CN203700978U - Box culvert pilot tubal curtain device - Google Patents

Box culvert pilot tubal curtain device Download PDF

Info

Publication number
CN203700978U
CN203700978U CN201320887634.4U CN201320887634U CN203700978U CN 203700978 U CN203700978 U CN 203700978U CN 201320887634 U CN201320887634 U CN 201320887634U CN 203700978 U CN203700978 U CN 203700978U
Authority
CN
China
Prior art keywords
box culvert
steel pipe
steel
steel pipes
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320887634.4U
Other languages
Chinese (zh)
Inventor
黎永索
禹建兵
阳军生
罗高亮
曾旺辉
杨姹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
247 TEAM OF HUNAN PROVINCIAL NONFERROUS GEOLOGICAL EXPLORATION BUREAU
Central South University
Hunan City University
Original Assignee
247 TEAM OF HUNAN PROVINCIAL NONFERROUS GEOLOGICAL EXPLORATION BUREAU
Central South University
Hunan City University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 247 TEAM OF HUNAN PROVINCIAL NONFERROUS GEOLOGICAL EXPLORATION BUREAU, Central South University, Hunan City University filed Critical 247 TEAM OF HUNAN PROVINCIAL NONFERROUS GEOLOGICAL EXPLORATION BUREAU
Priority to CN201320887634.4U priority Critical patent/CN203700978U/en
Application granted granted Critical
Publication of CN203700978U publication Critical patent/CN203700978U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a box culvert pilot tubal curtain device, which is arranged on the front end of a box culvert contour line, and comprises a plurality of steel pipes which are welded by steel plates and enable constructors to go in and out, cutting edges are arranged on the front ends of the steel pipes, the rear ends of the steel pipes are connected with a box culvert, a plurality of jacks are arranged between the steel pipes and the box culvert, and a layer of steel plate which is arranged on the rear ends of the steel pips extends outside the box culvert to form an outer cap edge. Construction outlets are arranged on the rear sides of the steel pipes which are distributed along the top portions and the two sides, construction outlets are arranged on the rear ends of the steel pipes which are distributed along the lower portion, and extend inside the box culvert to form an inner cap edge, and injection pipes are arranged on contact sides of the steel pipes with surrounding rocks. The box culvert pilot tubal curtain device constructs a underground passage in a weeping ground layer or a soft soil ground layer, is large in rigidity, can guarantee a tunnel face on the front end of the box culvert pilot tubal curtain device to be steady and safely constructed, does not need to break ground traffic, is small in sedimentation, excellent in construction continuity, short in construction period and easy to rectify, prevents the box culvert from plunging into ground, can be reused, and is low in cost and excellent in economic and environmental benefits.

Description

The first conduit proscenia of box culvert
Technical field
The utility model relates to underground engineering construction field, particularly the first conduit proscenia of box culvert.
Background technology
In municipal administration and underground engineering construction field, in weeping formation and soft soil layer, build down and wear the underground passage of the main line of communication and without interruption when face traffic, often adopt tunneling construction technology, as pipe shed method, Guan Mufa, pipe roof culvert box advancing method, pipe curtain box culvert double replacement method etc.These constructions respectively have its pluses and minuses and applicability, but these construction methods steel pipe quantity used is many, need repeatedly push pipe operation, and construction speed is slow, and steel pipe mostly is temporary measure, and rolled steel dosage is large, how can not reclaim, and direct cost is high.Although a steel pipe for pipe curtain box culvert double replacement method can reclaim, need to be by all soil bodys displacements within the scope of whole box culvert, the steel material needing is also very large, and the earthwork all excavates in each steel pipe, construction speed is slow.
Utility model content
The purpose of this utility model is to provide a kind of in weeping formation and soft soil layer, the first conduit proscenia of box culvert utilizing wear the underground passage of the main line of communication under building under face transportation condition without interruption time, improving under the prerequisite of working security, significantly reduce rolled steel dosage, shorten construction period, reduce construction cost, reduce the impact on environment.
For achieving the above object, the utility model adopts following technical scheme:
The first conduit proscenia of box culvert, be installed on box culvert outline line front end, the steel pipe of Gong the constructor turnover being formed by multiple Plate Weldings forms, steel pipe front end is provided with cutting edge, steel pipe rear end is connected with box culvert, multiple jack are set between steel pipe and box culvert, and for the jacking of first conduit proscenia and correction, steel pipe rear end has one deck steel plate to stretch to the outer shade of box culvert outside formation.This device is provided with construction outlet along the steel pipe rear side of top and both sides layout, being provided with construction outlet, and stretching out shade in formation along the steel pipe rear end of lower disposed in box culvert, and steel pipe is being provided with Grouting Pipe with country rock contact side.
Between steel pipe, also can be bolted.
The length of steel pipe can be isometric or not isometric.
The course of work of the present utility model is as follows:
When construction, starting in active well, after first this box culvert conduit proscenia and prefabricated box culvert are connected, utilize jacking mechanism to promote box culvert, by the jack between box culvert and first pipe guide, first conduit proscenia is first headed in soil layer again, in steel pipe, form soil plug, then under the protective effect of steel pipe, manage interior soil excavation, and by steel pipe rear end or the construction outlet of side, rear end, the earthwork is transported, realize the local displacement of first conduit proscenia soil layer, the box culvert of follow-up is replaced first conduit proscenia again, realize double replacement soil layer, under the first conduit proscenia of box culvert and box culvert supporting, carry out a cubic metre of earth heavy excavation simultaneously.
In soil excavation in the first pipe guide steel pipe of box culvert and box culvert, a cubic metre of earth heavy excavation can carry out simultaneously, and soil excavation and box culvert jacking can synchronously be carried out, and can realize the continuous production process of box culvert jacking.The first pipe guide of box culvert arrives after received well, removes received well enclosed structure, disassembles successively the first pipe guide of box culvert in received well, and box culvert jacking finishes.
The utility model is in weeping formation or soft soil layer when crest enters box culvert, the first conduit proscenia of box culvert that utilizes box culvert front end to install, first displace one section of earthwork in box culvert structure component range, and then the box culvert that utilizes follow-up is replaced the first conduit proscenia of box culvert, realize secondary and replace continuously soil layer, under the supporting of the first conduit proscenia of box culvert and box culvert, carry out the soil excavation of multiple work planes simultaneously, realize the continuity of construction.
(1) soil excavation excavates under the protection of the first conduit proscenia of box culvert and box culvert, and construction safety, easily controls ground settlement.
(2) first conduit proscenia length is short, general only needs 2~6 meters long, and rolled steel dosage is few compared with pipe shed method, Guan Mufa, pipe roof culvert box advancing method, pipe curtain box culvert double replacement method steel using amount, and can reuse, and direct cost is low.
(3) the method is replaced soil layer twice, and pipe curtain box culvert double replacement method is simple, and construction continuity is good, and the main earthwork adopts a heavy excavation form to complete, and speed of application is fast, and the duration is short, and cost is low, good in economic efficiency.
(4) underground passage of building, does not need to interrupt traffic above-ground, and environmental benefit is good.
Brief description of the drawings:
Fig. 1 is top view of the present utility model;
Fig. 2 is A-A cross-sectional elevational view in the utility model Fig. 1;
Fig. 3 is B-B cross-sectional elevational view in the utility model Fig. 1;
Fig. 4 is C-C cross section left view in the utility model Fig. 1.
Detailed description of the invention:
For further description the utility model, by following embodiment, the utility model is described in further detail, but protection domain of the present utility model is not limited to the explanation of following embodiment.
Embodiment 1 is referring to Fig. 1~Fig. 4, the first conduit proscenia of the utility model box culvert, be installed on box culvert outline line front end, the steel pipe 1 of Gong the constructor turnover being formed by multiple Plate Weldings forms, steel pipe front end is provided with cutting edge 2, steel pipe rear end is connected with box culvert 3, and multiple jack 4 are set between steel pipe and box culvert, and steel pipe rear end has one deck steel plate to stretch to box culvert 3 outsides to form outer shade 5.Be provided with construction outlet 6 along steel pipe 1 rear side of device top and lateral arrangement, be provided with construction outlet 7, and stretch out shade 8 in formation along the steel pipe rear end of device lower disposed in box culvert, steel pipe outside is provided with Grouting Pipe 11.In work progress, this device is headed in soil layer, the interior formation soil of steel pipe 1 plug 9, in the space that multiple steel pipes 1 surround, form soil plug 10, can excavate soil plug 9 and soil plug 10 simultaneously, realize the local displacement of first conduit proscenia soil layer, the large section box culvert jacking of follow-up is replaced first conduit proscenia again, realizes double replacement soil layer, simultaneously by Grouting Pipe 11 to space outside the outside grouting filling box culvert of box culvert 3 with control ground settlement.

Claims (3)

1. the first conduit proscenia of box culvert, it is characterized in that: the steel pipe of Gong the constructor turnover being formed by multiple Plate Weldings forms, multiple jack are set between steel pipe and culvert box, steel pipe front end is equipped with cutting edge, and rear end is connected with box culvert, and steel pipe rear end has one deck steel plate to stretch to the outer shade of box culvert outside formation, steel pipe rear side along top and both sides layout is provided with construction outlet, be provided with construction outlet along the steel pipe rear end of lower disposed, and stretch out shade in formation in box culvert, steel pipe outside is provided with Grouting Pipe.
2. the first conduit proscenia of box culvert according to claim 1, is characterized in that: between steel pipe, be bolted.
3. the first conduit proscenia of box culvert according to claim 1, is characterized in that: described steel pipe is made up of the steel pipe of equal length, or the steel pipe of different length composition.
CN201320887634.4U 2013-12-31 2013-12-31 Box culvert pilot tubal curtain device Expired - Fee Related CN203700978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320887634.4U CN203700978U (en) 2013-12-31 2013-12-31 Box culvert pilot tubal curtain device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320887634.4U CN203700978U (en) 2013-12-31 2013-12-31 Box culvert pilot tubal curtain device

Publications (1)

Publication Number Publication Date
CN203700978U true CN203700978U (en) 2014-07-09

Family

ID=51051435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320887634.4U Expired - Fee Related CN203700978U (en) 2013-12-31 2013-12-31 Box culvert pilot tubal curtain device

Country Status (1)

Country Link
CN (1) CN203700978U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894350A (en) * 2017-02-13 2017-06-27 中交隧道工程局有限公司 A kind of steel basil is buried jacking box culvert device and construction method
CN108590710A (en) * 2018-06-25 2018-09-28 中南大学 Prefabricated tunnel and construction method in a kind of underground goaf to be filled
CN108979641A (en) * 2017-05-31 2018-12-11 植村技研工业株式会社 The construction method of structure in ground
CN112627840A (en) * 2020-12-22 2021-04-09 中国十九冶集团有限公司 Leading guiding mechanism of pipe jacking engineering
CN113108123A (en) * 2021-03-04 2021-07-13 中国水利水电第五工程局有限公司 Multi-purpose tool pipe for artificial jacking pipe

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894350A (en) * 2017-02-13 2017-06-27 中交隧道工程局有限公司 A kind of steel basil is buried jacking box culvert device and construction method
CN108979641A (en) * 2017-05-31 2018-12-11 植村技研工业株式会社 The construction method of structure in ground
CN108590710A (en) * 2018-06-25 2018-09-28 中南大学 Prefabricated tunnel and construction method in a kind of underground goaf to be filled
CN108590710B (en) * 2018-06-25 2023-12-15 中南大学 Underground goaf inner prefabricated roadway to be filled and construction method
CN112627840A (en) * 2020-12-22 2021-04-09 中国十九冶集团有限公司 Leading guiding mechanism of pipe jacking engineering
CN113108123A (en) * 2021-03-04 2021-07-13 中国水利水电第五工程局有限公司 Multi-purpose tool pipe for artificial jacking pipe
CN113108123B (en) * 2021-03-04 2022-06-14 中国水利水电第五工程局有限公司 Multi-purpose tool pipe for artificial jacking pipe

Similar Documents

Publication Publication Date Title
AU2015345830B2 (en) Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence
CN203700978U (en) Box culvert pilot tubal curtain device
WO2018201706A1 (en) Method for efficient gas drainage in coal roadway strips and regional outburst elimination through staged fracturing with long borehole floor beddings
CN102425427B (en) Method for constructing tunnel by utilizing shield empty-pushing crossing mine method
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
AU2015377025B2 (en) Thick coal seam large seam height gob-side retained passageway method
CN103032073B (en) Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN105134216B (en) Anti- slump structure by the engineering method lane of breaking roof 110
CN105317459A (en) Subarea filling method used for controlling large-area falling disaster of hard roof
CN103114857A (en) Shield tunnel construction method
CN105089668A (en) Longwall working face coal-pillar-free mining method
CN104847355A (en) Continuous mining method for hollow ground of medium-thickness steeply inclined ore body
WO2015021783A1 (en) Man-made retaining dam for coal mine underground reservoir, and method for connecting coal pillar dam body, surrounding rock, and same
CN102261247B (en) Secondary coal-mining method for reversely filling paste in stripes
CN104500070A (en) Continuous coal mining machine paste filling mining method
CN105298496A (en) Full-mining and full-filling coal mining method with reserved working face coal pillar
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN102146794A (en) Grouting, consolidating and gob-side tunneling process method
CN110644993B (en) Z-shaped strip working face mining method
CN107905807A (en) A kind of future small coal pillar comprehensive mechanical coal mining supporting construction and construction method
US20230030467A1 (en) Method for slope geological disaster treatment and mineral resource recovery
CN105401973A (en) Method for performing extraction treatment on corner gas on work faces of adjacent roadways
CN105019917A (en) Impact drilling type advanced jet grouting pipe shed construction device and construction method
CN103375169A (en) Method for applying diamond wire saw to large-section underground rock project

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20141231

EXPY Termination of patent right or utility model