CN105350572B - Assembled underground pipe gallery - Google Patents

Assembled underground pipe gallery Download PDF

Info

Publication number
CN105350572B
CN105350572B CN201510716851.0A CN201510716851A CN105350572B CN 105350572 B CN105350572 B CN 105350572B CN 201510716851 A CN201510716851 A CN 201510716851A CN 105350572 B CN105350572 B CN 105350572B
Authority
CN
China
Prior art keywords
connector
adapter sleeve
prefabricated component
piping lane
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510716851.0A
Other languages
Chinese (zh)
Other versions
CN105350572A (en
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhaodi Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510716851.0A priority Critical patent/CN105350572B/en
Publication of CN105350572A publication Critical patent/CN105350572A/en
Priority to PCT/CN2016/000490 priority patent/WO2017071110A1/en
Application granted granted Critical
Publication of CN105350572B publication Critical patent/CN105350572B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention belongs to technical field of buildings, is related to a kind of assembled underground pipe gallery.Including hollow piping lane body, described piping lane body includes the prefabricated component of at least two pieces interconnections, and described prefabricated component forms circumferentially closed piping lane body after being connected with each other.The present invention uses fabricated construction, underground pipe gallery is divided into some prefabricated components, facilitate transport, when mounted, the build of prefabricated component is smaller, lighter in weight, easy for installation, especially with the mode of connector connection, make convenient and fast connection between prefabricated component, so as to greatly improve efficiency of construction, realize the Fast Installation of underground pipe gallery.

Description

Assembled underground pipe gallery
Technical field
The invention belongs to technical field of buildings, is related to a kind of assembled underground pipe gallery.
Background technology
Underground pipe gallery is also known as common trench, and it is to implement unified planning, design, construction and maintenance, is built in Urban Underground and is used for Lay the public utility of municipal public use pipeline.Refer to Urban Underground be used for concentrate laying electric power, communication, radio and television, The public tunnel of the municipal pipelines such as feedwater, draining, heating power, combustion gas.
Early in last century the '20s, Japanese capital Tokyo municipalities are just in the regional arterial road in nine sections of downtown Under, the pipelines such as electric power, phone, water supply and coal gas are concentrated and laid, form first, Tokyo underground pipe gallery.Hereafter, Formulate within 1963《On building the special measure method of common trench》, defining Japanese relevant departments from legal perspective need to be in traffic Measure the main trunk road infrastructure " common trench " of big and following possible congestion.The Tokyo national highway office of Transport Ministry subordinate bears The construction and management of Tokyo area backbone underground pipe gallery are blamed, the underground pipe gallery of secondary main line is then by Tokyo construction bureau It is responsible for.
More than 1000 meters of pipe gallery is just laid under the Tian'anmen Square early in 1958 in Beijing.2006 in Zhong Guan-cun The pipe gallery of China mainland area Article 2 modernization has been built up in West.The pipe gallery main line grows 2 kilometers, and branch line length 1 is public In, including the municipal pipeline such as water, electricity, hot and cold, combustion gas, communication.1994, Shanghai City government planning built first, continent Largest, distance most long pipe gallery --- Pudong New District Zhang Yanglu pipe galleries.The pipe gallery total length 11.125 is public In, house four kinds of urban pipelines such as feedwater, electric power, information and coal gas.Shanghai is comprehensive under also having built up Songjiang new city exemplarily The phase of conjunction piping lane engineering one and " ring adds a line ", are always about 6 kilometers of Jiading District Anting New Town pipe gallery system.It is Chinese and new The Suzhou Industrial Park infrastructure construction for adding slope to develop jointly, by the exploitation of 10 years, underground utilities corridor was also begun to take shape.
State Council pays much attention to promote Urban Underground pipe gallery construction, has successively been printed and distributed since 2013《State Council closes In the opinion for strengthening urban infrastructure construction》、《Guidance of the General Office of the State Council on strengthening City Buried Pipeline implementation management Opinion》, deployment development Urban Underground pipe gallery construction pilot work.
Chinese patent literature discloses a kind of integrated form underground pipe gallery [application number with compensation device: 201410559745.1], it is located at comprising some tube coupling sealing strips and some end to end tube coupling units, the tube coupling sealing strip Between the adjacent tube coupling unit, the tube coupling unit includes tube coupling and some pipelines be arrangeding in parallel, and the pipeline passes through solid On the bottom surface inside the tube coupling, the tube coupling both ends are respectively equipped with the tube coupling being adapted with the tube coupling shape and stretched for reservation Contracting connecting tube, the pipe ends are respectively equipped with pipeline extension connecting tube, and the tube coupling retractable connecting tube is away from the tube coupling One end is provided with flange one, and the described one end of pipeline extension connecting tube away from the pipeline is provided with flange two.Such scheme effectively drops The low difficulty of construction and installation, improves the installation effectiveness of piping lane and pipeline, saves a large amount of engineering times and expense, while prefabricated The tube coupling large carrying capacity of shaping, resistance to compression effect are good.But prefabricated profiled tube coupling weight is big, build is big, not readily transportable, When mounted, it is necessary to use the larger lifting apparatus of load, construction cost is high.
The content of the invention
Regarding the issue above, the present invention provides a kind of transport, be easy for installation, the assembling of efficiency of construction can be improved Formula underground pipe gallery.
To reach above-mentioned purpose, present invention employs following technical proposal:A kind of assembled underground pipe gallery, including it is hollow Piping lane body, described piping lane body include the prefabricated component of at least two pieces interconnections, shape after described prefabricated component is connected with each other The piping lane body circumferentially closed.
In above-mentioned assembled underground pipe gallery, some prefabricated components are fixed with described piping lane body, described is prefabricated Piping lane body interior is separated into some separate workplaces by part.
In above-mentioned assembled underground pipe gallery, every two blocks of adjacent prefabricated components are connected with each other with connector.
In above-mentioned assembled underground pipe gallery, described piping lane body interior and be provided with horizontal direction some pieces every Plate.
In above-mentioned assembled underground pipe gallery, described connector includes the connection being connected on one of prefabricated component The connector for covering and being connected on another block of prefabricated component, described adapter sleeve and connector phase interworking are suitable and can form fixed company Connect, when adapter sleeve is fixedly connected with connector, two blocks of adjacent prefabricated components are fixedly connected.
In above-mentioned assembled underground pipe gallery, described adapter sleeve and connector be connected to two pieces it is adjacent prefabricated On part, described adapter sleeve is connected to inside one of prefabricated component, described connector protrusion outside another block of prefabricated component, Connector coordinates with adapter sleeve grafting.
In above-mentioned assembled underground pipe gallery, described adapter sleeve and connector be connected to two pieces it is adjacent prefabricated On part, and adapter sleeve and connector are protruded outside prefabricated component respectively, described adapter sleeve and connector threaded.
In above-mentioned assembled underground pipe gallery, some dowels, described connection are fixed with inside described prefabricated component Set and connector are fixedly connected with dowel respectively, and the described dowel set in horizontal direction is close to piping lane body outer wall One end is provided with the external connection mechanism that can be fixedly connected with the bindiny mechanism of piping lane body exterior.
In above-mentioned assembled underground pipe gallery, the junction of every two blocks of adjacent prefabricated components is provided with sealing mechanism.
In above-mentioned assembled underground pipe gallery, described sealing mechanism is included in the junction of two blocks of adjacent prefabricated components Fill out the ethylene oxide resin set, waterstop or concrete setting thing.
Compared with prior art, the advantage of the invention is that:Using fabricated construction, if underground pipe gallery is divided into intervention Product, transport is facilitated, when mounted, the build of prefabricated component is smaller, lighter in weight, easy for installation, connects especially with connector The mode connect, makes convenient and fast connection between prefabricated component, so as to greatly improve efficiency of construction, realizes the fast of underground pipe gallery Speed installation.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the fundamental diagram of the present invention;
Fig. 3 is another structural representation of the present invention;
Fig. 4 is enlarged drawing at Fig. 1 A;
Fig. 5 is enlarged drawing at Fig. 2 B;
Fig. 6 is the schematic shapes of prefabricated component;
Fig. 7 is the structural representation of connector.
In figure:Piping lane body 1, prefabricated component 2, workplace 3, connector 4, adapter sleeve 41, connector 42, swivel nut 43, swivel nut Connection end 44, card 45, chuck 46, location nut 47, card baffle ring 48, boss 49, dividing plate 5, dowel 6, external connection mechanism 7, Strengthening mechanism 100.
Embodiment
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
As shown in figure 1, a kind of assembled underground pipe gallery, including hollow piping lane body 1, described piping lane body 1 include The prefabricated component 2 of at least two pieces interconnections, described prefabricated component 2 form circumferentially closed piping lane body 1 after being connected with each other.Namely Piping lane body 1 is fabricated, can form the pipeline configuration of closing after mounting.The shape of cross section of piping lane body 1 does not limit It is fixed, can be rectangle, circle or other shapes, it is, of course, preferable to be square.Prefabricated component 2 can be shape as shown in Figure 6, Can also be other shapes such as " Z " font, " U " font etc..The junction of every two blocks adjacent prefabricated components 2 is provided with sealer Structure.The fluid sealant set such as ethylene oxide resin or waterstop are filled out in the junction that sealing mechanism is included in two blocks of adjacent prefabricated components 2 Or concrete setting thing, wherein concrete can become concrete setting thing, have waterproof cast-in-place in seam crossing after solidification Effect.
With reference to shown in Fig. 1 and Fig. 3, some prefabricated components 2 are fixed with piping lane body 1, described prefabricated component 2 is piping lane body Some separate workplaces 3 are separated into inside 1, each workplace 3 is each independent, does not interfere with each other mutually, convenient maintenance and line Lay on road.As shown in Fig. 2 being provided with inside piping lane body 1 and in horizontal direction some pieces of dividing plates 5, can be placed on dividing plate 5 small Pipeline or circuit, it is convenient to be provided for the paving line inside piping lane body 1.
Can be with cast-in-place connection, as a kind of preferable scheme, as shown in figure 1, every two pieces adjacent prefabricated between prefabricated component 2 Part 2 is connected with each other with connector 4.
As shown in Figure 1 and Figure 4, connector 4 includes the adapter sleeve 41 being fixed therein on one block of prefabricated component 2 and is fixed on another Connector 42 on one block of prefabricated component 2, described adapter sleeve 41 and the phase interworking of connector 42 are suitable and can form a fixed connection, when even When female connector 41 is fixedly connected with connector 42, two blocks of adjacent prefabricated components 2 are fixedly connected.
As shown in figure 1, adapter sleeve 41 and connector 42 are separately fixed on two blocks of adjacent prefabricated components 2, described connection Set 41 is fixed therein inside one block of prefabricated component 2, and described connector 42 is protruded outside another block of prefabricated component 2, connector 42 Coordinate with the grafting of adapter sleeve 41.
As shown in figure 4, adapter sleeve 41 and connector 42 are separately fixed on two blocks of adjacent prefabricated components 2, and adapter sleeve 41 Protruded respectively outside prefabricated component 2 with connector 42, described adapter sleeve 41 and the threaded of connector 42.
The concrete structure and operation principle of connector are shown in before the applicant the patent applied.Such as Application No. 201510314380.0;200810060180.7;200810060181.1 patent.Because connector is prior art, herein Repeat no more.
A kind of preferable connector 4 is present embodiments provided, it is as shown in figs. 4 and 7, shown, including two are connected respectively Adapter sleeve 41 and connector 42 on adjacent prefabricated component 2, adapter sleeve 41 and connector 42 are fixedly connected with dowel 6 respectively, Wherein connector 42 can be directly affixed with dowel 6, can also be removably affixed equal to dowel 6 by nut, connection A swivel nut 43 is bolted with set 41, the one end of swivel nut 43 is in the swivel nut connection end 44 of cylinder, is formed after other end bifurcated some Individual card 45, per having gap between the adjacent card 45 of two panels, the middle part of card 45 is dashed forward to the direction away from the axial line of swivel nut 43 Go out the outer surface formation cambered surface so that card 45, make card 45 flexible, be easy to collapse.The quantity of card 45 2 with It is upper, preferably can be 3 or more than 3.There is the passage that inserted link connector 42 can be allowed to insert in described swivel nut 43, The end of connector 42 has the chuck 46 to be matched with the end of card 45, when connector 42 is inserted into swivel nut 43, card 45 cards how in chuck 46 so as to preventing connector 42 from being disconnected set 41, one is bolted with described connector 42 can be along even The location nut 47 that joint 42 axially moves up and down, when location nut 47 moves to the direction of adapter sleeve 41, card 45 and chuck There is a card baffle ring 48 46 clampings, the outward flange of chuck 46, and card 45 can be prevented to depart from chuck 46.
The present embodiment additionally provides alternative attachment 4, as shown in figure 4, including connecting two adjacent prefabricated components 2 respectively On adapter sleeve 41 and connector 42, wherein adapter sleeve 41 is fastened on dowel 6, and dowel 6 extends the end of prefabricated component 2 It is in boss 49 to expand, and adapter sleeve 41 can not be disconnected muscle 6 but can be rotated in a circumferential direction along dowel 6 after being blocked by boss 49, even There is external screw thread on joint 42, adapter sleeve 41 has internal thread, when two prefabricated components 2 close to when, rotation connection set 41 makes connection Set 41 is spirally connected with connector 42, realizes the quick connection of two prefabricated components 2.There is gap between two prefabricated components 2, can be in gap Place fills out above-mentioned sealing mechanism, so that gap reaches waterproof effect.
As depicted in figs. 1 and 2, some dowels 6 are fixed with inside prefabricated component 2, dowel 6 is rod iron, reinforcing bar, steel strand Line, chemical industry section bar such as carbon fiber rod etc., described adapter sleeve 41 and connector 42 are fixedly connected with dowel 6 respectively, such as Fig. 2 institutes Show, the described dowel 6 set in horizontal direction close to one end of the outer wall of piping lane body 1 be provided with can with outside piping lane body 1 The external connection mechanism 7 that is fixedly connected of bindiny mechanism, external connection mechanism 7 is usually adapter sleeve 41 or other connections Nut etc., it is fixed on inside prefabricated component 2, when the outside of prefabricated component 2 has other strengthening mechanisms 100, strengthening mechanism 100 can pass through External connection mechanism 7 achieves a fixed connection with piping lane body 1, so as to improve fixed effect of the piping lane body 1 in soil layer, prevents Sedimentation or displacement, strengthening mechanism 100 can be cement mixing method or prefabricated pile etc..
The piping lane body 1 of the present invention is formed using assembled, is readily transported, is installed, improve efficiency of construction, reduces and apply Work cost.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode Generation, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.

Claims (6)

1. a kind of assembled underground pipe gallery, including hollow piping lane body (1), it is characterised in that described piping lane body (1) bag The prefabricated component (2) of at least two pieces interconnections is included, described prefabricated component (2) forms circumferentially closed piping lane body after being connected with each other (1),
Every two blocks of adjacent prefabricated components (2) are connected with each other with connector (4),
Described connector (4) includes the adapter sleeve (41) being connected on one of prefabricated component (2) and is connected to another piece in advance Connector (42) on product (2), described adapter sleeve (41) and connector (42) phase interworking are suitable and can form a fixed connection, when When adapter sleeve (41) is fixedly connected with connector (42), two pieces of adjacent prefabricated components (2) are fixedly connected,
Be fixed with some dowels (6) inside described prefabricated component (2), described adapter sleeve (41) and connector (42) respectively with Dowel (6) is fixedly connected, and the described dowel (6) set in horizontal direction is set close to one end of piping lane body (1) outer wall There is the external connection mechanism (7) that bindiny mechanism that can be outside with piping lane body (1) is fixedly connected,
The junction of every two blocks of adjacent prefabricated components (2) is provided with sealing mechanism.
2. assembled underground pipe gallery according to claim 1, it is characterised in that be fixed with described piping lane body (1) Piping lane body (1) inside is separated into some separate workplaces (3) by some prefabricated components (2), described prefabricated component (2).
3. assembled underground pipe gallery according to claim 1, it is characterised in that described piping lane body (1) is internal and is in It is horizontally arranged to have some pieces of dividing plates (5).
4. assembled underground pipe gallery according to claim 1, it is characterised in that described adapter sleeve (41) and connector (42) it is connected on two pieces of adjacent prefabricated components (2), described adapter sleeve (41) is connected in one of prefabricated component (2) Portion, described connector (42) is prominent outside in another piece of prefabricated component (2), and connector (42) coordinates with adapter sleeve (41) grafting.
5. assembled underground pipe gallery according to claim 1, it is characterised in that described adapter sleeve (41) and connector (42) it is connected on two pieces of adjacent prefabricated components (2), and adapter sleeve (41) and connector (42) are protruded in prefabricated component respectively (2) it is outside, described adapter sleeve (41) and connector (42) threaded.
6. assembled underground pipe gallery according to claim 1, it is characterised in that described sealing mechanism is included in two pieces of phases The ethylene oxide resin set, waterstop or concrete setting thing are filled out in the junction of adjacent prefabricated component (2).
CN201510716851.0A 2015-10-29 2015-10-29 Assembled underground pipe gallery Active CN105350572B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510716851.0A CN105350572B (en) 2015-10-29 2015-10-29 Assembled underground pipe gallery
PCT/CN2016/000490 WO2017071110A1 (en) 2015-10-29 2016-08-29 Assembled-type underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510716851.0A CN105350572B (en) 2015-10-29 2015-10-29 Assembled underground pipe gallery

Publications (2)

Publication Number Publication Date
CN105350572A CN105350572A (en) 2016-02-24
CN105350572B true CN105350572B (en) 2017-11-24

Family

ID=55326624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510716851.0A Active CN105350572B (en) 2015-10-29 2015-10-29 Assembled underground pipe gallery

Country Status (2)

Country Link
CN (1) CN105350572B (en)
WO (1) WO2017071110A1 (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350572B (en) * 2015-10-29 2017-11-24 周兆弟 Assembled underground pipe gallery
CN105569676A (en) * 2016-03-02 2016-05-11 袁江 Slide type inserting part, prefabricated concrete pipe gallery and shield segment
CN106545343B (en) * 2016-10-28 2020-08-04 江西中恒地下空间科技有限公司 Construction method for underground pipe gallery and storage well
CN106592628A (en) * 2016-11-24 2017-04-26 中铁上海设计院集团有限公司 Splicing method of honeycomb type underground engineering structure system
CN106677209A (en) * 2017-01-18 2017-05-17 河南国隆实业有限公司 Intelligent comprehensive pre-fabricating pipe gallery and construction technique thereof
CN107747319A (en) * 2017-11-16 2018-03-02 中冶京诚工程技术有限公司 Underground comprehensive pipe rack and comprehensive pipe rack system
CN108533150A (en) * 2018-03-30 2018-09-14 国家电网公司 A kind of pipe gallery electric compartment fire resistant doorsets
CN109137968A (en) * 2018-07-27 2019-01-04 浙江鑫宙竹基复合材料科技有限公司 A kind of compound piping lane of bamboo with support component anti-rotating function
CN109098208B (en) * 2018-08-31 2024-04-26 郭毅轩 Submarine tunnel and construction method thereof
CN109083196B (en) * 2018-09-30 2024-04-02 广西壮族自治区城乡规划设计院 Utility tunnel composite node structure
CN110318420B (en) * 2019-06-28 2024-04-09 中国五冶集团有限公司 Prefabricated assembled underground utility tunnel
CN112112193B (en) * 2020-09-25 2022-06-03 福州市城乡建总集团有限公司 Double-sided superposed pipe gallery side wall with concealed columns and manufacturing method thereof
CN113047338B (en) * 2021-03-26 2024-04-26 上海浦东混凝土制品有限公司 Comparatively firm prefabricated utility tunnel of concatenation
CN113438690A (en) * 2021-05-08 2021-09-24 陕西墨斗星智能科技有限公司 Long-distance signal transmission method of latticed pipe gallery early warning system
CN114575385B (en) * 2022-03-25 2023-10-31 四川仟坤建设集团有限责任公司 Municipal utility tunnel and construction method thereof
CN114892721B (en) * 2022-04-23 2024-02-02 湖南华纬水电工程有限公司 Soft soil stratum piping lane movement joint waterproof construction
CN115680020A (en) * 2022-11-07 2023-02-03 李晓明 Underground street-crossing pipe gallery

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519876A (en) * 2008-03-17 2009-09-02 周兆弟 Cutting-free fast tearing butt coupler and butt joint piece
CN101519877A (en) * 2008-03-17 2009-09-02 周兆弟 Multi-headed fast tearing butt coupler and fabricated part
CN201934812U (en) * 2010-12-08 2011-08-17 南京联众机电制造有限公司 Urban underground pipeline shared pipeline corridor
CN104455889A (en) * 2014-10-20 2015-03-25 杨帆 Integrated underground pipe gallery with compensation device
CN104878758A (en) * 2015-06-09 2015-09-02 周兆弟 Insertion connecting component with tension connection function
CN205224087U (en) * 2015-10-29 2016-05-11 周兆弟 Assembled underground pipe gallery

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5762796B2 (en) * 2011-03-31 2015-08-12 日鐵住金建材株式会社 Steel pipe connection structure and method for pipe roof construction
CN105350572B (en) * 2015-10-29 2017-11-24 周兆弟 Assembled underground pipe gallery

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519876A (en) * 2008-03-17 2009-09-02 周兆弟 Cutting-free fast tearing butt coupler and butt joint piece
CN101519877A (en) * 2008-03-17 2009-09-02 周兆弟 Multi-headed fast tearing butt coupler and fabricated part
CN201934812U (en) * 2010-12-08 2011-08-17 南京联众机电制造有限公司 Urban underground pipeline shared pipeline corridor
CN104455889A (en) * 2014-10-20 2015-03-25 杨帆 Integrated underground pipe gallery with compensation device
CN104878758A (en) * 2015-06-09 2015-09-02 周兆弟 Insertion connecting component with tension connection function
CN205224087U (en) * 2015-10-29 2016-05-11 周兆弟 Assembled underground pipe gallery

Also Published As

Publication number Publication date
CN105350572A (en) 2016-02-24
WO2017071110A1 (en) 2017-05-04

Similar Documents

Publication Publication Date Title
CN105350572B (en) Assembled underground pipe gallery
CN204898721U (en) Steel construction city utility tunnel
CN105369824A (en) Cement mixing pile protective underground pipe gallery
CN105350570B (en) Assembled underground pipe gallery multiple-pass joint
CN105350583A (en) Underground pipe gallery fender wall construction method and underground pipe gallery construction method
CN105401593A (en) Assembly type square underground pipe gallery
CN103362517A (en) Assembled jacking pipe
CN108661075A (en) Assembled underground one corridor
CN206800446U (en) Assembled underground one corridor
WO2017071111A1 (en) Underground pipe gallery protection structure
CN208415305U (en) A kind of precast assembly monoblock type pipe gallery and component and unit
CN205224088U (en) Cement mixing method protection underground pipe gallery
CN206800484U (en) Ruggedized construction for underpass
CN205617425U (en) Prefabricated structure of assembling of utility tunnel
CN205296229U (en) Sewer manhole in utility tunnel
CN210315654U (en) Urban tunnel, rail transit interval tunnel and utility tunnel co-construction structure
CN205224087U (en) Assembled underground pipe gallery
CN104455889A (en) Integrated underground pipe gallery with compensation device
CN208650912U (en) Heat distribution pipeline fixing force transfer bracket system in heating power shield tunnel
CN208136954U (en) Precast splice type Pipe rack
CN205134385U (en) Underground pipe gallery protective structure
CN206396789U (en) A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge
CN205134361U (en) Assembled underground pipe gallery connects lead to more
CN206034485U (en) Corrugate ring pipe structure utility tunnel
CN204098066U (en) The square underground pipe gallery of assembling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210422

Address after: No.1 Workshop of Huzhou Wantuo metal products Co., Ltd., rujiadian Road, Lianshi Town, Nanxun District, Huzhou City, Zhejiang Province

Patentee after: Zhejiang Zhaodi Technology Co.,Ltd.

Address before: Kaohsiung streets Pu Beilun District 315800 in Zhejiang province Ningbo City No. 18

Patentee before: Zhou Zhaodi

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Fabricated underground pipe gallery

Effective date of registration: 20211227

Granted publication date: 20171124

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2021330002677

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220617

Granted publication date: 20171124

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2021330002677

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Prefabricated underground pipe gallery

Effective date of registration: 20230707

Granted publication date: 20171124

Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd.

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2023330001414

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20171124

Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd.

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2023330001414