CN105501393A - 一种船舶起重柱的安装方法 - Google Patents
一种船舶起重柱的安装方法 Download PDFInfo
- Publication number
- CN105501393A CN105501393A CN201610046991.6A CN201610046991A CN105501393A CN 105501393 A CN105501393 A CN 105501393A CN 201610046991 A CN201610046991 A CN 201610046991A CN 105501393 A CN105501393 A CN 105501393A
- Authority
- CN
- China
- Prior art keywords
- cylinder
- ships
- derrick post
- line
- derrick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Jib Cranes (AREA)
Abstract
一种船舶起重柱的安装方法,在船坞阶段预先对柱脚划出水平检验线和结构中心线,在地面阶段预先对柱体划出柱体中心线和柱体检验水线,待到需要加装起重柱时,将船舶停靠于码头,然后再将起重柱吊装到船舶上的柱脚上即可。通过该安装方法,起重柱的加装可以在码头上完成,既能满足起重柱安装的精度要求,其安装准确、快速,又能够免除二次进坞,进而缩短生产周期、降低使用费用,并避免二次进坞所带来的风险。
Description
技术领域
本发明涉及船舶领域,特别是涉及一种船舶起重柱的安装方法。
背景技术
起重柱是船上克令吊的支撑立柱,其焊接于船舶的甲板面上,截面为方形或圆形。一般而言,起重柱的安装会在船坞内完成,但若出坞后的船舶因其它原因需要增加克令吊,则需要将船舶二次进坞以进行起重柱的安装。这是因为非船坞环境,如停船码头上无法使用线锤、激光、全站仪等设备,而起重柱安装的精度要求又特别高,所以导致船舶不得不二次进坞。这将花费大量的时间和巨额的费用,还可能带来不可预估的风险,如外板坐墩变形等。
发明内容
本发明旨在提供一种能够在非船坞环境中进行起重柱安装的方法,使其既能满足起重柱安装的精度要求,又能够免除二次进坞,进而缩短生产周期、降低使用费用,并避免二次进坞所带来的风险。
本发明所述的船舶起重柱的安装方法,包括以下步骤:
A、划线:在船坞阶段,利用激光经纬仪对起重柱柱脚伸出舱口围板的部分划出水平线,即为水平检验线,另外利用激光将船体结构中心线引到起重柱柱脚伸出舱口围板的部分上;在地面阶段,在起重柱柱体上划出柱体中心线,另外以法兰面为基准面划出平行于法兰面的柱体检验水线;
B、吊装起重柱柱体:将起重柱柱体中心线对正柱脚上的结构中心线;
C、测量:测量起重柱柱体四周上的柱体检验水线到柱脚水平检验线的距离,并使最大距离与最小距离之差在设定范围内;另外,测量起重柱柱体检验水线到舱口围面的距离,并使该距离在设定范围内;
D、安装固定起重柱。
本发明所述的船舶起重柱的安装方法,在船坞阶段预先对柱脚划出水平检验线和结构中心线,在地面阶段——此时可按情况任意选择船坞、加装起重柱的码头边或其它地方进行——预先对柱体划出柱体中心线和柱体检验水线,如此即完成划线的初步准备工作。待到需要加装起重柱时,将船舶停靠于码头,然后再将起重柱吊装到船舶上的柱脚上即可,吊装时需要使起重柱柱体中心线对正柱脚上的结构中心线,并测量起重柱柱体四周上的柱体检验水线到柱脚水平检验线的距离,和起重柱柱体检验水线到舱口围面的距离,使其满足设定和安装要求。通过该安装方法,起重柱的加装可以在码头上完成,既能满足起重柱安装的精度要求,其安装准确、快速,又能够免除二次进坞,进而缩短生产周期、降低使用费用,并避免二次进坞所带来的风险。
附图说明
图1、2是船舶起重柱的安装方法的柱脚划线示意图。
图3是船舶起重柱的安装方法的柱体划线示意图。
图4是船舶起重柱的安装方法的柱脚限位板结构示意图。
图5、6是船舶起重柱的安装方法的测量示意图。
具体实施方式
一种船舶起重柱的安装方法,包括以下步骤:
A、划线:在船坞阶段,利用激光经纬仪对起重柱柱脚1伸出舱口围板的部分划出水平线,即为水平检验线3,另外利用激光将船体结构中心线引到起重柱柱脚伸出舱口围板的部分上;在地面阶段,在起重柱柱体2上划出柱体中心线5,另外以法兰面为基准面划出平行于法兰面的柱体检验水线;
B、吊装起重柱柱体:将起重柱柱体中心线对正柱脚上的结构中心线4;
C、测量:测量起重柱柱体四周上的柱体检验水线到柱脚水平检验线的距离,并使最大距离与最小距离之差在设定范围内;另外,测量起重柱柱体检验水线到舱口围面6的距离h,并使该距离在设定范围内;
D、安装固定起重柱。
所述的船舶起重柱的安装方法,在步骤A中,划柱脚结构中心线时,在柱脚的前、后两面均需划上结构中心线。可使得对准更加准确。
在步骤A中,划柱体中心线时,分别在柱体上、下端口找出起重柱的中心点,其两点连线即为柱体中心线;在柱体的前、后两面均需划上结构中心线。该方法简单、准确。
在步骤A中,划柱体检验水线时,分别在柱体上、下两端划出上检验水线7和下检验水线8。划线时,即划出上检验水线到柱脚水平检验线的距离H,和下检验水线到柱脚水平检验线的距离S,上、下检验水线的设置,可进一步提高安装精度。
在步骤A中,地面阶段时,柱体还需划出下口余量线:以法兰座上端面为基准,向柱体下口量取起重柱的理论高度值,根据理论高度算出余量,将余量割除,同时开好坡口。这既有利于提高精度,又可以提高安装的简便性。
在步骤B中,吊装起重柱柱体前,在柱脚顶部两侧安装限定柱体位置的限位板9。限位板可方便定位柱体和柱脚,使安装更加简便。
在步骤C中,测量起重柱柱体四周上的柱体检验水线到柱脚水平检验线的距离时,需测量上检验水线到柱脚水平检验线的距离,并使最大距离与最小距离之差不大于1mm;同时测量下检验水线到柱脚水平检验线的距离,并使最大距离与最小距离之差不大于1mm;测量起重柱柱体检验水线到舱口围面的距离时,测量值与理论值之差不大于7mm。该范围可满足起重柱安装的精度要求,又便于现场安装。
Claims (8)
1.一种船舶起重柱的安装方法,其特征在于包括以下步骤:
A、划线:在船坞阶段,利用激光经纬仪对起重柱柱脚伸出舱口围板的部分划出水平线,即为水平检验线,另外利用激光将船体结构中心线引到起重柱柱脚伸出舱口围板的部分上;在地面阶段,在起重柱柱体上划出柱体中心线,另外以法兰面为基准面划出平行于法兰面的柱体检验水线;
B、吊装起重柱柱体:将起重柱柱体中心线对正柱脚上的结构中心线;
C、测量:测量起重柱柱体四周上的柱体检验水线到柱脚水平检验线的距离,并使最大距离与最小距离之差在设定范围内;另外,测量起重柱柱体检验水线到舱口围面的距离,并使该距离在设定范围内;
D、安装固定起重柱。
2.根据权利要求1所述的船舶起重柱的安装方法,其特征在于:在步骤A中,划柱脚结构中心线时,在柱脚的前、后两面均需划上结构中心线。
3.根据权利要求1所述的船舶起重柱的安装方法,其特征在于:在步骤A中,划柱体中心线时,分别在柱体上、下端口找出起重柱的中心点,其两点连线即为柱体中心线。
4.根据权利要求1或2所述的船舶起重柱的安装方法,其特征在于:在步骤A中,划柱体中心线时,在柱体的前、后两面均需划上结构中心线。
5.根据权利要求1所述的船舶起重柱的安装方法,其特征在于:在步骤A中,划柱体检验水线时,分别在柱体上、下两端划出上检验水线和下检验水线。
6.根据权利要求1所述的船舶起重柱的安装方法,其特征在于:在步骤A中,地面阶段时,柱体划出下口余量线:以法兰座上端面为基准,向柱体下口量取起重柱的理论高度值,根据理论高度算出余量,将余量割除,同时开好坡口。
7.根据权利要求5所述的船舶起重柱的安装方法,其特征在于:在步骤C中,测量起重柱柱体四周上的柱体检验水线到柱脚水平检验线的距离时,需测量上检验水线到柱脚水平检验线的距离,并使最大距离与最小距离之差不大于1mm;同时测量下检验水线到柱脚水平检验线的距离,并使最大距离与最小距离之差不大于1mm。
8.根据权利要求1所述的船舶起重柱的安装方法,其特征在于:在步骤C中,测量起重柱柱体检验水线到舱口围面的距离时,测量值与理论值之差不大于7mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610046991.6A CN105501393B (zh) | 2016-01-25 | 2016-01-25 | 一种船舶起重柱的安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610046991.6A CN105501393B (zh) | 2016-01-25 | 2016-01-25 | 一种船舶起重柱的安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105501393A true CN105501393A (zh) | 2016-04-20 |
CN105501393B CN105501393B (zh) | 2017-12-15 |
Family
ID=55709802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610046991.6A Active CN105501393B (zh) | 2016-01-25 | 2016-01-25 | 一种船舶起重柱的安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105501393B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110153599A (zh) * | 2019-05-20 | 2019-08-23 | 浙江国际海运职业技术学院 | 克令吊安装工艺 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1663877A (zh) * | 2004-03-05 | 2005-09-07 | 上海外高桥造船有限公司 | 单点系泊浮子穴的建造方法 |
CN101168380A (zh) * | 2007-07-18 | 2008-04-30 | 中国葛洲坝集团机械船舶有限公司 | 一种用于船舶三主机三螺旋桨主机轴系安装的方法 |
CN104648612A (zh) * | 2013-11-22 | 2015-05-27 | 江南造船(集团)有限责任公司 | 船用吊机安装方法 |
CN105155497A (zh) * | 2015-09-21 | 2015-12-16 | 上海振华重工集团(南通)有限公司 | 一种自升式起重平台升降装置及其制造工艺 |
-
2016
- 2016-01-25 CN CN201610046991.6A patent/CN105501393B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1663877A (zh) * | 2004-03-05 | 2005-09-07 | 上海外高桥造船有限公司 | 单点系泊浮子穴的建造方法 |
CN101168380A (zh) * | 2007-07-18 | 2008-04-30 | 中国葛洲坝集团机械船舶有限公司 | 一种用于船舶三主机三螺旋桨主机轴系安装的方法 |
CN104648612A (zh) * | 2013-11-22 | 2015-05-27 | 江南造船(集团)有限责任公司 | 船用吊机安装方法 |
CN105155497A (zh) * | 2015-09-21 | 2015-12-16 | 上海振华重工集团(南通)有限公司 | 一种自升式起重平台升降装置及其制造工艺 |
Non-Patent Citations (2)
Title |
---|
杨德福: "300TEU船起重柱制造安装的精度控制", 《求新科协科技论文集》 * |
龙进军: "《船舶检验》", 31 August 2006, 哈尔滨工程大学出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110153599A (zh) * | 2019-05-20 | 2019-08-23 | 浙江国际海运职业技术学院 | 克令吊安装工艺 |
Also Published As
Publication number | Publication date |
---|---|
CN105501393B (zh) | 2017-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102358413B (zh) | 一种特殊角度的全回转舵桨装置的安装方法 | |
CN109606542B (zh) | 一种控制特种设备基座在总段上的定位安装精度的方法 | |
CN102490003B (zh) | 一种可伸缩全回转舵桨装置的安装方法 | |
CN104527922B (zh) | 船舶主机底脚螺栓孔的精确定位方法 | |
CN113916087A (zh) | 一种船舶设备基座定位测量工装以及定位测量方法 | |
CN101323351A (zh) | 一种船舶舵系照光及安装的方法 | |
CN101407248A (zh) | 一种造船过程中舷侧分段的一体建造方法 | |
CN203518893U (zh) | 一种船舶内外壳片体对合线拟合度测量尺 | |
CN106289193B (zh) | Fpso大面积海工模块的动态定位方法 | |
CN112697051B (zh) | 一种浮船坞定位测量系统及测量方法 | |
CN212772503U (zh) | 一种沉箱安装双gps测量定位装置 | |
CN110789684A (zh) | 一种大型甲板机械本体基座的装配方法 | |
CN105501393A (zh) | 一种船舶起重柱的安装方法 | |
CN102312436A (zh) | 钢管桩沉桩施工工艺 | |
WO2016150184A1 (zh) | 海洋油气水下设备重量测量和重心检测方法 | |
CN110788822B (zh) | 一种勘划船体甲板中心线的方法 | |
CN104149932A (zh) | 万吨级散货船尾鳍预装合拢工艺 | |
CN113320659B (zh) | 一种船舶双角度舵桨法兰与筒体的组装方法 | |
CN112572721B (zh) | 斜面槽型隔舱安装线划制方法及斜面槽型隔舱安装方法 | |
CN112112186B (zh) | 一种海上换流站上分体式导管架基础的安装方法 | |
CN203806101U (zh) | 一种辅助照光靶安装的定位装置 | |
CN212271652U (zh) | 一种高速铁路简支箱梁接触网预埋件定位装置 | |
CN211926698U (zh) | 焊接件定位测量装置 | |
CN105346686A (zh) | 一种大型水密门的安装方法 | |
CN109000626A (zh) | 一种船长测量方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20160420 Assignee: CSSC HUANGPU WENCHONG SHIPBUILDING Co.,Ltd. Assignor: GUANGZHOU WENCHONG SHIPYARD Co.,Ltd. Contract record no.: X2022440000046 Denomination of invention: An installation method of ship lifting column Granted publication date: 20171215 License type: Common License Record date: 20220705 |
|
EE01 | Entry into force of recordation of patent licensing contract |