CN105350583A - Underground pipe gallery fender wall construction method and underground pipe gallery construction method - Google Patents
Underground pipe gallery fender wall construction method and underground pipe gallery construction method Download PDFInfo
- Publication number
- CN105350583A CN105350583A CN201510716833.2A CN201510716833A CN105350583A CN 105350583 A CN105350583 A CN 105350583A CN 201510716833 A CN201510716833 A CN 201510716833A CN 105350583 A CN105350583 A CN 105350583A
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- underground pipe
- construction method
- soil
- preformed pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention belongs to the technical field of buildings, and relates to an underground pipe gallery fender wall construction method and an underground pipe gallery construction method. The underground pipe gallery fender wall construction method comprises the steps that A, positioning is conducted, i.e., corresponding pile driving lines are drawn on the ground and the two sides of an underground pipe gallery to be installed according to the size and direction of the underground pipe gallery to be installed; B, pile driving is conducted, cement stirring piles are driven in the soil layer according to the drawn pile driving lines and are connected along the pile driving lines to form two cement stirring pile walls oppositely arranged; and C, a trench used for containing the underground pipe gallery is dug in a cofferdam and between the two prefabricated pile walls, and the underground pipe gallery is put into the trench. The firmness is high, and the structural intensity is good.
Description
Technical field
The invention belongs to technical field of buildings, relate to a kind of underground pipe gallery protecting wall construction method and underground pipe gallery construction method.
Background technology
Underground pipe gallery is also known as common trench, and it implements unified planning, design, construction and maintenance, is built in Urban Underground for laying the public utility of municipal public use pipeline.Refer at Urban Underground for concentrating the public tunnel laying the municipal pipelines such as electric power, communication, radio and television, feedwater, draining, heating power, combustion gas.
As far back as the '20s in last century, the pipelines such as electric power, phone, water supply and coal gas, just under the arterial road that nine sections, center, city is regional, are concentrated and are laid, define Tokyo Article 1 underground pipe gallery by Tokyo, Japanese capital municipalities.After this, " about building the special measure method of common trench " of within 1963, formulating, defining Japanese relevant departments from legal perspective need and the main trunk road infrastructure " common trench " that future may block up large at the traffic volume.The Tokyo national highway office of Transport Ministry subordinate is responsible for the Construction and management of area, Tokyo trunk line underground pipe gallery, and the underground pipe gallery of secondary main line is then responsible for by Tokyo construction bureau.
The pipe gallery of more than 1000 meter was just laid as far back as 1958 in Beijing under the Tian'anmen Square.Within 2006, build up the modern pipe gallery of China mainland area Article 2 in West, Zhong Guan-cun.This pipe gallery main line is long 2 kilometers, a line length 1 kilometer, comprises the municipal pipelines such as water, electricity, hot and cold, combustion gas, communication.1994, Shanghai City government planning built pipe gallery---the Pudong New District Zhang Yanglu pipe gallery that continent Article 1 is largest, distance is the longest.This pipe gallery total length 11.125 kilometers, has accommodated four kinds of urban pipelines such as feedwater, electric power, information and coal gas.The Jiading District Anting New Town pipe gallery system that Songjiang new city exemplary underground pipe gallery engineering first phase and " ring adds a line " are always about 6 kilometers has also been built up in Shanghai.The Suzhou Industrial Park infrastructure construction that China and Singapore develop jointly, through the exploitation of 10 years, also began to take shape in underground utilities corridor.
State Council pays much attention to advance the construction of Urban Underground pipe gallery, successively print and distribute since 2013 " State Council is about the suggestion strengthening urban infrastructure construction ", " General Office of the State Council is about the instruction strengthening City Buried Pipeline implementation management ", disposed and carry out Urban Underground pipe gallery construction pilot work.
Chinese patent literature discloses a kind of integrated form underground pipe gallery [application number: 201410559745.1] with compensation arrangement, comprise some tube coupling weather strips and some end to end tube coupling unit, described tube coupling weather strip is located between adjacent described tube coupling unit, described tube coupling unit comprises tube coupling and some pipelines be arranged in parallel, described pipeline is located on the bottom surface of described tube coupling inside by holder, described tube coupling two ends are respectively equipped with the tube coupling retractable connecting tube suitable with described tube coupling shape, described pipe ends is respectively equipped with pipeline extension tube connector, described tube coupling retractable connecting tube is provided with flange one away from one end of described tube coupling, described pipeline extension tube connector is provided with flange two away from one end of described pipeline.Such scheme effectively reduces the difficulty of construction and installation, improves the installation effectiveness of piping lane and pipeline, saves a large amount of engineering time and expense, and prefabricated profiled tube coupling supporting capacity is large simultaneously, and resistance to compression is effective.But to have ignored around piping lane soil property to the protective action of piping lane, therefore, the structural strength of underground pipe gallery needs to be improved further.
Summary of the invention
The object of the invention is for the problems referred to above, provide a kind of intensity high, the underground pipe gallery protecting wall construction method of protective action can be played underground pipe gallery.
Another object of the present invention improves the high underground pipe gallery construction method of a kind of structural strength.
For achieving the above object, present invention employs following technical proposal: a kind of underground pipe gallery protecting wall construction method, comprises the following steps:
A, location: according to size and the trend of underground pipe gallery to be installed, on the ground and draw in underground pipe gallery both sides to be installed circuit of driving piles accordingly;
B, piling: according to the piling circuit drawn, in soil layer, beat cement mixing method, cement mixing method is interconnected to form the opposite Soil-cement piling wall in two sides along piling circuit;
C, cofferdam: squeeze into preformed pile respectively in the inner side of two sides Soil-cement piling wall, described preformed pile is radially interconnected to form prefabricated piling wall, and the trend of prefabricated piling wall and Soil-cement piling wall move towards corresponding, form underground pipe gallery protecting wall after the sclerosis of Soil-cement piling wall.
In above-mentioned underground pipe gallery protecting wall construction method, in stepb, the height of Soil-cement piling wall is not less than the height of underground pipe gallery.
In above-mentioned underground pipe gallery protecting wall construction method, in step C, the prefabricated piling wall of described preformed pile formation radially bonded to each other.
In above-mentioned underground pipe gallery protecting wall construction method, described preformed pile has concave-convex connection mechanism, forms prefabricated piling wall between preformed pile by the mutual compact siro spinning technology of concave-convex connection mechanism.
In above-mentioned underground pipe gallery protecting wall construction method, in step C, described preformed pile is fixedly connected with Soil-cement piling wall.
In above-mentioned underground pipe gallery protecting wall construction method, described preformed pile has the connecting portion of outstanding preformed pile pile body, and described connecting portion to be inserted in Soil-cement piling wall thus preformed pile is fixedly connected with Soil-cement piling wall.
Underground pipe gallery construction method, on the basis of above-mentioned underground pipe gallery protecting wall construction method, digging out one for placing the tunnel of underground pipe gallery, being placed in tunnel by underground pipe gallery in the prefabricated piling wall in two sides.
In above-mentioned underground pipe gallery construction method, described underground pipe gallery is cast-in-place shaping or shaping with the assembling of prefabricated built-up member in tunnel.
In above-mentioned underground pipe gallery construction method, have lateral connection muscle in described underground pipe gallery, have cross reinforcing in described preformed pile, described lateral connection muscle is fixedly connected with cross reinforcing.
In above-mentioned underground pipe gallery construction method, the end of described cross reinforcing has attaching nut, and described lateral connection muscle end has the external screw thread matched with attaching nut, and lateral connection muscle and cross reinforcing are spirally connected fixing.
Compared with prior art, the invention has the advantages that: Soil-cement piling wall descends the soil property around piping lane to play sclerosis reinforcement effect over the ground, play the located lateral to underground pipe gallery, preformed pile and Soil-cement piling wall become integral structure, strengthen the soil property of the surrounding of underground pipe gallery further; In addition, preformed pile can play the effect preventing underground pipe gallery sedimentation after being connected by reinforcing rib bindiny mechanism with underground pipe gallery, thus makes underground pipe gallery more firm, and structural strength is higher.
Accompanying drawing explanation
Fig. 1 is the structural representation of cement-soil mixing pile machine structure;
Fig. 2 structural representation of the present invention;
Fig. 3 is the cross sectional representation of preformed pile;
Fig. 4 is the cross sectional representation of another kind of preformed pile;
Fig. 5 is the cross sectional representation of another kind of preformed pile;
Fig. 6 is the cross sectional representation of another kind of preformed pile;
Fig. 7 is the cross sectional representation of another kind of preformed pile;
Fig. 8 is the cross sectional representation of another kind of preformed pile;
Fig. 9 is the cross sectional representation of another kind of preformed pile;
Figure 10 is the cross sectional representation of another kind of preformed pile;
Figure 11 is the A place enlarged drawing of Fig. 1;
Figure 12 is the B place enlarged drawing of Fig. 1;
Figure 13 is the C place enlarged drawing of Fig. 1;
Figure 14 is the D place enlarged drawing of Fig. 1;
Figure 15 is the E place enlarged drawing of Fig. 2;
Figure 16 is the schematic shapes of built-up member 100.
In figure: underground pipe gallery 1, cement mixing method 2, preformed pile 3, concave-convex connection mechanism 4, connecting portion 5, tunnel 6, protuberance 8, recess 9, cross reinforcing 11, lateral connection muscle 12, bindiny mechanism 13, attaching nut 14, collar 15, snap fit 16, built-up member 100, soil layer 101.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
Embodiment 1
A kind of underground pipe gallery 1 protecting wall construction method, comprises the following steps:
A, location: according to size and the trend of underground pipe gallery 1 to be installed, on the ground and draw in underground pipe gallery 1 both sides to be installed circuit of driving piles accordingly;
B, piling: according to the piling circuit drawn, in soil layer 101, beat cement mixing method 2, cement mixing method 2 is interconnected to form the opposite Soil-cement piling wall in two sides along piling circuit;
C, cofferdam: squeeze into preformed pile 3 respectively in the inner side of two sides Soil-cement piling wall, described preformed pile 3 is radially interconnected to form preformed pile 3 wall, and the trend of preformed pile 3 wall and Soil-cement piling wall move towards corresponding, form underground pipe gallery protecting wall after the sclerosis of Soil-cement piling wall.
Those skilled in the art are to be understood that, according to the shape of underground pipe gallery 1, the shape of Soil-cement piling wall should make corresponding change with landform or construction needs, therefore, article two, Soil-cement piling wall is not necessarily parallel, also be likely bending, or the distance between two Soil-cement piling walls can make corresponding adjustment according to the width of underground pipe gallery 1.
The preparation method of cement mixing method is prior art, it is a kind of method for reinforcing the low ground of saturated soft clay, it utilizes cement as curing compound, by special Mixing Machine, in ground depths by weak soil and curing compound action of forced stirring, utilize the series of physical chemical reaction produced between curing compound and weak soil, weak soil is hardened into have the high-quality ground of globality, water stability and some strength.The Chinese patent that application number is [201210445899.9] provides a kind of six axle cement mixing methods, the six roots of sensation cement mixing method same time is formed, then can realize seamless overlap joint, reduce the seam of former single shaft or the formation of two axle cement mixing methods, improve stagnant water effect and efficiency of construction, reduce the amount of labour used.
Preferred version, in stepb, the height of Soil-cement piling wall is not less than the height of underground pipe gallery 1.
In step C, described preformed pile 3 formation preformed pile 3 radially bonded to each other wall.Described preformed pile 3 has concave-convex connection mechanism 4, by concave-convex connection mechanism 4 compact siro spinning technology formation preformed pile 3 wall mutually between preformed pile 3.Described preformed pile 3 is fixedly connected with Soil-cement piling wall.Described preformed pile 3 has the connecting portion 5 of outstanding preformed pile 3 pile body, and described connecting portion 5 to be inserted in Soil-cement piling wall thus preformed pile 3 is fixedly connected with Soil-cement piling wall.
Specifically, as for the shape of cross section of preformed pile 3, the present embodiment does not limit, and as shown in Figure 3 and Figure 4, preformed pile 3 cross section is triangle, as shown in Fig. 5, Fig. 6, Fig. 8, preformed pile 3 cross section is polygon, and as shown in Figure 7, preformed pile 3 cross section is T-shaped, as shown in Figure 9 and Figure 10, preformed pile 3 cross section is circular.
As shown in Fig. 4, Fig. 5, Figure 10, preformed pile 3 has to the outside outstanding connecting portion 5 of preformed pile 3, described connecting portion 5 to be inserted in Soil-cement piling wall and to be fixedly connected with Soil-cement piling wall.In addition, for T-shaped stake as shown in Figure 7, itself just can be inserted into cement mixing method and be fixedly connected with it within the walls.
Concave-convex connection mechanism 4 comprises the protuberance 8 that extends preformed pile 3 outside and to the inner recessed recess 9 of preformed pile 3, and described protuberance 8 matches with recess 9 shape and size thus two adjacent preformed piles 3 can be made to fit tightly and is connected.
Embodiment 2
On the basis of embodiment 1, in two sides preformed pile 3 wall, dig out one for placing the tunnel 6 of underground pipe gallery 1, underground pipe gallery 1 is placed in tunnel 6.
Underground pipe gallery 1 is cast-in-place shaping or assemble shaping with prefabricated built-up member 100 in tunnel.Specifically, as shown in figure 16, built-up member 100 can be " one ", " Qian ", " Ji ", " ten ",
deng.
By cast-in-place fixing between built-up member 100, preferably add waterstop or sealing material in the junction of two built-up member 100, carry out leakproof.Also can be interconnected by connector between built-up member 100, the patent that the concrete structure of connector and operating principle are applied for before seeing the applicant.If application number is 201510314380.0; 200810060180.7; 200810060181.1 patent.Because connector is prior art, therefore repeat no more herein.
Built-up member 100 except above-mentioned shape, can also adopt other shape as
" day ", " field ", " mouth " etc., can form closed tubular structure after mounting.Also namely the cross section of underground pipe gallery 1 can be rectangle, circle or other shapes, certainly, is preferably square.
As shown in Figure 2, have lateral connection muscle 12 in underground pipe gallery 1, have cross reinforcing 11 in described preformed pile 3, described lateral connection muscle 12 is fixedly connected with cross reinforcing 11.The end of cross reinforcing 11 has attaching nut 14, and described lateral connection muscle 12 end has the external screw thread matched with attaching nut 14, and lateral connection muscle 12 and cross reinforcing 11 are spirally connected fixing.
In particular, as shown in Figure 1, in preformed pile 3, be provided with some walings 10 and cross reinforcing 11, then shown in composition graphs 11-14, be provided with some lateral connection muscle 12 in described underground pipe gallery 1, described lateral connection muscle 12 is interconnected by bindiny mechanism 13 with cross reinforcing 11.
As shown in figure 11, bindiny mechanism 13 comprises and is positioned at preformed pile 3 and the attaching nut 14 be fixedly connected with cross reinforcing 11, and the end of described lateral connection muscle 12 has the external screw thread that matches with attaching nut 14 thus makes lateral connection muscle 12 and attaching nut 14 threaded.
As shown in Figure 2, the end of cross reinforcing 11 extends in underground pipe gallery 1, as shown in Figure 1, described bindiny mechanism 13 comprises the attaching nut 14 be fixedly connected with cross reinforcing 11, and the end of described lateral connection muscle 12 has the external screw thread that matches with attaching nut 14 thus makes lateral connection muscle 12 and attaching nut 14 threaded.
As shown in figures 12 and 14, bindiny mechanism 13 comprises the collar 15 being separately positioned on cross reinforcing 11 and lateral connection muscle 12 end, and the collar 15 on cross reinforcing 11 and lateral connection muscle 12 is snap-fit engagement mutually; Or described bindiny mechanism 13 comprises the snap fit 16 being separately positioned on cross reinforcing 11 and lateral connection muscle 12 end, snap fit 16 can be that cross reinforcing 11 and lateral connection muscle 12 end are bent to form, also can make in advance and be fixedly connected with cross reinforcing 11 or lateral connection muscle 12, the snap fit 16 on cross reinforcing 11 and lateral connection muscle 12 is snap-fit engagement mutually.Again in conjunction with shown in Figure 15, overlapping, the clamping or be spirally connected mutually of cross reinforcing 11 and lateral connection muscle 12, thus make preformed pile 3 and underground pipe gallery 1 form interaction in the horizontal direction, prevent underground pipe gallery 1 sedimentation.
Specific embodiment described herein is only to the explanation for example of the present invention's spirit.Those skilled in the art can make various amendment or supplement or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present invention or surmount the scope that appended claims defines.
Claims (10)
1. a underground pipe gallery protecting wall construction method, is characterized in that, comprise the following steps:
A, location: according to size and the trend of underground pipe gallery to be installed, on the ground and draw in underground pipe gallery both sides to be installed circuit of driving piles accordingly;
B, piling: according to the piling circuit drawn, in soil layer, beat cement mixing method, cement mixing method is interconnected to form the opposite Soil-cement piling wall in two sides along piling circuit;
C, cofferdam: squeeze into preformed pile respectively in the inner side of two sides Soil-cement piling wall, described preformed pile is radially interconnected to form prefabricated piling wall, and the trend of prefabricated piling wall and Soil-cement piling wall move towards corresponding, form underground pipe gallery protecting wall after the sclerosis of Soil-cement piling wall.
2. underground pipe gallery protecting wall construction method according to claim 1, is characterized in that, in stepb, the height of Soil-cement piling wall is not less than the height of underground pipe gallery.
3. underground pipe gallery protecting wall construction method according to claim 1, is characterized in that, in step C, and the prefabricated piling wall of described preformed pile formation radially bonded to each other.
4. underground pipe gallery construction method according to claim 3, is characterized in that, described preformed pile has concave-convex connection mechanism, forms prefabricated piling wall between preformed pile by the mutual compact siro spinning technology of concave-convex connection mechanism.
5. the protecting wall construction method of the underground pipe gallery according to claim 1-4 any one, is characterized in that, in step C, described preformed pile is fixedly connected with Soil-cement piling wall.
6. underground pipe gallery construction method according to claim 5, it is characterized in that, described preformed pile has the connecting portion of outstanding preformed pile pile body, and described connecting portion to be inserted in Soil-cement piling wall thus preformed pile is fixedly connected with Soil-cement piling wall.
7. the underground pipe gallery construction method of the construction method construction according to claim 1-6 any one, is characterized in that, digging out one for placing the tunnel of underground pipe gallery, being placed in tunnel by underground pipe gallery in the prefabricated piling wall in two sides.
8. underground pipe gallery construction method according to claim 7, is characterized in that, described underground pipe gallery is cast-in-place shaping or shaping with the assembling of prefabricated built-up member in tunnel.
9. underground pipe gallery construction method according to claim 7, is characterized in that, has lateral connection muscle in described underground pipe gallery, has cross reinforcing in described preformed pile, and described lateral connection muscle is fixedly connected with cross reinforcing.
10. underground pipe gallery construction method according to claim 9, it is characterized in that, the end of described cross reinforcing has attaching nut, and described lateral connection muscle end has the external screw thread matched with attaching nut, and lateral connection muscle and cross reinforcing are spirally connected fixing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510716833.2A CN105350583A (en) | 2015-10-29 | 2015-10-29 | Underground pipe gallery fender wall construction method and underground pipe gallery construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510716833.2A CN105350583A (en) | 2015-10-29 | 2015-10-29 | Underground pipe gallery fender wall construction method and underground pipe gallery construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105350583A true CN105350583A (en) | 2016-02-24 |
Family
ID=55326635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510716833.2A Pending CN105350583A (en) | 2015-10-29 | 2015-10-29 | Underground pipe gallery fender wall construction method and underground pipe gallery construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105350583A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049530A (en) * | 2016-05-27 | 2016-10-26 | 俞晓东 | Urban comprehensive pipe gallery and construction method |
WO2017071113A1 (en) * | 2015-10-29 | 2017-05-04 | 周兆弟 | Cement-soil mixing pile protected underground pipe gallery |
CN106638670A (en) * | 2017-01-20 | 2017-05-10 | 福建省建筑设计研究院 | Semi-prefabricated pipe gallery and construction method |
CN108252329A (en) * | 2018-03-20 | 2018-07-06 | 浙江新盛建设集团有限公司 | The assembled pipe gallery and its construction method of building enclosure load |
CN108661076A (en) * | 2017-04-02 | 2018-10-16 | 杭州南联地基基础工程有限公司 | Meet ground and goes along with sb. to guard him the underground pipe gallery integration drag mode construction method of construction requirement |
CN111980063A (en) * | 2020-08-17 | 2020-11-24 | 济南轨道交通集团有限公司 | Subway open cut interval prefabricated box culvert laminated structure and construction method thereof |
CN111980064A (en) * | 2020-08-17 | 2020-11-24 | 济南轨道交通集团有限公司 | Prefabricated superposed structure for shallow-buried section of rail transit engineering and construction method thereof |
CN112554232A (en) * | 2020-12-03 | 2021-03-26 | 山西省工业设备安装集团有限公司 | Assembled prefabricated comprehensive pipe gallery and installation method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1195730A (en) * | 1998-05-06 | 1998-10-14 | 顺德市永基建筑基础有限公司 | Building foundation pit supporting method and special-purpose flat concrete pile |
JPH11336470A (en) * | 1998-05-22 | 1999-12-07 | Toda Constr Co Ltd | Underground tunnel and constructing method thereof |
CN203531010U (en) * | 2013-10-30 | 2014-04-09 | 北京城建亚泰建设集团有限公司 | Supporting platform of heat pipe trench and for crossing reserved subway station |
CN103953067A (en) * | 2014-04-14 | 2014-07-30 | 上海市政工程设计研究总院(集团)有限公司 | Foundation pit bracing and underground box type major structure integration structure and construction method thereof |
CN104131567A (en) * | 2013-05-02 | 2014-11-05 | 上海城地建设股份有限公司 | Novel waterstop prefabricated centrifugal rectangular pile retaining structure and construction method thereof |
CN104234080A (en) * | 2014-09-15 | 2014-12-24 | 上海市政工程设计研究总院(集团)有限公司 | Utility tunnel structure for preventing deformation at high-water-level liquefaction region |
-
2015
- 2015-10-29 CN CN201510716833.2A patent/CN105350583A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1195730A (en) * | 1998-05-06 | 1998-10-14 | 顺德市永基建筑基础有限公司 | Building foundation pit supporting method and special-purpose flat concrete pile |
JPH11336470A (en) * | 1998-05-22 | 1999-12-07 | Toda Constr Co Ltd | Underground tunnel and constructing method thereof |
CN104131567A (en) * | 2013-05-02 | 2014-11-05 | 上海城地建设股份有限公司 | Novel waterstop prefabricated centrifugal rectangular pile retaining structure and construction method thereof |
CN203531010U (en) * | 2013-10-30 | 2014-04-09 | 北京城建亚泰建设集团有限公司 | Supporting platform of heat pipe trench and for crossing reserved subway station |
CN103953067A (en) * | 2014-04-14 | 2014-07-30 | 上海市政工程设计研究总院(集团)有限公司 | Foundation pit bracing and underground box type major structure integration structure and construction method thereof |
CN104234080A (en) * | 2014-09-15 | 2014-12-24 | 上海市政工程设计研究总院(集团)有限公司 | Utility tunnel structure for preventing deformation at high-water-level liquefaction region |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017071113A1 (en) * | 2015-10-29 | 2017-05-04 | 周兆弟 | Cement-soil mixing pile protected underground pipe gallery |
CN106049530A (en) * | 2016-05-27 | 2016-10-26 | 俞晓东 | Urban comprehensive pipe gallery and construction method |
CN106638670A (en) * | 2017-01-20 | 2017-05-10 | 福建省建筑设计研究院 | Semi-prefabricated pipe gallery and construction method |
CN106638670B (en) * | 2017-01-20 | 2019-07-26 | 福建省建筑设计研究院有限公司 | Half prefabricated piping lane and construction method |
CN108661076A (en) * | 2017-04-02 | 2018-10-16 | 杭州南联地基基础工程有限公司 | Meet ground and goes along with sb. to guard him the underground pipe gallery integration drag mode construction method of construction requirement |
CN108252329A (en) * | 2018-03-20 | 2018-07-06 | 浙江新盛建设集团有限公司 | The assembled pipe gallery and its construction method of building enclosure load |
CN111980063A (en) * | 2020-08-17 | 2020-11-24 | 济南轨道交通集团有限公司 | Subway open cut interval prefabricated box culvert laminated structure and construction method thereof |
CN111980064A (en) * | 2020-08-17 | 2020-11-24 | 济南轨道交通集团有限公司 | Prefabricated superposed structure for shallow-buried section of rail transit engineering and construction method thereof |
CN112554232A (en) * | 2020-12-03 | 2021-03-26 | 山西省工业设备安装集团有限公司 | Assembled prefabricated comprehensive pipe gallery and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350583A (en) | Underground pipe gallery fender wall construction method and underground pipe gallery construction method | |
CN105369824A (en) | Cement mixing pile protective underground pipe gallery | |
CN105350572B (en) | Assembled underground pipe gallery | |
CN103256052B (en) | Construction method for integral straight middle wall type double-arch tunnel | |
CN204491666U (en) | A kind of steel corrugated sheet Urban Underground pipe gallery | |
CN109505611B (en) | Construction method for realizing underground excavation and top-down construction by utilizing combined jacking pipes | |
CN205224088U (en) | Cement mixing method protection underground pipe gallery | |
CN105350582A (en) | Protective structure of underground pipe gallery | |
CN110387889A (en) | A kind of multi-arch type foundation pit supporting method for strip deep basal pit | |
CN203939509U (en) | The waterproof construction of bolt-spary supports traffic tunnel | |
CN108661075A (en) | Assembled underground one corridor | |
CN207700221U (en) | A kind of prefabricated pipe gallery steel plate cast-in-place concrete sealing connection structure | |
CN205134385U (en) | Underground pipe gallery protective structure | |
CN105350570B (en) | Assembled underground pipe gallery multiple-pass joint | |
CN203904857U (en) | Precast-concrete three-arch culvert pipe | |
CN207160068U (en) | A kind of disjunctor corrugated steel piping lane | |
CN206800446U (en) | Assembled underground one corridor | |
CN105065040A (en) | Top-plate-prefabricated underground space underground excavation building method | |
CN202324155U (en) | Adjustable corrugated prestress anti-pollution drainage culvert | |
CN202247719U (en) | Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge | |
CN206800484U (en) | Ruggedized construction for underpass | |
CN205134362U (en) | Underground pipe gallery bi -pass connects | |
CN215561839U (en) | Overhead water pipe for road | |
CN212177148U (en) | Symmetrical horseshoe-shaped assembled concrete tunnel | |
CN204098067U (en) | Side's culvert formula underground pipe gallery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160224 |
|
RJ01 | Rejection of invention patent application after publication |