CN103603673A - Stope face parallel dual-U-type roadway - Google Patents

Stope face parallel dual-U-type roadway Download PDF

Info

Publication number
CN103603673A
CN103603673A CN201310591773.7A CN201310591773A CN103603673A CN 103603673 A CN103603673 A CN 103603673A CN 201310591773 A CN201310591773 A CN 201310591773A CN 103603673 A CN103603673 A CN 103603673A
Authority
CN
China
Prior art keywords
roadway
lane
auxiliary air
auxiliary
return airway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310591773.7A
Other languages
Chinese (zh)
Other versions
CN103603673B (en
Inventor
苗惠东
刘雁斌
梁谦
张志强
段向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201310591773.7A priority Critical patent/CN103603673B/en
Publication of CN103603673A publication Critical patent/CN103603673A/en
Application granted granted Critical
Publication of CN103603673B publication Critical patent/CN103603673B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a stope face parallel dual-U-type roadway, and aims to solve the problems that since stope face roadway arrangement is unreasonable, upper corner gas is difficult to control, control is uncompleted, and multiple roadway arrangement stope efficiency is low. The stope face parallel dual-U-type roadway comprises a track roadway, an equipment roadway, an air return roadway, an auxiliary air return roadway and an auxiliary air inlet roadway. The track roadway and the equipment roadway are located above a stope face, the air return roadway, the auxiliary air return roadway and the auxiliary air inlet roadway are located below the stope face, the right ends of the track roadway, the equipment roadway and the air return roadway are provided with an open-off cut roadway communicated with the track roadway, the equipment roadway and the air return roadway, the right ends of the auxiliary air return roadway and the auxiliary air inlet roadway are communicated, a plurality of ventilate connected roadways are arranged between the auxiliary air return roadway and the auxiliary air inlet roadway at intervals, and gas drainage pipes communicated with a goaf. The stope face parallel dual-U-type roadway has the advantages of green energy, conservation of resources and effective increase of recovery rate.

Description

Stope double-U-shaped tunnel arranged side by side
Technical field
The present invention relates to support in gateway of coal mining face arrangement under coal mine, be specially a kind of stope double-U-shaped tunnel arranged side by side.
Background technology
In China's coal-mine down-hole coal excavation process, generally adopt longwell process for stoping at present, stope according to entering, return aircourse arrangement is different, can be divided into " U " type, " U+L " type, " three enter two go back tos " etc., but there is the drawback that is difficult to overcome in these tunnel arrangements self at present, be when stope back production, upper corner gas control difficulty is large, improvement is not thorough; Shi Duo lane is arranged, coal column is set many, has reduced the rate of extraction.
Summary of the invention
The present invention for solve existing support in gateway of coal mining face arrange unreasonable cause upper corner gas control difficulty large, administer thoroughly and the low problem of the rate of extraction is arranged in many lanes, provide a kind of stope double-U-shaped tunnel arranged side by side.
The present invention adopts following technical scheme to realize: stope double-U-shaped tunnel arranged side by side, comprises the track lane, equipment lane, return airway, auxiliary return airway, the auxiliary air intake lane that set gradually from top to bottom; Track lane and equipment lane are positioned at the top of stope, return airway, auxiliary return airway and auxiliary air intake lane are positioned at the below of stope, the right-hand member of track lane, equipment lane and return airway is provided with and is communicated with Qie Yan lane with three, the right-hand member in auxiliary return airway and auxiliary air intake lane is communicated with, and between auxiliary return airway and auxiliary air intake lane, be arranged at intervals with some air connections, in auxiliary return airway, be provided with the gas drainage pipe being communicated with goaf.
After coal mine down-hole tunnel has been arranged, carry out back production, stoping period, the equipment lane of work plane inlet side and track lane coal column can carry out back production, simultaneously along with the advance of the face, equipment lane, track lane, working face open-off cut eye and return airway are caving thereupon, and auxiliary air intake lane and auxiliary return airway can successfully remain, and are this work plane and Adjacent Working Face service; Equipment lane, track lane, auxiliary air intake lane are three air intake lanes, and air intake is flowed through after work plane, and a part of distinguished and admirable inflow return airway flows into auxiliary return airway by air connection after the distinguished and admirable upper corner of flowing through of a part, has solved upper corner gas exceeding limit problem; And form whole wind pressure ventilation system after setting up auxiliary air intake lane, and with fresh wind circulation, cross the high concentration gas of the auxiliary return airway of air connection dilution, guaranteed that the gas density of auxiliary return airway does not exceed standard; Gas drainage pipe can be to the goaf at shutoff air connection place by high negative pressure pump drainage simultaneously, force goaf gas to discharge mine through gas pipeline, overcome existing support in gateway of coal mining face arrange unreasonable cause upper corner gas control difficulty large, administer not thorough and many lanes and arrange the low problem of the rate of extraction.
Reasonable in design of the present invention is reliable, has guaranteed that the gas density of return airway is no more than 1.0%, has strengthened the air quantity of work plane, and wind gas-removing ability effectively improves; And make goaf gas discharge mine by releasing pipe, improve stope extracting result; Between equipment lane and track lane, coal column can carry out back production simultaneously, has reduced goaf drop coal column, has advantages of environmental protection and energy saving, economizes on resources and effectively improves the rate of extraction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
In figure: 1-track lane, 2-equipment lane, 3-return airway, 4-assists return airway, ,6-Qie Yan lane, the auxiliary air intake lane of 5-, 7-air connection.
The specific embodiment
Stope double-U-shaped tunnel arranged side by side, comprises the track lane 1, equipment lane 2, return airway 3, auxiliary return airway 4, the auxiliary air intake lane 5 that set gradually from top to bottom; Track lane 1 and equipment lane 2 are positioned at the top of stope, return airway 3, auxiliary return airway 4 and auxiliary air intake lane 5 are positioned at the below of stope, the right-hand member of track lane 1, equipment lane 2 and return airway 3 is provided with and is communicated with Qie Yan lane 6 with three, the right-hand member in auxiliary return airway 4 and auxiliary air intake lane 5 is communicated with, and between auxiliary return airway 4 and auxiliary air intake lane 5, be arranged at intervals with some air connections 7, in auxiliary return airway 4, be provided with the gas drainage pipe being communicated with goaf.
In specific implementation process, by track lane 1, equipment lane 2 and return airway 3, form first U-shaped tunnel, by auxiliary return airway 4 and auxiliary air intake lane 5, form second U-shaped tunnel, between 1 two the air intake lanes in equipment lane 2 and track lane, at interval of one of 300m construction, get in touch with horizontal river, between return airway 3 and auxiliary return airway 4, at interval of an air connection 7 of 50-70m construction, meet the requirement of upper corner gas control; Auxiliary air intake lane 5 has a horizontal river of contact to carry out whole wind pressure ventilation, the gas density that dilution ventilation connection roadway 7 blows out with auxiliary return airway 4 in the construction of right side, tunnel.

Claims (1)

1. a stope double-U-shaped tunnel arranged side by side, is characterized in that: comprise the track lane (1), equipment lane (2), return airway (3), auxiliary return airway (4), the auxiliary air intake lane (5) that set gradually from top to bottom; Track lane (1) and equipment lane (2) are positioned at the top of stope, return airway (3), auxiliary return airway (4) and auxiliary air intake lane (5) are positioned at the below of stope, the right-hand member of track lane (1), equipment lane (2) and return airway (3) is provided with and is communicated with Qie Yan lane (6) with three, the right-hand member in auxiliary return airway (4) and auxiliary air intake lane (5) is communicated with, and between auxiliary return airway (4) and auxiliary air intake lane (5), be arranged at intervals with some air connections (7), in auxiliary return airway (4), be provided with the gas drainage pipe being communicated with goaf.
CN201310591773.7A 2013-11-22 2013-11-22 Stope face parallel dual-U-type roadway Active CN103603673B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310591773.7A CN103603673B (en) 2013-11-22 2013-11-22 Stope face parallel dual-U-type roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310591773.7A CN103603673B (en) 2013-11-22 2013-11-22 Stope face parallel dual-U-type roadway

Publications (2)

Publication Number Publication Date
CN103603673A true CN103603673A (en) 2014-02-26
CN103603673B CN103603673B (en) 2015-11-04

Family

ID=50121925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310591773.7A Active CN103603673B (en) 2013-11-22 2013-11-22 Stope face parallel dual-U-type roadway

Country Status (1)

Country Link
CN (1) CN103603673B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134214A (en) * 2015-09-24 2015-12-09 中国矿业大学 Method for ventilation-assisting roadway arrangement and surrounding rock stability control in later period of coal mining
CN108952716A (en) * 2018-06-22 2018-12-07 太原理工大学 A kind of more lane method for arranging in high seam coal wall
CN109057794A (en) * 2018-08-13 2018-12-21 中煤能源研究院有限责任公司 A kind of big coal-mining method of the coal column driving without coal pillar mining
CN111622773A (en) * 2020-06-10 2020-09-04 中国矿业大学 High-gas working face roadway structure, arrangement method and coal pillar width determination method thereof
CN117027921A (en) * 2023-09-28 2023-11-10 太原理工大学 Method for preventing influence of high-gas goaf on nearby working surface

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2343288C1 (en) * 2007-04-04 2009-01-10 Анатолий Владимирович Ремезов Method of ventilation of long mining face
CN101498225A (en) * 2009-02-24 2009-08-05 太原理工大学 U+I type ventilating system for top-coal caving face
CN101649741A (en) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 Laneway disposed by using large U to sleeve small u
CN101718208A (en) * 2009-12-17 2010-06-02 山西晋城无烟煤矿业集团有限责任公司 Ventilating system arranged in U+H shape under coal mine
CN201568069U (en) * 2009-12-20 2010-09-01 山西晋城无烟煤矿业集团有限责任公司 Three input and three output concentrating tunnel of coal mine downhole large-area panel
CN102182460A (en) * 2011-04-14 2011-09-14 山西晋城无烟煤矿业集团有限责任公司 High-gas multi-roadway no-coal-pillar mining method
CN102383808A (en) * 2011-10-24 2012-03-21 山西晋城无烟煤矿业集团有限责任公司 Optimized laneway arrangement structure for high gas mining work surface
CN102562088A (en) * 2012-02-15 2012-07-11 山西汾西矿业(集团)有限责任公司 Method for preventing gas from being accumulated at corners on coal faces
CN102865092A (en) * 2012-09-22 2013-01-09 山西晋城无烟煤矿业集团有限责任公司 U+U type laneway ventilating system of coalface
CN103291344A (en) * 2013-05-07 2013-09-11 中国矿业大学 Cross-district double-U-shaped ventilating system for high-gas working face and application method for cross-district double-U-shaped ventilating system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2343288C1 (en) * 2007-04-04 2009-01-10 Анатолий Владимирович Ремезов Method of ventilation of long mining face
CN101498225A (en) * 2009-02-24 2009-08-05 太原理工大学 U+I type ventilating system for top-coal caving face
CN101649741A (en) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 Laneway disposed by using large U to sleeve small u
CN101718208A (en) * 2009-12-17 2010-06-02 山西晋城无烟煤矿业集团有限责任公司 Ventilating system arranged in U+H shape under coal mine
CN201568069U (en) * 2009-12-20 2010-09-01 山西晋城无烟煤矿业集团有限责任公司 Three input and three output concentrating tunnel of coal mine downhole large-area panel
CN102182460A (en) * 2011-04-14 2011-09-14 山西晋城无烟煤矿业集团有限责任公司 High-gas multi-roadway no-coal-pillar mining method
CN102383808A (en) * 2011-10-24 2012-03-21 山西晋城无烟煤矿业集团有限责任公司 Optimized laneway arrangement structure for high gas mining work surface
CN102562088A (en) * 2012-02-15 2012-07-11 山西汾西矿业(集团)有限责任公司 Method for preventing gas from being accumulated at corners on coal faces
CN102865092A (en) * 2012-09-22 2013-01-09 山西晋城无烟煤矿业集团有限责任公司 U+U type laneway ventilating system of coalface
CN103291344A (en) * 2013-05-07 2013-09-11 中国矿业大学 Cross-district double-U-shaped ventilating system for high-gas working face and application method for cross-district double-U-shaped ventilating system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134214A (en) * 2015-09-24 2015-12-09 中国矿业大学 Method for ventilation-assisting roadway arrangement and surrounding rock stability control in later period of coal mining
CN105134214B (en) * 2015-09-24 2017-12-19 中国矿业大学 A kind of coal mining later stage secondary ventilation roadway layout and adjoining rock stability control method
CN108952716A (en) * 2018-06-22 2018-12-07 太原理工大学 A kind of more lane method for arranging in high seam coal wall
CN109057794A (en) * 2018-08-13 2018-12-21 中煤能源研究院有限责任公司 A kind of big coal-mining method of the coal column driving without coal pillar mining
CN111622773A (en) * 2020-06-10 2020-09-04 中国矿业大学 High-gas working face roadway structure, arrangement method and coal pillar width determination method thereof
CN117027921A (en) * 2023-09-28 2023-11-10 太原理工大学 Method for preventing influence of high-gas goaf on nearby working surface
CN117027921B (en) * 2023-09-28 2023-12-12 太原理工大学 Method for preventing influence of high-gas goaf on nearby working surface

Also Published As

Publication number Publication date
CN103603673B (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN103603673B (en) Stope face parallel dual-U-type roadway
CN102071958B (en) Inverse Y-shaped ventilation method for coal mining working face
CN102080526B (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN107882565B (en) A kind of adopt without driving without coal column stays integrated production practice
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN102720518B (en) Double-U ventilation system for fully-mechanized caving coal working face
CN104196554A (en) U-U-type ventilation method and system for coalfaces
CN104179520A (en) Z-shaped ventilation method and system for gob-side entry of coalface
CN105114116B (en) A kind of hydrothermal reaction coupling pressure break strengthening region gas pumping method
CN204152537U (en) Retaining Roadways Along Goaf at Coal Face Z-type ventilation system
CN207420614U (en) A kind of working face in the pit dash system
CN103277129B (en) One prevents Top Corner Gas on Coal Face to transfinite technology
CN201802435U (en) Coal mine ventilation system
CN105484790A (en) Method for promoting gas extraction and working face dust fall by injecting water at intervals in drilling holes
CN102748064A (en) Large-mining-height fully-mechanized caving face gas control method
CN207847676U (en) A kind of high prominent U-shaped ventilating system of mine coal-cutting working face
CN201568069U (en) Three input and three output concentrating tunnel of coal mine downhole large-area panel
CN104594943A (en) Ground composite L-shaped drilling well for gas control and gas control method
CN108590754A (en) Concentrate sluicing lane method for arranging in a kind of monocline coal seam exploiting field
CN105401973A (en) Method for performing extraction treatment on corner gas on work faces of adjacent roadways
CN204152536U (en) A kind of coal-face U-U type ventilation system
CN102003201B (en) Gas drainage method in gob of coal mine
CN104343453A (en) Filling mining method of slowly-inclined medium-thick ore deposit
CN107100667A (en) A kind of U-shaped ventilation operation face goaf is servo-actuated gas pumping method
CN106437826A (en) Coal-bed gas extraction method achieving automatic adjustment of negative-pressure drill-hole zoning and source differentiating

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant