- CN105401725B CN105401725B CN201510703611.7A CN201510703611A CN105401725B CN 105401725 B CN105401725 B CN 105401725B CN 201510703611 A CN201510703611 A CN 201510703611A CN 105401725 B CN105401725 B CN 105401725B
- Authority
- CN
- China
- Prior art keywords
- doubly
- concrete
- linked
- steel
- soft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510703611.7A CN105401725B (zh) | 2015-10-27 | 2015-10-27 | 带有软夹层混凝土双连梁的施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510703611.7A CN105401725B (zh) | 2015-10-27 | 2015-10-27 | 带有软夹层混凝土双连梁的施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105401725A CN105401725A (zh) | 2016-03-16 |
CN105401725B true CN105401725B (zh) | 2017-07-28 |
Family
ID=55467445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510703611.7A Active CN105401725B (zh) | 2015-10-27 | 2015-10-27 | 带有软夹层混凝土双连梁的施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105401725B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111734127A (zh) * | 2020-06-29 | 2020-10-02 | 中国航空规划设计研究总院有限公司 | 现浇混凝土多连梁模板结构及其支模方法 |
CN115450421B (zh) * | 2022-09-21 | 2024-07-26 | 中国建筑第八工程局有限公司 | 双连梁抽屉式模板结构及双连梁的浇筑方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09170331A (ja) * | 1995-12-20 | 1997-06-30 | Penta Ocean Constr Co Ltd | コンクリート充填方法 |
CN201474109U (zh) * | 2009-04-16 | 2010-05-19 | 姚攀峰 | 预制、现浇混合式双连梁 |
CN102661045A (zh) * | 2012-05-21 | 2012-09-12 | 赵永利 | 多连梁隔模 |
-
2015
- 2015-10-27 CN CN201510703611.7A patent/CN105401725B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09170331A (ja) * | 1995-12-20 | 1997-06-30 | Penta Ocean Constr Co Ltd | コンクリート充填方法 |
CN201474109U (zh) * | 2009-04-16 | 2010-05-19 | 姚攀峰 | 预制、现浇混合式双连梁 |
CN102661045A (zh) * | 2012-05-21 | 2012-09-12 | 赵永利 | 多连梁隔模 |
Non-Patent Citations (2)
Title |
---|
对混凝土双连梁设计与施工中一些问题的探讨;高志辉 等;《工程建设与设计》;20130626(第12期);第160-162页 * |
浅析剪力墙双连梁设计;林杰;《福建建设科技》;20120802;第3卷;第15-17页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105401725A (zh) | 2016-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021023245A1 (zh) | 桩板式挡土墙整体浇筑模板结构及其施工方法 | |
CN107724533A (zh) | 一种超高层核心筒梁与竖向结构连接方法 | |
CN104294920B (zh) | 一种u形钢混凝土组合梁与异形钢管混凝土柱的节点组件及制备方法 | |
CN105696790B (zh) | 一种双层连梁洞口模板系统及其应用于双层连梁的工法 | |
CN105401725B (zh) | 带有软夹层混凝土双连梁的施工工艺 | |
CN206233560U (zh) | 墙体支模结构 | |
KR101458434B1 (ko) | 선제작된 pc패널을 이용한 hpc기둥의 제작방법 및 이를 이용한 시공방법 | |
CN207110214U (zh) | 一种预制内填充混凝土墙板 | |
CN106049717A (zh) | 弹簧连接的现浇整体式钢框架填充墙体系及其施工方法 | |
CN108978946B (zh) | 一种蒸压加气混凝土砌块填充墙及其施工方法 | |
CN107227845A (zh) | 一种填充墙构造柱支模方法 | |
JPS6156393B2 (zh) | ||
CN107237448B (zh) | 一种预制内填充混凝土墙板及其制造方法 | |
CN106703260A (zh) | 一种建筑墙体及其施工方法 | |
CN102121313B (zh) | 砌体施工免植筋支模方法及其装置 | |
CN206571004U (zh) | 一种无砌筑、无抹灰、全现浇建筑填充墙结构 | |
CN105971196A (zh) | 砌体结构内嵌式方钢管混凝土圈梁-构造柱建造方法 | |
CN102296969B (zh) | 一种隧道中隔墙衬砌施工方法 | |
CN206539016U (zh) | 构造柱浇筑装置 | |
CN211736048U (zh) | 填充墙砌体圈梁施工结构 | |
CN108661206A (zh) | 二次结构砌筑墙体自隔声保温构造及其施工方法 | |
CN108193706A (zh) | 一种部分逆作法竖向结构下延施工砼浇注方法 | |
CN211774796U (zh) | 一种十字形墙体连接处构造柱免支模结构 | |
CN208981019U (zh) | 带有辅助块的梯形预制板 | |
CN207846677U (zh) | 首层竖向构件与地下室顶板的延性连接构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 046011 Technology Management Department of the third provincial construction company, No.22, Shengjian lane, Taihang West Street, Changzhi City, Shanxi Province Patentee after: SHANXI THIRD CONSTRUCTION Co.,Ltd. Address before: 046011 Technology Management Department of the third provincial construction company, No.22, Shengjian lane, Taihang West Street, Changzhi City, Shanxi Province Patentee before: SHANXI NO.3 CONSTRUCTION ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: No.266 Taihang East Street, Changzhi City, Shanxi Province 046000 Patentee after: SHANXI THIRD CONSTRUCTION Co.,Ltd. Address before: 046011 Technology Management Department of the third provincial construction company, No.22, Shengjian lane, Taihang West Street, Changzhi City, Shanxi Province Patentee before: SHANXI THIRD CONSTRUCTION Co.,Ltd. |
|
CP02 | Change in the address of a patent holder |