CN205557584U - Steel pipe corridor and large -scale utility tunnel system - Google Patents

Steel pipe corridor and large -scale utility tunnel system Download PDF

Info

Publication number
CN205557584U
CN205557584U CN201620351062.1U CN201620351062U CN205557584U CN 205557584 U CN205557584 U CN 205557584U CN 201620351062 U CN201620351062 U CN 201620351062U CN 205557584 U CN205557584 U CN 205557584U
Authority
CN
China
Prior art keywords
piping lane
piping
steel
square
lanes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620351062.1U
Other languages
Chinese (zh)
Inventor
谢志树
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620351062.1U priority Critical patent/CN205557584U/en
Application granted granted Critical
Publication of CN205557584U publication Critical patent/CN205557584U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a city subterranean pipe line technical field, concretely relates to steel pipe corridor and large -scale utility tunnel system, the steel pipe corridor includes the piping lane body of tubular structure, the cross sectional shape semicircular in shape of piping lane body, its upper end be the circular arc shaped plate with underpass inner wall contact, and the lower extreme be respectively the bottom plate with two end connection of circular arc shaped plate, are provided with the support of installation cable on this internal convex face of piping lane, and the bottom surface of piping lane body is used for arranging multiple pipeline and being used for placing the dolly that transports the article, the piping lane system includes two at least steel pipe corridors. Because the characteristics of steel structure can realize the quick concatenation of piping lane, and intensity high, antiseismic, the difficult emergence reveal, piping lane size that can be different according to different requirement design to the urban road or the secret overall arrangement of identical standard, can be standardized production with the piping lane, improve production efficiency, and the construction installation rate is fast and the anti -corrosion measure of steel product is thorough, the piping lane is longe -lived, comprehensive cost is low.

Description

A kind of steel piping lane and large-scale synthesis piping lane system
Technical field
This utility model relates to a kind of Urban Underground pipeline facilities, particularly a kind of steel piping lane and large-scale synthesis piping lane system.
Background technology
Pipe gallery is a kind of to comprehensively utilize the underground tunnel structure of life pipeline needed for urban underground space, rationally storage Urban Operation, it is enforcement unified planning, designs, constructs and safeguard, it is built in Urban Underground for laying the public utility of municipal public use pipeline, which obviate the trouble causing road surface to repeat excavation owing to burying underground or keep in repair pipeline, and soil and groundwater is not contacted due to pipeline, avoid the soil corrosion to pipeline, extend pipeline service life, additionally, it has also reserved the underground space of preciousness for city planning and development from now on.
But, the underground piping structure structure of current city integrated piping lane many employings armored concrete, material is many, the engineering time is long for the consuming of this structure, it is difficult to carry out standardization prefabricated component assembled, can not standardized production, production efficiency low, relatively costly, cause that Urban Buried Pipeline Network construction is big, long construction period, building and maintenance impact raw on urban human people's livelihood life birth.
Utility model content
Goal of the invention of the present utility model is: for the underground piping structure structure of existing city integrated piping lane many employings armored concrete, material is many, the engineering time is long for the consuming of this structure, it is difficult to carry out standardization prefabricated component assembled, can not standardized production, production efficiency low, relatively costly, cause that Urban Buried Pipeline Network construction is big, the problem of long construction period, a kind of steel piping lane and large-scale synthesis piping lane system are provided, the quick splicing of piping lane can be realized, and intensity is high, antiseismic, be not susceptible to leakage;Can be according to the different tube lane dimension of different Demand Design, urban road or underground layout for identical standard, also can be by piping lane standardized production, raising production efficiency, construction and installation speed is fast and steel product anti-corrosion measure is thorough, piping lane life-span length, integrated cost are low.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of steel piping lane, piping lane body including the steel of tubular structure, the cross sectional shape semicircular in shape of described piping lane body, its upper end is the circular arc plate with underpass contact internal walls, lower end is the base plate being connected with circular arc plate both ends respectively, being provided with the support installing cable on the intrinsic arc-shaped surface of piping lane, the bottom surface of piping lane body is for arranging pipelines and for placing the dolly of transport object.
The underground pipe gallery that existing armored concrete makes is optimized for steel piping lane, and its piping lane body semicircular in shape, top is suitable with the general circular configuration of underpass, bottom is the platy structure of plane, it is simple to the steady installation of whole steel piping lane, also allows for connecting below piping lane body installing more Pipe rack, convenient and swift, due to structure of steel product, the quick splicing of piping lane can be realized, and intensity is high, antiseismic, be not susceptible to leakage;Can be according to the different tube lane dimension of different Demand Design, urban road or underground layout for identical standard, also can be by piping lane standardized production, raising production efficiency, construction and installation speed is fast and steel product anti-corrosion measure is thorough, piping lane life-span length, integrated cost are low.
On the other hand; at this internal support arranging installation cable of piping lane; it is easy to cable install; protection cable safe handling and life-time service; pipeline in piping lane body sole arrangement is arranged for various pipelines; and configure the dolly of transport object, it is simple in workmen and the transport of materials of piping lane gut line installation, improve efficiency of construction.
As preferred version of the present utility model, being also connected with square piping lane below described piping lane body, the memory space of described piping lane body and square piping lane is separate.Square piping lane is connected in the lower section of piping lane body, the size of the size of square piping lane with piping lane body is correspondingly arranged, the steel piping lane formed a whole, separate piping lane body and square piping lane form separate space, so steel piping lane of composition forms two separate cavity space, can be used for installing different pipelines respectively, meet use demand.
As preferred version of the present utility model, described square piping lane is provided with the collecting pipe connected with upper space, is used for collecting rainwater or sewage.Square piping lane and ground or municipal water pipeline connection are easy in the setting of collecting pipe.
As preferred version of the present utility model, in described square piping lane, it is additionally provided with desilting intelligent machine.Square piping lane, as rainwater or the collection of sewage and the chamber that circulates, has the impurity such as mud unavoidably and exists, arrange desilting intelligent machine in square piping lane, it is ensured that the runner of square piping lane is unobstructed.
A kind of large-scale synthesis piping lane system, including the steel piping lane that at least two is above-mentioned.Two or more steel piping lanes use simultaneously, and lower pipeline arranges complicated situation contentedly, by the setting of multiple steel piping lanes, are arranged by underground utilities locellus, simultaneously as steel piping lane standardization is installed after making simultaneously, can improve efficiency of construction.
As preferred version of the present utility model, including two steel piping lanes, two described steel piping lanes make and become an entirety.Being made as two steel piping lanes installation, beneficially accelerating construction progress simultaneously of entirety, be particularly suitable for installing or pipeline modification at Urban Underground piping lane, speed of application is fast, can reduce the impact on urban transportation.
As preferred version of the present utility model, two described steel piping lanes all include piping lane body and square piping lane, this system also includes being connected to the cover plate between two square piping lane sidewalls and base plate, and the sidewall of described cover plate, base plate and two square piping lanes forms the 3rd installation cavity of separate space structure.Space between two steel piping lanes is formed the 3rd installation cavity, is conducive to arranging more pipeline reasonable Arrangement, and chamber can be divided to arrange pipeline.
As preferred version of the present utility model, described 3rd installation cavity is by connecting outside emptying tube and tube.Ensure chamber and outside ventilation, reduce security risk.
As preferred version of the present utility model, being connected with the first breather between two square piping lanes, be connected with the second breather between the piping lane body of two steel piping lanes, described first breather and the second breather are all by connecting outside emptying tube and tube.Two piping lane bodies and two square piping lanes are respectively communicated with, form ventilating system, and dry and wet is respectively communicated with, it is to avoid the pipeline in the dry chamber of influence of moisture normally works.
As preferred version of the present utility model, this system also includes the upper cover plate being connected between two piping lane bodies, forms the chamber on duty of separate space structure between described upper cover plate, cover plate and two piping lane bodies.Upper cover plate arranges formation chamber on duty, makes full use of the space between two steel piping lanes, it is provided that install pipeline or maintenance pipeline and the night shift room of piping lane to workman, and comparatively safe work and resting space.
As preferred version of the present utility model, described chamber on duty is additionally provided with ventilation duct, is connected outside piping lane system by ventilation duct.
In sum, owing to have employed technique scheme, the beneficial effects of the utility model are:
1, the underground pipe gallery that existing armored concrete makes is optimized for steel piping lane, and its piping lane body semicircular in shape, top is suitable with the general circular configuration of underpass, bottom is the platy structure of plane, it is simple to the steady installation of whole steel piping lane, also allows for connecting below piping lane body installing more Pipe rack, convenient and swift, due to structure of steel product, the quick splicing of piping lane can be realized, and intensity is high, antiseismic, be not susceptible to leakage;Can be according to the different tube lane dimension of different Demand Design, urban road or underground layout for identical standard, also can be by piping lane standardized production, raising production efficiency, construction and installation speed is fast and steel product anti-corrosion measure is thorough, piping lane life-span length, integrated cost are low;
2, square piping lane is connected in the lower section of piping lane body, the size of the size of square piping lane with piping lane body is correspondingly arranged, the steel piping lane formed a whole, separate piping lane body and square piping lane form separate space, so steel piping lane of composition forms two separate cavity space, can be used for installing the pipeline that dry and wet condition is different respectively, meet use demand;
3, two or more steel piping lanes use simultaneously, and lower pipeline arranges complicated situation contentedly, by the setting of multiple steel piping lanes, are arranged by underground utilities locellus, simultaneously as steel piping lane standardization is installed after making simultaneously, can improve efficiency of construction;
4, being made as two steel piping lanes installation, beneficially accelerating construction progress simultaneously of entirety, be particularly suitable for installing or pipeline modification at Urban Underground piping lane, speed of application is fast, can reduce the impact on urban transportation;Space between two steel piping lanes is formed the 3rd installation cavity, is conducive to arranging more pipeline reasonable Arrangement, and chamber can be divided to arrange pipeline;Increase upper cover plate and formation chamber on duty is set, make full use of the space between two steel piping lanes, it is provided that to workman pipeline or maintenance pipeline and the night shift room of piping lane be installed, and comparatively safe work and resting space.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model steel piping lane.
Fig. 2 is the structural representation of embodiment medium-and-large-sized pipe gallery system.
Fig. 3 is the structural representation of another embodiment medium-and-large-sized pipe gallery system.
Labelling in figure: 1-piping lane body, 2-communication cable, 3-power cable, 4-feed pipe, 5-dolly, 6-hot-water line, 7-base plate, the square piping lane of 8-, 9-collecting pipe, 10-desilting intelligent machine, 11-cover plate, 12-the second breather, 13-the first breather, 14-first row blank pipe, 15-second row blank pipe, 16-base plate, 17-upper cover plate, 18-ventilation duct.
Detailed description of the invention
Below in conjunction with the accompanying drawings, this utility model is described in detail.
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, this utility model is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain this utility model, is not used to limit this utility model.
Embodiment 1
As shown in Figure 1, the steel piping lane of the present embodiment, piping lane body 1 including the steel of tubular structure, the cross sectional shape semicircular in shape of described piping lane body 1, its upper end is the circular arc plate with underpass contact internal walls, lower end is the base plate 7 being connected with circular arc plate both ends respectively, and the arc-shaped surface in piping lane body 1 is provided with the support installing cable, and the bottom surface of piping lane body 1 is for arranging pipelines and for placing the dolly 5 of transport object.
The underground pipe gallery that existing armored concrete makes is optimized for steel piping lane, and its piping lane body semicircular in shape, top is suitable with the general circular configuration of underpass, bottom is the platy structure of plane, it is simple to the steady installation of whole steel piping lane, also allows for connecting below piping lane body installing more Pipe rack, convenient and swift, due to structure of steel product, the quick splicing of piping lane can be realized, and intensity is high, antiseismic, be not susceptible to leakage;Can be according to the different tube lane dimension of different Demand Design, urban road or underground layout for identical standard, also can be by piping lane standardized production, raising production efficiency, construction and installation speed is fast and steel product anti-corrosion measure is thorough, piping lane life-span length, integrated cost are low.
On the other hand; at this internal support arranging installation cable of piping lane; it is easy to cable install; protection cable safe handling and life-time service; pipeline in piping lane body sole arrangement is arranged for various pipelines; and configure the dolly of transport object, it is simple in workmen and the transport of materials of piping lane gut line installation, improve efficiency of construction.
In the present embodiment, as shown in Figure 1, the cable bearer of piping lane body 1 is respectively provided with communication cable 2 and power cable 3, base plate 7 is provided with feed pipe 4, dolly 5 and hot-water line 6, it is arranged on the pipeline in this steel piping lane and cable installation rational deployment, and owing to steel piping lane is unlikely to deform, intensity is high, antiseismic, be not susceptible to leakage, the placement position of each facility can keep constant for a long time, improves the safety that equipment uses.
Embodiment 2
As depicted in figs. 1 and 2, steel piping lane as described in Example 1, below the piping lane body 1 of steel piping lane, also it is connected with square piping lane 8, the memory space of described piping lane body 1 and square piping lane 8 is separate.Square piping lane is connected in the lower section of piping lane body, the size of the size of square piping lane with piping lane body is correspondingly arranged, the steel piping lane formed a whole, separate piping lane body and square piping lane form separate space, so steel piping lane of composition forms two separate cavity space, can be used for installing different pipelines respectively, meet use demand.
In the present embodiment, described square piping lane 8 is provided with the collecting pipe 9 connected with upper space, is used for collecting rainwater or sewage.The size of collecting pipe and length according to demand depending on, square piping lane and ground or municipal water pipeline connection are easy in the setting of collecting pipe.
In the present embodiment, in described square piping lane 9, it is additionally provided with desilting intelligent machine 10.Square piping lane, as rainwater or the collection of sewage and the chamber that circulates, has the impurity such as mud unavoidably and exists, arrange desilting intelligent machine in square piping lane, it is ensured that the runner of square piping lane is unobstructed.
Embodiment 3
As in figure 2 it is shown, the present embodiment is a kind of large-scale synthesis piping lane system, including two steel piping lanes, two described steel piping lanes make and become an entirety.Being made as two steel piping lanes installation, beneficially accelerating construction progress simultaneously of entirety, be particularly suitable for installing or pipeline modification at Urban Underground piping lane, speed of application is fast, can reduce the impact on urban transportation.
In the present embodiment, two described steel piping lanes all include piping lane body 1 and square piping lane 8, this system also includes being connected to the cover plate 11 between two square piping lane 8 sidewalls and base plate 16, and the sidewall of described cover plate 11, base plate 16 and two square piping lanes 8 forms the 3rd installation cavity of separate space structure.Space between two steel piping lanes is formed the 3rd installation cavity, is conducive to arranging more pipeline reasonable Arrangement, and chamber can be divided to arrange pipeline.
As shown in Figure 2, being disposed with feed pipe 4, dolly 5 and hot-water line 6 on the base plate 16 of the 3rd installation cavity, such large-scale piping lane system just can meet increasingly complex need of pipe line arrangement, and pipeline can be layered, sub-chamber arranges, make pipeline not interfere with each other, improve maintenance and change efficiency of construction.
In the present embodiment, described 3rd installation cavity connects by second row blank pipe 15 and pipe are outer.Ensure chamber and outside ventilation, reduce security risk.
In the present embodiment, between two square piping lanes 8, it is connected with the first breather 13, is connected with the second breather 12, described first breather 13 and the second breather 12 between the piping lane body 1 of two steel piping lanes and all connects by first row blank pipe 14 and pipe are outer.Two piping lane bodies and two square piping lanes are respectively communicated with, form ventilating system, and dry and wet is respectively communicated with, it is to avoid the pipeline in the dry chamber of influence of moisture normally works.
Embodiment 4
As it is shown on figure 3, the present embodiment is a kind of large-scale synthesis piping lane system, including two steel piping lanes, two described steel piping lanes make and become an entirety.Being made as two steel piping lanes installation, beneficially accelerating construction progress simultaneously of entirety, be particularly suitable for installing or pipeline modification at Urban Underground piping lane, speed of application is fast, can reduce the impact on urban transportation.
In the present embodiment, this system also includes the upper cover plate 12 being connected between two piping lane bodies 1, described upper cover plate 17, the chamber on duty of formation separate space structure between cover plate 11 and the sidewall of two piping lane bodies 1.Upper cover plate arranges formation chamber on duty, makes full use of the space between two steel piping lanes, it is provided that install pipeline or maintenance pipeline and the night shift room of piping lane, comparatively safe work and resting space to workman.
In the present embodiment, as it is shown on figure 3, described chamber on duty connects by ventilation duct 18 and pipe are outer.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all any amendment, equivalent and improvement etc. made within spirit of the present utility model and principle, within should be included in protection domain of the present utility model.

Claims (10)

1. a steel piping lane, piping lane body including tubular structure, it is characterized in that, the cross sectional shape semicircular in shape of described piping lane body, its upper end is the circular arc plate with underpass contact internal walls, lower end is the base plate being connected with circular arc plate both ends respectively, is provided with the support installing cable on the intrinsic arc-shaped surface of piping lane, and the bottom surface of piping lane body is for arranging pipelines and for placing the dolly of transport object.
Steel piping lane the most according to claim 1, it is characterised in that being also connected with square piping lane below described piping lane body, the memory space of described piping lane body and square piping lane is separate.
Steel piping lane the most according to claim 2, it is characterised in that be provided with, on described square piping lane, the collecting pipe connected with upper space, is used for collecting rainwater or sewage.
Steel piping lane the most according to claim 3, it is characterised in that be additionally provided with desilting intelligent machine in described square piping lane.
5. a large-scale synthesis piping lane system, it is characterised in that include the steel piping lane that at least two such as one of claim 1-4 is described.
Large-scale synthesis piping lane system the most according to claim 5, it is characterised in that include that two steel piping lanes, two described steel piping lanes make and become an entirety.
Large-scale synthesis piping lane system the most according to claim 6, it is characterized in that, two described steel piping lanes all include piping lane body and square piping lane, this system also includes being connected to the cover plate between two square piping lane sidewalls and base plate, and the sidewall of described cover plate, base plate and two square piping lanes forms the 3rd installation cavity of separate space structure.
Large-scale synthesis piping lane system the most according to claim 7, it is characterised in that described 3rd installation cavity is by connecting outside emptying tube and tube.
Large-scale synthesis piping lane system the most according to claim 6, it is characterized in that, being connected with the first breather between two square piping lanes, be connected with the second breather between the piping lane body of two steel piping lanes, described first breather and the second breather are all by connecting outside emptying tube and tube.
Large-scale synthesis piping lane system the most according to claim 9, it is characterised in that this system also includes the upper cover plate being connected between two piping lane bodies, forms the chamber on duty of separate space structure between described upper cover plate, cover plate and two piping lane bodies.
CN201620351062.1U 2016-04-25 2016-04-25 Steel pipe corridor and large -scale utility tunnel system Expired - Fee Related CN205557584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620351062.1U CN205557584U (en) 2016-04-25 2016-04-25 Steel pipe corridor and large -scale utility tunnel system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620351062.1U CN205557584U (en) 2016-04-25 2016-04-25 Steel pipe corridor and large -scale utility tunnel system

Publications (1)

Publication Number Publication Date
CN205557584U true CN205557584U (en) 2016-09-07

Family

ID=56807344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620351062.1U Expired - Fee Related CN205557584U (en) 2016-04-25 2016-04-25 Steel pipe corridor and large -scale utility tunnel system

Country Status (1)

Country Link
CN (1) CN205557584U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836289A (en) * 2017-02-24 2017-06-13 大连理工大学 A kind of connection land, island, the seabed pipe gallery system of reef
CN108448528A (en) * 2018-05-16 2018-08-24 王利群 A kind of municipal administration underground plastic tube corridor
CN110080300A (en) * 2019-05-23 2019-08-02 田西武 A kind of multifunctional groups guard water-tight device in architecture information underground pipe gallery
CN111188362A (en) * 2020-01-15 2020-05-22 中国十七冶集团有限公司 Intelligent remote control hydraulic driving system for steel integrated inner support of pipe gallery and using method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836289A (en) * 2017-02-24 2017-06-13 大连理工大学 A kind of connection land, island, the seabed pipe gallery system of reef
CN108448528A (en) * 2018-05-16 2018-08-24 王利群 A kind of municipal administration underground plastic tube corridor
CN108448528B (en) * 2018-05-16 2023-12-19 王利群 Underground plastic pipe gallery for municipal administration
CN110080300A (en) * 2019-05-23 2019-08-02 田西武 A kind of multifunctional groups guard water-tight device in architecture information underground pipe gallery
CN111188362A (en) * 2020-01-15 2020-05-22 中国十七冶集团有限公司 Intelligent remote control hydraulic driving system for steel integrated inner support of pipe gallery and using method
CN111188362B (en) * 2020-01-15 2022-01-25 中国十七冶集团有限公司 Method for installing steel-made integrated inner support of pipe gallery

Similar Documents

Publication Publication Date Title
CN205557584U (en) Steel pipe corridor and large -scale utility tunnel system
CN104746531B (en) A kind of stainless steel composite pipe gallery
CN205062838U (en) Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN105113543A (en) Assembled and combined cabin concrete structure of shallow-buried 0815-type underground comprehensive pipe gallery
CN205576972U (en) Three storehouse formula utility tunnel structures
CN106351254A (en) Multilayer urban underground comprehensive pipe gallery
CN206090610U (en) Utility tunnel system
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN106320370A (en) Underground comprehensive pipe rack system
CN106558861A (en) A kind of multi-functional cable ditch
CN104410031B (en) A kind of pre-fabricated electric cables comb
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN204551523U (en) A kind of stainless steel composite pipe gallery
CN205296229U (en) Sewer manhole in utility tunnel
CN210369044U (en) Building structure that subway and city beneath utility tunnel were built jointly
CN208605197U (en) A kind of building structure that subway driving section is built together with Urban Underground pipe gallery
CN103775100A (en) Prefabricated assembled urban comprehensive pipe gallery
CN201162227Y (en) Underground pipe canal
CN205171548U (en) Novel plastics piping lane
CN211057848U (en) Circular utility tunnel extensible structure of individual layer
CN210766884U (en) Underground cover plate ditch suitable for pipeline collection
CN206467688U (en) Include the pipe gallery of sewage pipe and rain pipe
CN206736961U (en) A kind of Novel steel-plastic composite pipe corridor
CN206844150U (en) A kind of shallow embedding formula pipe gallery
CN202474776U (en) Cable conduit with convenience for detection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20200425

CF01 Termination of patent right due to non-payment of annual fee