CN2915808Y - Steel pipe combined structure elevator shaft bracket - Google Patents

Steel pipe combined structure elevator shaft bracket Download PDF

Info

Publication number
CN2915808Y
CN2915808Y CN 200620090095 CN200620090095U CN2915808Y CN 2915808 Y CN2915808 Y CN 2915808Y CN 200620090095 CN200620090095 CN 200620090095 CN 200620090095 U CN200620090095 U CN 200620090095U CN 2915808 Y CN2915808 Y CN 2915808Y
Authority
CN
China
Prior art keywords
column
steel pipe
base
frame
shaft bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620090095
Other languages
Chinese (zh)
Inventor
赵硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING DONG'AO ELEVATOR CO Ltd
Original Assignee
LIAONING DONG'AO ELEVATOR CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING DONG'AO ELEVATOR CO Ltd filed Critical LIAONING DONG'AO ELEVATOR CO Ltd
Priority to CN 200620090095 priority Critical patent/CN2915808Y/en
Application granted granted Critical
Publication of CN2915808Y publication Critical patent/CN2915808Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a steel pipe combined structure elevator shaft bracket which is an elevator installation technology field, resolves the poor stability and difficult adjustment problem of the existing technology, the main components can be standardization produced in the factory, fine overall stability, simple and feasible adjustment method, includes the steel pipe column, a horizontal frame, a top cap and a base, the top cap and base are respectively arranged with the lower connection angle and upper connection angle, the columns are arranged in the upper and lower connecting angle by fastening elbow bolts, the horizontal frame is arranged on the column between the base and top cap, the column can be connected and extended with the connection piece, the upper part of the column is arranged a shaft bracket fixation iron which is connected with the neighboring building, the central part of the column can be arranged the floor fixation iron which is connected with the floor. The utility model can be arranged in the civil engineering shaft, or for the transformation site of the old building as the sundries elevator or meal escalator shaft bracket.

Description

Steel pipe assembling structure elevator hoistways frame
Technical field:
The utility model relates to elevator field engineering field, and exactly, it is a kind of steel pipe assembling structure elevator hoistways frame.
Background technology:
At present, elevator hoistways is substantially by two kinds of frame modes, and a kind of is the civil engineering elevator hoistways, and another kind is an angle steel package assembly elevator hoistways frame.In civil engineering elevator hoistways when construction,, the user will build hoistway by laying bricks or stones according to guide rail bracket of elevator installation site and technical requirements that elevator manufacturer provides, the pre-buried via hole of rail brackets is set, and uses during guide rail bracket of elevator to be installed.The civil engineering elevator hoistways is big because of its required installing space, and lifting height of lift height, nominal payload are big, so the civil engineering elevator hoistways is mainly used in the original elevator design of building, manned or freight lift.Angle steel package assembly elevator hoistways frame mainly is used in the occasion that installing space is little, nominal payload is little, hoisting depth is low, and the occasion of particularly transform on the basis of existing building, setting up elevator is mainly used in dumb waiter or meal ladder are installed.Angle steel package assembly elevator hoistways frame adopts the standard angle steel as the hoistway frame, in advance rail brackets is welded on the horizontal frame of hoistway frame before dispatching from the factory, need not the on-site installation rail brackets, manufacturing expense is low, it is little to take up room, installation period is short, the user only need reserve the elevator installing space or cut a hole through-flooring in existing building elevator can be installed, so its application scenario is very extensive.But, find that in the practice that the hoistway frame is installed the main shortcoming that the hoistway frame of this structure exists is exactly that hoistway frame resistance to overturning is relatively poor, and adjusts difficulty.
Summary of the invention:
The utility model is that its purpose just provides the steel pipe assembling structure elevator hoistways frame that a kind of resistance to overturning is good, mounting process is simple, the duration is short, easy to adjust to the technological improvement of existing angle steel package assembly elevator hoistways frame.
The purpose of this utility model is to realize like this.Steel pipe assembling structure elevator hoistways frame comprises column, horizontal frame, last cap and base, base (10) is installed on the ground (9) with anchoring bolt (12), it is characterized in that: column (5) is installed on the base (10), last cap (1) be installed in column (5) above, on the column (5) between last cap (1) and the base (10) horizontal frame (4) is housed, base (10) is provided with down joint angle (11), column (5) is installed in down in the joint angle (11) with fastening clench bolt (14), last cap (1) is provided with joint angle (2), column (5) is installed in the joint angle (2) with fastening clench bolt (14), horizontal frame (4) is provided with joint angle (6), column (5) is installed in the joint angle (6) with fastening clench bolt (14), the available attaching parts of column (5) (7) connects prolongation, the top of column (5) is provided with fixedly iron (3) of derrick, be used for being connected with contiguous building structure, when the hoistway frame is installed on the two-layer above building, fixedly iron (13) of floor can be set on the column (5), be used for being connected with floor (8).
The utility model is on the basis that has kept existing angle steel package assembly elevator hoistways frame plurality of advantages, adopt steel pipe as primary member, parts such as column, last cap, horizontal frame all can be produced at factory's internal standardization, the working accuracy height, on-the-spot aggregate erection, need not welding, do not need to build scaffold, shortened installation period significantly; Utilize column attaching parts simple in structure, easy for installation, can arbitrarily increase the height of hoistway frame; Particularly the utility model adopts the joint angle of unified standard to be connected horizontal frame and column with fastening clench bolt, and resistance to overturning is good, and method of adjustment is simple and easy to do, has also simplified the treatment process after the encapsulation.
Description of drawings:
Fig. 1 is an integral structure scheme drawing of the present utility model.
Fig. 2 is the fixing structural representation of iron of cap and derrick on the utility model.
Fig. 3 is the structural representation of the horizontal frame of the utility model.
Fig. 4 is the structural representation of the utility model base
Fig. 5 is the structural representation of the utility model column attaching parts.
The specific embodiment:
Base 10 of the present utility model, last cap 1 can be made through welding with angle steel, and column 5, horizontal frame 4 can adopt rectangular steel tube, and joint angle 2,6,11 and attaching parts 7, derrick fixedly parts such as iron 3, fastening clench bolt 14 all can adopt metallic material to make.Shown in accompanying drawing 1 and accompanying drawing 4, base 10 usefulness anchoring bolts 12 are installed on the ground 9, and following joint angle 11 is welded on four angles of base 10, and the unified fastening clench bolt of making 14 of column 5 usefulness is installed in down in the joint angle 11.As shown in Figures 1 and 2, as the last cap 1 that sets up the elevator traction machine bearing beam be installed in column 5 above, last joint angle 2 is welded on four angles of cap 1 bottom, the fastening clench bolt 14 of column 5 usefulness is installed in the joint angle 2.Shown in accompanying drawing 1 and accompanying drawing 3, horizontal frame 4 is housed on the column 5 between last cap 1 and the base 10, basic identical with last cap 1 and base 10, joint angle 6 is welded on four angles of horizontal frame 4, the fastening clench bolt 14 of column 5 usefulness is installed in the joint angle 6, to increase the resistance to overturning of hoistway frame intensity, raising hoistway frame.Shown in accompanying drawing 1 and accompanying drawing 5, when the hoistway frame need increase, available attaching parts 7 coupled together column 5, and attaching parts is inserted in column 5 pipe and gets final product in two ends about in the of 7.As shown in Figures 1 and 2, the top of column 5 should be provided with fixedly iron 3 of derrick, is used for being connected with contiguous building structure, with the stability of further raising hoistway frame.As shown in Figure 1, when the hoistway frame was installed on the two-layer above building, the hoistway frame passes on the column 5 at floor place should be provided with fixedly iron 13 of floor, and fixedly iron 13 can be welded on the column 5, be used for being connected with floor 8, its purpose also is in order to improve the resistance to overturning of hoistway frame.
Column 5 of the present utility model, horizontal frame 4, base 10, last cap 1, joint angle 2,6,11, and fastening clench bolt 14 all can make shaping in factory, assembled on site gets final product during construction.

Claims (7)

1, a kind of steel pipe assembling structure elevator hoistways frame, comprise column, horizontal frame, go up cap and base, base (10) is installed on the ground (9) with anchoring bolt (12), it is characterized in that: column (5) is installed on the base (10), last cap (1) be installed in column (5) above, on the column (5) between last cap (1) and the base (10) horizontal frame (4) is housed.
2, steel pipe assembling structure elevator hoistways frame according to claim 1, it is characterized in that: base (10) is provided with down joint angle (11), and column (5) is installed in down in the joint angle (11) with fastening clench bolt (14).
3, steel pipe assembling structure elevator hoistways frame according to claim 1 is characterized in that: go up cap (1) and be provided with joint angle (2), column (5) is installed in the joint angle (2) with fastening clench bolt (14).
4, steel pipe assembling structure elevator hoistways frame according to claim 1, it is characterized in that: horizontal frame (4) is provided with joint angle (6), and column (5) is installed in the joint angle (6) with fastening clench bolt (14).
5, steel pipe assembling structure elevator hoistways frame according to claim 1 is characterized in that: the available attaching parts of column (5) (7) connects prolongation.
6, steel pipe assembling structure elevator hoistways frame according to claim 1 is characterized in that: the top of column (5) is provided with fixedly iron (3) of derrick.
7, steel pipe assembling structure elevator hoistways frame according to claim 1 is characterized in that: column (5) is provided with fixedly iron (13) of floor.
CN 200620090095 2006-03-31 2006-03-31 Steel pipe combined structure elevator shaft bracket Expired - Fee Related CN2915808Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620090095 CN2915808Y (en) 2006-03-31 2006-03-31 Steel pipe combined structure elevator shaft bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620090095 CN2915808Y (en) 2006-03-31 2006-03-31 Steel pipe combined structure elevator shaft bracket

Publications (1)

Publication Number Publication Date
CN2915808Y true CN2915808Y (en) 2007-06-27

Family

ID=38186714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620090095 Expired - Fee Related CN2915808Y (en) 2006-03-31 2006-03-31 Steel pipe combined structure elevator shaft bracket

Country Status (1)

Country Link
CN (1) CN2915808Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583131A (en) * 2011-01-04 2012-07-18 张向阳 Elevator shaft wall assembled by combined shaft frames
CN103979381A (en) * 2014-05-30 2014-08-13 湖南海诺电梯有限公司 Novel aluminum alloy elevator well
CN105417317A (en) * 2016-01-15 2016-03-23 苏州德易斯电梯有限公司 Novel multifunctional liftway frame convenient for field assembling and mounting
CN111215811A (en) * 2019-08-12 2020-06-02 杭州顺达伯耐特电梯有限公司 Well frame welding tool and welding method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583131A (en) * 2011-01-04 2012-07-18 张向阳 Elevator shaft wall assembled by combined shaft frames
CN102583131B (en) * 2011-01-04 2015-11-25 张向阳 A kind of elevator shaft wall adopting combined shaft frame to assemble
CN103979381A (en) * 2014-05-30 2014-08-13 湖南海诺电梯有限公司 Novel aluminum alloy elevator well
CN103979381B (en) * 2014-05-30 2017-04-05 湖南海诺电梯有限公司 A kind of aluminium alloy elevator hoistways
CN105417317A (en) * 2016-01-15 2016-03-23 苏州德易斯电梯有限公司 Novel multifunctional liftway frame convenient for field assembling and mounting
CN111215811A (en) * 2019-08-12 2020-06-02 杭州顺达伯耐特电梯有限公司 Well frame welding tool and welding method
CN111215811B (en) * 2019-08-12 2021-08-17 杭州顺达伯耐特电梯有限公司 Well frame welding tool and welding method

Similar Documents

Publication Publication Date Title
CN201217898Y (en) Concrete prefabricated stairs
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
KR19990072014A (en) Lift-up method for building buildings from above to the ground
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN107399656B (en) Outdoor elevator and construction method thereof
CN102561669A (en) Cantilever scaffold and construction method thereof
CN2915808Y (en) Steel pipe combined structure elevator shaft bracket
CN111395641A (en) Precast concrete external wallboard and construction method thereof
CN107476583A (en) A kind of concrete assembled building builds construction method
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
CN203428696U (en) Combined lift shaft
CN202450761U (en) Overhanging type scaffold
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN102815631B (en) Plug-in tower crane support frame
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN215107737U (en) Prefabricated assembled concrete stand structure of inspection hole in lightweight storehouse
CN109797964A (en) A kind of lifting platform system of integrated tower crane
CN110185250A (en) A kind of nacelle construction device
CN105858501A (en) Self-attaching tower crane provided with foundation underpinning device and construction method thereof
CN216616216U (en) Large-scale high-rise steel truss disjunctor structure
CN216787874U (en) Large-scale ring type truss hoisting structure in large-span high altitude
CN216336266U (en) Assembled building element hoist and mount construction platform structure
CN108408635A (en) A kind of combined bay that lifting jack detachable load is combined with guiding
CN207526051U (en) A kind of hoistway structure for installing elevator additional
KR100427751B1 (en) An installation beam of tower-crane for an outer wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070627