CN103603673B - Stope face parallel dual-U-type roadway - Google Patents

Stope face parallel dual-U-type roadway Download PDF

Info

Publication number
CN103603673B
CN103603673B CN201310591773.7A CN201310591773A CN103603673B CN 103603673 B CN103603673 B CN 103603673B CN 201310591773 A CN201310591773 A CN 201310591773A CN 103603673 B CN103603673 B CN 103603673B
Authority
CN
China
Prior art keywords
lane
return airway
auxiliary
air inlet
stope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310591773.7A
Other languages
Chinese (zh)
Other versions
CN103603673A (en
Inventor
苗惠东
刘雁斌
梁谦
张志强
段向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201310591773.7A priority Critical patent/CN103603673B/en
Publication of CN103603673A publication Critical patent/CN103603673A/en
Application granted granted Critical
Publication of CN103603673B publication Critical patent/CN103603673B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The present invention is specially a kind of stope face parallel dual-U-type roadway, solve existing support in gateway of coal mining face arrange unreasonable cause gas at upper corner difficulty of governance large, administer not thorough and many lanes and arrange the problem that the rate of extraction is low.Comprise set gradually from top to bottom track lane, equipment lane, return airway, auxiliary return airway, auxiliary air inlet lane; Track lane and equipment lane are positioned at the top of stope, return airway, auxiliary return airway and auxiliary air inlet lane are positioned at the below of stope, track lane, equipment lane and the right-hand member of return airway are provided with the Qie Yan lane be communicated with three, auxiliary return airway is communicated with the right-hand member in auxiliary air inlet lane, and auxiliary between return airway and auxiliary air inlet lane, be arranged at intervals with some air connections, be provided with the gas drainage pipe be communicated with goaf in auxiliary return airway.The present invention has environmental protection and energy saving, economizes on resources and effective advantage improving the rate of extraction.

Description

Stope face parallel dual-U-type roadway
Technical field
The present invention relates to underground coal mine support in gateway of coal mining face arrangement, be specially a kind of stope face parallel dual-U-type roadway.
Background technology
Longwell process for stoping is generally adopted in current China's coal-mine down-hole coal excavation process, stope according to entering, return aircourse arrangement is different, " U " type, " U+L " type, " three enter twice " etc. can be divided into, but there is the drawback being difficult to overcome in these gateway layout method self at present, be when stope back production, gas at upper corner difficulty of governance is large, improvement is not thorough; Shi Duo lane is arranged, arranges coal column many, reduces the rate of extraction.
Summary of the invention
In order to solve, existing support in gateway of coal mining face layout is unreasonable causes the problem that gas at upper corner difficulty of governance is large, improvement is thorough and many lanes layout rate of extraction is low in the present invention, provides a kind of stope face parallel dual-U-type roadway.
The present invention adopts following technical scheme to realize: stope face parallel dual-U-type roadway, comprise set gradually from top to bottom track lane, equipment lane, return airway, auxiliary return airway, auxiliary air inlet lane; Track lane and equipment lane are positioned at the top of stope, return airway, auxiliary return airway and auxiliary air inlet lane are positioned at the below of stope, track lane, equipment lane and the right-hand member of return airway are provided with the Qie Yan lane be communicated with three, auxiliary return airway is communicated with the right-hand member in auxiliary air inlet lane, and auxiliary between return airway and auxiliary air inlet lane, be arranged at intervals with some air connections, be provided with the gas drainage pipe be communicated with goaf in auxiliary return airway.
After coal mine down-hole tunnel has been arranged, carry out back production, stoping period, equipment lane and the track lane coal column of work plane inlet side can carry out back production, simultaneously along with the advance of the face, equipment lane, track lane, working face open-off cut eye and return airway are caving thereupon, and auxiliary air inlet lane and auxiliary return airway can successfully remain, and are this work plane and Adjacent Working Face service; Equipment lane, track lane, auxiliary air inlet lane are three air intake lanes, after air intake flows through work plane, and a part of distinguished and admirable inflow return airway, distinguished and admirable the flowing through after upper corner of a part flows into auxiliary return airway by air connection, solves gas at upper corner overrun issues; And form whole wind pressure ventilation system after setting up auxiliary air inlet lane, with the fresh distinguished and admirable high concentration gas by the auxiliary return airway of air connection dilution, ensure that the gas density of auxiliary return airway does not exceed standard; Gas drainage pipe can to the goaf at shutoff air connection place by high negative pressure pump drainage simultaneously, force goaf gas to discharge mine through gas pipeline, overcome existing support in gateway of coal mining face arrange unreasonable cause gas at upper corner difficulty of governance large, administer not thorough and many lanes and arrange the problem that the rate of extraction is low.
Reasonable in design of the present invention is reliable, and ensure that the gas density of return airway is no more than 1.0%, increase the air quantity of work plane, wind resource assessment ability effectively improves; And make goaf gas discharge mine by releasing pipe, improve stope extracting result; Between equipment lane and track lane, coal column can carry out back production simultaneously, decreases goaf drop coal column, has environmental protection and energy saving, economizes on resources and effective advantage improving the rate of extraction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
In figure: 1-track lane, 2-equipment lane, 3-return airway, 4-assists return airway, 5-auxiliary air inlet lane, 6-Qie Yan lane, 7-air connection.
Detailed description of the invention
Stope face parallel dual-U-type roadway, comprise set gradually from top to bottom track lane 1, equipment lane 2, return airway 3, auxiliary return airway 4, auxiliary air inlet lane 5; Track lane 1 and equipment lane 2 are positioned at the top of stope, return airway 3, auxiliary return airway 4 and auxiliary air inlet lane 5 are positioned at the below of stope, track lane 1, equipment lane 2 and the right-hand member of return airway 3 are provided with the Qie Yan lane 6 be communicated with three, auxiliary return airway 4 is communicated with the right-hand member in auxiliary air inlet lane 5, and auxiliary between return airway 4 and auxiliary air inlet lane 5, be arranged at intervals with some air connections 7, be provided with the gas drainage pipe be communicated with goaf in auxiliary return airway 4.
In specific implementation process, first U-shaped tunnel is formed by track lane 1, equipment lane 2 and return airway 3, second U-shaped tunnel is formed by auxiliary return airway 4 and auxiliary air inlet lane 5, construct one at interval of 300m between equipment lane 2 and air intake lane, 1 two, track lane and get in touch with horizontal river, to construct an air connection 7 at interval of 50-70m between return airway 3 and auxiliary return airway 4, meet the requirement that gas at upper corner is administered; Auxiliary air inlet lane 5 and auxiliary return airway 4 constructs one and are got in touch with horizontal river and carry out whole wind pressure ventilation, the gas density of dilution ventilation connection roadway 7 blowout on the right side of tunnel.

Claims (1)

1. a stope face parallel dual-U-type roadway, is characterized in that: comprise set gradually from top to bottom track lane (1), equipment lane (2), return airway (3), auxiliary return airway (4), auxiliary air inlet lane (5); Track lane (1) and equipment lane (2) are positioned at the top of stope, return airway (3), auxiliary return airway (4) and auxiliary air inlet lane (5) are positioned at the below of stope, track lane (1), equipment lane (2) and the right-hand member of return airway (3) are provided with the Qie Yan lane (6) be communicated with three, auxiliary return airway (4) is communicated with the right-hand member of auxiliary air inlet lane (5), and auxiliary between return airway (4) and auxiliary air inlet lane (5), be arranged at intervals with some air connections (7), assist in return airway (4) and be provided with the gas drainage pipe be communicated with goaf.
CN201310591773.7A 2013-11-22 2013-11-22 Stope face parallel dual-U-type roadway Active CN103603673B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310591773.7A CN103603673B (en) 2013-11-22 2013-11-22 Stope face parallel dual-U-type roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310591773.7A CN103603673B (en) 2013-11-22 2013-11-22 Stope face parallel dual-U-type roadway

Publications (2)

Publication Number Publication Date
CN103603673A CN103603673A (en) 2014-02-26
CN103603673B true CN103603673B (en) 2015-11-04

Family

ID=50121925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310591773.7A Active CN103603673B (en) 2013-11-22 2013-11-22 Stope face parallel dual-U-type roadway

Country Status (1)

Country Link
CN (1) CN103603673B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134214B (en) * 2015-09-24 2017-12-19 中国矿业大学 A kind of coal mining later stage secondary ventilation roadway layout and adjoining rock stability control method
CN108952716B (en) * 2018-06-22 2020-06-09 太原理工大学 Thick coal seam longwall working face multi-lane arrangement method
CN109057794A (en) * 2018-08-13 2018-12-21 中煤能源研究院有限责任公司 A kind of big coal-mining method of the coal column driving without coal pillar mining
CN111622773A (en) * 2020-06-10 2020-09-04 中国矿业大学 High-gas working face roadway structure, arrangement method and coal pillar width determination method thereof
CN117027921B (en) * 2023-09-28 2023-12-12 太原理工大学 Method for preventing influence of high-gas goaf on nearby working surface

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2343288C1 (en) * 2007-04-04 2009-01-10 Анатолий Владимирович Ремезов Method of ventilation of long mining face
CN101498225A (en) * 2009-02-24 2009-08-05 太原理工大学 U+I type ventilating system for top-coal caving face
CN101649741A (en) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 Laneway disposed by using large U to sleeve small u
CN101718208A (en) * 2009-12-17 2010-06-02 山西晋城无烟煤矿业集团有限责任公司 Ventilating system arranged in U+H shape under coal mine
CN201568069U (en) * 2009-12-20 2010-09-01 山西晋城无烟煤矿业集团有限责任公司 Three input and three output concentrating tunnel of coal mine downhole large-area panel
CN102182460A (en) * 2011-04-14 2011-09-14 山西晋城无烟煤矿业集团有限责任公司 High-gas multi-roadway no-coal-pillar mining method
CN102383808A (en) * 2011-10-24 2012-03-21 山西晋城无烟煤矿业集团有限责任公司 Optimized laneway arrangement structure for high gas mining work surface
CN102562088A (en) * 2012-02-15 2012-07-11 山西汾西矿业(集团)有限责任公司 Method for preventing gas from being accumulated at corners on coal faces
CN102865092A (en) * 2012-09-22 2013-01-09 山西晋城无烟煤矿业集团有限责任公司 U+U type laneway ventilating system of coalface
CN103291344A (en) * 2013-05-07 2013-09-11 中国矿业大学 Cross-district double-U-shaped ventilating system for high-gas working face and application method for cross-district double-U-shaped ventilating system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2343288C1 (en) * 2007-04-04 2009-01-10 Анатолий Владимирович Ремезов Method of ventilation of long mining face
CN101498225A (en) * 2009-02-24 2009-08-05 太原理工大学 U+I type ventilating system for top-coal caving face
CN101649741A (en) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 Laneway disposed by using large U to sleeve small u
CN101718208A (en) * 2009-12-17 2010-06-02 山西晋城无烟煤矿业集团有限责任公司 Ventilating system arranged in U+H shape under coal mine
CN201568069U (en) * 2009-12-20 2010-09-01 山西晋城无烟煤矿业集团有限责任公司 Three input and three output concentrating tunnel of coal mine downhole large-area panel
CN102182460A (en) * 2011-04-14 2011-09-14 山西晋城无烟煤矿业集团有限责任公司 High-gas multi-roadway no-coal-pillar mining method
CN102383808A (en) * 2011-10-24 2012-03-21 山西晋城无烟煤矿业集团有限责任公司 Optimized laneway arrangement structure for high gas mining work surface
CN102562088A (en) * 2012-02-15 2012-07-11 山西汾西矿业(集团)有限责任公司 Method for preventing gas from being accumulated at corners on coal faces
CN102865092A (en) * 2012-09-22 2013-01-09 山西晋城无烟煤矿业集团有限责任公司 U+U type laneway ventilating system of coalface
CN103291344A (en) * 2013-05-07 2013-09-11 中国矿业大学 Cross-district double-U-shaped ventilating system for high-gas working face and application method for cross-district double-U-shaped ventilating system

Also Published As

Publication number Publication date
CN103603673A (en) 2014-02-26

Similar Documents

Publication Publication Date Title
CN103603673B (en) Stope face parallel dual-U-type roadway
CN102071958B (en) Inverse Y-shaped ventilation method for coal mining working face
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN102080526B (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN107882565B (en) A kind of adopt without driving without coal column stays integrated production practice
CN105221179B (en) A kind of highly gassy mine Y type method of ventilations
WO2015103861A1 (en) Method for extracting gas by drilling hole in gob-side entry retaining y-type ventilation high-position return airway
CN103277129B (en) One prevents Top Corner Gas on Coal Face to transfinite technology
CN104196554A (en) U-U-type ventilation method and system for coalfaces
CN104179520A (en) Z-shaped ventilation method and system for gob-side entry of coalface
CN204152537U (en) Retaining Roadways Along Goaf at Coal Face Z-type ventilation system
CN201802435U (en) Coal mine ventilation system
CN102748064A (en) Large-mining-height fully-mechanized caving face gas control method
CN105484790A (en) Method for promoting gas extraction and working face dust fall by injecting water at intervals in drilling holes
CN102720518A (en) Double-U ventilation system for fully-mechanized caving coal working face
CN207847676U (en) A kind of high prominent U-shaped ventilating system of mine coal-cutting working face
CN105401973A (en) Method for performing extraction treatment on corner gas on work faces of adjacent roadways
CN108590754A (en) Concentrate sluicing lane method for arranging in a kind of monocline coal seam exploiting field
CN102003201B (en) Gas drainage method in gob of coal mine
CN107100667A (en) A kind of U-shaped ventilation operation face goaf is servo-actuated gas pumping method
CN204152536U (en) A kind of coal-face U-U type ventilation system
CN103410557B (en) Single, low air permeability coal seam mash gas harnessing method
CN102644477A (en) Method for extracting gas of protected layer through wear layer drilling in protective layer airway high-position drilling field
CN202745919U (en) Backward crossing shield type drainage system for mining face upper corner
CN103291344A (en) Cross-district double-U-shaped ventilating system for high-gas working face and application method for cross-district double-U-shaped ventilating system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant