CN208605197U - A kind of building structure that subway driving section is built together with Urban Underground pipe gallery - Google Patents
A kind of building structure that subway driving section is built together with Urban Underground pipe gallery Download PDFInfo
- Publication number
- CN208605197U CN208605197U CN201821269217.2U CN201821269217U CN208605197U CN 208605197 U CN208605197 U CN 208605197U CN 201821269217 U CN201821269217 U CN 201821269217U CN 208605197 U CN208605197 U CN 208605197U
- Authority
- CN
- China
- Prior art keywords
- cabin
- pipe gallery
- underground pipe
- building structure
- urban underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses the building structure that a kind of subway driving section and Urban Underground pipe gallery are built together, the Shield designed comprising subway driving section and Urban Underground pipe gallery with section circle, its design feature is: one is equipped in Shield along the middle partition of horizontal radial setting and two along the partition wall being arranged radially vertically, the inner cavity of Shield is divided by a middle partition and two partition walls, under, it is left, right four regions, one of region is subway driving cabin, its excess-three section is respectively the underground pipe gallery cabin for being used to lay communication cable or water power pipe or high-tension cable or low-voltage cable or running water pipe.The utility model has the advantages that: excavated volume is few, and lateral occupied space is few, and construction risk is low, short construction period, disturbs to surrounding enviroment smaller.
Description
Technical field
It builds together field the utility model relates to subway and piping lane, particularly relates to a kind of subway driving section and city
The building structure that underground pipe gallery is built together.
Background technique
Currently, the construction of subway and pipe gallery starts one upsurge at home, wherein Urban Underground pipe gallery is main
Refer to and build a tunnel space in Urban Underground, by electric power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are combined in
One, equipped with special access hole, hoisting port and monitoring system, implementation unified planning, Uniting, unification are built and are managed
Municipal underground infrastructure;Based on subway is run primarily as one kind in underground, for alleviating the city of road traffic congestion
City's Rail Transit System.
Wherein, Urban Underground pipe gallery not only solves Urban Traffic Jam Based, also greatly facilitates electric power, leads to
The maintenance and maintenance of the urban operating mechanisms such as letter, combustion gas, water supply and sewage, while also can avoid frequently digging due to laying and repairing underground utilities
Pick road and traffic and resident trip are impacted and are interfered, it is complete and beautiful to maintain the appearance of a street, reduces road surface and repeatedly turns over
The maintenance cost of the expense and utilities pipeline repaired maintains the integrality on road surface and the durability of all kinds of pipelines.Convenient for various pipes
Laying, increase and decrease, maintenance and the daily management of line, and pipeline compact and reasonable arrangement are effectively utilized the space under road, save
Urban land, reduces the roofbolt of road and inspection shaft, the room of various pipelines etc., the graceful landscape in city, to meeting the people's livelihood
Primary demand and the city integrated bearing capacity of raising play an important role.
The country is with the continuous promotion of living standard, and car is more more and more universal, and urban population is more and more intensive, hands over to city
Logical to bring very big pressure, especially some big key cities, this traffic jam issue is particularly acute.And subway is as one
It plants the City Rail Transit System based on mainly running in underground and can then play and alleviate road traffic congestion problems well, thus
Subway is just built to alleviate traffic congestion in major cities on a large scale.
But Urban Underground pipe gallery is same as subway to be used as underground engineering, between inevitable during building
How the phenomenon that will appear intersection or being overlapped meets in the limited underground space while build Urban Underground pipe gallery and ground
Iron, and non-interference the problem of becoming current urgent need to resolve each other.
Utility model content
To solve technical problem present in above-mentioned background, the purpose of this utility model is to provide a kind of subway driving areas
Between build together with Urban Underground pipe gallery, i.e., be arranged by subway driving section and pipe gallery and tied in same circular cross section space
Structure, and all spaces in circular cross section are fully and rationally used, so that it is again non-interference each other between the two, while again
Energy synchronous construction operation, can not only reduce the excavated volume of underground cubic metre of earth, can also reduce subway and Urban Underground pipe gallery
Lateral occupied space, while can be shortened construction period again, reduced construction risk, reduced and surrounding enviroment are disturbed.
To achieve the above object, the technical solution that the utility model is taken are as follows: a kind of subway driving section and Urban Underground
The building structure that pipe gallery is built together, the section shield designed comprising subway driving section and Urban Underground pipe gallery with section circle
Structure tunnel, one is equipped in the Shield will radially be divided into the area Liang Ge up and down in the Shield
Between middle partition, the middle partition top be equipped with one by section on the Shield be divided into left and right two sections
Upper partition wall, be equipped with one in described middle the lower partition and section under the Shield be divided into two sections in left and right
Lower partition wall;
Wherein, the section on the right side of the upper partition wall is subway driving cabin or the comprehensive cabin of water power or communication cable cabin;
Wherein, the section on the left of the upper partition wall is communication cable cabin or the comprehensive cabin of water power or subway driving cabin;
Wherein, the section at left and right sides of the lower partition wall is high-tension cable cabin or is respectively originally water tank and low
Voltage cable cabin.
Further, the middle partition and the upper partition wall and lower partition wall are all made of cast-in-situ steel reinforced concrete and pour one simultaneously
It is body formed.
Further, the cross sectional shape of the Shield is round and a diameter of 8.2m~8.4m.
Further, the height in the communication cable cabin is 4.0m~4.4m, and width is 1.86m~2.0m, logical for placing
Communication cable.
Further, the height in the comprehensive cabin of the water power is 4.0m~4.4m, and width is 1.56m~2.0m, for placing
10kv cable and regeneration water pipe.
Further, the height in each high-tension cable cabin is 2.2m~2.4m, and width is 1.1m~3.5m, for placing
3 times 220kv high-tension cables.
Further, the height of the originally water tank is 2.2m~2.4m, and width is 1.1m~3.5m, for placing DN400
Feed pipe.
Further, the height in the low-voltage cable cabin is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times
110kv high-tension cable.
Further, equal in the comprehensive cabin of the water power, communication cable cabin, high-tension cable cabin, originally water tank and low-voltage cable cabin
Also it is laid with several personal cables.
Further, two sections at left and right sides of the upper partition wall interconnect, and are located at described lower partition wall or so two
Two sections of side interconnect.
Compared with prior art, the utility model has the beneficial effects that
(1) comprehensive pipe gallery structure is set to around subway driving cabin, and be located in same circular cross section space structure, and
All spaces in circular cross section are subjected to rationalization partition utilization and non-interference, the electric power laid, communication has been effectively ensured,
The various pipelines such as combustion gas, heat supply, plumbing and the current route of subway are not interfere with each other;
(2) pipe gallery can construct simultaneously with subway, can effectively shorten construction period, reduce and disturb to surrounding enviroment;
(3) earthwork excavated volume is few, and lateral occupied space is few, and relatively far away from apart from existing building, construction risk is low.
Detailed description of the invention
Fig. 1 is that the building structure section structure that the utility model subway driving section is built together with Urban Underground pipe gallery shows
It is intended to;
Fig. 2 is the schematic cross-section of the first Application Example of Shield;
Fig. 3 is the schematic cross-section of second of Application Example of Shield;
In figure: 1, Shield;2, middle partition;3, upper partition wall;4, lower partition wall;5, subway driving cabin;6, communication electricity
Cable cabin;7, the comprehensive cabin of water power;8, high-tension cable cabin;9, originally water tank;10, low-voltage cable cabin;11, communication cable;12,10kv electricity
Cable;13, water pipe is regenerated;14,220kv high-tension cable;15, DN400 feed pipe;16,110kv high-tension cable;17, personal cable;
18, subway;19, evacuation platform;
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below
In conjunction with the drawings and specific embodiments, it is further described how the utility model is implemented.
As shown in Figure 1, a kind of subway driving section provided by the utility model is built with what Urban Underground pipe gallery was built together
Building structure, comprising the Shield 1 that subway driving section and Urban Underground pipe gallery are designed with section circle, in the section
The middle partition 2 that upper and lower two sections will be radially divided into Shield 1 is equipped in shield tunnel 1, in interval
2 top of plate is equipped with the upper partition wall 3 that section on Shield 1 is divided into two sections in left and right, in middle 2 lower part of partition
The lower section of Shield 1 is divided into the lower partition wall 4 in two sections in left and right equipped with one.
In practical applications, since subway 18 is way traffic, so it includes left and right that subway driving section, which usually has,
Two kinds of Shield structures, as shown in Figures 2 and 3.
As shown in Fig. 2, when above-mentioned Shield 1 is for running situation on the left of subway 18:
Wherein, 2 top of middle partition in shield tunnel 1 and the section being located on the right side of upper partition wall 3 are subway driving
Cabin 5;And it is located at middle 2 top of partition and is located at 3 left side of upper partition wall and the section parallel with subway driving cabin 5 is communication cable cabin
6 or the comprehensive cabin 7 of water power;It is high-tension cable cabin positioned at middle 2 lower part of partition and positioned at two sections of lower 4 left and right sides of partition wall
8 or be respectively originally water tank 9 and low-voltage cable cabin 10;And in the present embodiment, it is located at middle 2 top of partition and is located at upper partition wall
The section in 3 left sides is communication cable cabin 6, is height positioned at middle 4 lower part of partition and positioned at two sections of lower 4 left and right sides of partition wall
Voltage cable cabin 8.
As shown in figure 3, when above-mentioned Shield 1 is for 18 race running situation of subway:
Wherein, 2 top of middle partition in shield tunnel 1 and the section being located on the left of upper partition wall 3 are subway driving
Cabin 5;And it is located at middle 2 top of partition and is located at upper 3 right side of partition wall and the section parallel with subway driving cabin 5 for the comprehensive cabin of water power
7 or communication cable cabin 6;Positioned at middle 2 lower part of partition and two sections being located at 4 left and right sides of lower partition wall are respectively originally water tank
9 and low-voltage cable cabin 10 or be high-tension cable cabin 8;And in the present embodiment, it is located at middle 2 top of partition and is located at upper partition wall
The section on 3 right sides is the comprehensive cabin 7 of water power, is distinguished positioned at middle 4 lower part of partition and positioned at two sections of lower 4 left and right sides of partition wall
For originally water tank 9 and low-voltage cable cabin 10.
The upkeep operation of each pipeline, the Shield 1 in left side are carried out positioned at artificial disengaging pipe gallery convenient to overhaul
The interior subway driving cabin 5 comprehensive cabin 7 in communication cable cabin 6 or water power in parallel interconnects, and is located under subway driving cabin 5
Two high-tension cable cabins 8 in portion or originally water tank 9 and low-voltage cable cabin 10 interconnect;The Shield 1 on right side
The interior subway driving cabin 5 comprehensive cabin 7 of water power in parallel or communication cable cabin 6 interconnect, and are located under subway driving cabin 5
The originally water tank 9 in portion and low-voltage cable cabin 10 or two high-tension cable cabins 8 interconnect.
Wherein, middle partition 2 is all made of cast-in-situ steel reinforced concrete and pours integrated molding simultaneously with upper partition wall 3 and lower partition wall 4.
Wherein, the cross sectional shape of shield tunnel 1 is round and a diameter of 8.2m~8.4m.
Wherein, the height in communication cable cabin 6 is 4.0m~4.4m, and width is 1.86m~2.0m, for placing communication cable
11。
Wherein, the height in the comprehensive cabin 7 of water power is 4.0m~4.4m, and width is 1.56m~2.0m, for placing 10kv cable
12 and regeneration water pipe 13.
Wherein, the height in each high-tension cable cabin 8 is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times
220kv high-tension cable 14.
Wherein, originally the height of water tank 9 is 2.2m~2.4m, and width is 1.1m~3.5m, for placing DN400 feed pipe
15;
Wherein, the height in low-voltage cable cabin 10 is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times 110kv
High-tension cable 16.
In addition, in communication cable cabin 6, the comprehensive cabin 7 of water power, high-tension cable cabin 8, originally water tank 9 and low-voltage cable cabin 10
It is additionally provided with several personal cables 17;The evacuation that one passes in and out subway 18 for passenger is additionally provided in subway driving cabin 5 to put down
Platform 19.
Finally illustrate, the above description is only the embodiments of the present invention, is not intended to limit the patent of the utility model
Range, equivalent structure or equivalent flow shift made by using the description of the utility model and the drawings, or directly or
Other related technical areas are used in indirectly, are also included in the patent protection scope of the utility model.
Claims (10)
1. the building structure that a kind of subway driving section and Urban Underground pipe gallery are built together includes subway driving section and city
Shield (1) of the underground pipe gallery with section circle design, it is characterised in that: in the Shield (1)
The middle partition (2) in upper and lower two sections will be radially divided into the Shield (1) equipped with one, in the interval
Plate (2) top is equipped with the upper partition wall (3) that section on the Shield (1) is divided into two sections in left and right,
Middle partition (2) lower part be equipped with one by section under the Shield (1) be divided into left and right two sections under every
Wall (4);
Wherein, being located at the section on the right side of the upper partition wall (3) is subway driving cabin (5) or water power comprehensive cabin (6) or communication cable
Cabin (7);
Wherein, it is located at the section on the left of the upper partition wall (3) for communication cable cabin (7) or water power comprehensive cabin (6) or subway driving
Cabin (5);
Wherein, it is located at the section at left and right sides of the lower partition wall (4) to be high-tension cable cabin (8) or be respectively originally water tank
(9) and low-voltage cable cabin (10).
2. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature
Be: the middle partition (2) and the upper partition wall (3) and lower partition wall (4) are all made of cast-in-situ steel reinforced concrete and pour one simultaneously
It is body formed.
3. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature
Be: the cross sectional shape of the Shield (1) is round and a diameter of 8.2m~8.4m.
4. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature
Be: the height of the communication cable cabin (7) is 4.0m~4.4m, and width is 1.86m~2.0m, for placing communication cable
(11)。
5. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature
Be: the height of the water power comprehensive cabin (6) is 4.0m~4.4m, and width is 1.56m~2.0m, for placing 10kv cable
(12) and water pipe (13) are regenerated.
6. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature
Be: the height of each high-tension cable cabin (8) is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times
220kv high-tension cable (14).
7. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature
Be: the height of the originally water tank (9) is 2.2m~2.4m, and width is 1.1m~3.5m, for placing DN400 feed pipe
(15)。
8. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature
Be: the height of the low-voltage cable cabin (10) is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times 110kv high
Voltage cable (16).
9. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature
It is: in the water power comprehensive cabin (6), communication cable cabin (7), high-tension cable cabin (8), originally water tank (9) and low-voltage cable cabin
(10) several personal cables (17) are also laid with.
10. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature
It is: is located at two sections at left and right sides of the upper partition wall (3) and interconnects, be located at left and right sides of the lower partition wall (4)
Two sections interconnect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821269217.2U CN208605197U (en) | 2018-08-08 | 2018-08-08 | A kind of building structure that subway driving section is built together with Urban Underground pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821269217.2U CN208605197U (en) | 2018-08-08 | 2018-08-08 | A kind of building structure that subway driving section is built together with Urban Underground pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208605197U true CN208605197U (en) | 2019-03-15 |
Family
ID=65670562
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821269217.2U Expired - Fee Related CN208605197U (en) | 2018-08-08 | 2018-08-08 | A kind of building structure that subway driving section is built together with Urban Underground pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208605197U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110617079A (en) * | 2019-10-28 | 2019-12-27 | 中铁二院工程集团有限责任公司 | Shield comprehensive pipe gallery pipeline installation shed frame system |
CN111271090A (en) * | 2020-03-17 | 2020-06-12 | 中铁二局集团有限公司 | Construction method for partition plate in urban underground comprehensive pipe gallery |
CN112878361A (en) * | 2019-11-29 | 2021-06-01 | 中国电建集团华东勘测设计研究院有限公司 | Multifunctional urban underground space fire-resistant structure |
-
2018
- 2018-08-08 CN CN201821269217.2U patent/CN208605197U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110617079A (en) * | 2019-10-28 | 2019-12-27 | 中铁二院工程集团有限责任公司 | Shield comprehensive pipe gallery pipeline installation shed frame system |
CN112878361A (en) * | 2019-11-29 | 2021-06-01 | 中国电建集团华东勘测设计研究院有限公司 | Multifunctional urban underground space fire-resistant structure |
CN111271090A (en) * | 2020-03-17 | 2020-06-12 | 中铁二局集团有限公司 | Construction method for partition plate in urban underground comprehensive pipe gallery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105113543B (en) | 0815 type underground pipe gallery assembling combination cabin concrete structure of shallow embedding | |
CN208605197U (en) | A kind of building structure that subway driving section is built together with Urban Underground pipe gallery | |
CN205062838U (en) | Combination cabin concrete structure is assembled to shallow utility tunnel of burying | |
CN106013225B (en) | Six layers of circular traffic, pipe gallery and sponge Urban Underground Complex | |
CN207348091U (en) | A kind of assembled pipe gallery | |
CN205954798U (en) | Large -traffic, height falls poor drainage drop well | |
CN106013221B (en) | Four layers of class rectangle Urban Underground Complex | |
CN106013215A (en) | Three-layer rectangle-like urban underground complex | |
CN106013223B (en) | Elliptical section Urban Underground Complex | |
CN106351254A (en) | Multilayer urban underground comprehensive pipe gallery | |
CN109944273A (en) | A kind of city tunnel, track traffic regional tunnel and pipe gallery build structure jointly | |
CN105971009A (en) | Five-layer circular urban underground complex | |
CN106436755A (en) | Four-layer stair-like city underground comprehensive body | |
CN104410031B (en) | A kind of pre-fabricated electric cables comb | |
CN208605198U (en) | A kind of building structure that subway station is built together with Urban Underground pipe gallery | |
CN210315654U (en) | Urban tunnel, rail transit interval tunnel and utility tunnel co-construction structure | |
CN206189448U (en) | Elliptical section city underground complex | |
CN106013222A (en) | Urban underground complex with three-circle cross section | |
CN106638682A (en) | Efficient-seismic-reduction quasi-rectangular city underground architecture complex | |
CN207672609U (en) | A kind of foundation pit supporting construction also serves as the pipe gallery of main body | |
CN106837348B (en) | The interflow of shape of a hoof shield machine construction is regulated and stored moldeed depth layer tunnel | |
CN106013226B (en) | Double Circle section Urban Underground Complex | |
CN206090613U (en) | Ungulate city of span underground complex | |
CN106013224A (en) | Double-horseshoe-shaped urban underground complex | |
CN210509196U (en) | Large-section tunnel structure of hard rock stratum underground excavation single-layer lining subway parking line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190315 |
|
CF01 | Termination of patent right due to non-payment of annual fee |