CN105545337A - 一种液压支架的立柱回路及控制方法 - Google Patents

一种液压支架的立柱回路及控制方法 Download PDF

Info

Publication number
CN105545337A
CN105545337A CN201510907219.4A CN201510907219A CN105545337A CN 105545337 A CN105545337 A CN 105545337A CN 201510907219 A CN201510907219 A CN 201510907219A CN 105545337 A CN105545337 A CN 105545337A
Authority
CN
China
Prior art keywords
way valve
mouth
liang
communicated
electromagnet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510907219.4A
Other languages
English (en)
Other versions
CN105545337B (zh
Inventor
仉志强
李永堂
金坤善
刘志奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINGDE HANHAI XINGYUN INTELLIGENT TECHNOLOGY RESEARCH AND DEVELOPMENT Co.,Ltd.
Original Assignee
Taiyuan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Science and Technology filed Critical Taiyuan University of Science and Technology
Priority to CN201510907219.4A priority Critical patent/CN105545337B/zh
Publication of CN105545337A publication Critical patent/CN105545337A/zh
Application granted granted Critical
Publication of CN105545337B publication Critical patent/CN105545337B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/16Hydraulic or pneumatic features, e.g. circuits, arrangement or adaptation of valves, setting or retracting devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/16Hydraulic or pneumatic features, e.g. circuits, arrangement or adaptation of valves, setting or retracting devices
    • E21D23/26Hydraulic or pneumatic control

Abstract

一种液压支架的立柱回路及控制方法,属于液压支架技术领域,其特征是该立柱回路包含增压缸,第二两位四通阀控制增压缸实现连续增压工作,第一两位四通阀控制增压缸实现主供液路和立柱缸的无杆腔之间的双向增压,一方面主供液路的高压乳化液经第一两位四通阀、第二两位四通阀、增压缸进入立柱缸的无杆腔,另一方面立柱缸的无杆腔内的高压乳化液经第一两位四通阀、第二两位四通阀、增压缸进入主供液路。优点是不仅可以提高立柱缸的无杆腔压力,还可以实现立柱缸的无杆腔压力能回收和再利用。

Description

一种液压支架的立柱回路及控制方法
技术领域
本发明属于液压支架技术领域,具体涉及一种液压支架的立柱回路及控制方法。
背景技术
液压支架作为采煤技术中的主要安全支护设备,正向大流量、高压力、节能方向发展。目前,综采面液压支架的立柱在工作过程中存在如下问题:
(1)综采工作面的高压泵站距离液压支架为200m~500m,该高压供液路额定压力为31.5MPa,由于管路通径大,其压力等级难以提高;立柱初撑阶段,受移架速度和多支架同时移架等因素影响,立柱缸的无杆腔难以达到更高初撑力。
(2)根据液压支架支护要求,液压支架立柱初撑阶段的无杆腔压力需达到25MPa以上,在承载阶段,无杆腔压力会接近安全压力40MPa。因此,移架降柱初期,立柱缸的无杆腔内储存的压力能需要在短时间内泄压,这部分能量没有得到利用,降低了能量利用率。综采工作面一般约有100~200台液压支架,每台液压支架有两条立柱,立柱高度可达7m以上,立柱缸内径可达500mm,因此立柱缸内储存的总压力能相当可观。
目前,国内外使用的液压支架的立柱回路,一部分可以实现立柱缸增压,一部分可以实现降柱能量回收再利用,但任一立柱回路均没有很好地兼备两种功能,降低了立柱回路的性价比。
发明内容
本发明提供一种液压支架的立柱回路及控制方法,可有效地实现立柱缸增压和降柱泄压能量回收再利用的问题。本发明是这样实现的,其结构特征是:乳化液泵站分别与低压回液路和主供液路连通,主供液路经过第一两位四通阀、第二两位四通阀与增压缸的A口连通,增压缸的B口经第二两位四通阀与第二储液箱连通,增压缸的C口经第四单向阀与第一两位四通阀的A口连通,增压缸的D口经第三单向阀、第四单向阀与第一两位四通阀的A口连通,增压缸的E口经第二单向阀、第一单向阀与第一两位四通阀的A口连通,增压缸的F口经第一单向阀与第一两位四通阀的A口连通,第一两位四通阀的B口分别与安全阀的进油口、第一压力传感器、两位两通阀的B口、第一两位三通阀的A口、第二两位三通阀的A口、第一液控单向阀的B口连通,安全阀的出油口与低压回液路连通,两位两通阀的A口与蓄能器的进液口连通,第一两位三通阀的B口和第二两位三通阀的B口与第一储液箱连通,第一两位三通阀的C口与第一液控单向阀的控制口连通,第二两位三通阀的C口与第二液控单向阀的控制口连通,第二液控单向阀的B口分别与立柱缸的无杆腔进油口、第二压力传感器连通;
所述的液压支架的立柱回路的控制方法是:
(1)立柱无杆腔在增压阶段:第二两位四通阀的电磁铁1Y反复通电与断电,通电-断电周期为△t,第一两位三通阀的电磁铁4Y通电,主供液路的高压乳化液经过第一两位四通阀、第二两位四通阀、增压缸、第一液控单向阀、第二液控单向阀,进入立柱缸的无杆腔,当立柱缸的无杆腔压力达到预设值时,第二两位四通阀的电磁铁1Y和第一两位三通阀的电磁铁4Y断电,增压阶段结束;
(2)液压支架在降柱泄压能量回收阶段:如果第二压力传感器的信号值大于第一压力传感器的信号值时,第二两位四通阀的电磁铁1Y反复通电与断电,通电-断电周期为△t,第一两位四通阀的电磁铁2Y、两位两通阀的电磁铁3Y、第二两位三通阀的电磁铁5Y通电,立柱缸的无杆腔内的压力能进入蓄能器,然后经过第一两位四通阀、第二两位四通阀、增压缸,进入主供液路;当第二压力传感器的信号值减小到预设值时,第二两位四通阀的电磁铁1Y、第一两位四通阀的电磁铁2Y、两位两通阀的电磁铁3Y、第二两位三通阀的电磁铁5Y断电,降柱泄压能量回收阶段结束。
本发明优点及积极效果是:
(1)实现了立柱缸的无杆腔增压,提高了立柱初撑力,有效防止顶板发生片帮和冒顶,保障了综采工作面安全;
(2)实现了立柱缸无杆腔内压力能回收和再利用,提高了能量利用率。
附图说明
图1为液压支架的立柱回路示意图。
图中:1-乳化液泵站,2-低压回液路,3-主供液路,4-第一两位四通阀,5-安全阀,6-第一压力传感器,7-蓄能器,8-两位两通阀,9-第一两位三通阀,10-第一液控单向阀,11-第一储液箱,11’-第二储液箱,12-第二压力传感器,13-第二液控单向阀,14-第二两位三通阀,15-立柱缸,16-第一单向阀,17-第二单向阀,18-第三单向阀,19-第四单向阀,20-增压缸,21-第二两位四通阀。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细描述。
如图1所示,一种液压支架的立柱回路,各个元件的连接关系是:乳化液泵站1分别与低压回液路2和主供液路3连通,主供液路3经过第一两位四通阀4、第二两位四通阀21与增压缸20的A口连通,增压缸20的B口经第二两位四通阀21与第二储液箱11’连通,增压缸20的C口经第四单向阀19与第一两位四通阀4的A口连通,增压缸20的D口经第三单向阀18、第四单向阀19与第一两位四通阀4的A口连通,增压缸20的E口经第二单向阀17、第一单向阀16与第一两位四通阀4的A口连通,增压缸20的F口经第一单向阀16与第一两位四通阀4的A口连通,第一两位四通阀4的B口分别与安全阀5的进油口、第一压力传感器6、两位两通阀8的B口、第一两位三通阀9的A口、第二两位三通阀14的A口、第一液控单向阀9的B口连通,安全阀5的出油口与低压回液路2连通,两位两通阀8的A口与蓄能器7的进液口连通,第一两位三通阀9的B口和第二两位三通阀14的B口与第一储液箱11连通,第一两位三通阀9的C口与第一液控单向阀10的控制口连通,第二两位三通阀14的C口与第二液控单向阀13的控制口连通,第二液控单向阀13的B口分别与立柱缸15的无杆腔进油口、第二压力传感器12连通。
本发明中的控制方法及工作过程是:
(1)立柱无杆腔在增压阶段:第二两位四通阀21的电磁铁1Y反复通电与断电,通电-断电周期为△t,第一两位三通阀9的电磁铁4Y通电,主供液路3的高压乳化液经过第一两位四通阀4、第二两位四通阀21、增压缸20、第一液控单向阀10、第二液控单向阀13,进入立柱缸15的无杆腔,当立柱缸15的无杆腔压力达到预设值时,第二两位四通阀21的电磁铁1Y和第一两位三通阀9的电磁铁4Y断电,增压阶段结束;
(2)液压支架在降柱泄压能量回收阶段:如果第二压力传感器12的信号值大于第一压力传感器6的信号值时,第二两位四通阀21的电磁铁1Y反复通电与断电,通电-断电周期为△t,第一两位四通阀4的电磁铁2Y、两位两通阀8的电磁铁3Y、第二两位三通阀14的电磁铁5Y通电,立柱缸15的无杆腔内的压力能进入蓄能器7,然后经过第一两位四通阀4、第二两位四通阀21、增压缸20,进入主供液路3;当第二压力传感器12的信号值减小到预设值时,第二两位四通阀21的电磁铁1Y、第一两位四通阀4的电磁铁2Y、两位两通阀8的电磁铁3Y、第二两位三通阀14的电磁铁5Y断电,降柱泄压能量回收阶段结束。

Claims (2)

1.一种液压支架的立柱回路,其特征在于:乳化液泵站(1)分别与低压回液路(2)和主供液路(3)连通,主供液路(3)经过第一两位四通阀(4)、第二两位四通阀(21)与增压缸(20)的A口连通,增压缸(20)的B口经第二两位四通阀(21)与第二储液箱(11’)连通,增压缸(20)的C口经第四单向阀(19)与第一两位四通阀(4)的A口连通,增压缸(20)的D口经第三单向阀(18)、第四单向阀(19)与第一两位四通阀(4)的A口连通,增压缸(20)的E口经第二单向阀(17)、第一单向阀(16)与第一两位四通阀(4)的A口连通,增压缸(20)的F口经第一单向阀(16)与第一两位四通阀(4)的A口连通,第一两位四通阀(4)的B口分别与安全阀(5)的进油口、第一压力传感器(6)、两位两通阀(8)的B口、第一两位三通阀(9)的A口、第二两位三通阀(14)的A口、第一液控单向阀(9)的B口连通,安全阀(5)的出油口与低压回液路(2)连通,两位两通阀(8)的A口与蓄能器(7)的进液口连通,第一两位三通阀(9)的B口和第二两位三通阀(14)的B口与第一储液箱(11)连通,第一两位三通阀(9)的C口与第一液控单向阀(10)的控制口连通,第二两位三通阀(14)的C口与第二液控单向阀(13)的控制口连通,第二液控单向阀(13)的B口分别与立柱缸(15)的无杆腔进油口、第二压力传感器(12)连通。
2.如权利要求1所述的液压支架的立柱回路的控制方法,其特征在于:
(1)立柱无杆腔在增压阶段:第二两位四通阀(21)的电磁铁1Y反复通电与断电,通电-断电周期为△t,第一两位三通阀(9)电磁铁4Y通电,主供液路(3)的高压乳化液经过第一两位四通阀(4)、第二两位四通阀(21)、增压缸(20)、第一液控单向阀(10)、第二液控单向阀(13),进入立柱缸(15)的无杆腔,当立柱缸(15)的无杆腔压力达到预设值时,第二两位四通阀(21)的电磁铁1Y和第一两位三通阀(9)电磁铁4Y断电,增压阶段结束;
(2)液压支架在降柱泄压能量回收阶段:如果第二压力传感器(12)的信号值大于第一压力传感器(6)的信号值时,第二两位四通阀(21)的电磁铁1Y反复通电与断电,通电-断电周期为△t,第一两位四通阀(4)电磁铁2Y、两位两通阀(8)的电磁铁3Y、第二两位三通阀(14)的电磁铁5Y通电,立柱缸(15)的无杆腔内的压力能进入蓄能器(7),然后经过第一两位四通阀(4)、第二两位四通阀(21)、增压缸(20),进入主供液路(3);当第二压力传感器(12)的信号值减小到预设值时,第二两位四通阀(21)的电磁铁1Y、第一两位四通阀(4)的电磁铁2Y、两位两通阀(8)的电磁铁3Y、第二两位三通阀(14)的电磁铁5Y断电,降柱泄压能量回收阶段结束。
CN201510907219.4A 2015-12-10 2015-12-10 一种液压支架的立柱回路及控制方法 Active CN105545337B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510907219.4A CN105545337B (zh) 2015-12-10 2015-12-10 一种液压支架的立柱回路及控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510907219.4A CN105545337B (zh) 2015-12-10 2015-12-10 一种液压支架的立柱回路及控制方法

Publications (2)

Publication Number Publication Date
CN105545337A true CN105545337A (zh) 2016-05-04
CN105545337B CN105545337B (zh) 2017-10-20

Family

ID=55824842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510907219.4A Active CN105545337B (zh) 2015-12-10 2015-12-10 一种液压支架的立柱回路及控制方法

Country Status (1)

Country Link
CN (1) CN105545337B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640166A (zh) * 2016-12-20 2017-05-10 中国神华能源股份有限公司 用于液压支架的泄液回收装置及液压系统
CN107313913A (zh) * 2017-08-08 2017-11-03 贵州盘江矿山机械有限公司 一种矿用节能乳化液泵站及其控制方法
CN108222983A (zh) * 2018-03-12 2018-06-29 太原科技大学 一种液压支架的立柱增压回路
CN108952707A (zh) * 2018-09-11 2018-12-07 中国矿业大学 用于连采机的连续式临时护顶装置和连采机
CN109209373A (zh) * 2018-09-11 2019-01-15 中国矿业大学 一种具有连续式临时护顶装置的连采机的施工方法
CN109538259A (zh) * 2019-01-08 2019-03-29 辽宁工程技术大学 一种带有蓄能器快速吸能让位的液压立柱
CN109695465A (zh) * 2018-12-05 2019-04-30 山东塔高矿业机械装备制造有限公司 用于放顶煤支架的液压装置
CN111720388A (zh) * 2020-07-06 2020-09-29 长沙理工大学 一种新型组合式液压势能再生系统
CN111911216A (zh) * 2020-06-19 2020-11-10 太原理工大学 一种具有流量连续调节功能的方向流量阀及其控制方法
CN111911214A (zh) * 2020-06-24 2020-11-10 中煤科工开采研究院有限公司 液压支架安全阀工作状态的监测方法
CN113217064A (zh) * 2021-05-08 2021-08-06 中煤科工开采研究院有限公司 一种液压支架快速供液系统
CN113217064B (zh) * 2021-05-08 2024-05-10 中煤科工开采研究院有限公司 一种液压支架快速供液系统

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU750101A1 (ru) * 1978-07-18 1980-07-23 Коммунарский горно-металлургический институт Секци механизированной крепи
US5062033A (en) * 1987-05-09 1991-10-29 Gewerkschaft Eisenhutte Westfalia Gmbh Electro-hydraulic control system for a mineral mining installation
RU2165529C1 (ru) * 2000-03-28 2001-04-20 Тульский государственный университет Гидропривод перекрытия секции механизированной крепи
GB2403762B (en) * 2003-06-23 2005-06-15 Dbt Gmbh Hydraulic shield support
CN201502392U (zh) * 2009-09-28 2010-06-09 刘红 液压支架自动装载装置
CN102777446A (zh) * 2012-07-17 2012-11-14 徐州铭硕机械科技有限公司 一种油水转换变量乳化液泵站
CN202611733U (zh) * 2012-04-11 2012-12-19 山西平阳重工机械有限责任公司 支架用自动增压装置
CN204082720U (zh) * 2014-09-03 2015-01-07 吉林工业职业技术学院 一种压力机的节能液压系统

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU750101A1 (ru) * 1978-07-18 1980-07-23 Коммунарский горно-металлургический институт Секци механизированной крепи
US5062033A (en) * 1987-05-09 1991-10-29 Gewerkschaft Eisenhutte Westfalia Gmbh Electro-hydraulic control system for a mineral mining installation
RU2165529C1 (ru) * 2000-03-28 2001-04-20 Тульский государственный университет Гидропривод перекрытия секции механизированной крепи
GB2403762B (en) * 2003-06-23 2005-06-15 Dbt Gmbh Hydraulic shield support
CN201502392U (zh) * 2009-09-28 2010-06-09 刘红 液压支架自动装载装置
CN202611733U (zh) * 2012-04-11 2012-12-19 山西平阳重工机械有限责任公司 支架用自动增压装置
CN102777446A (zh) * 2012-07-17 2012-11-14 徐州铭硕机械科技有限公司 一种油水转换变量乳化液泵站
CN204082720U (zh) * 2014-09-03 2015-01-07 吉林工业职业技术学院 一种压力机的节能液压系统

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
寇子明 等: "液压支架自动增压初撑系统动态特性的研究", 《煤炭学报》 *
王军 等: "新型履带行走式液压支架液压系统分析", 《煤矿机械》 *
郭猛: "蓄能器在行走式液压支架上的应用", 《煤矿安全》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640166B (zh) * 2016-12-20 2019-09-10 中国神华能源股份有限公司 用于液压支架的泄液回收装置及液压系统
CN106640166A (zh) * 2016-12-20 2017-05-10 中国神华能源股份有限公司 用于液压支架的泄液回收装置及液压系统
CN107313913A (zh) * 2017-08-08 2017-11-03 贵州盘江矿山机械有限公司 一种矿用节能乳化液泵站及其控制方法
CN108222983A (zh) * 2018-03-12 2018-06-29 太原科技大学 一种液压支架的立柱增压回路
WO2020052013A1 (zh) * 2018-09-11 2020-03-19 中国矿业大学 用于连采机的连续式临时护顶装置和连采机
CN109209373A (zh) * 2018-09-11 2019-01-15 中国矿业大学 一种具有连续式临时护顶装置的连采机的施工方法
CN108952707A (zh) * 2018-09-11 2018-12-07 中国矿业大学 用于连采机的连续式临时护顶装置和连采机
CN109209373B (zh) * 2018-09-11 2020-05-19 中国矿业大学 一种具有连续式临时护顶装置的连采机的施工方法
CN109695465A (zh) * 2018-12-05 2019-04-30 山东塔高矿业机械装备制造有限公司 用于放顶煤支架的液压装置
CN109538259A (zh) * 2019-01-08 2019-03-29 辽宁工程技术大学 一种带有蓄能器快速吸能让位的液压立柱
CN111911216A (zh) * 2020-06-19 2020-11-10 太原理工大学 一种具有流量连续调节功能的方向流量阀及其控制方法
CN111911214A (zh) * 2020-06-24 2020-11-10 中煤科工开采研究院有限公司 液压支架安全阀工作状态的监测方法
CN111911214B (zh) * 2020-06-24 2022-07-05 中煤科工开采研究院有限公司 液压支架安全阀工作状态的监测方法
CN111720388A (zh) * 2020-07-06 2020-09-29 长沙理工大学 一种新型组合式液压势能再生系统
CN113217064A (zh) * 2021-05-08 2021-08-06 中煤科工开采研究院有限公司 一种液压支架快速供液系统
CN113217064B (zh) * 2021-05-08 2024-05-10 中煤科工开采研究院有限公司 一种液压支架快速供液系统

Also Published As

Publication number Publication date
CN105545337B (zh) 2017-10-20

Similar Documents

Publication Publication Date Title
CN105545337A (zh) 一种液压支架的立柱回路及控制方法
CN103883338B (zh) 一种含有液压增压器的液压支架立柱自助增压系统
CN105484778A (zh) 一种液压支架立柱节能回路及控制方法
CN108412820B (zh) 一种30000Psi超高压井口安全控制系统
CN101793158A (zh) 半卸载交替推进式极薄煤层液压支架
CN104033430A (zh) 顺应突变载荷的tbm实验台推进液压系统
CN102926804A (zh) 分布式地下水库群及地下水库群内矿井水的转移方法
CN202500842U (zh) 双阀控制单轨吊液压回路系统
CN103008362B (zh) 一种板带轧机液压压下并联伺服控制的方法及回路
CN203516244U (zh) 快进工进回路
CN203779817U (zh) 一种蓄能器应用在注塑机控制油路中的自动泄压系统
CN203743135U (zh) 节能型压力机的液压回路
CN207454434U (zh) 拖移式装车机液压系统
CN204140545U (zh) 一种增加油缸缓冲行程的液压机构
CN202431284U (zh) 静压水升柱机
CN106762975A (zh) 一种液压支架立柱与千斤顶试压系统
CN104989682B (zh) 便携式增压控制装置
CN206357693U (zh) 一种大吨位高效节能油压机
CN204020865U (zh) 一种工程车辆快速响应液压制动系统
CN103541941A (zh) 一种总功率控制的多泵多工作装置液压系统
CN203129017U (zh) 混合动力顶升装置与系统
CN204025234U (zh) 一种连续增压试验台
CN109058191B (zh) 一种芯棒支撑架快速泄压控制回路
CN211231043U (zh) 电石炉液压控制系统
CN212027840U (zh) 一种煤矿用液压支架的设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191216

Address after: 233000 Yannan Road, Bengbu High-tech Zone, Anhui Province (1st Floor, 1st Floor, Terminal Science Park, High-tech Zone)

Patentee after: Bengbu Anzhi Intellectual Property Operations Co., Ltd.

Address before: 030024 Taiyuan City, Shanxi Province Wan Road, No. 66, No.

Patentee before: Taiyuan Univ. of Science & Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200902

Address after: No.8226, floor 2, health and intelligent manufacturing center, No.2, Jingde Economic Development Zone, Huangjia Park, Xuancheng City, Anhui Province

Patentee after: JINGDE HANHAI XINGYUN INTELLIGENT TECHNOLOGY RESEARCH AND DEVELOPMENT Co.,Ltd.

Address before: 233000 Yannan Road, Bengbu High-tech Zone, Anhui Province (1st Floor, 1st Floor, Terminal Science Park, High-tech Zone)

Patentee before: Bengbu Anzhi Intellectual Property Operations Co.,Ltd.