CN105401973A - Method for performing extraction treatment on corner gas on work faces of adjacent roadways - Google Patents
Method for performing extraction treatment on corner gas on work faces of adjacent roadways Download PDFInfo
- Publication number
- CN105401973A CN105401973A CN201510693739.XA CN201510693739A CN105401973A CN 105401973 A CN105401973 A CN 105401973A CN 201510693739 A CN201510693739 A CN 201510693739A CN 105401973 A CN105401973 A CN 105401973A
- Authority
- CN
- China
- Prior art keywords
- gas
- face
- extraction
- coal
- air return
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000605 extraction Methods 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000010276 construction Methods 0.000 claims abstract description 9
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 claims description 6
- 238000005086 pumping Methods 0.000 claims description 4
- 238000009423 ventilation Methods 0.000 claims description 3
- 230000002457 bidirectional effect Effects 0.000 claims description 2
- 239000003245 coal Substances 0.000 abstract description 7
- 238000005553 drilling Methods 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 abstract 1
- 230000005641 tunneling Effects 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F7/00—Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Ventilation (AREA)
Abstract
The invention relates to a gas treatment method, in particular to a method for performing extraction treatment on the corner gas on the work faces of adjacent roadways. The problems that according to existing treatment on corner gas on the work faces, the tunneling workload is large, cost is high, and an extraction pipeline is prone to damage are solved. After an air returning gate roadway of a coal face A is finished, a return airway of a next work face B is arranged in advance at 30-meter interval, the gas extraction pipeline is arranged in the return airway, a gas extraction drill site is arranged in the return airway every 80 meters, drilling is constructed in the gas extraction drill sites to extract the corner gas on the coal face A, and after the coal face A is extracted, holes towards the coal face B are drilled in the drill sites for gas extraction. The method has the beneficial effects that the purpose that the extraction pipeline is arranged on one roadway and the two adjacent work faces are commonly used is achieved, the project of repeated construction of the gas extraction drill sites in the two roadways is avoided, and the construction progress is greatly increased.
Description
Technical field
The present invention relates to a kind of mash gas harnessing method, be specially a kind of adjacent tunnel extraction control face gas at upper corner method.
Background technology
At present, coal mine fully-mechanized mining working takes extraction gas at upper corner control face gas before back production old power station, the ancillary facility such as gas pumping station and sump is generally arranged in the lane, panel of this work plane, construction extraction pipeline during extraction of drilling is arranged in this work plane air return way lane, and period does not affect face haulage circuit in order to drill, need to arrange a gas drainage under suction drill site at interval of about 80 meters in air return way, excavation work amount is larger.Gas drainage pipeline is arranged in air return way, easily causes gas to reveal the installations and facilities infringements such as extraction pipeline during air return way transport if any unexpected, and extraction pipeline gas leakage very easily to cause in air return way gas alarming or transfinites, ineffective to trouble free service.The schemes synthesis of current use shows as: excavation work amount is many, cost is large.
Summary of the invention
The present invention is large in order to solve the headwork amount that exists in existing face upper corner angle gas control, and cost is high, and extraction pipeline is the problem such as damaged easily, provides a kind of adjacent tunnel extraction control face gas at upper corner method.
Technical scheme of the present invention is as follows: a kind of adjacent tunnel extraction control face gas at upper corner method, after the air return way of coal-face A completes, the return airway of next work plane B is arranged at 30 meters, interval in advance, in the return airway that gas drainage pipeline is arranged in, a gas drainage under suction drill site is arranged at interval of about 80 meters in return airway, construction drill extraction coal-face A gas at upper corner in gas drainage under suction drill site, after extraction coal-face A terminates, and then boring to draw out methane what beat towards coal-face B in drill site.
Compared with prior art, scheme of the present invention is by arranging that in adjacent tunnel drill site and gas drainage pipeline carry out the gas of extraction face upper corner angle, accomplish that extraction pipeline is arranged in a lane, the object that two adjacent work planes use jointly, avoid in two lanes the engineering repeating construction gas drainage under suction drill site, substantially increase construction speed.Do not construct the air return way tunnel of gas treatment technique as haulage drift, avoids extraction installations and facilities such as breaking extraction pipeline and cause gas to reveal and gas alarming or the gas accident such as to transfinite in extraction pipeline gas leakage generation air return way.
Accompanying drawing explanation
Fig. 1 is the solution of the present invention arrangement diagram;
In figure: 1-air return way, 2-return airway, 3-gas drainage pipeline, 4-gas pumping station, 5-gas drainage under suction drill site, 6-holes, 7-fire dam, 8-fire dam, 9-air crossing, 10-bidirectional ventilation door, 11-regulation wind window.
Detailed description of the invention
As schematically shown in Figure 1, a kind of adjacent tunnel extraction control face gas at upper corner method, after the air return way 1 of coal-face A completes, the return airway 2 of next work plane B is arranged at 30 meters, interval in advance, in the return airway 2 that gas drainage pipeline 3 is arranged in, a gas drainage under suction drill site 5 is arranged at interval of about 80 meters in return airway 2, construction drill 6 extraction coal-face A gas at upper corner in gas drainage under suction drill site 5, after extraction coal-face A terminates, and then boring to draw out methane what beat towards coal-face B in drill site.
Fire dam 8 is provided with between described air return way 1 and return airway 2, air crossing 9 is set up between the tunnel of coal-face A and air return way 1, bidirectional ventilation door 10 is provided with in air return way 1 rear end, front end is provided with fire dam 7, is also provided with the gas pumping station 4 connecting gas drainage pipeline in air return way 1 rear end.By above layout, the gas of two work planes can be made to be able to efficient extraction, and save the drill site construction quantity in a tunnel, reduce the amount of labour and human cost.Do not construct air return way 1 tunnel of gas treatment technique as the haulage drift in coal mining exploitation process, avoids haulage device and coal and break the extraction installations and facilities such as extraction pipeline and cause gas to reveal and gas alarming or the gas accident such as to transfinite in extraction pipeline gas leakage generation air return way.
Claims (2)
1. an adjacent tunnel extraction control face gas at upper corner method, it is characterized in that: after the air return way (1) of coal-face A completes, the return airway (2) of next work plane B is arranged at 30 meters, interval in advance, in the return airway (2) that gas drainage pipeline (3) is arranged in, a gas drainage under suction drill site (5) is arranged at interval of about 80 meters in return airway (2), construction drill (6) extraction coal-face A gas at upper corner in gas drainage under suction drill site (5), after extraction coal-face A terminates, and then it is boring to draw out methane what beat towards coal-face B in drill site.
2. adjacent tunnel extraction control face according to claim 1 gas at upper corner method, it is characterized in that: between described air return way (1) and return airway (2), be provided with fire dam (8), air crossing (9) is set up between the tunnel of coal-face A and air return way (1), bidirectional ventilation door (10) is provided with in air return way (1) rear end, front end is provided with fire dam (7), is also being provided with the gas pumping station (4) connecting gas drainage pipeline in air return way (1) rear end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510693739.XA CN105401973A (en) | 2015-10-24 | 2015-10-24 | Method for performing extraction treatment on corner gas on work faces of adjacent roadways |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510693739.XA CN105401973A (en) | 2015-10-24 | 2015-10-24 | Method for performing extraction treatment on corner gas on work faces of adjacent roadways |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105401973A true CN105401973A (en) | 2016-03-16 |
Family
ID=55467688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510693739.XA Pending CN105401973A (en) | 2015-10-24 | 2015-10-24 | Method for performing extraction treatment on corner gas on work faces of adjacent roadways |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105401973A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106321140A (en) * | 2016-08-31 | 2017-01-11 | 辽宁工程技术大学 | Arrangement method of extra-thick seam gas pre-extraction drill holes |
CN107503790A (en) * | 2017-08-06 | 2017-12-22 | 陕西富源煤业有限责任公司 | Fast extraction fully mechanized coal face comprehensive gas drainage arranges administering method |
CN108194126A (en) * | 2017-12-19 | 2018-06-22 | 大同煤矿集团有限责任公司 | High Position Drilling gas channel transformation dredging method |
CN112127939A (en) * | 2020-08-28 | 2020-12-25 | 晋城蓝焰煤业股份有限公司 | Gas control method during initial mining period of coal face |
CN113266414A (en) * | 2021-06-10 | 2021-08-17 | 中煤科工集团西安研究院有限公司 | Coal roadway tunneling gas control and ventilation method based on large-diameter directional drilling |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101169042A (en) * | 2007-11-23 | 2008-04-30 | 煤炭科学研究总院抚顺分院 | Caving zone edge inclined drill hole bushing burying method for extracting and discharging gas for goaf and adjacent layer |
CN102226413A (en) * | 2011-05-24 | 2011-10-26 | 中国矿业大学 | Gas extraction method of cross hole drilling area of gas discharge laneway |
CN102865092A (en) * | 2012-09-22 | 2013-01-09 | 山西晋城无烟煤矿业集团有限责任公司 | U+U type laneway ventilating system of coalface |
RU2520669C1 (en) * | 2013-03-12 | 2014-06-27 | Федеральное государственное бюджетное учреждение науки Институт горного дела им. Н.А. Чинакала Сибирского отделения Российской академии наук | Coal seam degassing |
CN104100290A (en) * | 2014-06-19 | 2014-10-15 | 山西晋城无烟煤矿业集团有限责任公司 | Gas prevention and control technique in cut-through of coal seam excavated roadways |
CN104481540A (en) * | 2014-10-08 | 2015-04-01 | 六盘水师范学院 | Method for controlling multiple coal mining hazards by high level borehole grouting |
-
2015
- 2015-10-24 CN CN201510693739.XA patent/CN105401973A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101169042A (en) * | 2007-11-23 | 2008-04-30 | 煤炭科学研究总院抚顺分院 | Caving zone edge inclined drill hole bushing burying method for extracting and discharging gas for goaf and adjacent layer |
CN102226413A (en) * | 2011-05-24 | 2011-10-26 | 中国矿业大学 | Gas extraction method of cross hole drilling area of gas discharge laneway |
CN102865092A (en) * | 2012-09-22 | 2013-01-09 | 山西晋城无烟煤矿业集团有限责任公司 | U+U type laneway ventilating system of coalface |
RU2520669C1 (en) * | 2013-03-12 | 2014-06-27 | Федеральное государственное бюджетное учреждение науки Институт горного дела им. Н.А. Чинакала Сибирского отделения Российской академии наук | Coal seam degassing |
CN104100290A (en) * | 2014-06-19 | 2014-10-15 | 山西晋城无烟煤矿业集团有限责任公司 | Gas prevention and control technique in cut-through of coal seam excavated roadways |
CN104481540A (en) * | 2014-10-08 | 2015-04-01 | 六盘水师范学院 | Method for controlling multiple coal mining hazards by high level borehole grouting |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106321140A (en) * | 2016-08-31 | 2017-01-11 | 辽宁工程技术大学 | Arrangement method of extra-thick seam gas pre-extraction drill holes |
CN106321140B (en) * | 2016-08-31 | 2019-02-01 | 辽宁工程技术大学 | A kind of method for arranging of super high seam gas pre-drainage drilling |
CN107503790A (en) * | 2017-08-06 | 2017-12-22 | 陕西富源煤业有限责任公司 | Fast extraction fully mechanized coal face comprehensive gas drainage arranges administering method |
CN107503790B (en) * | 2017-08-06 | 2018-03-30 | 陕西富源煤业有限责任公司 | Fast extraction fully mechanized coal face comprehensive gas drainage arranges administering method |
CN108194126A (en) * | 2017-12-19 | 2018-06-22 | 大同煤矿集团有限责任公司 | High Position Drilling gas channel transformation dredging method |
CN112127939A (en) * | 2020-08-28 | 2020-12-25 | 晋城蓝焰煤业股份有限公司 | Gas control method during initial mining period of coal face |
CN112127939B (en) * | 2020-08-28 | 2023-12-05 | 晋城蓝焰煤业股份有限公司 | Gas control method for initial mining period of coal face |
CN113266414A (en) * | 2021-06-10 | 2021-08-17 | 中煤科工集团西安研究院有限公司 | Coal roadway tunneling gas control and ventilation method based on large-diameter directional drilling |
CN113266414B (en) * | 2021-06-10 | 2023-11-28 | 中煤科工集团西安研究院有限公司 | Coal roadway tunneling gas control and ventilation method based on large-diameter directional drilling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105401973A (en) | Method for performing extraction treatment on corner gas on work faces of adjacent roadways | |
CN105240013B (en) | Broadwall N00 engineering methods | |
CN102080526B (en) | Method for extracting gas from bedding level fractured well of ground coal seam roof | |
CN102661167B (en) | Protected seam bottom plate upward comb-shaped drilled hole gas extraction method | |
AU2015345830B2 (en) | Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence | |
CN105221179B (en) | A kind of highly gassy mine Y type method of ventilations | |
CN104847355B (en) | Continuous mining method for hollow ground of medium-thickness steeply inclined ore body | |
WO2015103861A1 (en) | Method for extracting gas by drilling hole in gob-side entry retaining y-type ventilation high-position return airway | |
CN107882565B (en) | A kind of adopt without driving without coal column stays integrated production practice | |
CN103277129B (en) | One prevents Top Corner Gas on Coal Face to transfinite technology | |
CN105089668A (en) | Longwall working face coal-pillar-free mining method | |
CN102587960A (en) | Arrangement method of high gas coal seam extraction working face roadway | |
CN109915148B (en) | Open-pit end slope coal-pressing radial mining method | |
CN103899350A (en) | Fully mechanized caving face supporting top coal gas extraction system | |
CN205638458U (en) | Accelerate construction structures of broken system construction speed of underground swift current | |
CN102777185A (en) | Inclined well shaft construction technology | |
CN105736040A (en) | Method for pumping and exhausting gas of coal beds in front of parallel adit and main cave by means of parallel adit drilling construction | |
CN103485786A (en) | Steeply inclined coal seam strike long-wall mechanization mining method | |
CN107905807A (en) | A kind of future small coal pillar comprehensive mechanical coal mining supporting construction and construction method | |
CN102031972B (en) | L-shaped mining method under open-underground mining | |
CN104533419A (en) | Method for partial recovery of residual coal from wide coal pillar | |
CN203700978U (en) | Box culvert pilot tubal curtain device | |
CN110644993B (en) | Z-shaped strip working face mining method | |
CN103603673B (en) | Stope face parallel dual-U-type roadway | |
CN104989330A (en) | Coalbed gas recovery method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160316 |