CN105804251A - Container prefabricated house - Google Patents
Container prefabricated house Download PDFInfo
- Publication number
- CN105804251A CN105804251A CN201610159326.8A CN201610159326A CN105804251A CN 105804251 A CN105804251 A CN 105804251A CN 201610159326 A CN201610159326 A CN 201610159326A CN 105804251 A CN105804251 A CN 105804251A
- Authority
- CN
- China
- Prior art keywords
- framework
- layers
- fixed
- layer
- house
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 19
- 230000000712 assembly Effects 0.000 claims abstract description 6
- 238000000429 assembly Methods 0.000 claims abstract description 6
- 230000002787 reinforcement Effects 0.000 claims description 11
- 238000000034 method Methods 0.000 description 10
- 238000009434 installation Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000011900 installation process Methods 0.000 description 3
- 238000013475 authorization Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000004146 energy storage Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001678 irradiating effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/344—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts
- E04B1/3442—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts folding out from a core cell
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34336—Structures movable as a whole, e.g. mobile home structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H2001/1283—Small buildings of the ISO containers type
Abstract
The invention relates to a container prefabricated house, which comprises a first-floor house assembly, a second-floor house assembly, reinforcing assemblies and lifting and pulling assemblies. The container prefabricated house is characterized in that the first-floor house assembly comprises a first-floor framework, top plates, bottom plates, wall plates and side plates; the second-floor house assembly comprises a second-floor framework, first fences, second fences, a sunshade and baffle plates; the reinforcing assemblies comprise reinforcing pull chain fixing ends, first reinforcing elements, second reinforcing elements, reinforcing pull chains, fixing elements and position limiting elements; the lifting and pulling assemblies comprise four third fixed pulleys, four second fixed pulleys, two first fixed pulleys, lifting and pulling beams, passive pull chains, active pull chains and pull hooks; the pull hooks are arranged on the passive pull chains arranged between the two third fixed pulleys; one ends of the active pull chains are fixed on the pull hooks; and the other ends of the active pull chains are movably connected to the front side or the back side of the second-floor house assembly after passing through the first fixed pulleys. The container prefabricated house fundamentally solves the problems of small space, assembling difficulty and the like of the existing container prefabricated house, and has the advantages that the assembly is convenient and fast, the structure is stable and reliable, the space is capacious, the functions are many and the like.
Description
Technical field
The present invention relates to dismantled and assembled technical field of buildings, specifically a kind of band is from the container trailer of lowering or hoisting gear.
Background technology
As disclosed in patent of invention that Authorization Notice No. is CN103089031B a kind of " arc roof type container combination house ", including by one layer of house base, one layer of house corner post, lower corner fittings, one layer of house that wallboard and one layer of house entablature are constituted, one layer of house is provided with two layers of house, and wherein the wallboard in one layer of house is provided with door, and described two layers of house are placed in one layer of house in transportation;Curved beam is provided with connection bump;The corner of one layer of house base is provided with lower corner fittings, and lower corner fittings is provided with the lower corner fittings connecting portion for inserting one layer of house corner post;Being connected by upper corner fittings between one layer of house corner post and one layer of house entablature, be provided with reinforcement plate in upper corner fittings, upper corner fittings is provided with the upper corner fittings connecting portion for inserting one layer of house corner post;It is provided with load-bearing plug connector between two layers of house and upper corner fittings.It may be evident, however, that this house is only capable of realizing the double-decker of container bottom size, it is impossible to the greater room layout of foundation;Crane need to be equipped with during assembling sling in two layers of house, or place that space comparatively narrow and small relatively low at ground bearing pressure, it is virtually impossible to realize assembling.
Summary of the invention
It is an object of the invention to provide a kind of band container trailer from lowering or hoisting gear, fundamentally solving the problems such as little, the assembling difficulty in existing container trailer space, it has the advantages such as quick, Stability Analysis of Structures is reliable, space is spacious, diverse in function easy to assembly.
For achieving the above object, the technical scheme is that this container trailer includes one layer of house assembly, two layers of house assembly, reinforcement assemblies and lift assembly, be characterized in that: described one layer of house assembly includes arranging one layer of framework in the horizontal plane, the top board being respectively hinged at one layer of framework both sides and base plate, the wallboard being hinged on base plate, is arranged on the side plate of top board and base plate and wall panels end;
Two layers of house assembly includes spacing two layers of framework on one layer of framework, is arranged on the fence I of side before and after two layers of framework, is arranged on the fence II being connected with fence I on top board, the retractable awning being arranged on two layers of framework left and right sides, be arranged on the baffle plate of both sides before and after two layers of framework, is provided with the support member of L-shaped between fence I and one layer framework;
Reinforcement assembly includes being fixed on the zip of both sides before and after two layers of framework and fixes end, is fixed on top board and the girth member I on wallboard and side plate, the girth member II being fixed on base plate and wallboard and side plate, tractive are fixed at zip and held and reinforcing zip, be fixed on the fixture inside one layer of frame roof and locating part between reinforcement assembly I or girth member II;
Lift assembly includes spacing four fixed pulley III on one layer of framework base angle, spacing four fixed pulley II on lift beam and two fixed pulley I, is fixed on the lift beam on one layer of framework top, passive slide fastener, actively slide fastener and drag hook;Passive slide fastener one end is fixed on one of them base angle of two layers of framework, and the passive slide fastener other end is fixed on another base angle of homonymy of two layers of framework after sequentially passing through one of them fixed pulley II, two fixed pulley III, another fixed pulley II;Drag hook is arranged on the passive slide fastener between two fixed pulley III, and actively slide fastener one end is fixed on drag hook, and the other end is lived after fixed pulley I and is connected to front side or the rear side of two layers of framework.
Described sunshade and baffle plate upper surface are provided with flexible photovoltaic film.
Can mutually replace between described passive slide fastener or actively slide fastener and reinforcing zip.
Beneficial effects of the present invention: by arranging the lift assembly being made up of parts such as some fixed pulleys, active zip and passive zips, only need two people can realize the installation of container trailer, and without big machineries such as cranes, therefore at environment space by limited time, still can realize fast easily installing.Added the space in one layer of house by the top board being hinged, base plate, wallboard and side plate, and be effectively ensured stablizing of one layer of house by reinforcing zip, girth member I and girth member II, it is to avoid the deformation that one layer of base plate causes due to unbalance stress.Actively slide fastener or passive slide fastener can adopt same parts with reinforcing zip, to alleviate transport difficulty, play the function of one-object-many-purposes.Meanwhile, in two layers of house step of lifting of installation process, is sling by pulley assembly as traction chain in house by reinforcing zip, and reinforcement assembly step is being installed, reinforcing zip is pulled in house sidepiece, constitutes stable triangular structure.In sum, the container trailer of the present invention has the advantages such as quick and easy for installation, structural safety is stable, use space big.
Accompanying drawing explanation
Fig. 1 is present invention isometry side-looking structural representation when delivering;
Fig. 2 is the structural representation I of assembling process of the present invention;
Fig. 3 is the structural representation II of assembling process of the present invention;
Fig. 4 is the structural representation III of assembling process of the present invention;
Fig. 5 is the structural representation IV of assembling process of the present invention;
Fig. 6 is the structural representation V of assembling process of the present invention;
Fig. 7 is the structural representation VI of assembling process of the present invention;
Fig. 8 is the structural representation VII of assembling process of the present invention;
Fig. 9 is the isometry side-looking structural representation after the present invention assembles;
Figure 10 is the structural representation after Fig. 9 sunshade is packed up;
Figure 11 is the structural representation I of hoisting structure;
Figure 12 is the structural representation II of hoisting structure;
Figure 13 is the structural representation III of hoisting structure;
Figure 14 is the structural representation I of supporting construction assembling process;
Figure 15 is the structural representation II of supporting construction assembling process;
Figure 16 is the structural representation of supporting construction;
Figure 17 is the structural representation after having lifted;
Figure 18 is the structural representation of stair installation site;
Figure 19 is the structural representation of solar panels;
Figure 20 is the structural representation reinforcing chain;
Figure 21 be Fig. 9 look up isometry side-looking structural representation;
The process schematic that Figure 22 ~ 26 are unloaded by trailer for container house.
Description of reference numerals:
In Fig. 1: 1 one layers of house assembly, 2 two layers of house assembly;
In Fig. 2: 3 top boards, 4 base plates;
In Fig. 3: 3 top boards, 4 base plates, 5 wallboards;
In Fig. 4: 3 top boards, 4 base plates, 5 wallboards;
In Fig. 5: 6 side plates;
In Fig. 6: 7 fence I;
In Fig. 7: 8 two layers of framework;
In Fig. 8: 9 fence II, 10 girth member I, 11 girth member II, 12 reinforcing zips;
In Fig. 9: 10 girth member I, 11 girth member II, 13 sunshades, 14 solar water heaters, 15 baffle plates;
In Figure 11: 7 fence I, 8 two layers of framework, 16 fixed pulley I, 17 fixed pulley II, 18 passive slide fasteners, 19 lift beam;
In Figure 12: 8 two layers of framework, 16 fixed pulley I, 17 fixed pulley II, 18 passive slide fasteners, 181 active slide fastener, 20 drag hooks, 21 fixed pulley III;
In Figure 13: 16 fixed pulley I, 17 fixed pulley II, 19 fixed pulley III, 20 drag hooks;
In Figure 14: 8 two layers of framework, 22 1 layers of framework, 23 locating parts, 24 fixture;
In Figure 15: 23 locating parts, 24 fixtures;
In Figure 17: 25 stair installing ports;
In Figure 18: 26 support members, 27 stair;
In Figure 19: the fixing end of 28 zips;
In Figure 20: 12 reinforce zip, the fixing end of 28 zips;
In Figure 22: 29 jack.
Detailed description of the invention
Below in conjunction with Fig. 1 ~ 26, describe present disclosure in detail by specific embodiment.This container trailer includes 1, two layers of house assembly 2 of one layer of house assembly, reinforcement assembly and lift assembly.Wherein, one layer of house assembly includes arranging one layer of framework 22 in the horizontal plane, the top board 3 being respectively hinged at one layer of framework both sides and base plate 4, the wallboard 5 being hinged on base plate, the side plate 6 that is arranged on top board and base plate and wall panels end.
Two layers of house assembly includes spacing two layers of framework 8 on one layer of framework, is arranged on the fence I7 of side before and after two layers of framework, the fence II9 being connected with fence I being arranged on top board, the retractable awning 13 being arranged on two layers of framework left and right sides, the solar water heater 14 being fixed on two layers of frame roof, be arranged on the baffle plate 15 of both sides before and after two layers of framework, is provided with the support member 26 of L-shaped between fence I and one layer framework.Sunshade and baffle plate upper surface are provided with flexible photovoltaic film, and photovoltaic film is connected with solar recharging system.Baffle bottom is supported on both sides before and after two layers of framework by miniature electromotive handspike (like that the electric pushrod of triumphant prestige 10 ~ 100kg specification), when the sun is near a wherein side shield, opposite side baffle plate is propped by the cylinder of opposite side, thus ensure that the best irradiating angle of the two side shields corresponding sun constantly.Sunshade with light source power automatic open close, it is achieved thereby that when sunny, sunshade is fully extended in shielding status, can convert solar energy into electrical energy storage simultaneously.When light source is more weak, sunshade is contraction state, it is ensured that the illuminance in house.
Reinforcement assembly includes being fixed on the zip of both sides before and after two layers of framework and fixes end, is fixed on top board and the girth member I10 on wallboard and side plate, the girth member II11 being fixed on base plate and wallboard and side plate, tractive fix reinforcing zip 12, be fixed on the fixture 24 inside one layer of frame roof and locating part 23 between end 28 and reinforcement assembly I or girth member II at zip.
Lift assembly includes spacing four fixed pulley III19 on one layer of framework base angle, spacing four fixed pulley II17 on lift beam and two fixed pulley I16, is fixed on the lift beam 19 on one layer of framework top, passive slide fastener 18, actively slide fastener 181 and drag hook 20;Passive slide fastener one end is fixed on one of them base angle of two layers of framework, and the passive slide fastener other end is fixed on another base angle of homonymy of two layers of framework after sequentially passing through one of them fixed pulley II, two fixed pulley III, another fixed pulley II;Drag hook is arranged on the passive slide fastener between two fixed pulley III, and actively slide fastener one end is fixed on drag hook, and the other end is lived after fixed pulley I and is connected to front side or the rear side of two layers of framework.Can mutually replace between passive slide fastener 18, actively slide fastener 181 and reinforcing zip 12, due to different in different erection stage roles, therefore have employed different component names, for reducing transport and assembly difficulty, same parts can be adopted mutually to replace.
The base plate of two layers of framework leaves stair installing port 25, in one layer of framework, is installed on the stair 27 that stair installing port position is corresponding.
Installation process:
Lorry is sailed into house and installs ground by step 1), is propped by container trailer by jack 29, and when lorry rolls away from, prefabricated house is suspended in the air, after prefabricated house being down to level ground by jack, is removed by jack;Jack is connected with solar recharging system, it is not necessary to external power supply;
Step 2) top board of one layer of framework left and right sides is dug to horizontal position, base plate and wallboard are turned to horizontal position, then by wallboard from digging in base plate to vertical position, now between top board, wallboard, base plate and one layer of framework, forms frame structure;
The side plate of both sides, front and back is fixed on end to form the one layer of building structure closed by step 3);
Step 4) is at one layer of frame roof fixing fence I, part fence II and lift beam, and now, fixed pulley I and fixed pulley II is spacing on lift beam, and fixed pulley III is spacing on the base angle of one layer of framework, on the drag hook passive slide fastener between fixed pulley III;
Step 5) installation personnel is by pulling downward on the active slide fastener being positioned at both sides, front and back, the associated component of two layers of framework and inside thereof is sling, respectively through the fixing fixture of bolt and locating part on the corner of the inside of one layer of framework top layer after slinging, can unclamping actively slide fastener after installing, now two layers of framework are overlapped on locating part;
Step 6) removes actively slide fastener, passive slide fastener and lift beam, girth member I and girth member II it is respectively mounted outside house, L-shaped support member is installed between fence I and one layer framework, to prevent one layer of Building Deformation, then install between the fixing end of the zip on girth member I or girth member II and two layer framework and reinforce zip (the active slide fastener of dismounting or passive slide fastener can be adopted as reinforcing zip), to prevent house from subsiding laterally, and by girth member I, complete fence II is installed;
Step 7) will be located in the associated component (solar water heater, baffle plate, telescopic sunshade) in two layers of framework and takes out, solar water heater is arranged on two layers of frame roof, baffle plate is arranged on both sides before and after two layers of framework, telescopic sunshade is arranged on two layers of framework left and right sides, stair are installed between two layers of base of frame and one layer of framework, and drain assembly etc. is installed, installation process can be completed.
Claims (3)
1. a container trailer, including one layer of house assembly, two layers of house assembly, reinforcement assemblies and lift assembly, it is characterised in that: described one layer of house assembly includes arranging one layer of framework in the horizontal plane, the top board being respectively hinged at one layer of framework both sides and base plate, the wallboard being hinged on base plate, is arranged on the side plate of top board and base plate and wall panels end;
Two layers of house assembly includes spacing two layers of framework on one layer of framework, is arranged on the fence I of side before and after two layers of framework, is arranged on the fence II being connected with fence I on top board, the retractable awning being arranged on two layers of framework left and right sides, be arranged on the baffle plate of both sides before and after two layers of framework, is provided with the support member of L-shaped between fence I and one layer framework;
Reinforcement assembly includes being fixed on the zip of both sides before and after two layers of framework and fixes end, is fixed on top board and the girth member I on wallboard and side plate, the girth member II being fixed on base plate and wallboard and side plate, tractive are fixed at zip and held and reinforcing zip, be fixed on the fixture inside one layer of frame roof and locating part between reinforcement assembly I or girth member II;
Lift assembly includes spacing four fixed pulley III on one layer of framework base angle, spacing four fixed pulley II on lift beam and two fixed pulley I, is fixed on the lift beam on one layer of framework top, passive slide fastener, actively slide fastener and drag hook;Passive slide fastener one end is fixed on one of them base angle of two layers of framework, and the passive slide fastener other end is fixed on another base angle of homonymy of two layers of framework after sequentially passing through one of them fixed pulley II, two fixed pulley III, another fixed pulley II;Drag hook is arranged on the passive slide fastener between two fixed pulley III, and actively slide fastener one end is fixed on drag hook, and the other end is lived after fixed pulley I and is connected to front side or the rear side of two layers of framework.
2. container trailer according to claim 1, it is characterised in that: described sunshade and baffle plate upper surface are provided with flexible photovoltaic film.
3. container trailer according to claim 1, it is characterised in that: can mutually replace between described passive slide fastener or actively slide fastener and reinforcing zip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610159326.8A CN105804251B (en) | 2016-03-21 | 2016-03-21 | Container trailer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610159326.8A CN105804251B (en) | 2016-03-21 | 2016-03-21 | Container trailer |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105804251A true CN105804251A (en) | 2016-07-27 |
CN105804251B CN105804251B (en) | 2017-10-20 |
Family
ID=56454025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610159326.8A Expired - Fee Related CN105804251B (en) | 2016-03-21 | 2016-03-21 | Container trailer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105804251B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759920A (en) * | 2017-01-26 | 2017-05-31 | 常州铝行舱集成房屋有限公司 | A kind of packaged type folds integrated house |
CN110565811A (en) * | 2019-10-15 | 2019-12-13 | 金陵科技学院 | Deformable removal room |
CN110847637A (en) * | 2019-11-01 | 2020-02-28 | 苏州天地彩钢制造有限公司 | Multi-layer spliced box-type house and assembling method thereof |
CN111677339A (en) * | 2020-05-06 | 2020-09-18 | 海宏技术有限公司 | Assembling method of zero-carbon attendance sentry box for construction site |
CN112854822A (en) * | 2021-02-05 | 2021-05-28 | 南通荣光建筑钢品有限公司 | Integrated portable energy-saving environment-friendly mobile house and preparation method thereof |
WO2021175292A1 (en) * | 2020-03-05 | 2021-09-10 | 张跃 | Multifunctional movable frame and installation method therefor |
EP3951119A4 (en) * | 2019-04-05 | 2022-12-28 | NTN Corporation | Portable facility provided with natural energy power generation unit |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3890688A (en) * | 1973-05-17 | 1975-06-24 | Lely Cornelis V D | Apparatus for the construction and or assembly of prefabricated building sections or room units |
CN2570397Y (en) * | 2002-04-28 | 2003-09-03 | 张学让 | Folding type multifunction tent style room |
CN201007037Y (en) * | 2007-02-09 | 2008-01-16 | 周述光 | Up-down cockloft |
CN101297086A (en) * | 2005-09-26 | 2008-10-29 | 韦瑟黑文资源公司 | Collapsible modular shelter for containerized transportation |
CN101939234A (en) * | 2007-11-10 | 2011-01-05 | 韦瑟黑文资源公司 | Extendible height container and shelter |
CN201835550U (en) * | 2010-07-02 | 2011-05-18 | 深圳华强智能技术有限公司 | Linkage device for wall lifting and cover plate extending |
CN103089031A (en) * | 2013-02-21 | 2013-05-08 | 张信东 | Arc roof type container combination house and building method thereof |
KR101315900B1 (en) * | 2012-06-18 | 2013-10-08 | 농업회사법인 주식회사 홀인원 | Variable structure |
CN103898977A (en) * | 2014-03-18 | 2014-07-02 | 万华集成房屋(烟台)有限公司 | Modularized integrated house |
CN205012464U (en) * | 2015-08-20 | 2016-02-03 | 箱子客酒店管理(上海)有限公司 | House container house |
-
2016
- 2016-03-21 CN CN201610159326.8A patent/CN105804251B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3890688A (en) * | 1973-05-17 | 1975-06-24 | Lely Cornelis V D | Apparatus for the construction and or assembly of prefabricated building sections or room units |
CN2570397Y (en) * | 2002-04-28 | 2003-09-03 | 张学让 | Folding type multifunction tent style room |
CN101297086A (en) * | 2005-09-26 | 2008-10-29 | 韦瑟黑文资源公司 | Collapsible modular shelter for containerized transportation |
CN201007037Y (en) * | 2007-02-09 | 2008-01-16 | 周述光 | Up-down cockloft |
CN101939234A (en) * | 2007-11-10 | 2011-01-05 | 韦瑟黑文资源公司 | Extendible height container and shelter |
CN201835550U (en) * | 2010-07-02 | 2011-05-18 | 深圳华强智能技术有限公司 | Linkage device for wall lifting and cover plate extending |
KR101315900B1 (en) * | 2012-06-18 | 2013-10-08 | 농업회사법인 주식회사 홀인원 | Variable structure |
CN103089031A (en) * | 2013-02-21 | 2013-05-08 | 张信东 | Arc roof type container combination house and building method thereof |
CN103898977A (en) * | 2014-03-18 | 2014-07-02 | 万华集成房屋(烟台)有限公司 | Modularized integrated house |
CN205012464U (en) * | 2015-08-20 | 2016-02-03 | 箱子客酒店管理(上海)有限公司 | House container house |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759920A (en) * | 2017-01-26 | 2017-05-31 | 常州铝行舱集成房屋有限公司 | A kind of packaged type folds integrated house |
EP3951119A4 (en) * | 2019-04-05 | 2022-12-28 | NTN Corporation | Portable facility provided with natural energy power generation unit |
CN110565811A (en) * | 2019-10-15 | 2019-12-13 | 金陵科技学院 | Deformable removal room |
CN110565811B (en) * | 2019-10-15 | 2024-02-02 | 金陵科技学院 | Deformable movable house |
CN110847637A (en) * | 2019-11-01 | 2020-02-28 | 苏州天地彩钢制造有限公司 | Multi-layer spliced box-type house and assembling method thereof |
CN110847637B (en) * | 2019-11-01 | 2021-02-12 | 苏州天地智造环境科技有限公司 | Multi-layer spliced box-type house and assembling method thereof |
WO2021175292A1 (en) * | 2020-03-05 | 2021-09-10 | 张跃 | Multifunctional movable frame and installation method therefor |
CN111677339A (en) * | 2020-05-06 | 2020-09-18 | 海宏技术有限公司 | Assembling method of zero-carbon attendance sentry box for construction site |
CN112854822A (en) * | 2021-02-05 | 2021-05-28 | 南通荣光建筑钢品有限公司 | Integrated portable energy-saving environment-friendly mobile house and preparation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN105804251B (en) | 2017-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105804251A (en) | Container prefabricated house | |
US20120255240A1 (en) | Prefabricated container house | |
US10252895B2 (en) | Solar array lifter and method | |
CN207844890U (en) | A kind of hoisting fixture for building curtain wall | |
CN106121255A (en) | Apparatus installed by a kind of Super High glass curtain wall | |
CN101774511B (en) | Climbing type hoist and using method thereof | |
US20150143769A1 (en) | Steel-frame building, plant, and method for assembling steel-frame building | |
CN107060152B (en) | Attachment device and method between a kind of prefabricated internal partition wall of substation and floor | |
CN210828372U (en) | Lifting and mounting integrated ALC partition board mounting machine | |
CN107476439A (en) | A kind of retractable flexible encapsulated net canopy of new large span | |
CN203428696U (en) | Combined lift shaft | |
CN113502911A (en) | Assembled intelligent container board house and construction method thereof | |
CN106429884A (en) | Photovoltaic panel vacuum lifting device | |
CN105926918A (en) | Foldable elevator shaft operation steel platform device and erecting method | |
CN202850517U (en) | Room | |
CN108894509B (en) | Steel structure assembly type house prefabricated sandwich heat-insulation external wall panel construction method without external frame | |
CN216549362U (en) | Assembling and hoisting device for components above foundation pit | |
CN103556837B (en) | A kind of method realizing steel column at annex place and install | |
CN201825635U (en) | Hoisting structure of power station boiler | |
CN113175222B (en) | Method for installing embedded prefabricated external wall panel component | |
CN108075370A (en) | Electric power prefabricated cabin | |
CN211172563U (en) | Inclined glass curtain wall mounting system | |
CN209211836U (en) | Modularization integrates elevator steel frame shaft structure | |
CN201619965U (en) | Climbing lift | |
CN215974496U (en) | Assembled is hoisting device for maintenance is transported to externally-hung wallboard for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171020 |