CN205296229U - Sewer manhole in utility tunnel - Google Patents

Sewer manhole in utility tunnel Download PDF

Info

Publication number
CN205296229U
CN205296229U CN201620025960.8U CN201620025960U CN205296229U CN 205296229 U CN205296229 U CN 205296229U CN 201620025960 U CN201620025960 U CN 201620025960U CN 205296229 U CN205296229 U CN 205296229U
Authority
CN
China
Prior art keywords
pipe
inspection
pipe gallery
inspection shaft
sewage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620025960.8U
Other languages
Chinese (zh)
Inventor
徐飞飞
王家华
司书鹏
葛华飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design and Research Institute (Group)
Original Assignee
Shanghai Urban Construction Design and Research Institute (Group)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design and Research Institute (Group) filed Critical Shanghai Urban Construction Design and Research Institute (Group)
Priority to CN201620025960.8U priority Critical patent/CN205296229U/en
Application granted granted Critical
Publication of CN205296229U publication Critical patent/CN205296229U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

本实用新型公开了一种综合管廊内的污水检查井,管道舱内设有T形支架,T形支架固定在管道舱的内壁上,检查井筒设置在T形支架上部,所述检查井筒的上部穿过管道舱的顶板延伸至外侧,污水管从检查井筒内部穿过,检查井筒外部的管道舱顶板上设有检查井外壁,管道舱内还设有电力管支架和通信管支架、自用支架和备用支架,在管道舱内部布置检查井筒,采用一体化薄壁式塑料检查井筒,检查井筒利用管廊内部T形支架固定,检查井筒延伸出管廊顶板一小段,在其外侧设置检查井外壁,由于内部检查井筒井不用承受外部荷载,外侧检查井外壁不直接与管廊内部污水管相连,具有易于布置、密封性好、移植性强和投资小等特点,实用性较强。

The utility model discloses a sewage inspection well in a comprehensive pipe gallery. A T-shaped bracket is arranged in the pipeline cabin, and the T-shaped bracket is fixed on the inner wall of the pipeline cabin. The inspection shaft is arranged on the upper part of the T-shaped bracket. The upper part passes through the roof of the pipe cabin and extends to the outside. The sewage pipe passes through the inside of the inspection shaft. The outer wall of the inspection well is set on the roof of the pipe cabin outside the inspection shaft. There are also power pipe brackets, communication pipe brackets, and self-use brackets in the pipeline cabin. And spare brackets, the inspection shaft is arranged inside the pipeline cabin, and the integrated thin-walled plastic inspection shaft is adopted. The inspection shaft is fixed by the T-shaped bracket inside the pipe gallery. , because the internal inspection shaft does not need to bear external loads, and the outer wall of the outer inspection shaft is not directly connected to the internal sewage pipe of the pipe gallery, it has the characteristics of easy layout, good sealing, strong transplantability and small investment, and has strong practicability.

Description

综合管廊内的污水检查井Sewage inspection well in the comprehensive utility gallery

技术领域 technical field

本实用新型涉及雨水排放技术领域,尤其涉及一种综合管廊内的污水检查井。 The utility model relates to the technical field of rainwater discharge, in particular to a sewage inspection well in a comprehensive pipe gallery.

背景技术 Background technique

城市道路作为都市的骨架,不仅担负着繁重的地面交通负荷,同时还是城市各种市政公用事业管线的地下通道,合理高效地开发利用城市道路下部空间,正受到越来越多的国家和城市的重视。2013年,国务院下发了“关于加强城市基础设施建设的意见”(国发〔2013〕36号),首次提出计划开展城市地下综合管廊试点,用3年左右时间,在全国36个大中城市全面启动地下综合管廊试点工程。2015年7月28日,国务院常务会议中更是将地下综合管廊建设提升到新的高度。 As the skeleton of the city, urban roads not only bear heavy ground traffic loads, but also serve as underground passages for various municipal utility pipelines in the city. The rational and efficient development and utilization of the lower space of urban roads is being sought by more and more countries and cities. Pay attention to. In 2013, the State Council issued the "Opinions on Strengthening Urban Infrastructure Construction" (Guo Fa [2013] No. 36), and for the first time proposed to carry out the pilot project of urban underground comprehensive pipe corridors. In about 3 years, 36 large and medium-sized The city has fully launched the pilot project of underground comprehensive utility corridors. On July 28, 2015, the executive meeting of the State Council raised the construction of the underground comprehensive utility corridor to a new height.

《城市综合管廊工程技术规范》(GB50838-2015)版发布前,国内纳入综合管廊的管线多为电力管、给水管和通信管,通常为单舱布置,且老的《城市综合管廊工程技术规范》(GB50838-2012)中不建议在综合管廊内纳入雨水和污水管线,也未对雨水、污水、天然气管纳入综合管廊的手段进行详细说明。而《城市综合管廊工程技术规范》(GB50838-2015)对于雨水、污水和天然气管纳入综合管廊的技术措施进行了较为详细的说明,此后国务院也提倡尽量将所有地下管线均纳入综合管廊内。 Before the release of the "Technical Specifications for Urban Comprehensive Pipe Gallery Engineering" (GB50838-2015), the pipelines included in the comprehensive pipe gallery in China were mostly power pipes, water supply pipes and communication pipes, usually arranged in a single cabin, and the old "Urban Comprehensive Pipe Gallery In the Engineering Technical Specifications (GB50838-2012), it is not recommended to incorporate rainwater and sewage pipelines into the comprehensive pipe gallery, nor does it describe in detail the means of incorporating rainwater, sewage, and natural gas pipes into the comprehensive pipe gallery. The "Technical Specifications for Urban Comprehensive Pipe Gallery Engineering" (GB50838-2015) has made a more detailed description of the technical measures for incorporating rainwater, sewage and natural gas pipes into the comprehensive pipe gallery. Since then, the State Council has also advocated that all underground pipelines be included in the comprehensive pipe gallery. Inside.

针对地形条件和排水系统能满足雨水、污水纳入的情况,需考虑将雨水、污水纳入综合管廊内,《城市综合管廊工程技术规范》(GB50838-2015)中规定污水纳入综合管廊内应采用管道形式,主要是从密封性的角度考虑。但是规范中未对污水纳入综合管廊时通风、检修设施的布置进行详细说明。由于市政污水管口径较大,且长度较长,按建筑排水管的室内检查口的布置方法,难以满足管道通风和检修的需求,而按室外污水管的布置形式,则应设置污水检查井。而一般检查井的壁厚较大,直接将市政排水检查井固定于管廊内,不仅布置困难,且会导致管廊断面的增大,从而增加投资。如何设置适用于综合管廊内的污水检查井十分重要。 In view of the topographical conditions and drainage system that can meet the requirements of rainwater and sewage, it is necessary to consider incorporating rainwater and sewage into the comprehensive pipe gallery. The "Technical Specifications for Urban Comprehensive Pipe Gallery Engineering" (GB50838-2015) stipulates that sewage should be included in the comprehensive pipe gallery. The form of the pipeline is mainly considered from the perspective of sealing. However, the specification does not specify the layout of ventilation and maintenance facilities when sewage is brought into the comprehensive pipe gallery. Due to the large diameter and long length of municipal sewage pipes, it is difficult to meet the needs of pipeline ventilation and maintenance according to the layout of indoor inspection ports of building drainage pipes, and sewage inspection wells should be provided according to the layout of outdoor sewage pipes. However, the wall thickness of the general inspection well is relatively large, and directly fixing the municipal drainage inspection well in the pipe gallery is not only difficult to arrange, but also leads to an increase in the section of the pipe gallery, thereby increasing investment. It is very important how to set up the sewage inspection well suitable for the comprehensive utility corridor.

实用新型内容 Utility model content

有鉴于现有技术的上述缺陷,本实用新型提供一种综合管廊内的污水检查井,在综合管廊内部布置污水检查井,管廊内采用一体化薄壁式塑料检查井筒,检查井筒利用管廊内部T形支架固定,检查井筒出管廊顶板一小段,在其外侧设置检查井外壁,由于内部塑料检查井不用承受外部荷载,外侧检查井外壁不直接与管廊内部污水管道相连,具有易于布置、密封性好、移植性强和投资小等特点,实用性较强。 In view of the above-mentioned defects of the prior art, the utility model provides a sewage inspection well in the comprehensive pipe gallery, the sewage inspection well is arranged inside the comprehensive pipe gallery, and the integrated thin-walled plastic inspection shaft is used in the pipe gallery, and the inspection shaft is used The T-shaped bracket inside the pipe gallery is fixed, and the inspection shaft exits a short section of the roof of the pipe gallery, and the outer wall of the inspection well is set outside it. Since the inner plastic inspection well does not need to bear external loads, the outer wall of the outer inspection well is not directly connected to the sewage pipe inside the pipe gallery. Easy to arrange, good sealing, strong transplantability and small investment, etc., and has strong practicability.

为实现上述目的,本实用新型提供了一种综合管廊内的污水检查井,包括管道舱,所述管道舱内设有T形支架,T形支架固定在管道舱的内壁上,检查井筒设置在T形支架上部,所述检查井筒的上部穿过管道舱的顶板延伸至外侧,污水管从检查井筒内部穿过,检查井筒外部的管道舱顶板上设有检查井外壁,管道舱内还设有电力管支架和通信管支架、自用支架和备用支架。 In order to achieve the above purpose, the utility model provides a sewage inspection well in a comprehensive pipe gallery, including a pipeline cabin, and a T-shaped bracket is arranged in the pipeline cabin, and the T-shaped bracket is fixed on the inner wall of the pipeline cabin. On the upper part of the T-shaped bracket, the upper part of the inspection shaft passes through the roof of the pipeline cabin and extends to the outside. The sewage pipe passes through the inside of the inspection shaft. There are power pipe support and communication pipe support, self-use support and spare support.

优选的是,所述检查井筒为薄壁式塑料检查井筒。 Preferably, the inspection shaft is a thin-walled plastic inspection shaft.

上述任一方案优选的是,所述检查井外壁为砖砌检查井外壁。 Preferably, in any of the above schemes, the outer wall of the inspection well is an outer wall of a brick inspection well.

上述任一方案优选的是,所述检查井外壁设置在地面下部。 Preferably in any of the above schemes, the outer wall of the inspection well is arranged at the lower part of the ground.

上述任一方案优选的是,所述检查井筒的上部穿过管道舱顶板的高度为50-80cm。 Preferably in any of the above schemes, the height of the upper part of the inspection shaft passing through the roof of the pipeline cabin is 50-80cm.

上述任一方案优选的是,所述自用支架、备用支架、通信管支架和电力管支架从上到下依次设置且相互平行。 Preferably, in any of the above schemes, the self-use support, spare support, communication pipe support and power pipe support are arranged in sequence from top to bottom and are parallel to each other.

上述任一方案优选的是,所述管道舱内部还设有排水沟。 Preferably, in any of the above schemes, a drainage ditch is also provided inside the pipeline compartment.

上述任一方案优选的是,顶板下部还设有S形热气溶胶和照明灯具。 Preferably, in any of the above schemes, the lower part of the top plate is also provided with S-shaped hot aerosol and lighting fixtures.

本实用新型的有益效果:管道舱内设有T形支架,T形支架固定在管道舱的内壁上,检查井筒设置在T形支架上部,所述检查井筒的上部穿过管道舱的顶板延伸至外侧,污水管从检查井筒内部穿过,检查井筒外部的管道舱顶板上设有检查井外壁,管道舱内还设有电力管支架和通信管支架、自用支架和备用支架,提供一种综合管廊内的污水检查井,在在管道舱内部布置检查井筒,采用一体化薄壁式塑料检查井筒,检查井筒利用管廊内部T形支架固定,检查井筒延伸出管廊顶板一小段,在其外侧设置检查井外壁,由于内部检查井筒井不用承受外部荷载,外侧检查井外壁不直接与管廊内部污水管相连,具有易于布置、密封性好、移植性强和投资小等特点,实用性较强。 Beneficial effects of the utility model: there is a T-shaped bracket in the pipeline cabin, the T-shaped bracket is fixed on the inner wall of the pipeline cabin, the inspection shaft is arranged on the upper part of the T-shaped bracket, and the upper part of the inspection shaft passes through the roof of the pipeline cabin and extends to On the outside, the sewage pipe passes through the inside of the inspection shaft, and the outer wall of the inspection shaft is arranged on the top plate of the pipe cabin outside the inspection shaft. There are also power pipe brackets, communication pipe brackets, self-use brackets and spare brackets in the pipeline cabin, providing a comprehensive pipeline. For the sewage inspection well in the corridor, the inspection shaft is arranged inside the pipeline compartment, and the integrated thin-walled plastic inspection shaft is used. The inspection shaft is fixed by the T-shaped bracket inside the pipe gallery. The outer wall of the inspection well is set. Since the inner inspection well does not need to bear external loads, the outer wall of the outer inspection well is not directly connected to the internal sewage pipe of the pipe gallery. It has the characteristics of easy layout, good sealing, strong transplantability and small investment, and is more practical. .

以下将结合附图对本实用新型的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本实用新型的目的、特征和效果。 The conception, specific structure and technical effects of the present utility model will be further described below in conjunction with the accompanying drawings, so as to fully understand the purpose, characteristics and effects of the present utility model.

附图说明 Description of drawings

图1为本实用新型的剖视图。 Fig. 1 is a sectional view of the utility model.

图2为图1的局部结构俯视图。 FIG. 2 is a top view of the partial structure of FIG. 1 .

具体实施方式 detailed description

如图1-图2所示,一种综合管廊内的污水检查井,包括管道舱1,所述管道舱1内设有T形支架2,T形支架2固定在管道舱1的内壁上,检查井筒3设置在T形支架2上部,所述检查井筒3的上部穿过管道舱1的顶板11延伸至外侧,污水管4从检查井筒3内部穿过,检查井筒3外部的管道舱1的顶板11上设有检查井外壁5,管道舱1内还设有电力管支架6和通信管支架7、自用支架8和备用支架9。 As shown in Figures 1-2, a sewage inspection well in a comprehensive pipe gallery includes a pipeline cabin 1, and a T-shaped bracket 2 is arranged in the pipeline cabin 1, and the T-shaped bracket 2 is fixed on the inner wall of the pipeline cabin 1 , the inspection shaft 3 is arranged on the upper part of the T-shaped bracket 2, the upper part of the inspection shaft 3 extends to the outside through the roof 11 of the pipeline cabin 1, the sewage pipe 4 passes through the inside of the inspection shaft 3, and the pipeline cabin 1 outside the inspection shaft 3 The top plate 11 is provided with the outer wall 5 of the inspection well, and the pipe cabin 1 is also provided with a power pipe support 6 and a communication pipe support 7, a self-use support 8 and a spare support 9.

本实用新型进一步优化的技术方案,所述检查井筒3为薄壁式塑料检查井筒。 In the further optimized technical solution of the utility model, the inspection shaft 3 is a thin-walled plastic inspection shaft.

本实用新型进一步优化的技术方案,所述检查井外壁5为砖砌检查井外壁。 In the further optimized technical solution of the utility model, the outer wall 5 of the inspection well is an outer wall of a brick inspection well.

本实用新型进一步优化的技术方案,所述检查井外壁5设置在地面10下部。 In the further optimized technical solution of the utility model, the outer wall 5 of the inspection well is arranged at the lower part of the ground 10 .

本实用新型进一步优化的技术方案,所述检查井筒3的上部穿过顶板11的高度为50-80cm。 In the further optimized technical solution of the utility model, the height at which the upper part of the inspection shaft 3 passes through the top plate 11 is 50-80 cm.

本实用新型进一步优化的技术方案,所述自用支架8、备用支架9、通信管支架7和电力管支架6从上到下依次设置且相互平行。 In the further optimized technical solution of the utility model, the self-use bracket 8, the spare bracket 9, the communication tube bracket 7 and the power tube bracket 6 are arranged in sequence from top to bottom and are parallel to each other.

本实用新型进一步优化的技术方案,所述管道舱1内部还设有排水沟12。 In the further optimized technical solution of the utility model, a drainage ditch 12 is also provided inside the pipeline cabin 1 .

本实用新型进一步优化的技术方案,顶板11下部还设有S形热气溶胶13和照明灯具14。 In the further optimized technical solution of the utility model, an S-shaped hot aerosol 13 and a lighting fixture 14 are also provided on the lower part of the top plate 11 .

本实用新型提供一种综合管廊内的污水检查井,在管道舱1内部布置检查井筒3,采用一体化薄壁式塑料检查井筒,检查井筒利用管廊内部T形支架2固定,检查井筒3延伸出管廊顶板一小段,在其外侧设置检查井外壁5,由于内部检查井筒3井不用承受外部荷载,外侧检查井外壁5不直接与管廊内部污水管4相连,具有易于布置、密封性好、移植性强和投资小等特点,实用性较强。 The utility model provides a sewage inspection well in a comprehensive pipe gallery. An inspection shaft 3 is arranged inside a pipeline cabin 1, and an integrated thin-walled plastic inspection shaft is adopted. The inspection shaft is fixed by a T-shaped bracket 2 inside the pipe gallery, and the inspection shaft 3 Extend a short section of the roof of the pipe gallery, and set the outer wall 5 of the inspection well outside it. Since the inner inspection shaft 3 does not need to bear external loads, the outer wall 5 of the outer inspection well is not directly connected to the sewage pipe 4 inside the pipe gallery, which is easy to arrange and tight. Good, strong portability and small investment and other characteristics, strong practicability.

以上详细描述了本实用新型的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本实用新型的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本实用新型的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。 The preferred specific embodiments of the present utility model have been described in detail above. It should be understood that those skilled in the art can make many modifications and changes according to the concept of the utility model without creative efforts. Therefore, all technical solutions that can be obtained by those skilled in the art based on the concept of the utility model through logical analysis, reasoning or limited experiments on the basis of the prior art should be within the scope of protection defined by the claims .

Claims (8)

1. the sewage inspection well in a pipe gallery, including pipeline cabin (1), it is characterized in that, it is provided with T-shaped support (2) in described pipeline cabin (1), T-shaped support (2) is fixed on the inwall of pipeline cabin (1), check that pit shaft (3) is arranged on T-shaped support (2) top, the top of described inspection pit shaft (3) extends to outside through the top board (11) of pipeline cabin (1), soil pipe (4) is from checking the internal traverse of pit shaft (3), check that the top board (11) in the pipeline cabin (1) of pit shaft (3) outside is provided with inspection shaft outer wall (5), power pipe support (6) and communication tube support (7) it is additionally provided with in pipeline cabin (1), personal support (8) and standby support (9).
2. the sewage inspection well in pipe gallery as claimed in claim 1, it is characterised in that, described inspection pit shaft (3) is thin wall-type plastic inspection well cylinder.
3. the sewage inspection well in pipe gallery as claimed in claim 1, it is characterised in that, described inspection shaft outer wall (5) is brick inspection shaft outer wall.
4. the sewage inspection well in the pipe gallery as described in claim 1 or 3, it is characterised in that, described inspection shaft outer wall (5) is arranged on ground (10) bottom.
5. the sewage inspection well in pipe gallery as claimed in claim 1 or 2, it is characterised in that, the top of described inspection pit shaft (3) is 50-80cm through the height of top board (11).
6. the sewage inspection well in pipe gallery as claimed in claim 1, it is characterized in that, described personal support (8), standby support (9), communication tube support (7) and power pipe support (6) set gradually from top to bottom and are parallel to each other.
7. the sewage inspection well in pipe gallery as claimed in claim 1, it is characterised in that, described pipeline cabin (1) is internal is additionally provided with gutter (12).
8. the sewage inspection well in pipe gallery as claimed in claim 1, it is characterised in that, top board (11) bottom is additionally provided with S shape hot aerosol (13) and lighting (14).
CN201620025960.8U 2016-01-12 2016-01-12 Sewer manhole in utility tunnel Expired - Fee Related CN205296229U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620025960.8U CN205296229U (en) 2016-01-12 2016-01-12 Sewer manhole in utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620025960.8U CN205296229U (en) 2016-01-12 2016-01-12 Sewer manhole in utility tunnel

Publications (1)

Publication Number Publication Date
CN205296229U true CN205296229U (en) 2016-06-08

Family

ID=56474807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620025960.8U Expired - Fee Related CN205296229U (en) 2016-01-12 2016-01-12 Sewer manhole in utility tunnel

Country Status (1)

Country Link
CN (1) CN205296229U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049542A (en) * 2016-07-29 2016-10-26 上海市政工程设计研究总院(集团)有限公司 Arrangement method for drainage inspection wells applied to comprehensive pipe rack
CN106592635A (en) * 2016-12-13 2017-04-26 海宁亚大塑料管道系统有限公司 Integrated inspection shaft and installation method thereof
CN113718853A (en) * 2021-08-20 2021-11-30 新疆生产建设兵团第六建筑工程有限责任公司 Drainage overhead construction system for high-rise residential building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049542A (en) * 2016-07-29 2016-10-26 上海市政工程设计研究总院(集团)有限公司 Arrangement method for drainage inspection wells applied to comprehensive pipe rack
CN106592635A (en) * 2016-12-13 2017-04-26 海宁亚大塑料管道系统有限公司 Integrated inspection shaft and installation method thereof
CN113718853A (en) * 2021-08-20 2021-11-30 新疆生产建设兵团第六建筑工程有限责任公司 Drainage overhead construction system for high-rise residential building

Similar Documents

Publication Publication Date Title
CN206467686U (en) Pipe gallery with Regulation Function
CN205576972U (en) Three storehouse formula utility tunnel structures
CN106320370A (en) Underground comprehensive pipe rack system
CN205894103U (en) Prefabricated parabola type utility tunnel
CN211714133U (en) A rainwater and sewage diversion pipeline structure in an urban village
CN206396792U (en) A kind of three-way sewage pipe crosses pipe gallery crossover node structure
CN206396791U (en) A kind of four-way sewage pipe crosses pipe gallery crossover node structure
CN205557584U (en) Steel pipe corridor and large -scale utility tunnel system
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN209891245U (en) Prefabricated integral reinforced concrete gas valve well
CN206396789U (en) A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge
CN209817036U (en) Fabricated drop well suitable for urban drainage pipe network
CN206396790U (en) A kind of comprehensive pipe gallery structure for being easy to rainwater to discharge
CN221523750U (en) A multi-compartment municipal integrated pipe gallery drainage branch pipe access node structure
CN205296222U (en) Two sides enlarge arrangement structure of utility tunnel pipeline branch mouth
CN205348223U (en) Node structure of being connected control center and two cabin utility tunnel
CN105484291A (en) Unilaterally-expanded comprehensive pipe gallery joint structure
CN205296221U (en) Many function synthesis piping lane
CN206418520U (en) A kind of comprehensive pipe gallery structure for accessing storm sewer
CN205205863U (en) Prefabricated inspection shaft
CN203514353U (en) Glass fiber reinforced plastics inspection well
CN201713858U (en) Rainwater collecting, processing and lifting device
CN211057848U (en) Circular utility tunnel extensible structure of individual layer
CN209368878U (en) Prefabricated underground pipe gallery
CN102587597B (en) Rainwater vertical tube mounting structure for flat roof of building based on low impact development thought and mounting method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

CF01 Termination of patent right due to non-payment of annual fee