CN105393667A - Method using ecological trench to intercept forest surface runoff - Google Patents

Method using ecological trench to intercept forest surface runoff Download PDF

Info

Publication number
CN105393667A
CN105393667A CN201510844719.8A CN201510844719A CN105393667A CN 105393667 A CN105393667 A CN 105393667A CN 201510844719 A CN201510844719 A CN 201510844719A CN 105393667 A CN105393667 A CN 105393667A
Authority
CN
China
Prior art keywords
forest
ecological
rainwash
ditch
forest land
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510844719.8A
Other languages
Chinese (zh)
Inventor
刘利芳
于立忠
张金鑫
姚博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Applied Ecology of CAS
Original Assignee
Institute of Applied Ecology of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Applied Ecology of CAS filed Critical Institute of Applied Ecology of CAS
Priority to CN201510844719.8A priority Critical patent/CN105393667A/en
Publication of CN105393667A publication Critical patent/CN105393667A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P60/00Technologies relating to agriculture, livestock or agroalimentary industries
    • Y02P60/20Reduction of greenhouse gas [GHG] emissions in agriculture, e.g. CO2

Abstract

The invention discloses a method using ecological trenches to intercept forest surface runoff, and aims to provide a method reducing water and soil loss in woodland of large slope and loosening soil; the method comprises the following steps: dividing the woodland with large slope into a plurality of small units in a contour direction; arranging ecological trenches on the lower portion of each unit along the contour; planting local shrubs and herbals in the ecological trenches so as to intercept surface runoff, thus reserving water and soil. The method can divide slope length so as to cut the slope runoff flow lines, thus reducing slope current flow velocity, prolonging runoff detention time on the slope, enhancing infiltration, reducing surface runoff amount and current sand carrying ability, reducing soil loss rate, and effectively improving forest water and soil maintenance capability. The method is simple and easy in operation, and simple means can realize water and soil maintenance effect, so the method is small in invest and cost, and has small damages on the forest.

Description

A kind of method utilizing ecological ditch to tackle forest rainwash
Technical field
The invention belongs to forest soil erosion control technical field, be specifically related to a kind of method utilizing ecological ditch to tackle forest rainwash.
Background technology
Rainwash is one of main driving source of earth's surface water erosion, is the main component of flood discharge, the geomorphic feature in the energy eroded soil had with it, change basin.Forest ecosystem has stronger adjustment conversion runoff function, and especially a large amount of rainwashes can be rapidly converted into and flow at a slow speed by forest ecosystem, thus reduces runoff function.
The impact of vegetation on runoff is the problem that numerous scientist has known, the reallocation etc. be mainly manifested in retardance rainwash, extending the time of infiltrating, affect the water yield.The Elements research affecting rainwash mainly concentrates on the aspects such as rainfall intensity, land type, the gradient, Litter-fall thickness, vegetation cover degree, soil moisture content, soil types and soil density.Correlative study shows: flow path surface and rainfall intensity are power function relationship; With linearly negative correlation, the logarithm positive correlation of filling straw mulch degree; Be negative correlation, power function relationship with Litter Layer thickness; Be proportionate with the gradient, exponential function relation; Be negative linear correlation etc. with soil antecedent water content.
At present engineering measure and non-engineering measure are mainly contained to the prophylactico-therapeutic measures of forest rainwash.Non-engineering measure comprises biological control measure, chemical measure etc.But for a long time, usually do not run off as leading indicator using soil to the bringing soil erosion under control of forest, the object of improvement overemphasizes soil, and ignores the main body of water and soil loss---rainwash.
Summary of the invention
For prior art above shortcomings, the present invention takes a kind of segmentation, weakens the method that rainwash washes away power and regulation and control slope runoff, can control surface flow of forest incidence preferably, effectively reduce the water and soil loss in forest land.
In order to effectively control the water and soil loss in forest land, the technical solution used in the present invention is:
Utilize ecological ditch to tackle a method for forest rainwash, on forest land is domatic, forest land is divided into some forest lands junior unit along contour direction, ecological ditch is set in the bottom of each forest land junior unit.During concrete segmentation, arrange different segmentation spacing (junior unit length of grade) according to the different gradients, when the forest land gradient is 5 °-10 °, the domatic length of junior unit is 16-20m; When the forest land gradient is 10 °-15 °, the domatic length of junior unit is 10-16m; When the forest land gradient is 15 °-20 °, the domatic length of junior unit is 8-12m; When the forest land gradient is 20 °-25 °, the domatic length of junior unit is 6-10m; When the forest land gradient is for being greater than 25 °, the domatic length of junior unit is 4-8m.
Described forest land by being divided into some little unit along the ecological ditch in contour direction, ecological ditch width 30-40cm, degree of depth 30-50cm.It implements to be the horizontal ditch carrying out implementing to excavate before plant starts to grow, and the engineering time is after fall foliage or Second Year spring.And plant adaptable with both sides limes marginis (30-100cm) in the horizontal ditch dug, the Indigenous Shrub Species of well developed root system and draft form ecological ditch.
The domatic longitudinal direction in described forest land is provided with the drain ditch being communicated with many ecological ditches, and this drain ditch communicates with the sand basin of this forest land physical features lowest part; After annual spring or each heavy rain, sand basin silt is returned forest land domatic on.The method interception flow path surface is the runoff within rainfall intensity 130mm/h.
This method is by segmentation length of grade, and slope runoff streamline is cut off, and runoff rate graph is more former domatic planarized, and slope flow flow velocity reduces, and runoff is at domatic increased retention, and increase is infiltrated, the large minimizing of soil erosion, control erosion successful.
Advantage of the present invention is:
The present invention does not need big machinery and a large amount of labour to complete, easy and simple to handle, laborsaving, adopts simple measure, can reach the effect conserving water and soil and run off.Cost is low, efficient, practical, facilitate forest land application with a varied topography.
Accompanying drawing explanation
Fig. 1 ecological ditch interception forest rainwash overall schematic.
The ecological ditch forest land gradient of Fig. 2 and critical plane method relation schematic diagram.
The ecological ditch width of Fig. 3, the degree of depth and vegetation plant schematic diagram.
Embodiment
Below in conjunction with Figure of description, the present invention is described in more detail.
As Figure 1-3, upper as can be seen from figure, the method of the present invention's ecological ditch interception forest rainwash, slope is divided into some junior units along contour direction, carry out again taking horizontal ditch along contour on each unit, and in horizontal ditch, plant Indigenous Shrub Species and the draft of well developed root system, be referred to as " ecological ditch ".
During concrete segmentation, determine different critical plane method l according to different gradient α, when the forest land gradient is 5 °-10 °, the domatic length of junior unit is 16-20m; When the forest land gradient is 10 °-15 °, the domatic length of junior unit is 10-16m; When the forest land gradient is 15 °-20 °, the domatic length of junior unit is 8-12m; When the forest land gradient is 20 °-25 °, the domatic length of junior unit is 6-10m; When the forest land gradient is for being greater than 25 °, the domatic length of junior unit is 4-8m.Specifically in table 1.(empirical equation: l=0.03 α 2-1.8 α+33.15R 2=0.9943)
Table 1 forest land cutting unit slope length recommendation
The gradient (°) 5°≤α<10° 10°≤α<20° 20°≤α<25° 20°≤α<25° ≥25°
Length of grade (l, m) 16-20 10-16 8-12 6-10 4-8
Ecological ditch is shown in Fig. 1, Fig. 2 and Fig. 3, and take horizontal ditch along contour direction, forest land is divided into some junior units, the spacing of horizontal ditch is critical plane method, horizontal furrow width 30-40cm, degree of depth 30-50cm.Former state is maintained in the junior unit of forest land.Inside horizontal ditch and two survey limes marginis (30-100cm) and plant shrub and the draft of well developed root system.Vegetation is selected according to land occupation condition with suiting measures to local conditions.
The present invention has carried out experimental test at Manchu Autonomous County of Qingyuan of Fushun City great Su river chief of township Sha Cun, wherein select respectively within the scope of each gradient: a kind of for being reference without measure visite Forest Land of Larch Plantations, another kind of is test plot for digging ecological ditch Forest Land of Larch Plantations, by the method for artificially-simulated rainfall, employing length of grade is 5 kinds of gradients (10 ° of 20m, 15 °, 20 °, 25 °, 30 °) and a rainfall intensity level (2.117mm/min) observe, consistent for ensureing the front Soil Slope primary condition of each test, adopt watering process that soil is reached capacity, the single test duration is 30min.Research shows: ecological ditch is more corresponding, and without measure forest land, run-off obviously reduces, and has significant water conservation and soil conservation effect.Design parameter is in table 2.
The ecological ditch of table 2 is to Forest Land of Larch Plantations rainwash interception result
By taking ecological ditch method to Forest Land of Larch Plantations and not taking the observation data in any measure forest land to compare analysis, under identical gradient condition, have the runoff analysis benefit of ecological ditch more remarkable, wherein maximum reaches 71.10%; And within the scope of certain gradient, along with the increase of the gradient, ecological ditch regulation measure benefit is more obvious.
The present invention's employing arranges ecological ditch and splits length of grade, is divided into some little unit, to reduce the domatic length in former forest land.After this measure is implemented in forest land, domatic cut-off through streamline, runoff rate graph is more former domatic planarized, slope flow speed reduces, the increased retention of runoff on domatic, and increase is infiltrated, reduce flow path surface, alleviate the erosion of runoff to earth's surface, the sediment carrying capacity of current significantly reduces, and plays obvious Soil and water conservation.Ecological ditch is easy to operate, and cost is low, corrosion inhibitor remarkable benefit.

Claims (7)

1. utilize ecological ditch to tackle a method for forest rainwash, it is characterized in that:
On forest land is domatic, be interval with many ecological ditches, the ecological bank contour of every bar is arranged; The rainwash that ecological ditch produces for tackling forest, while taking into account water-holding capacity, can also prevent rainwash washing away and alleviating water and soil loss earth's surface.
2. a kind of method utilizing ecological ditch to tackle forest rainwash according to claim 1, is characterized in that:
If forest land is divided into the dry junior unit in forest land along contour direction, ecological ditch is set in the bottom of each forest land junior unit; When forest land gradient α is 5-10 °, the domatic length l of junior unit is 16-20m; When forest land gradient α is 10-15 °, the domatic length l of junior unit is 10-16m; When forest land gradient α is 15-20 °, the domatic length l of junior unit is 8-12m; When forest land gradient α is 20-25 °, the domatic length l of junior unit is 6-10m; When forest land gradient α is greater than 25 °, the domatic length l of junior unit is 4-8m (partitioning standards " the national classification of soil erosion grade scale " SL190-2007 of the gradient and " Comprehensive Control of Soil Conservation technical specification " GB/T16453-2008, and the actual conditions division in local forest land).
3. the method for utilization according to claim 1 ecological ditch interception forest rainwash, is characterized in that:
Described ecological ditch is the horizontal ditch carrying out implementing to excavate before plant starts to grow, and the engineering time is after fall foliage or Second Year spring.
4. the method for utilization according to claim 3 ecological ditch interception forest rainwash, is characterized in that:
Described horizontal furrow width 30-40cm, degree of depth 30-50cm.
5. the method for utilization according to claim 1 ecological ditch interception forest rainwash, is characterized in that:
Plant adaptable with both sides limes marginis (30-100cm) in the horizontal ditch dug, the Indigenous Shrub Species of well developed root system and draft form ecological ditch.
6. the method for utilization according to claim 1 ecological ditch interception forest rainwash, is characterized in that:
Described forest rainwash interception amount is the runoff within the raininess 130mm/h of rainfall.
7., according to the method for utilization according to claim 1 ecological ditch interception forest rainwash, it is characterized in that:
The domatic longitudinal direction in described forest land is provided with the drain ditch being communicated with many ecological ditches, and this drain ditch communicates with the sand basin of this forest land physical features lowest part; After annual spring or each heavy rain, sand basin silt is returned forest land domatic on.
CN201510844719.8A 2015-11-26 2015-11-26 Method using ecological trench to intercept forest surface runoff Pending CN105393667A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510844719.8A CN105393667A (en) 2015-11-26 2015-11-26 Method using ecological trench to intercept forest surface runoff

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510844719.8A CN105393667A (en) 2015-11-26 2015-11-26 Method using ecological trench to intercept forest surface runoff

Publications (1)

Publication Number Publication Date
CN105393667A true CN105393667A (en) 2016-03-16

Family

ID=55459725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510844719.8A Pending CN105393667A (en) 2015-11-26 2015-11-26 Method using ecological trench to intercept forest surface runoff

Country Status (1)

Country Link
CN (1) CN105393667A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108575170A (en) * 2018-03-20 2018-09-28 美尚生态景观股份有限公司 Hill forest green method is replied immediately soon
CN109511455A (en) * 2018-12-28 2019-03-26 西南大学 A kind of biological ridge construction method of the solid soil shield bank of Slope Cropland with Purple Soil
CN110485533A (en) * 2019-08-28 2019-11-22 新疆农业大学 Drought-hit area collection rain flood storage tree planting channel
CN111108837A (en) * 2020-01-09 2020-05-08 河北省林业和草原科学研究院 Method for promoting slope broad-leaved forest to form uniform withered matter and humus layer
CN112136410A (en) * 2020-09-30 2020-12-29 中国科学院水生生物研究所 Method for rapidly building plants in flood plain wetland of Yangtze river central island
CN113068570A (en) * 2021-04-08 2021-07-06 西北农林科技大学 Vegetation configuration method for controlling water and soil loss of alpine slope
CN113068462A (en) * 2021-03-31 2021-07-06 怀化职业技术学院 Hillside orchard mechanized operation land preparation method
CN113248020A (en) * 2021-04-22 2021-08-13 朴草(重庆)生态环境科技有限公司 Design method of small micro-wetland of bamboo forest

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101270570A (en) * 2008-04-09 2008-09-24 中国科学院水利部成都山地灾害与环境研究所 Mud silt blocking method for dilute debris flow and high-sandiness floods and uses thereof
CN102322066A (en) * 2011-06-21 2012-01-18 福建省长汀县水土保持站 Three-in-one slope collapse managing method employing slope management, slope lowering and slope stabilization
CN102524014A (en) * 2012-03-12 2012-07-04 西北农林科技大学 Water collection and retention method for rain harvesting and infiltration in woodlands on mountain slopes
CN102239760B (en) * 2011-04-22 2013-03-20 中国科学院水利部成都山地灾害与环境研究所 Transverse-furrow and sequential-ridge mellow soil anti-erosion farming method of purple soil slope farmland
CN104711993A (en) * 2015-03-04 2015-06-17 河北省林业科学研究院 Water and soil conservation method for forest cutover land

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101270570A (en) * 2008-04-09 2008-09-24 中国科学院水利部成都山地灾害与环境研究所 Mud silt blocking method for dilute debris flow and high-sandiness floods and uses thereof
CN102239760B (en) * 2011-04-22 2013-03-20 中国科学院水利部成都山地灾害与环境研究所 Transverse-furrow and sequential-ridge mellow soil anti-erosion farming method of purple soil slope farmland
CN102322066A (en) * 2011-06-21 2012-01-18 福建省长汀县水土保持站 Three-in-one slope collapse managing method employing slope management, slope lowering and slope stabilization
CN102524014A (en) * 2012-03-12 2012-07-04 西北农林科技大学 Water collection and retention method for rain harvesting and infiltration in woodlands on mountain slopes
CN104711993A (en) * 2015-03-04 2015-06-17 河北省林业科学研究院 Water and soil conservation method for forest cutover land

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108575170A (en) * 2018-03-20 2018-09-28 美尚生态景观股份有限公司 Hill forest green method is replied immediately soon
CN109511455A (en) * 2018-12-28 2019-03-26 西南大学 A kind of biological ridge construction method of the solid soil shield bank of Slope Cropland with Purple Soil
CN110485533A (en) * 2019-08-28 2019-11-22 新疆农业大学 Drought-hit area collection rain flood storage tree planting channel
CN111108837A (en) * 2020-01-09 2020-05-08 河北省林业和草原科学研究院 Method for promoting slope broad-leaved forest to form uniform withered matter and humus layer
CN111108837B (en) * 2020-01-09 2021-05-11 河北省林业和草原科学研究院 Method for promoting slope broad-leaved forest to form uniform withered matter and humus layer
CN112136410A (en) * 2020-09-30 2020-12-29 中国科学院水生生物研究所 Method for rapidly building plants in flood plain wetland of Yangtze river central island
CN112136410B (en) * 2020-09-30 2022-11-01 中国科学院水生生物研究所 Method for rapidly building plants in flood plain wetland of Yangtze river central island
CN113068462A (en) * 2021-03-31 2021-07-06 怀化职业技术学院 Hillside orchard mechanized operation land preparation method
CN113068570A (en) * 2021-04-08 2021-07-06 西北农林科技大学 Vegetation configuration method for controlling water and soil loss of alpine slope
CN113248020A (en) * 2021-04-22 2021-08-13 朴草(重庆)生态环境科技有限公司 Design method of small micro-wetland of bamboo forest

Similar Documents

Publication Publication Date Title
CN105393667A (en) Method using ecological trench to intercept forest surface runoff
Boers et al. A review of rainwater harvesting
CN100473271C (en) System engineering method for modifying alkaline land by use of pipe drainage method
CN103314763B (en) Micro-reformation and vegetation restoration method for degraded plateau and lake wetlands
CN105000748B (en) Typical agricultural non -point pollution thing " point-line-surface " comprehensively cuts control system
Shakya et al. New drainage technologies for salt-affected waterlogged areas of southwest Punjab, India
CN102090175A (en) Method for regulating and controlling limited downslope tillage of corroded slope farmland
RU2563146C1 (en) Method of anti-erosion protection of relief on polders for growing herbs
CN103774607B (en) A kind of Lakeside Zone Wa Tangdui island Sediment rehabilitation method
CN105210797A (en) The afforestation and soil preparation method of a kind of North China water conservation forest
CN109041623A (en) A kind of salt-soda soil comprehensive processing method
CN106638629B (en) A kind of device for loess slope slope greening
Joko Flood reduction function of paddy rice fields under different water saving irrigation techniques
CN115193903A (en) Water-vapor bidirectional circulation efficient salt-washing and saline-alkali soil intensive fertilization improvement method
CN104790518A (en) Utilizing method of saline-alkali soil surface water
CN206173913U (en) Plain river network region farmland drainage recharges and utilizes and nitrogen phosphorus interception removal system
CN210421033U (en) Slope farmland runoff pollution retaining system
CN104067898A (en) Method for conducting water storage soil moisture conservation water saving forestation in dry windy dusty desert region
Mazhayskiy et al. Deep loosening as effective adaptive agromeliorative practice on drained mineral soil of European polesie in variable climatic conditions
CN109496485B (en) Method for controlling salt in farmland soil
Okuda et al. Problems and Measures for the Adoption of Cut-drain and Its Applicability to Soil Conditions in Uzbekistan
Lukianchuk et al. Necessity and possible approaches to applying deep loosening when cultivating rice.
CN217936458U (en) System for efficient salt washing and intensive fertilization and improvement of saline-alkali soil by water-vapor bidirectional circulation
CN112385348B (en) Method for treating high-saline-alkali soil by using salt resistance and salt discharge of reed
CN210959683U (en) Facility vegetable annual rainwater and saline water mixed irrigation system in coastal water-deficient area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160316