adopted in the utility model is:
On the one hand, provide a kind of arm tower crane, it comprises crane arm, the revolution upper bracket linked together by gyration gear ring and revolution undersetting; Crane arm is arranged on revolution upper bracket actively; Crane arm is faced upward the torque arm mechanism of bowing and is connected with one for controlling it by crane arm pull bar; Suspension hook on crane arm is connected with a lifting mechanism carrying out the lifting of weight for controlling hook lifting; Revolution upper bracket is provided with a root post; Be fixedly mounted on revolution upper bracket uprights vertical; Column and at least one are fixed on ground, are connected for the hound of support post with adjusting post squareness.
When the place of roof is by limited time, on the other hand, also provide a kind of arm tower crane of different layout, it comprises crane arm, the revolution upper bracket linked together by gyration gear ring and revolution undersetting; Crane arm is arranged on revolution upper bracket actively; Crane arm is faced upward the torque arm mechanism of bowing and is connected with one for controlling it by crane arm pull bar; Suspension hook on crane arm is connected with a lifting mechanism carrying out the lifting of weight for controlling hook lifting; Revolution upper bracket is provided with a root post; Be fixedly mounted on revolution upper bracket uprights vertical; Revolution upper bracket is installed with an equilibrium arm, and column and at least one are fixed on equilibrium arm, are connected for the hound of support post with adjusting post squareness.
Beneficial aspects of the present utility model is: by turning round on upper bracket by being arranged on of uprights vertical, and balance when keeping arm tower crane hoisting heavy by hound, solve arm tower crane and the problem limited by place restriction and roof load-carrying capacity is installed on roof; Reduce user to use and purchase cost, what improve single device installs and uses rate simultaneously.
Accompanying drawing explanation
Fig. 1 is that the hound of the arm tower crane of the utility model embodiment is fixedly mounted on ground structural representation with revolution undersetting by anchor structure;
Fig. 2 is on the basis of Fig. 1, sets up an equilibrium arm, and on equilibrium arm, installs the structural representation of the arm tower crane of torque arm mechanism and lifting mechanism;
Fig. 3 is on the basis of Fig. 1, after leg is installed at the edge of revolution undersetting, and the structural representation of arm tower crane leg fixed on the ground by anchor structure;
Fig. 4 is on the basis of Fig. 2, after leg is installed at the edge of revolution undersetting, and the structural representation of arm tower crane leg fixed on the ground by anchor structure;
Fig. 5 is the birds-eye view after two hounds and column link together;
Fig. 6 is the structural representation of the arm tower crane of another embodiment of the utility model.
Wherein, 1, suspension hook; 2, crane arm; 3, crane arm pull bar; 4, fixed pulley group; 5, column; 6, upper bracket is turned round; 7, undersetting is turned round; 8, hound; 9, swing type mechanism engine installation; 10, strut bar; 11, lifting mechanism; 12, torque arm mechanism; 13, anchor fitting; 14, electric control system; 15, equilibrium arm; 16, supporting leg.
Detailed description of the invention
Below detailed description of the invention of the present utility model is described; so that those skilled in the art understand the utility model; but should be clear; the utility model is not limited to the scope of detailed description of the invention; to those skilled in the art; as long as various change to limit and in the spirit and scope of the present utility model determined, these changes are apparent in appended claim, the utility model creation that all utilize the utility model to conceive is all at the row of protection.
The hound shown as the arm tower crane of the utility model embodiment with reference to figure 1, Fig. 1 is fixedly mounted on ground structural representation with revolution undersetting by anchor structure; As shown in Figure 1, the technical scheme that the present embodiment adopts is:
This arm tower crane comprises crane arm, the revolution upper bracket 6 linked together by gyration gear ring and revolution undersetting 7, revolution upper bracket 6 is provided with the swing type mechanism engine installation 9 driving revolution upper bracket 6 to rotate, and swing type mechanism engine installation 9 can be motor.Wherein crane arm 2 is arranged on revolution upper bracket 6 by rotating shaft, and the steel cable that the tip of crane arm 2 faces upward the torque arm mechanism 12 of bowing with for controlling it by crane arm pull bar 3 is connected; Suspension hook 1 on crane arm 2 is elevated the lifting mechanism 11 carrying out weight lifting with one is connected for controlling suspension hook 1.
Revolution upper bracket 6 is also provided with a root post 5 by shipping and reselling on another market, and column 5 adopts vertical mode to be fixedly mounted on revolution upper bracket 6; Column 5 is fixed on ground with at least one, is connected for the hound 8 of support post 5 with adjusting post 5 squareness; Hound 8 can be installed on the ground by bolt, by the squareness of adjusting bolt adjusting post 5 during installation, turns round during to ensure that tower machine turns round with the axial line of column 5.
Above-mentioned swing type mechanism engine installation 9, torque arm mechanism 12 are all connected with electric control system 14 with lifting mechanism 11, are realizing the lifting of weight and are driving weight rotation all automatically can be completed by the control of electric control system 14.The implementation procedure rotated in the lifting and drive weight that realize weight is: the rotation being controlled swing type mechanism engine installation 9 by electric control system 14, swing type mechanism engine installation 9 drives revolution upper bracket 6 to rotate by driving gyration gear ring, and then drives the crane arm 2 on revolution upper bracket 6 and column 5 to rotate.
Pull-up weighing arm 2 steel rope that the reel of torque arm mechanism 12 is wound around is fixed on crane arm 2 by the pulley on crane arm pull bar 3 after walking around the fixed pulley group 4 of installing at column 5 top, controlled the rotation of torque arm mechanism reel by electric control system 14, and then the amplitude of bowing of facing upward completing crane arm converts.
In the implementation procedure of the lifting realizing weight be: the reel of lifting mechanism 11 is wound around steel wire ropes for hoisting, hoist rope moves in suspension hook 1 by crane arm 2 arm point after walking around the rope pulley excessively in the fixed pulley group in the middle part of column 5, controlled the rotation of the reel of lifting mechanism 11 by electric control system 14, and then the lifting of weight is carried out in the lifting completing 1 group, suspension hook.
When this arm tower crane be arranged on roof carry out the dismounting of other goliaths time, as long as it is smooth for meeting revolution undersetting 7 installation position place, other positions can according to the concrete structure on roof by expansion bolt or girder steel and building fixing.
Fig. 5 show two hounds 8 link together with column 5 after birds-eye view; As shown in Figure 5 when hound 8 is one, when this hoisting crane turns round, the pulling force of a hound 8 is limited, is difficult to meet operating needs, so in an embodiment of the present utility model, the hound 8 that column 5 can be fixed on the ground by two connects.If when the horizontal projection angle of two hounds 8 is less, the pulling force of itself an and employing hound 8 is similar, and effect is little.When the horizontal projection angle of two hounds 8 is very large, although it provides larger pulling force can to column 5, but the rotational steps of crane arm 2 can be had a strong impact on, so the installation horizontal projection angle of two hounds 8 can be arranged on about 90 °, be preferably 90 °, the maximum rotational steps of such crane arm 2 can reach 220 °.
With reference to figure 2, in an embodiment of the present utility model, hound 8 and revolution undersetting 6 can be fixedly mounted on the ground by anchor structure 13.Because the size of anchor structure 13 can be selected according to in-site installation area, the pressure of roof carrying during arm tower crane hoisting heavy can be disperseed like this, avoid local area stressed excessive, damage is caused to building.
With reference to figure 2, when the area on roof is enough large, can fixedly mount an equilibrium arm 15 on revolution upper bracket 6, the increase of equilibrium arm 15 can improve the stability of arm tower crane further, can increase the bearing load of arm tower crane so further.In this case, when carrying out arm tower crane installation, before installation column 5, can first strut bar 10 be connected on column 5, after column 5 and revolution upper bracket 6 connect, use bearing pin to be arranged on equilibrium arm 15 or ground with support post 5 pin-and-hole of strut bar 10 lower end.
When roof area is enough wide, torque arm mechanism 12, electric control system 14 and lifting mechanism 11 all can fixedly mount on the ground.
With reference to figure 2, but when the area on roof is less, be difficult to install downward moving arm tower crane when realizing the necessary parts hoisted, generally can adopt and fixedly mount an equilibrium arm 15 on revolution upper bracket 6, equilibrium arm 15 now is just being not stability for improving arm tower crane further, but for carrying torque arm mechanism 12, electric control system 14 and lifting mechanism 11.
With reference to figure 3 and Fig. 4, when roof is installed arm tower crane, pressure for the ease of roof carrying scatter as much as possible, can also at least fixedly mount three supporting legs 16 at the edge of revolution undersetting 7, be equivalent to so at least be provided with three stress points in the below of revolution undersetting 7; Supporting leg 16 is fixedly mounted on the ground by anchor structure 13.The stressed of such house can be disperseed by multiple supporting legs 16 of installation and anchor structure 13, avoids roof local pressure, occurs cracking or other damages.When carrying out roof and installing, consider from the angle of assembly and disassembly, be typically chosen in upper four supporting legs 16 of edge fixed installation of revolution undersetting 7.
With reference to figure 6, it illustrates the technical scheme that arm tower crane one and the embodiment provided exist following distinguishing characteristics above:
The revolution upper bracket 6 of this technical scheme is installed with an equilibrium arm 15, the hound 8 for support post 5 and adjusting post 5 squareness is arranged on equilibrium arm 15 instead of installs on the ground.
The technical scheme of this mode is except revolution upper bracket 15 is installed with an equilibrium arm 15, be arranged on outside the mounting means of two parts on equilibrium arm 15 and each technical scheme above-mentioned have any different for the hound 8 of support post 5 and adjusting post 5 squareness, the structure of other parts all can adopt the identical mode of technique scheme to install, the various distortion that prior art scheme is mentioned, are equally also applicable to the distortion of the technical scheme in Fig. 6.
Claims (10)
1. an arm tower crane, comprises crane arm, the revolution upper bracket linked together by gyration gear ring and revolution undersetting; Described crane arm is arranged on described revolution upper bracket actively; Described crane arm is faced upward the torque arm mechanism of bowing and is connected with one for controlling it by crane arm pull bar; Suspension hook on described crane arm is connected with a lifting mechanism carrying out weight lifting for controlling hook lifting; Described revolution upper bracket is provided with a root post; It is characterized in that: be fixedly mounted on described revolution upper bracket described uprights vertical; Described column and at least one are fixed on ground, for supporting described column and regulating the hound of described verticality of stand column and be connected.
2. arm tower crane according to claim 1, is characterized in that: described column is connected with two hounds fixed on the ground; The installation horizontal projection angle of two hounds is at least 90 °.
3. arm tower crane according to claim 2, is characterized in that: described hound and described revolution undersetting are fixedly mounted on the ground by anchor structure.
4., according to the arbitrary described arm tower crane of claim 1-3, it is characterized in that: described revolution upper bracket is also installed with an equilibrium arm, described equilibrium arm being at least installed with one for supporting the strut bar of described column.
5. arm tower crane according to claim 4, is characterized in that: described torque arm mechanism and the fixed installation of described lifting mechanism are on the ground.
6. want the arm tower crane described in 4 according to right, it is characterized in that: described torque arm mechanism and described lifting mechanism are fixedly mounted on described equilibrium arm.
7. the arm tower crane according to claim 1,2,3,5 or 6, is characterized in that: the edge of described revolution undersetting is at least installed with three supporting legs, and described supporting leg is fixedly mounted on the ground by anchor structure.
8. arm tower crane according to claim 7, is characterized in that: the edge of described revolution undersetting is installed with four supporting legs.
9. an arm tower crane, comprises crane arm, the revolution upper bracket linked together by gyration gear ring and revolution undersetting; Described crane arm is arranged on described revolution upper bracket actively; Described crane arm is faced upward the torque arm mechanism of bowing and is connected with one for controlling it by crane arm pull bar; Suspension hook on described crane arm is connected with a lifting mechanism carrying out the lifting of weight for controlling hook lifting; Described revolution upper bracket is provided with a root post; It is characterized in that: be fixedly mounted on described revolution upper bracket described uprights vertical; Described revolution upper bracket is installed with an equilibrium arm, and described column and at least one are fixed on equilibrium arm, for supporting described column and regulating the hound of described verticality of stand column and be connected.
10. arm tower crane according to claim 9, is characterized in that: the edge of described revolution undersetting is at least installed with three supporting legs, and described supporting leg is fixedly mounted on the ground by anchor structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420632257.4U CN204237468U (en) | 2014-10-29 | 2014-10-29 | A kind of arm tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420632257.4U CN204237468U (en) | 2014-10-29 | 2014-10-29 | A kind of arm tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204237468U true CN204237468U (en) | 2015-04-01 |
Family
ID=52766987
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420632257.4U Expired - Fee Related CN204237468U (en) | 2014-10-29 | 2014-10-29 | A kind of arm tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204237468U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104386595A (en) * | 2014-10-29 | 2015-03-04 | 四川锦城建筑机械有限责任公司 | Luffing jib tower crane |
CN106429880A (en) * | 2016-11-11 | 2017-02-22 | 沈阳建筑大学 | Compound movable arm type roof crane |
-
2014
- 2014-10-29 CN CN201420632257.4U patent/CN204237468U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104386595A (en) * | 2014-10-29 | 2015-03-04 | 四川锦城建筑机械有限责任公司 | Luffing jib tower crane |
CN106429880A (en) * | 2016-11-11 | 2017-02-22 | 沈阳建筑大学 | Compound movable arm type roof crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203855328U (en) | Novel hoisting machine | |
CN202346637U (en) | Holding rod of double-flat-arm spinning self-lifting seat | |
EP3394426B1 (en) | Methods for mounting or dismounting wind turbine components of a multirotor wind turbine | |
CN201240787Y (en) | Flat-top tower crane | |
CN101284628A (en) | Hoisting method for framework of large tonnage pressing machine | |
CN205077878U (en) | Unit type curtain plate hoisting device | |
CN204237468U (en) | A kind of arm tower crane | |
CN203998746U (en) | Portable suspension installation | |
CN103708360B (en) | Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method | |
CN102992203B (en) | Simple hoisting device for steel structure bridge installation | |
CN102351129B (en) | Super-lifting device for improving lifting performance of crane and crane | |
CN105540409A (en) | Double-blade hoisting equipment and method | |
CN203998705U (en) | Single arm frame steel wire rope luffing stationary crane | |
CN202322105U (en) | Crane and device for installing auxiliary boom of crane | |
CN104386595A (en) | Luffing jib tower crane | |
CN106966291A (en) | Lifting appliance for mounting wind driven generator | |
CN101660660B (en) | Novel installing method of gas cabinet | |
CN203728448U (en) | Light mounting and dismounting frame for tower crane | |
CN103539020B (en) | Novel hoisting construction method and special hanging device | |
CN204057780U (en) | Hoisting crane and jib, auxiliary bracing or strutting arrangement | |
CN202625662U (en) | Self-balancing amplitude modulation hold pole | |
CN101942923A (en) | Auxiliary pole fixing base | |
CN103510742B (en) | Multifunctional rotary derrick | |
CN204251234U (en) | For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance | |
CN202594608U (en) | Turnover device for large-size wind generating set rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150401 Termination date: 20201029 |
|
CF01 | Termination of patent right due to non-payment of annual fee |