CN203428696U - Combined lift shaft - Google Patents

Combined lift shaft Download PDF

Info

Publication number
CN203428696U
CN203428696U CN201320464362.7U CN201320464362U CN203428696U CN 203428696 U CN203428696 U CN 203428696U CN 201320464362 U CN201320464362 U CN 201320464362U CN 203428696 U CN203428696 U CN 203428696U
Authority
CN
China
Prior art keywords
rod
assembled portion
assembled
fixed
rectangular frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320464362.7U
Other languages
Chinese (zh)
Inventor
吕科谚
游孟洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HSIN PO HEIEN MACHINERY CO Ltd
Original Assignee
HSIN PO HEIEN MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HSIN PO HEIEN MACHINERY CO Ltd filed Critical HSIN PO HEIEN MACHINERY CO Ltd
Priority to CN201320464362.7U priority Critical patent/CN203428696U/en
Application granted granted Critical
Publication of CN203428696U publication Critical patent/CN203428696U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a combined lift shaft, which at least comprises a base, at least two first external frames, at least two second external frames, an upper seat and track connecting assemblies, wherein the base and the upper seat are provided with a rectangular frame respectively, the first external frames are arranged on the base, the second external frames are arranged on the first external frames, the upper seat is fixedly arranged on the second external frames for forming a shaft structure, and the track connecting assemblies are arranged between the first external frames and the second external frames respectively for fixing a track and allowing a lifting car to stably move along the track up and down. The combined lift shaft not only can be used for being applied to fast assembly in site, but also can be used for achieving the effects of convenience in construction, shortened construction period, reduced cost and the like.

Description

Combination elevator hoistway
Technical field
The utility model is about a kind of combination elevator hoistway, espespecially a kind ofly reaches simple and easy installation, reduces the combination elevator hoistway of human cost.
Background technology
Existing elevator building is all at the beginning of design, just to have planned the structure of elevator hoistways, therefore, when building has been built, as long as the members such as the necessary track of formation hoistway are installed in inside, just can assemble elevator hoistways, then lift-mounting again.Yet for general apartment, thoroughly lay and factory building installs additional for elevator in sky, the elevator hoistways constituted mode in existing elevator building can not be converted completely.Even if in general apartment, lay and factory building adopts the mode of concrete grouting outward in sky thoroughly, also may reach the hoistway object of making elevator, yet required material is also relatively many, such as reinforcing bar, cement, sandy soil etc., cause the increase of Material Cost, and construction is comparatively consuming time, generally reaches two, three months, causes the significantly increase of cost.
Although can utilize in addition electric welding that the Components Compositions such as H shaped steel, a plurality of horizontal side plates, door track and Men Liang are welded into elevator hoistways, but when the H shaped steel of upper and lower layer framework is assembled electric welding, plural number props up the members such as H shaped steel, a plurality of horizontal side plates, door track and Men Liang in addition, by the carrying from lower to upper one by one of cage mouth, or by window, balcony handling, because generally H shaped steel length is long and heavy, cause and transport being difficult for when carrying, especially the equipment that needs some handling liftings, increases construction cost.Separately, utilize the Components Compositions such as H shaped steel, a plurality of horizontal side plates, door track and Men Liang to be welded into after framework, its appearance general using wave plate encapsulation, mostly mutually hole corresponding with a plurality of horizontal side plate two sides on H shaped steel, with J type bolt or iron wire loop, tie up, form outward appearance simple and crude not U.S. refined, and need again decorate, cause the increase of decoration cost.
Utility model content
The technical matters that the utility model solves is providing a kind of combination elevator hoistway, espespecially a kind of simple and easy installation, combination elevator hoistway of minimizing human cost of reaching.
The technological means that the utility model adopts is as described below.
A hoistway, at least includes: base, there is a rectangular frame, and the top side of these four corners of rectangular frame is also provided with the first assembled portion; At least two first outriggers, there are two first bodies of rod that be arranged in parallel, and the pipe link that connects 2 first bodies of rod, this first body of rod bottom side also has the second assembled portion, for correspondence, be assembled in this first assembled portion, this first body of rod is near top sides and have the 3rd assembled portion; At least two second outriggers, have two second bodies of rod that be arranged in parallel, and a pipe link that connects 2 second bodies of rod, this second body of rod is located near bottom side and is had the 4th assembled portion, for correspondence, be assembled in the 3rd assembled portion, this second body of rod is near top sides and have the 5th assembled portion; The seat of honour, has a rectangular frame, and the bottom side of these four corners of rectangular frame is also provided with the 6th assembled portion, for correspondence, is assembled in the 5th assembled portion; And track connecting assembly, be installed in respectively this first, second outrigger.
For on reaching, take off object, combination elevator hoistway of the present utility model at least includes: base, at least two first outriggers and the second outrigger, the seat of honour and track connecting assembly, this base and the seat of honour have respectively a rectangular frame, can be for this first outrigger of installing on this base, this second outrigger is installed on this first outrigger, this seat of honour is installed and is fixed on this second outrigger, to form hoistway structure, and this track connecting assembly be installed in respectively this first, between the second outrigger, in order to trapped orbit, can can stably carry over track for lifting compartment moves up and down.
By this, the utility model combination elevator hoistway not only can be in on-the-spot rapid-assembling, more can reach the effects such as easy construction, duration shorten, cost.Especially, the utility model can utilize preformed hole added lifting compartment in the house or factory building without lifting hoistway, and can increase according to desired height the mutual serial connection of plural the second outrigger.
For reaching above-mentioned purpose, described track connecting assembly has crossbeam and attaching parts, this crossbeam assembles between 2 first outriggers and be assembled between 2 second outriggers, and this attaching parts has orthogonal first, second riser, this first riser is for being assembled on this crossbeam, and this second riser is for being assembled in a track.
For reaching above-mentioned purpose, in described the first outrigger, the inner side of at least one first body of rod is provided with diagonal brace fixed part, for being connected and fixed a diagonal brace body of rod.
For reaching above-mentioned purpose, in described the second outrigger, the inner side of at least one second body of rod is provided with diagonal brace connecting portion, for being connected and fixed a diagonal brace body of rod.
For reaching above-mentioned purpose, described base has two rectangular pipes and two short square tubes interfix and form rectangular frame, and the top side of these four corners of rectangular frame has respectively upper plate, and this first assembled portion is fixation hole configurations, and is positioned at this upper plate place.
For reaching above-mentioned purpose, described the first body of rod bottom side is provided with lower shoe, and the shape of this lower shoe is identical with this upper plate, and this second assembled portion is fixation hole configurations, and be positioned at this lower shoe place, utilize plural connecting element to be arranged in and between first, second assembled portion, reach fixed effect.
For reaching above-mentioned purpose, between described 2 first bodies of rod, there are two pipe links that be arranged in parallel, and between two pipe links, be further provided with the diagonal brace body of rod.
For reaching above-mentioned purpose, described the 3rd, the 4th assembled portion is fixation hole configurations respectively, and utilizes a fixed plate respectively for being connected and fixed between the 3rd, the 4th assembled portion.
For reaching above-mentioned purpose, the described seat of honour has two rectangular pipes and two short square tubes interfix and form rectangular frame, and the bottom side of these four corners of rectangular frame is fixed with respectively the column towards downward-extension, and the 6th assembled portion is fixation hole configurations, and is positioned at this column and locates near bottom side.
For reaching above-mentioned purpose, described the 5th assembled portion is fixation hole configurations, and utilizes a fixed plate respectively for being connected and fixed between the 5th, the 6th assembled portion.
For reaching above-mentioned purpose, described first body of rod is provided with first crossbeam fixed part with respect to this second body of rod place, and this second body of rod is provided with second cross beam fixed part with respect to this first body of rod place, for being connected and fixed this crossbeam between this first, second crossbeam fixed part.
The beneficial effect that the utility model produces is as follows: simple and easy installation, reduces human cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of combination elevator hoistway in the utility model.
Fig. 2 is the STRUCTURE DECOMPOSITION figure of base in the utility model.
Fig. 3 is the STRUCTURE DECOMPOSITION figure of base and the first outrigger in the utility model.
Fig. 4 is another visual angle STRUCTURE DECOMPOSITION figure of base and the first outrigger in the utility model.
Fig. 5 is the STRUCTURE DECOMPOSITION figure of the first outrigger and the second outrigger in the utility model.
Fig. 6 is another visual angle STRUCTURE DECOMPOSITION figure of the first outrigger and the second outrigger in the utility model.
Fig. 7 is the STRUCTURE DECOMPOSITION figure at the second outrigger and the seat of honour in the utility model.
Figure number explanation:
Base 10
Rectangular pipe 11
Short square tube 12
Upper plate 13
The first assembled portion 14
The first outrigger 20
First body of rod 21
First crossbeam fixed part 211
Diagonal brace fixed part 212
Pipe link 22
The diagonal brace body of rod 23
Lower shoe 24
The second assembled portion 25
The 3rd assembled portion 26
The second outrigger 30
Second body of rod 31
Second cross beam fixed part 311
Diagonal brace connecting portion 312
Pipe link 32
The diagonal brace body of rod 33
The 4th assembled portion 34
The 5th assembled portion 35
The seat of honour 40
Rectangular pipe 41
Short square tube 42
Column 43
The 6th assembled portion 44
Track connecting assembly 50
Crossbeam 51
Attaching parts 52
The first riser 521
The second riser 522
Fixed plate 60
Track 70
The diagonal brace body of rod 80.
The specific embodiment
As shown in the structural representation that Fig. 1 is the utility model combination elevator hoistway, combination elevator hoistway of the present utility model at least includes: base 10, at least two first outriggers 20 and the second outrigger 30, the seat of honour 40 and track connecting assembly 50.
This base 10 has a rectangular frame, shown in Fig. 2 and Fig. 3, this base 10 has two rectangular pipes 11 and two short square tubes 12 interfix and form rectangular frame, and the top side of these four corners of rectangular frame has respectively upper plate 13, these upper plate 13 places are also provided with the first assembled portion 14, in embodiment as shown in the figure, this first assembled portion 14 is fixation hole configurations.
This first outrigger 20 has two first bodies of rod 21 that be arranged in parallel, and the pipe link 22 that connects 2 first bodies of rod 21, in embodiment as shown in the figure, 2 first 21 of the bodies of rod have two pipe links that be arranged in parallel 22, and two 22 of pipe links are further provided with the diagonal brace body of rod 23, by the setting of this diagonal brace body of rod 23, can be increased the intensity of the first outrigger 20, these first body of rod, 21 bottom sides are provided with lower shoe 24, the shape of this lower shoe 24 is identical with this upper plate 13, these lower shoe 24 places also have the second assembled portion 25, and this second assembled portion 25 is fixation hole configurations, for correspondence, be assembled in this first assembled portion 14, utilize plural connecting element (not shown) to be arranged in first, the second assembled portion 14, 25 and reach fixed effect, and this first body of rod 21 is near top sides and have the 3rd assembled portion 26, wherein, the 3rd assembled portion 26 is fixation hole configurations.
As shown in Figure 5, this second outrigger 30 has two second bodies of rod 31 that be arranged in parallel, and the pipe link 32 that connects 2 second bodies of rod 31, in embodiment as shown in the figure, 2 first 31 of the bodies of rod have three pipe links that be arranged in parallel 32, and 32 of those pipe links are further provided with the diagonal brace body of rod 33, by the setting of this diagonal brace body of rod 33, can be increased the intensity of the second outrigger 30, this second body of rod 31 is located near bottom side and is had the 4th assembled portion 34, the 4th assembled portion 34 is fixation hole configurations, for correspondence, be assembled in the 3rd assembled portion 26, and utilize a fixed plate 60 respectively for being connected and fixed on the 3rd, the 4th assembled portion 26, 34, this second body of rod 31 is near top sides and have the 5th assembled portion 35, the 5th assembled portion 35 is fixation hole configurations.
As shown in Figure 7, this seat of honour 40 has a rectangular frame, wherein this seat of honour 40 has two rectangular pipes 41 and two short square tubes 42 interfix and form rectangular frame, and the bottom side of these four corners of rectangular frame is fixed with respectively the column 43 towards downward-extension, the 6th assembled portion 44 is located and be provided with to this column 43 near bottom side, and the 6th assembled portion 44 is fixation hole configurations, for correspondence, be assembled in the 5th assembled portion 35, can utilize a fixed plate 60 respectively for being connected and fixed on 35,44 of the 5th, the 6th assembled portion.
The first outrigger 20 installings are fixed on this base 10, as shown in Figure 1, this second outrigger 30 is installed on this first outrigger 20, this seat of honour 40 installing is fixed on this second outrigger 30, to form hoistway structure, and this track connecting assembly 50 is installed in respectively between this first, second outrigger 20,30, in order to trapped orbit 70, can stably carries over track for lifting compartment and move up and down; Certainly, the mutual serial connection of plural the second outrigger can be increased according to desired height, to increase the height of integral combined hoistway.
Wherein, the utility model combination elevator hoistway not only can be in on-the-spot rapid-assembling, more can reach the effects such as easy construction, duration shorten, cost.Especially, the utility model can, in the house or factory building without lifting hoistway, utilize preformed hole added lifting compartment.
Moreover, this track connecting assembly 50 has crossbeam 51 and attaching parts 52, as shown in Figure 4, the place, inner side of corresponding first body of rod 21 of 2 first outriggers 20 is respectively equipped with crossbeam fixed part 211, for being connected and fixed this crossbeam 51 between those crossbeam fixed parts 211, and as shown in Figure 6, the place, inner side of corresponding second body of rod 31 of 2 second outriggers 30 is respectively equipped with crossbeam fixed part 311, for being connected and fixed this crossbeam 51 between those crossbeam fixed parts 311, this crossbeam 51 is assembled between 2 first outriggers 20 and be assembled between 2 second outriggers 30, and this attaching parts 52 has orthogonal first, the second riser 521, 522, this first riser 521 is for being assembled on this crossbeam 51, 522 confessions of this second riser are assembled in a track 70.
In addition, as shown in Figure 5, in this first outrigger, the inner side of at least one first body of rod 21 is provided with diagonal brace fixed part 212, for being connected and fixed a diagonal brace body of rod 80, in this second outrigger, the inner side of at least one second body of rod 31 is provided with diagonal brace connecting portion 312, same for being connected and fixed a diagonal brace body of rod 80, by the diagonal brace body of rod 80 of assembling in addition, can increase the assembling intensity of first, second outrigger 20,30.
It is worth mentioning that, the utility model can be applicable to there is preformed hole in house or factory building, but there is no the setting of traditional lifting hoistway, after mutually assembling by each structure of the utility model, can form hoistway structure, can supply added lifting compartment, and each interstructural assembling of the utility model need be by traditional welding engineering method, directly utilize connecting element (for example bolt) to interlock mutually to pay fixing, can reach the construction environment of rapid energy-saving free of smoke environmental protection, and can significantly shorten man-hour, and can promote the installation quality in lifting compartment; In addition, whole hoistway structure periphery can further adopt decoration or curtain engineering method, creates individual style, the limitation of escape tradition construction building.

Claims (10)

1. a combination elevator hoistway, is characterized in that, at least includes:
Base, has a rectangular frame, and the top side of these four corners of rectangular frame is also provided with the first assembled portion;
At least two first outriggers, there are two first bodies of rod that be arranged in parallel, and the pipe link that connects 2 first bodies of rod, this first body of rod bottom side also has the second assembled portion, for correspondence, be assembled in this first assembled portion, this first body of rod is near top sides and have the 3rd assembled portion;
At least two second outriggers, have two second bodies of rod that be arranged in parallel, and a pipe link that connects 2 second bodies of rod, this second body of rod is located near bottom side and is had the 4th assembled portion, for correspondence, be assembled in the 3rd assembled portion, this second body of rod is near top sides and have the 5th assembled portion;
The seat of honour, has a rectangular frame, and the bottom side of these four corners of rectangular frame is also provided with the 6th assembled portion, for correspondence, is assembled in the 5th assembled portion; And
Track connecting assembly, is installed in respectively this first, second outrigger.
2. combination elevator hoistway as claimed in claim 1, it is characterized in that, this track connecting assembly has crossbeam and attaching parts, this crossbeam assembles between 2 first outriggers and be assembled between 2 second outriggers, and this attaching parts has orthogonal first, second riser, this first riser is for being assembled on this crossbeam, and this second riser is for being assembled in a track.
3. combination elevator hoistway as claimed in claim 1 or 2, is characterized in that, in this first outrigger, the inner side of at least one first body of rod is provided with diagonal brace fixed part, for being connected and fixed a diagonal brace body of rod; In this second outrigger, the inner side of at least one second body of rod is provided with diagonal brace connecting portion, for being connected and fixed a diagonal brace body of rod.
4. combination elevator hoistway as claimed in claim 1 or 2, it is characterized in that, this base has two rectangular pipes and two short square tubes interfix and form rectangular frame, and the top side of these four corners of rectangular frame has respectively upper plate, and this first assembled portion is fixation hole configurations, and be positioned at this upper plate place.
5. combination elevator hoistway as claimed in claim 4, it is characterized in that, this first body of rod bottom side is provided with lower shoe, the shape of this lower shoe is identical with this upper plate, and this second assembled portion is fixation hole configurations, and be positioned at this lower shoe place, utilize plural connecting element to be arranged in and between first, second assembled portion, reach fixed effect.
6. combination elevator hoistway as claimed in claim 1 or 2, is characterized in that, has two pipe links that be arranged in parallel between 2 first bodies of rod, and between two pipe links, is provided with the diagonal brace body of rod.
7. combination elevator hoistway as claimed in claim 1 or 2, is characterized in that, the 3rd, the 4th assembled portion is fixation hole configurations respectively, and utilizes a fixed plate respectively for being connected and fixed between the 3rd, the 4th assembled portion.
8. combination elevator hoistway as claimed in claim 1 or 2, in it is characterized in that, this seat of honour has two rectangular pipes and two short square tubes interfix and form rectangular frame, and the bottom side of these four corners of rectangular frame is fixed with respectively the column towards downward-extension, and the 6th assembled portion is fixation hole configurations, and is positioned at this column and locates near bottom side.
9. combination elevator hoistway as claimed in claim 8, is characterized in that, the 5th assembled portion is fixation hole configurations, and utilizes a fixed plate respectively for being connected and fixed between the 5th, the 6th assembled portion.
10. combination elevator hoistway as claimed in claim 1 or 2, it is characterized in that, this first body of rod is provided with first crossbeam fixed part with respect to this second body of rod place, this second body of rod is provided with second cross beam fixed part with respect to this first body of rod place, for being connected and fixed this crossbeam between this first, second crossbeam fixed part.
CN201320464362.7U 2013-07-31 2013-07-31 Combined lift shaft Expired - Fee Related CN203428696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320464362.7U CN203428696U (en) 2013-07-31 2013-07-31 Combined lift shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320464362.7U CN203428696U (en) 2013-07-31 2013-07-31 Combined lift shaft

Publications (1)

Publication Number Publication Date
CN203428696U true CN203428696U (en) 2014-02-12

Family

ID=50057747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320464362.7U Expired - Fee Related CN203428696U (en) 2013-07-31 2013-07-31 Combined lift shaft

Country Status (1)

Country Link
CN (1) CN203428696U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105417317A (en) * 2016-01-15 2016-03-23 苏州德易斯电梯有限公司 Novel multifunctional liftway frame convenient for field assembling and mounting
CN107117517A (en) * 2017-05-26 2017-09-01 广东易佳梯科技有限公司 A kind of modularization elevator hoistways monomer and its elevator hoistways
CN110612266A (en) * 2017-05-11 2019-12-24 蒂森克虏伯电梯股份公司 Elevator system with two hoistways
WO2020001668A1 (en) 2018-06-26 2020-01-02 Skovajsa Jiri Composite assembly of the steel structure for lifting equipment
CZ309622B6 (en) * 2021-05-07 2023-05-24 Jiří Ing Skovajsa A component sectional steel structure assembly for a lifting device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105417317A (en) * 2016-01-15 2016-03-23 苏州德易斯电梯有限公司 Novel multifunctional liftway frame convenient for field assembling and mounting
CN110612266A (en) * 2017-05-11 2019-12-24 蒂森克虏伯电梯股份公司 Elevator system with two hoistways
CN110612266B (en) * 2017-05-11 2022-07-08 蒂森克虏伯电梯创新与运营有限公司 Elevator system with two hoistways
CN107117517A (en) * 2017-05-26 2017-09-01 广东易佳梯科技有限公司 A kind of modularization elevator hoistways monomer and its elevator hoistways
WO2020001668A1 (en) 2018-06-26 2020-01-02 Skovajsa Jiri Composite assembly of the steel structure for lifting equipment
CZ309622B6 (en) * 2021-05-07 2023-05-24 Jiří Ing Skovajsa A component sectional steel structure assembly for a lifting device

Similar Documents

Publication Publication Date Title
CN203428696U (en) Combined lift shaft
CN205444446U (en) Assembled industrialization steel construction house
CN104074267A (en) Dismountable skid-mounted steel structure camping house
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN106906984A (en) A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure and its construction method
CN205476593U (en) Instrument formula foundation ditch packway
CN104358309A (en) Quickly installed high-strength house structure
CN101775896A (en) Method for installing pipeline scaffold of steel roof equipment and rigid suspended scaffold
CN104358318B (en) A kind of building using concrete steel structural upright
CN206448504U (en) It is a kind of be used for interior build by laying bricks or stones, the lift Mobile operating platform of plastering construction
CN106930401A (en) A kind of assembled industrialization steel structure house
CN205100531U (en) Lift scaffold support body assembly
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN102815631B (en) Plug-in tower crane support frame
CN105804416A (en) Connecting structure for prefabricated assembling type building tower crane
CN201187165Y (en) Composite type main transformer fireproof wall of transformer substation
CN2915808Y (en) Steel pipe combined structure elevator shaft bracket
CN203594247U (en) Prefabricated assembly type integrated roof self-supporting communication base station
KR20110037676A (en) Jig for lifting wall and column pre-fabricated steel bar and lifting method using jig
CN103352579A (en) Reinforcement and reconstruction masonry structure using externally-added gallery bridge and externally-added elevator and construction method
CN204282788U (en) Shaping type scaffold can be assembled
CN107724643A (en) One kind installs elevator hoistways structure and installation method additional
CN204299072U (en) The two badly bleeding stair of a kind of two circular hollow steel column supporting
CN206737358U (en) A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20150731

EXPY Termination of patent right or utility model