CN105821890A - Slope surface strengthening device and method - Google Patents

Slope surface strengthening device and method Download PDF

Info

Publication number
CN105821890A
CN105821890A CN201610226338.8A CN201610226338A CN105821890A CN 105821890 A CN105821890 A CN 105821890A CN 201610226338 A CN201610226338 A CN 201610226338A CN 105821890 A CN105821890 A CN 105821890A
Authority
CN
China
Prior art keywords
water
slope
side slope
wells
slope surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610226338.8A
Other languages
Chinese (zh)
Other versions
CN105821890B (en
Inventor
刘美芳
冯熊凯
钟小兵
田北平
毛亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University of Science and Engineering
Original Assignee
Sichuan University of Science and Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University of Science and Engineering filed Critical Sichuan University of Science and Engineering
Priority to CN201610226338.8A priority Critical patent/CN105821890B/en
Publication of CN105821890A publication Critical patent/CN105821890A/en
Application granted granted Critical
Publication of CN105821890B publication Critical patent/CN105821890B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G2/00Vegetative propagation

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Botany (AREA)
  • Developmental Biology & Embryology (AREA)
  • Environmental Sciences (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本发明公开了一种边坡坡面加固装置,包括边坡,边坡表面喷射砂浆层并留有若干绿化坑,还包括由若干集水井和若干分水井组成的供液系统,各分水井均匀设置在边坡的土体内且相互之间连通,各集水井设置在砂浆层上并与各分水井相直接或间接连通。加固方法为:在坡面上分别开挖若干绿化坑、集水井和分水井以及连通各集水井和分水井的沟槽,并立模对各沟槽、集水井、分水井、绿化坑现浇砂浆或混凝土成型;对坡面整体喷射砂浆或混凝土,将除绿化坑、集水井之外的其他部位全部覆盖。本发明施工简便,造价低廉,使用寿命长;对坡面进行加固的同时,还实现了坡面绿化,且能利用植被根系对坡面加固从而有效延长坡面使用寿命。

The invention discloses a side slope reinforcement device, which comprises a side slope, a mortar layer is sprayed on the surface of the side slope and a number of greening pits are left, and a liquid supply system composed of a number of water collection wells and a number of water diversion wells, each water diversion well is uniform The water collection wells are arranged on the mortar layer and are directly or indirectly connected with the water diversion wells. The reinforcement method is: excavate a number of greening pits, water collection wells and water diversion wells on the slope, and trenches connecting the water collection wells and water diversion wells; Or concrete molding; spray mortar or concrete on the slope as a whole, and cover all parts except the greening pit and water collection well. The invention has the advantages of simple construction, low cost and long service life; while reinforcing the slope surface, it also realizes slope greening, and can use vegetation root system to reinforce the slope surface so as to effectively prolong the service life of the slope surface.

Description

一种边坡坡面加固装置及加固方法A slope reinforcement device and reinforcement method

技术领域 technical field

本发明涉及道路、桥梁、轨道技术领域,特别是一种边坡坡面加固装置及加固方法。 The invention relates to the technical fields of roads, bridges and tracks, in particular to a slope reinforcement device and a reinforcement method.

背景技术 Background technique

近年来随着公路、铁路的高速发展,边坡坡面防护越来越重要。但作为坡面防护措施之一的喷水泥砂浆(或混凝土)由于全封闭坡面难以绿化,影响景观及不利于排水,在气候影响下易造成抹面喷浆所形成的硬壳破损而不被推荐使用。 In recent years, with the rapid development of highways and railways, slope protection has become more and more important. However, as one of the slope protection measures, spraying cement mortar (or concrete) is not recommended because it is difficult to green the fully enclosed slope, affects the landscape and is not conducive to drainage. Under the influence of climate, it is easy to cause damage to the hard shell formed by plastering and spraying use.

因此,很有必要重新设计一种方法或装置,在起到边坡坡面加固防护作用的同时,还能满足绿化的需求。 Therefore, it is necessary to redesign a method or device that can meet the needs of greening while playing the role of slope reinforcement and protection.

发明内容 Contents of the invention

本发明的发明目的在于:针对上述存在的问题,提供一种边坡坡面加固装置以及加固方法,可有效解决边坡防护和绿化的问题。 The object of the present invention is to provide a slope reinforcement device and a reinforcement method for the above existing problems, which can effectively solve the problems of slope protection and greening.

本发明采用的技术方案是这样的: The technical scheme that the present invention adopts is such:

一种边坡坡面加固装置,包括边坡,边坡表面喷射砂浆层并留有若干绿化坑,还包括由若干集水井和若干分水井组成的供液系统,各分水井均匀设置在边坡的土体内且相互之间连通,各集水井设置在砂浆层上并与各分水井相直接或间接连通。 A side slope surface reinforcement device, including a side slope, a mortar layer sprayed on the surface of the side slope and a number of greening pits, and a liquid supply system composed of several water collection wells and several water distribution wells, each water distribution well is evenly arranged on the side slope The soil body is connected with each other, and each water collection well is arranged on the mortar layer and is directly or indirectly connected with each water diversion well.

作为优选,各分水井呈阶梯状分布,水平间距为2-3m,竖向间距为1.5-2m,各分水井分别与上下排相邻的分水井相连。 Preferably, the water diversion wells are distributed in steps, with a horizontal spacing of 2-3m and a vertical spacing of 1.5-2m, and each water diversion well is connected to the upper and lower rows of adjacent water diversion wells.

作为优选,各绿化坑间隔1-1.5m。 Preferably, each greening pit is spaced 1-1.5m apart.

作为优选,所述砂浆层厚度为120-200mm,强度不低于C20。 Preferably, the thickness of the mortar layer is 120-200mm, and the strength is not lower than C20.

一种边坡坡面加固方法,包括以下步骤: A slope reinforcement method, comprising the following steps:

第一步,平整边坡的坡面。 The first step is to level the slope of the slope.

第二步,在坡面上分别开挖若干绿化坑、集水井和分水井以及连通各集水井和分水井的沟槽,并立模对各沟槽、集水井、分水井、绿化坑现浇砂浆或混凝土成型。 The second step is to excavate a number of greening pits, water collection wells and water diversion wells on the slope, as well as the trenches connecting the water collection wells and water diversion wells, and set up the mold to pour mortar into each groove, water collection well, water diversion well, and green pits. or concrete molding.

第二步中,各分水井呈阶梯状分布,水平间距为2-3m,竖向间距为1.5-2m,各分水井分别与上下排相邻的分水井相连。 In the second step, the diversion wells are distributed in steps, with a horizontal spacing of 2-3m and a vertical spacing of 1.5-2m, and each diversion well is connected to the upper and lower rows of adjacent diversion wells.

第二步中,各绿化坑间隔1-1.5m。 In the second step, the interval between each greening pit is 1-1.5m.

第三步,对坡面整体喷射砂浆或混凝土,将除绿化坑、集水井之外的其他部位全部覆盖。 The third step is to spray mortar or concrete on the slope as a whole to cover all parts except the greening pit and water collection well.

第三步中,所述砂浆层厚度为120-200mm,强度不低于C20。 In the third step, the thickness of the mortar layer is 120-200mm, and the strength is not lower than C20.

本发明具有以下优点: The present invention has the following advantages:

1、从原理上讲,通过点状绿化(绿化坑实现)、截水(砂浆层实现)、集水(集水井实现)、分水(分水井实现)及植物根系网来实现坡面防护及绿化,解决了以往由于喷水泥砂浆或混凝土形成全封闭坡面而难以绿化的问题以及喷浆后的坡面不利于排水从而在气候影响下易造成坡面硬壳破损的问题,从而扩展了喷水泥砂浆或混凝土的使用范围。 1. In principle, slope protection and protection are realized through point-shaped greening (realized by greening pits), water interception (realized by mortar layer), water collection (realized by water collection wells), water diversion (realized by water diversion wells) and plant root network. Greening solves the problem that in the past it was difficult to green due to the fully enclosed slope formed by spraying cement mortar or concrete, and the slope after spraying is not conducive to drainage, which easily causes damage to the hard shell of the slope under the influence of the climate, thus expanding the scope of spraying. Range of use for cement mortar or concrete.

2、从构造上讲,布置在横纵方向上的集水井和分水井可有效调动植物根系的向水性和向肥性,从而形成植物根系网对边坡坡面进行防护,进而实现了植树对坡面防护与绿化一体化,打破了传统防护方法中的主要依靠坡面喷浆来实现坡面防护的瓶颈。 2. From a structural point of view, the water collection wells and water diversion wells arranged in the horizontal and vertical directions can effectively mobilize the water-tropism and fertilization of the plant root system, thereby forming a plant root system network to protect the slope surface, thereby realizing tree planting. The integration of slope protection and greening breaks the bottleneck of traditional protection methods that mainly rely on slope spraying to achieve slope protection.

3、从边坡使用寿命上讲,由于主要以植物根系网对边坡坡面进行防护,而坡面喷浆只起到截水辅助作用,随着时间的推移,必定会促使人工边坡坡面向自然边坡坡面转化,从而延长了边坡的使用寿命。 3. From the perspective of the service life of the slope, since the plant root network is mainly used to protect the slope surface, and the spraying on the slope surface only plays an auxiliary role in water interception, as time goes by, it will definitely promote the artificial slope slope. It is converted to the natural slope surface, thereby prolonging the service life of the slope.

综上所述,由于采用了上述技术方案,本发明的有益效果是:施工简便,造价低廉,使用寿命长;在对坡面进行加固的同时,还实现了坡面绿化,且能利用植被根系对坡面加固从而有效延长坡面使用寿命,可用于铁路、公路等行业中坡面不大于45°的填方边坡坡面加固工程,应用前景非常广泛。 In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: simple construction, low cost, long service life; while reinforcing the slope surface, it also realizes slope greening, and can utilize vegetation root system The slope can be reinforced to effectively prolong the service life of the slope, and it can be used in the slope reinforcement projects of filling slopes with a slope not greater than 45° in railways, highways and other industries, and has a very wide application prospect.

附图说明 Description of drawings

图1是本发明的立面图。 Fig. 1 is the elevation view of the present invention.

图2是图1中标记为4的供液系统的连接图。 Fig. 2 is a connection diagram of the liquid supply system marked 4 in Fig. 1 .

图中标记:1为边坡,2为绿化坑,3为砂浆层,4为供液系统,41为集水井,42为分水井。 Marks in the figure: 1 is the side slope, 2 is the green pit, 3 is the mortar layer, 4 is the liquid supply system, 41 is the water collection well, 42 is the water diversion well.

具体实施方式 detailed description

下面结合附图,对本发明作详细的说明。 Below in conjunction with accompanying drawing, the present invention is described in detail.

实施例1: Example 1:

如图1所示,一种边坡坡面加固装置,包括边坡1,边坡1表面喷射砂浆层3并留有若干绿化坑2,还包括由若干集水井41和若干分水井42组成的供液系统4。各分水井42均匀设置在边坡1的土体内且相互之间连通,各集水井41设置在砂浆层3上并与各分水井42相直接或间接连通,如图2所示。 As shown in Figure 1, a slope surface reinforcement device includes a slope 1, a mortar layer 3 is sprayed on the surface of the slope 1 and a number of greening pits 2 are left, and a plurality of water collection wells 41 and a number of water diversion wells 42 are also included. Liquid supply system4. The water diversion wells 42 are evenly arranged in the soil body of the slope 1 and communicate with each other. The water collection wells 41 are arranged on the mortar layer 3 and communicate directly or indirectly with each water diversion well 42 , as shown in FIG. 2 .

各分水井42呈阶梯状分布,水平间距为2-3m,竖向间距为1.5-2m,各分水井42分别与上下排相邻的分水井42相连。 The water diversion wells 42 are distributed in steps, with a horizontal spacing of 2-3m and a vertical spacing of 1.5-2m.

各绿化坑2间隔1-1.5m。 Each green pit 2 is spaced 1-1.5m apart.

所述砂浆层3厚度为120-200mm,强度不低于C20。 The thickness of the mortar layer 3 is 120-200mm, and the strength is not lower than C20.

实施例2: Example 2:

一种边坡坡面加固方法,包括以下步骤: A slope reinforcement method, comprising the following steps:

第一步,平整边坡1的坡面。 The first step is to level the slope of side slope 1.

第二步,在坡面上分别开挖若干绿化坑2、集水井41和分水井42以及连通各集水井41和分水井42的沟槽,并立模对各沟槽、集水井41、分水井42、绿化坑2现浇砂浆或混凝土成型,如图1所示。 The second step is to excavate some greening pits 2, water collection wells 41 and water diversion wells 42 and the grooves connecting each water collection wells 41 and water diversion wells 42 respectively on the slope surface, and establish molds for each groove, water collection wells 41 and water diversion wells. 42. The greening pit 2 is formed by casting mortar or concrete, as shown in Figure 1.

第二步中,各分水井42呈阶梯状分布,水平间距为2-3m,竖向间距为1.5-2m,各分水井42分别与上下排相邻的分水井42相连,如图2所示。 In the second step, each water-distributing well 42 is distributed in a ladder shape, with a horizontal spacing of 2-3m and a vertical spacing of 1.5-2m. Each water-distributing well 42 is connected to the adjacent water-distributing wells 42 of the upper and lower rows respectively, as shown in Figure 2 .

第二步中,各绿化坑2间隔1-1.5m。 In the second step, each greening pit 2 is spaced 1-1.5m apart.

第三步,对坡面整体喷射砂浆或混凝土,将除绿化坑2、集水井41之外的其他部位全部覆盖。 The third step is to spray mortar or concrete on the slope as a whole to cover all the other parts except the greening pit 2 and the water collection well 41 .

第三步中,所述砂浆层3厚度为120-200mm,强度不低于C20。 In the third step, the thickness of the mortar layer 3 is 120-200mm, and the strength is not lower than C20.

Claims (8)

1. a side slope surface bracing means, including side slope (1), some greenings hole (2) are also left in side slope (1) surface spray furnace layer (3), it is characterized in that: also include the liquid-supplying system (4) being made up of some sumps (41) and some water-distributing wells (42), in each water-distributing well (42) is uniformly arranged on the soil body of side slope (1) and connecting each other, each sump (41) is arranged on screed (3) and above and the most directly or indirectly connects with each water-distributing well (42).
A kind of side slope surface bracing means the most according to claim 1, it is characterized in that: each water-distributing well (42) stepped distribution, level interval is 2-3m, and vertical spacing is 1.5-2m, each water-distributing well (42) respectively with arrange up and down adjacent water-distributing well (42) be connected.
A kind of side slope surface bracing means the most according to claim 1, it is characterised in that: respectively afforest interval, hole (2) 1-1.5m.
A kind of side slope surface bracing means the most according to claim 1, it is characterised in that: described screed (3) thickness is 120-200mm, and intensity is not less than C20.
5. a side slope surface reinforcement means, it is characterised in that comprise the following steps:
The first step, smooth side slope (1) domatic;
Second step, on domatic, excavate some greenings hole (2), sump (41) and water-distributing well (42) respectively and connect each sump (41) and the groove of water-distributing well (42), and formwork erection is to each groove, sump (41), water-distributing well (42), greening hole (2) cast-in-place mortar or concrete formation;
Other positions in addition to greening hole (2), sump (41), to domatic integral spray mortar or concrete, are all covered by the 3rd step.
A kind of side slope surface bracing means the most according to claim 5, it is characterized in that: in second step, each water-distributing well (42) stepped distribution, level interval is 2-3m, vertical spacing is 1.5-2m, each water-distributing well (42) respectively with arrange adjacent water-distributing well (42) up and down and be connected.
A kind of side slope surface bracing means the most according to claim 5, it is characterised in that: in second step, respectively afforest interval, hole (2) 1-1.5m.
A kind of side slope surface bracing means the most according to claim 5, it is characterised in that: in the 3rd step, described screed (3) thickness is 120-200mm, and intensity is not less than C20.
CN201610226338.8A 2016-04-13 2016-04-13 A kind of side slope surface bracing means and reinforcement means Expired - Fee Related CN105821890B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610226338.8A CN105821890B (en) 2016-04-13 2016-04-13 A kind of side slope surface bracing means and reinforcement means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610226338.8A CN105821890B (en) 2016-04-13 2016-04-13 A kind of side slope surface bracing means and reinforcement means

Publications (2)

Publication Number Publication Date
CN105821890A true CN105821890A (en) 2016-08-03
CN105821890B CN105821890B (en) 2018-02-06

Family

ID=56525849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610226338.8A Expired - Fee Related CN105821890B (en) 2016-04-13 2016-04-13 A kind of side slope surface bracing means and reinforcement means

Country Status (1)

Country Link
CN (1) CN105821890B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106879415A (en) * 2016-12-21 2017-06-23 深圳市铁汉生态环境股份有限公司 A kind of method that side slope reparation is carried out using Martin fig

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH592220A5 (en) * 1975-12-24 1977-10-14 Boeck Andreas Roof tile with opening for plant pot - is incorporated in sloping roof carrying growing green plants
CN103485411A (en) * 2013-09-24 2014-01-01 杜振义 Device for digging pits in sloping field for storing rainwater
CN104255280A (en) * 2014-10-23 2015-01-07 陈洪凯 High and steep rocky slope vegetation planting method
CN205348200U (en) * 2016-01-26 2016-06-29 四川理工学院 Slope surface protective structure
CN205530297U (en) * 2016-04-13 2016-08-31 四川理工学院 Slope surface reinforcing apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH592220A5 (en) * 1975-12-24 1977-10-14 Boeck Andreas Roof tile with opening for plant pot - is incorporated in sloping roof carrying growing green plants
CN103485411A (en) * 2013-09-24 2014-01-01 杜振义 Device for digging pits in sloping field for storing rainwater
CN104255280A (en) * 2014-10-23 2015-01-07 陈洪凯 High and steep rocky slope vegetation planting method
CN205348200U (en) * 2016-01-26 2016-06-29 四川理工学院 Slope surface protective structure
CN205530297U (en) * 2016-04-13 2016-08-31 四川理工学院 Slope surface reinforcing apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106879415A (en) * 2016-12-21 2017-06-23 深圳市铁汉生态环境股份有限公司 A kind of method that side slope reparation is carried out using Martin fig

Also Published As

Publication number Publication date
CN105821890B (en) 2018-02-06

Similar Documents

Publication Publication Date Title
CN203394170U (en) Prefabricated enclosing wall
CN106808578B (en) A kind of prefabricated piping lane of two-piece unit formula and method for prefabricating
CN110241849A (en) An assembled concrete box retaining wall and its construction method
CN110249813B (en) A greening method for high and steep rocky slopes in mining pits
CN110306595A (en) A co-construction structure and construction method of a power utility gallery and a flood wall
CN109252470A (en) A kind of expressway greening isolation strip and its construction method
CN108643205A (en) Arched framework slope protection construction method
CN105821890B (en) A kind of side slope surface bracing means and reinforcement means
CN207469029U (en) A kind of football field structure on the natural lawn of combined type
CN205196512U (en) Road green tree tree well rail guard
CN207567892U (en) A kind of large size karst depression flood drainage system
CN205530297U (en) Slope surface reinforcing apparatus
CN201405442Y (en) Grass lawn mold components
CN205908109U (en) Vertical greening enclosure
CN105951890B (en) A kind of application method of concrete works swaging die air bag
CN207944429U (en) Prefabricated interlocking blocks for slope protection
CN208183462U (en) A kind of water conservation tree pond cover board
CN206928320U (en) A kind of retaining wall for hydraulic engineering
CN205502020U (en) Sloping underground structure is put to stagnant water
CN209243751U (en) A kind of low-rise building
CN214545888U (en) Novel tree pool structure
CN208038957U (en) A kind of tree well protective device for taking into account security protection and rainwater-collecting
CN114000510A (en) Construction method of greening concrete on wet soil soft slope
CN207092013U (en) A kind of hollow water conservancy ecosystem bank protection concrete component of cube
CN207998831U (en) A kind of river course slope protection masonry and river course slope protection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206