CN106351254A - Multilayer urban underground comprehensive pipe gallery - Google Patents

Multilayer urban underground comprehensive pipe gallery Download PDF

Info

Publication number
CN106351254A
CN106351254A CN201610889072.5A CN201610889072A CN106351254A CN 106351254 A CN106351254 A CN 106351254A CN 201610889072 A CN201610889072 A CN 201610889072A CN 106351254 A CN106351254 A CN 106351254A
Authority
CN
China
Prior art keywords
pipe gallery
layer
structure layer
urban underground
system architecture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610889072.5A
Other languages
Chinese (zh)
Inventor
岳雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Dongfang Holding Co Ltd
Original Assignee
Mcc Dongfang Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mcc Dongfang Holding Co Ltd filed Critical Mcc Dongfang Holding Co Ltd
Priority to CN201610889072.5A priority Critical patent/CN106351254A/en
Publication of CN106351254A publication Critical patent/CN106351254A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The invention discloses a multilayer urban underground comprehensive pipe gallery. The multilayer urban underground comprehensive pipe gallery comprises a hazardous gas structure layer arranged on the top layer of the comprehensive pipe gallery and used for bearing a natural gas pipeline, an electric power and telecom system structure layer arranged below the hazardous gas structure layer and used for electric power and telecom devices and cable devices, and a sewage discharging structure layer arranged on a bottom layer of the comprehensive pipe gallery and used for discharging sewage in the comprehensive pipe gallery, wherein the hazardous gas structure layer, the electric power and telecom system structure layer and the sewage discharging structure layer are mutually isolated to from function partitioned independent cabin. According to the multilayer urban underground comprehensive pipe gallery, the comprehensive utilization efficiency of urban land is remarkably improved, the safety of pipe gallery design is improved, the building costs of the urban comprehensive pipe gallery is reduced, and a positive guiding significance is played on the urban comprehensive pipe gallery.

Description

Multiple field Urban Underground pipe gallery
Technical field
The present invention relates to a kind of underground pipe gallery, more particularly, to a kind of multiple field Urban Underground pipe gallery.
Background technology
The instruction (Office of the State Council sends out (2015) No. 61) that the General Office of the State Council builds with regard to propulsion Urban Underground pipe gallery Announce within 10th in August in 2015.The target of this instruction is to the year two thousand twenty, builds up and a collection of has international most advanced level Underground pipe gallery simultaneously puts into effect, and " road slide fastener " problem repeatedly excavating ground is obviously improved, pipeline safety level and anti- Calamity anti-disaster ability is obviously improved, successive elimination arterial street Aranea formula aerial line, and urban ground landscape is clearly better.
Urban Underground pipe gallery engineering refers to that building a municipal administration below urban road shares tunnel, by electric power, leads to Multiple municipal pipelines such as letter, water supply, combustion gas concentrate on one, carry out " unified planning, unified construction, unified management ", to accomplish The comprehensive utilization of the underground space and resource shared.
At present, domestic like a raging fire for pipe gallery design and construction, design specification is also continuously updated, and " city is comprehensive Closing piping lane engineering legislation " gb50838-2015 is specification and the standard mainly instructing engineering design.
However, due to historical reasons, most domestic pipe gallery is all planned and is built in Urban New District or exploitation In area, it is difficult to enter in old town and is built, its difficult inclusion mainly facing: underground pipe gallery section is wider, and Urban pavement or passage are too narrow and can not meet piping lane construction requirements;Open cut, section mistake to be carried out during underground pipe gallery construction Wide impact city traffic and people's lives;Urban land resource scarcity is it is impossible to provide more soil for underground pipe gallery Ground resource;Underground and ground means of transportation are numerous and jumbled, and underground pipe gallery construction may affect the overall communication function in city and friendship The reasons such as logical installation security.
Therefore, for overcoming above-mentioned difficulties, the invention provides one kind is not required to take wider soil, safe and reliable, and will not The impact overall communication function in city and the multiple field Urban Underground pipe gallery of Safety of Underground-Transportation Facilities.
Content of the invention
For solving problem above, the invention provides a kind of multiple field Urban Underground pipe gallery, this multiple field city ground Lower pipe gallery has the characteristics that multilayer distributed, narrow section, with the arrangement arrangement of convenient construction and all kinds of pipeline.
For achieving the above object, the concrete technical scheme of the multiple field Urban Underground pipe gallery of the present invention is as follows:
A kind of multiple field Urban Underground pipe gallery, comprising: hazardous gas structure sheaf, is arranged on the top layer of pipe gallery, For carrying natural gas line;Electric power telecommunication system architecture layer, is arranged on the lower section of hazardous gas structure sheaf, for carrying electric power With communication equipment and cable unit;And pollution discharge structure layer, it is arranged on the bottom of pipe gallery, arrange for sewage in pipe gallery Water;Wherein, hazardous gas structure sheaf, mutually isolated, to form function between electric power telecommunication system architecture layer and pollution discharge structure layer The independent cabin of subregion.
Further, the top of pollution discharge structure layer is formed with discharge structure layer, and discharge structure layer is used for rain draining and city row Water, discharge structure layer and pollution discharge structure layer may be provided in same cabin.
Further, the lower section of electric power telecommunication system architecture layer is provided with power system architecture layer, and power system architecture layer is used In carrying heat distribution pipeline.
Further, the lower section of electric power telecommunication system architecture layer is provided with non-powered system structure layer, non-powered system structure Layer is used for carrying water supply and sewerage pipeline.
Further, the lower section of electric power telecommunication system architecture layer is provided with the power system architecture layer for carrying heat distribution pipeline With the non-powered system structure layer for carrying water supply and sewerage pipeline, power system architecture layer is arranged at non-powered system structure layer Top.
Further, the lower section of electric power telecommunication system architecture layer is provided with the power system architecture layer for carrying heat distribution pipeline With the non-powered system structure layer for carrying water supply and sewerage pipeline, power system architecture layer is arranged at non-powered system structure layer Top, non-powered system structure layer and power system architecture layer may be disposed in same cabin.
Further, the side of pipe gallery is formed with vent passages, and vent passages are vertically extending to run through pipe gallery Entire depth.
Further, electric power telecommunication system architecture layer, power system architecture layer, non-powered system structure layer, discharge structure layer And be respectively formed with air vent on the side wall of pollution discharge structure layer, and it is connected with vent passages by respective air vent respectively Logical.
Further, the top of hazardous gas structure sheaf is formed with air vent, arranges in the air vent of hazardous gas structure sheaf There is mechanical ventilator.
Further, the opposite side of pipe gallery is formed with drainage channel, and drainage channel is vertically extending to run through pipe gallery Bottom.
Further, power system architecture layer, non-powered system structure layer, discharge structure layer and pollution discharge structure layer another It is respectively formed with osculum on the side wall of side, and be connected with drainage channel by respective osculum respectively.
Further, pipe gallery section in the width direction is rectangle, trapezoidal or circular.
The multiple field Urban Underground pipe gallery of the present invention has the advantage that
1) hazardous gas structure sheaf is arranged on the superiors, and it typically carries natural gas line, due to natural gas density itself Little, diffuse up during leakage, work will not be examined to other structures layer internal diffusion in the convenient ventilation of the superiors and dimension, simultaneously natural Feed channel is generally dry gas not draining substantially, and therefore natural gas is more reasonable in the superiors.
2) electric power telecommunication system architecture layer carries electric power telecommunication line system, due to electric power telecommunication system no dewatering needs, Maintenance difficulty is low simultaneously, and dilatation demand is big, and increases part telecommunications with network technical development and automaticity demand Equipment and facility upgrading speed are fast, are therefore arranged in this aspect and are conducive to extending capacity reformation;Electric power telecommunication system architecture layer cloth Put the top in power system architecture layer, non-powered system structure layer, discharge structure layer and pollution discharge structure layer, prevent other aqueous Layer leak affects the work of electric power telecommunication system.
3) power system architecture layer mainly carries heat distribution pipeline system, and city thermal system is mainly used in city and concentrates confession Heat;Non-powered system structure layer mainly carries urban water supply system, and such system is mainly used in the plumbing in city.In city In the case of small scale or for investment reduction, improve piping lane working efficiency, power system architecture layer and non-powered system structure layer Can merge and be arranged in same cabin, simultaneously because power system architecture layer and non-powered system structure layer drainage requirement are higher, Therefore close on the comprehensive blowdown of bottom and rain draining, be conducive to meeting System drainage demand.
4) multiple field Urban Underground comprehensive pipe gallery structure arrangement is compared to traditional structure pattern, can significantly more efficient incite somebody to action Combustion gas, electric power telecommunication system and heating power and supply and drain water system separate, and reduce security incident risk.
Brief description
Fig. 1 is the structural representation of the multiple field Urban Underground pipe gallery according to one embodiment of the invention with rectangular cross section Figure;
Fig. 2 is that the structure of the multiple field Urban Underground pipe gallery having trapezoidal cross-section according to another embodiment of the present invention is shown It is intended to;
Fig. 3 is that the structure of the multiple field Urban Underground pipe gallery having circular cross section according to further embodiment of this invention is shown It is intended to;
Fig. 4 is the sectional view cut open along vent passages on the length direction of multiple field Urban Underground pipe gallery;
Fig. 5 is the sectional view cut open along drainage channel on the length direction of multiple field Urban Underground pipe gallery.
Specific embodiment
In order to be best understood from the purpose of the present invention, structure and function, below in conjunction with the accompanying drawings, the multiple field city to the present invention City's underground pipe gallery does further detailed description.
As shown in figure 1, the present invention's goes up the multiple field Urban Underground pipe gallery that section is rectangle in the width direction from upper Down include successively: for carrying the hazardous gas structure sheaf 1 of natural gas line, for carrying electric power and communication equipment and cable The electric power telecommunication system architecture layer 2 of device, for carrying the power system architecture layer 3 of heat distribution pipeline, for carrying supplying drainage The non-powered system structure layer 4 in road, for the discharge structure layer 5 of rain draining and municipal drainage, and for dirty in pipe gallery The pollution discharge structure layer 6 of water draining.Concrete slab or steel plate isolation, hazardous gas is adopted between the main body of above-mentioned each structure sheaf 1-6 Structure sheaf 1 and the isolation of other structures layer, can prevent hazardous gas from permeating.
Describe each structure sheaf of the pipe gallery of the present invention below as order from top to bottom in detail.
In hazardous gas structure sheaf 1, general only configuration combustion gas class pipeline, predominantly natural gas line, do not place other types Pipeline, such as electric power Telecom Facilities.Meanwhile, in hazardous gas structure sheaf 1 in addition to comprising natural gas line, putting of correlation also can be set Dissipate, illumination, monitoring, report to the police, fire fighting device.
City 220kv, 110kv, 10kv power cable and communication cable can be carried in electric power telecommunication system architecture layer 2. Meanwhile, in electric power telecommunication system architecture layer 2 in addition to comprising 220kv, 110kv, 10kv power cable and communication cable, also can be equipped with The illumination of correlation, monitoring, warning and fire fighting device.
Heat distribution pipeline can be carried, heat distribution pipeline system is mainly used in city heat supply, works as heating power in power system architecture layer 3 When pipeline is less, power system architecture layer 3 can carry water supply and sewerage pipeline, communication cable simultaneously.Meanwhile, power system architecture layer Illumination, monitoring, warning, fire-fighting and the pumping equipment of correlation also can be provided with 3.
Feedwater piping, regeneration waterpipe can be carried, if in power system architecture layer 3 in non-powered system structure layer 4 Heat distribution pipeline be not belonging to steam medium, and there is larger space arrangement, then non-powered system structure layer 4 and dynamical system Structure sheaf 3 merging is arranged in same cabin.Meanwhile, related illumination, monitoring, report can be also provided with non-powered system structure layer 4 Police, fire-fighting and pumping equipment.
Discharge structure layer 5, is mainly used in rain-water drainage and municipal sewage draining, can take into account piping lane internal drainage simultaneously.Row Different cabins can be separated to form in water-bound layer 5, separate between different cabins to prevent from mixing.
Pollution discharge structure layer 6, is mainly used in the internal blowdown of pipe gallery, when blowdown water quality meets discharge standard, Ke Yiyu Discharge structure layer 5 merging is arranged in same cabin.
Thus, above-mentioned each structure sheaf be can work independently cabin by the spaced formation of divider wall, so that it is guaranteed that integrated pipe The overall security of corridor.
Further, as shown in figs. 1 and 4, in the multiple field Urban Underground pipe gallery for rectangle for the above-mentioned section, integrated pipe The side of corridor is provided with vent passages 7, the vertical depth of the whole pipe gallery of the vertically extending insertion of vent passages 7, namely respectively The outside of structure sheaf 1-6 is formed with vent passages 7, and vent passages 7 are enclosed with the outer wall of pipe gallery by the side wall of each structure sheaf 1-6 Become, vent passages 7 are preferably a plurality of and arrange one every 50 meters~200 meters on pipe gallery length direction.Electric power electricity Letter system structure layer 2, power system architecture layer 3, non-powered system structure layer 4, discharge structure layer 5 and pollution discharge structure layer 6 The side wall top of sidepiece (preferably) is respectively formed with air vent 8, is preferably formed with rain-proof, waterproof construction, structure in air vent 8 Layer 2-6 can be connected with vent passages 7 so that structure sheaf 2-6 can carry out gas exchange with external environment by air vent 8.Dangerous The top of gas formation layer 1 is also formed with air vent 8, on the basis of guaranteeing safety in hazardous gas structure sheaf 1, with the external world Environment carries out gas exchange.
Thus, hazardous gas structure sheaf 1 is arranged on single aeration structure, and the air vent 8 of hazardous gas structure sheaf 1 Setting mechanical ventilator;Other each structure sheaf unifications are connected with vent passages 7, can adopt gravity-flow ventilation or force ventilation mould Formula, to meet ventilation requirement.
Further, as described in figures 1 and 5, in the multiple field Urban Underground pipe gallery for rectangle for the above-mentioned section, integrated pipe The opposite side of corridor is provided with drainage channel 9, drainage channel 9 preferably vertically extending through power system architecture layer 3, non-powered system System structure sheaf 4, discharge structure layer 5, pollution discharge structure layer 6, namely the outside of structure sheaf 3-6 are formed with drainage channel 9, drainage channel 9 are oppositely arranged with vent passages 7.The side wall bottom of side wall (preferably) of structure sheaf 3-6 is respectively formed with osculum 10, structure Layer 3-6 can be connected with drainage channel 9 by respective osculum 10, the current in structure sheaf 3-5 is entered the blowdown of bottom In structure sheaf 6, to meet power system architecture layer 3, the proper drainage of non-powered system structure layer 4 or accident dewatering needs.
According to another embodiment of the present invention, as Figure 2-3, respectively illustrate go up in the width direction section be trapezoidal, Circular multiple field Urban Underground pipe gallery.Trapezoidal or circular multiple field Urban Underground pipe gallery also includes hazardous gas Structure sheaf 1, electric power telecommunication system architecture layer 2, power system architecture layer 3, non-powered system structure layer 4, discharge structure layer 5 and row Dirty structure sheaf 6, each structure sheaf 1-6 carry respectively natural gas line, power pipeline, heat distribution pipeline, water supply and sewerage pipeline, rain draining and Composite wastewater draining.Trapezoidal or circular multiple field Urban Underground pipe gallery and rectangular multilayer formula Urban Underground pipe gallery Differ only in the section configuration along pipe gallery width, structure in addition is comprehensive with rectangular multilayer formula Urban Underground Piping lane is identical, will not be described here.Additionally, comprehensive pipe gallery structure that section be combined shaped may also be employed, to meet differently Shape and geologic condition.
In practice, the comprehensive pipe gallery structure of different section shape can be adopted according to landform geological conditions, for example, work as employing Have rectangular cross section pipe gallery when, can more effectively improve the prefabricated efficiency of piping lane corridor body, simultaneously accelerate on-site consolidation Progress, is conducive to prefabricated processing, is suitable for open cut piping lane corridor body construction or construction speed requires higher engineering.When using having The stability of pipeline section structure during the pipe gallery of trapezoidal cross-section, can be strengthened, and be shaped like with construction foundation pit, reduce and prop up Shield difficulty, is conducive to constructing, reduces construction cost.When using have circular cross section pipe gallery when, can more effectively improve The anti-pressure ability of piping lane, is conducive to shield-tunneling construction, more efficiently improves the construction quality of deep layer piping lane.
It should be noted that the arrangement order of each structure sheaf of above-mentioned multiple field Urban Underground pipe gallery can be adjusted or Increase and decrease, but each structure sheaf still follows certain order on the whole.For example, according to the operation work characteristics of each structure sheaf, dangerous Gas formation layer 1 should be beneficial to hazardous gas diffusion positioned at the superiors, can effectively prevent hazardous gas from entering other structures simultaneously Layer;Electric power telecommunication system architecture layer 2 should be arranged in power system architecture layer 3, non-powered system structure layer 4, discharge structure layer 5 He The top of pollution discharge structure layer 6, the general no dewatering needs of electric power telecommunication system architecture layer 2, but there is wanting of water proof, protection against the tide and radiating Ask, therefore avoid it to be subject to affecting of the structure sheaf of dewatering needs as far as possible.
As a kind of alternative, power system architecture layer 3 and non-powered system structure layer 4 merging are arranged in same cabin Room, discharge structure layer 5 and pollution discharge structure layer 6 can also merge and be arranged in same cabin, to reduce the independent cabin of isolation setting Quantity.
The method of construction of the multiple field Urban Underground pipe gallery of the present invention is described below in detail:
First, build multiple field underground pipe gallery, including construction hazardous gas structure sheaf 1 respectively, electric power telecommunication system Structure sheaf 2, power system architecture layer 3, non-powered system structure layer 4, discharge structure layer 5, and pollution discharge structure layer 6, each structure Layer is using concrete slab or steel plate isolation.During construction, can be built using the construction method such as shield, shallow buried covered excavation, cut and cover method Make.Additionally, according to different construction methods, construction sequence can be pollution discharge structure layer 6 from from hazardous gas structure sheaf 1 to bottom according to Secondary carry out build construction it is also possible to from pollution discharge structure layer 6 to the hazardous gas structure sheaf 1 at top successively carry out build construction, Can integral prefabricated construct.
Then, build vent passages 7, make the vertical extension of the whole pipe gallery of the vertically extending insertion of vent passages 7, and And it is formed at the side of pipe gallery.When building vent passages 7, preferably build one every 50 meters~200 meters.Electric power telecommunications system System structure sheaf 2, power system architecture layer 3, non-powered system structure layer 4, discharge structure layer 5, and the side wall of pollution discharge structure layer 6 Top is respectively provided with air vent 8, and the air vent 8 on structure sheaf 2-6 is connected with vent passages 7 respectively.The air port of vent passages 7 is not It is arranged on same position with the air vent 8 of hazardous gas structure sheaf 1, the air vent 8 of hazardous gas structure sheaf 1 adopts force ventilation Pattern.Above-mentioned vent passages 7 and air vent 8 may be used as feed opening.
Finally, drainage channel 9, the bottom of the vertically extending insertion pipe gallery of drainage channel 9 are built, drainage channel 9 sets It is set to a plurality of, and build a drainage channel 9 every 50 meters~200 meters.Hazardous gas structure sheaf 1, carries electric power and communication The electric power telecommunication system architecture layer 2 setting osculum of equipment and cable unit, is not also connected with drainage channel 9.Drainage channel exists Construct outside piping lane, power system architecture layer 3, non-powered system structure layer 4, discharge structure layer 5 and pollution discharge structure layer 6 are built The osculum 10 made, these structure sheafs 3-6 is connected with drainage channel 9 by respective osculum 10, is led to using unified draining Road 9 carries out overall blowdown.
The multiple field Urban Underground pipe gallery of the present invention, solves the drainage problem within piping lane, all of row first Water can directly be collected to drainage system by drainage channel 9, and internal draining simultaneously only needs using gravity, no longer needs Add power setting, simplify the configuration of piping lane auxiliary equipment;Secondly, natural gas line independently forms pipe layers after entering corridor, Its ventilating system is completely cut off with other system, positioned at multilamellar top surface, in conjunction with natural gas characteristic, when there is gas pipeline leakage, Can effectively prevent natural gas from spreading to other pipe layers, reduce overall operations risks;Secondly, piping lane global sections root According to different construction demands, can be adjusted, to ensure construction quality;Again, the design of multiple field, can more added with The utilization Urban Underground solid space of effect, particularly in the case that piping lane passage top surface area is limited, it is possible to reduce soil Usable floor area, has accomplished soil saving;Finally, multilayer architecture is conducive to material handling, can effectively utilize propping up of section Material is transported to each structure sheaf by vent passages (as blanking hole) by support effect.
It is appreciated that the present invention is described by some embodiments, those skilled in the art know, are not taking off In the case of the spirit and scope of the present invention, various changes or equivalence replacement can be carried out to these features and embodiment.Separately Outward, under the teachings of the present invention, these features and embodiment can be modified to adapt to particular situation and material and not The spirit and scope of the present invention can be departed from.Therefore, the present invention is not limited to the particular embodiment disclosed, and is fallen with Embodiment in the range of claims hereof broadly falls in the range of the present invention protected.

Claims (14)

1. a kind of multiple field Urban Underground pipe gallery is it is characterised in that include:
Hazardous gas structure sheaf (1), is arranged on the top layer of pipe gallery, for carrying natural gas line;
Electric power telecommunication system architecture layer (2), is arranged on the lower section of hazardous gas structure sheaf (1), sets for carrying electric power and communication Standby and cable unit;And
Pollution discharge structure layer (6), is arranged on the bottom of pipe gallery, for sewage drainage in pipe gallery;
Wherein, hazardous gas structure sheaf (1), mutually isolated between electric power telecommunication system architecture layer (2) and pollution discharge structure layer (6), To form the independent cabin of function division.
2. multiple field Urban Underground pipe gallery according to claim 1 it is characterised in that pollution discharge structure layer (6) upper Side is formed with discharge structure layer (5), and discharge structure layer (5) is used for rain draining and municipal drainage.
3. multiple field Urban Underground pipe gallery according to claim 2 it is characterised in that discharge structure layer (5) with row Dirty structure sheaf (6) is arranged in same cabin.
4. multiple field Urban Underground pipe gallery according to claim 1 and 2 is it is characterised in that electric power telecommunication system is tied The lower section of structure layer (2) is provided with power system architecture layer (3), and power system architecture layer (3) is used for carrying heat distribution pipeline.
5. multiple field Urban Underground pipe gallery according to claim 1 and 2 is it is characterised in that electric power telecommunication system is tied The lower section of structure layer (2) is provided with non-powered system structure layer (4), and non-powered system structure layer (4) is used for carrying water supply and sewerage pipeline.
6. multiple field Urban Underground pipe gallery according to claim 1 is it is characterised in that electric power telecommunication system architecture layer (2) lower section is provided with the power system architecture layer (3) for carrying heat distribution pipeline and moves for carrying the non-of water supply and sewerage pipeline Force system structure sheaf (4), power system architecture layer (3) is arranged at the top of non-powered system structure layer (4).
7. multiple field Urban Underground pipe gallery according to claim 2 is it is characterised in that electric power telecommunication system architecture layer (2) lower section is provided with the power system architecture layer (3) for carrying heat distribution pipeline and moves for carrying the non-of water supply and sewerage pipeline Force system structure sheaf (4), power system architecture layer (3) is arranged at the top of non-powered system structure layer (4).
8. the multiple field Urban Underground pipe gallery according to claim 6 or 7 is it is characterised in that non-powered system structure Layer (4) and power system architecture layer (3) are arranged in same cabin.
9. multiple field Urban Underground pipe gallery according to claim 7 is it is characterised in that the side of pipe gallery is formed There are vent passages (7), the vertically extending entire depth running through pipe gallery of vent passages (7).
10. multiple field Urban Underground pipe gallery according to claim 9 is it is characterised in that electric power telecommunication system architecture Layer (2), power system architecture layer (3), non-powered system structure layer (4), discharge structure layer (5) and pollution discharge structure layer (6) Air vent (8) is respectively formed with the wall of side, and is connected with vent passages (7) by respective air vent (8) respectively.
11. multiple field Urban Underground pipe galleries according to claim 1 or 10 are it is characterised in that hazardous gas structure The top of layer (1) is formed with air vent (8), is provided with mechanical ventilator in the air vent (8) of hazardous gas structure sheaf (1).
12. multiple field Urban Underground pipe galleries according to claim 7 are it is characterised in that the opposite side of pipe gallery It is formed with drainage channel (9), the vertically extending bottom running through pipe gallery of drainage channel (9).
13. multiple field Urban Underground pipe galleries according to claim 12 are it is characterised in that power system architecture layer (3), non-powered system structure layer (4), difference shape on the side wall of the opposite side of discharge structure layer (5) and pollution discharge structure layer (6) Become to have osculum (10), and be connected with drainage channel (9) by respective osculum (10) respectively.
14. multiple field Urban Underground pipe galleries according to claim 1 are it is characterised in that pipe gallery is along width side To section be rectangle, trapezoidal or circular.
CN201610889072.5A 2016-10-11 2016-10-11 Multilayer urban underground comprehensive pipe gallery Pending CN106351254A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610889072.5A CN106351254A (en) 2016-10-11 2016-10-11 Multilayer urban underground comprehensive pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610889072.5A CN106351254A (en) 2016-10-11 2016-10-11 Multilayer urban underground comprehensive pipe gallery

Publications (1)

Publication Number Publication Date
CN106351254A true CN106351254A (en) 2017-01-25

Family

ID=57866343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610889072.5A Pending CN106351254A (en) 2016-10-11 2016-10-11 Multilayer urban underground comprehensive pipe gallery

Country Status (1)

Country Link
CN (1) CN106351254A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759488A (en) * 2017-02-24 2017-05-31 南华大学 A kind of city integrated piping lane in integrated cargo transport cabin
CN106836289A (en) * 2017-02-24 2017-06-13 大连理工大学 A kind of connection land, island, the seabed pipe gallery system of reef
CN106906846A (en) * 2017-04-27 2017-06-30 中冶京诚工程技术有限公司 Prefabricated pipe gallery
CN107142958A (en) * 2017-06-13 2017-09-08 上海市城市建设设计研究总院(集团)有限公司 Double shield pattern synthesis piping lane node wells
CN107700529A (en) * 2017-09-20 2018-02-16 深圳冠艺工业设计有限公司 Underground pipe gallery transportation system
CN107893911A (en) * 2017-10-30 2018-04-10 广州地铁设计研究院有限公司 The booster monitoring system of feed pipe
CN108643229A (en) * 2018-05-25 2018-10-12 中国十七冶集团有限公司 A kind of the multilayer Pipe rack and its construction method of depth piping lane foundation pit
CN108730618A (en) * 2018-04-28 2018-11-02 安徽砼宇特构科技有限公司 A kind of concrete pipe gallery with ventilation device
CN108755753A (en) * 2018-05-25 2018-11-06 中国十七冶集团有限公司 A kind of Pipe rack and its construction method of Collapsible Loess District and Soft Soil
CN114263210A (en) * 2021-12-29 2022-04-01 中国电建集团河南省电力勘测设计院有限公司 Prefabricated integral type utility tunnel lattice stock barricade

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207515A (en) * 2000-01-21 2001-08-03 Eiichi Tashiro Underground common space
CN204608830U (en) * 2014-12-30 2015-09-02 青岛厚科信息工程有限公司 Novel underground pipe gallery
CN105780807A (en) * 2016-04-01 2016-07-20 上海市政工程设计研究总院(集团)有限公司 Double-cabin stacked section of utility tunnel
CN105804116A (en) * 2016-04-01 2016-07-27 上海市政工程设计研究总院(集团)有限公司 Combined-construction section structure of underpass tunnel and comprehensive pipe gallery
CN105887924A (en) * 2016-04-25 2016-08-24 安徽砼宇特构科技有限公司 Underground pipe gallery

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207515A (en) * 2000-01-21 2001-08-03 Eiichi Tashiro Underground common space
CN204608830U (en) * 2014-12-30 2015-09-02 青岛厚科信息工程有限公司 Novel underground pipe gallery
CN105780807A (en) * 2016-04-01 2016-07-20 上海市政工程设计研究总院(集团)有限公司 Double-cabin stacked section of utility tunnel
CN105804116A (en) * 2016-04-01 2016-07-27 上海市政工程设计研究总院(集团)有限公司 Combined-construction section structure of underpass tunnel and comprehensive pipe gallery
CN105887924A (en) * 2016-04-25 2016-08-24 安徽砼宇特构科技有限公司 Underground pipe gallery

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中华人民共和国住房和城乡建设部等: "《城市综合管廊工程技术规范》", 22 May 2015 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759488A (en) * 2017-02-24 2017-05-31 南华大学 A kind of city integrated piping lane in integrated cargo transport cabin
CN106836289A (en) * 2017-02-24 2017-06-13 大连理工大学 A kind of connection land, island, the seabed pipe gallery system of reef
CN106906846A (en) * 2017-04-27 2017-06-30 中冶京诚工程技术有限公司 Prefabricated pipe gallery
CN106906846B (en) * 2017-04-27 2022-08-02 中冶京诚工程技术有限公司 Prefabricated comprehensive pipe gallery
CN107142958A (en) * 2017-06-13 2017-09-08 上海市城市建设设计研究总院(集团)有限公司 Double shield pattern synthesis piping lane node wells
CN107142958B (en) * 2017-06-13 2019-05-03 上海市城市建设设计研究总院(集团)有限公司 Double shield pattern synthesis piping lane node wells
CN107700529A (en) * 2017-09-20 2018-02-16 深圳冠艺工业设计有限公司 Underground pipe gallery transportation system
CN107893911A (en) * 2017-10-30 2018-04-10 广州地铁设计研究院有限公司 The booster monitoring system of feed pipe
CN108730618A (en) * 2018-04-28 2018-11-02 安徽砼宇特构科技有限公司 A kind of concrete pipe gallery with ventilation device
CN108643229A (en) * 2018-05-25 2018-10-12 中国十七冶集团有限公司 A kind of the multilayer Pipe rack and its construction method of depth piping lane foundation pit
CN108755753A (en) * 2018-05-25 2018-11-06 中国十七冶集团有限公司 A kind of Pipe rack and its construction method of Collapsible Loess District and Soft Soil
CN114263210A (en) * 2021-12-29 2022-04-01 中国电建集团河南省电力勘测设计院有限公司 Prefabricated integral type utility tunnel lattice stock barricade

Similar Documents

Publication Publication Date Title
CN106351254A (en) Multilayer urban underground comprehensive pipe gallery
CN106638681B (en) A kind of pipe gallery
CN207685859U (en) A kind of underground pipe gallery
CN205954798U (en) Large -traffic, height falls poor drainage drop well
CN106013221B (en) Four layers of class rectangle Urban Underground Complex
CN208088344U (en) With waterproof, the underground pipe gallery structure of drain function
CN110593305A (en) Utility tunnel who constructs with green way of shore river jointly and do revetment retaining wall concurrently
CN102705006B (en) Method for governing operating tunnel flood by adopting wellpoint dewatering method
CN206110182U (en) Three large -scale arcading city utility tunnel
CN208605197U (en) A kind of building structure that subway driving section is built together with Urban Underground pipe gallery
CN110924509A (en) Turn-back type ultra-deep inspection well
WO2021063295A1 (en) Fire-fighting water supply system for super-long tunnel
CN211113865U (en) Fire control water supply system in overlength tunnel
CN206319337U (en) Large-scale square tube type Urban Underground comprehensive tunnel
CN210597374U (en) Utility tunnel who constructs with green way of shore river jointly and do revetment retaining wall concurrently
CN106013222B (en) Three circular cross section Urban Underground Complexes
CN208121811U (en) Pipe gallery integration exploitation and subway are total to the open-cut station of structure
CN106437842B (en) The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant
CN215906846U (en) Underground pipe gallery
CN210766871U (en) Be applied to municipal road's basic type utility tunnel
CN211057848U (en) Circular utility tunnel extensible structure of individual layer
CN209145605U (en) The round more cabin pipe galleries of shield-tunneling construction
CN206110168U (en) Three -layer quasi -rectangular city underground complex
CN208605198U (en) A kind of building structure that subway station is built together with Urban Underground pipe gallery
CN110635436A (en) Compound cable pit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 014010 the Inner Mongolia Autonomous Region Baotou City Queensland Steel Street

Applicant after: Alex Hua Tian Baotou design and Research Institute Co., Ltd.

Address before: 014010 the Inner Mongolia Autonomous Region Baotou City Queensland Steel Street

Applicant before: MCC Dongfang Holding Co Ltd

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125