CN208605197U - A kind of building structure that subway driving section is built together with Urban Underground pipe gallery - Google Patents

A kind of building structure that subway driving section is built together with Urban Underground pipe gallery Download PDF

Info

Publication number
CN208605197U
CN208605197U CN201821269217.2U CN201821269217U CN208605197U CN 208605197 U CN208605197 U CN 208605197U CN 201821269217 U CN201821269217 U CN 201821269217U CN 208605197 U CN208605197 U CN 208605197U
Authority
CN
China
Prior art keywords
cabin
pipe gallery
underground pipe
building structure
urban underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821269217.2U
Other languages
Chinese (zh)
Inventor
吴立
苏勇
周超月
余太平
汪齐
何延召
汪恂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Urban Construction Design Institute Ltd By Share Ltd
Original Assignee
Hubei Urban Construction Design Institute Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Urban Construction Design Institute Ltd By Share Ltd filed Critical Hubei Urban Construction Design Institute Ltd By Share Ltd
Priority to CN201821269217.2U priority Critical patent/CN208605197U/en
Application granted granted Critical
Publication of CN208605197U publication Critical patent/CN208605197U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses the building structure that a kind of subway driving section and Urban Underground pipe gallery are built together, the Shield designed comprising subway driving section and Urban Underground pipe gallery with section circle, its design feature is: one is equipped in Shield along the middle partition of horizontal radial setting and two along the partition wall being arranged radially vertically, the inner cavity of Shield is divided by a middle partition and two partition walls, under, it is left, right four regions, one of region is subway driving cabin, its excess-three section is respectively the underground pipe gallery cabin for being used to lay communication cable or water power pipe or high-tension cable or low-voltage cable or running water pipe.The utility model has the advantages that: excavated volume is few, and lateral occupied space is few, and construction risk is low, short construction period, disturbs to surrounding enviroment smaller.

Description

A kind of building structure that subway driving section is built together with Urban Underground pipe gallery
Technical field
It builds together field the utility model relates to subway and piping lane, particularly relates to a kind of subway driving section and city The building structure that underground pipe gallery is built together.
Background technique
Currently, the construction of subway and pipe gallery starts one upsurge at home, wherein Urban Underground pipe gallery is main Refer to and build a tunnel space in Urban Underground, by electric power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are combined in One, equipped with special access hole, hoisting port and monitoring system, implementation unified planning, Uniting, unification are built and are managed Municipal underground infrastructure;Based on subway is run primarily as one kind in underground, for alleviating the city of road traffic congestion City's Rail Transit System.
Wherein, Urban Underground pipe gallery not only solves Urban Traffic Jam Based, also greatly facilitates electric power, leads to The maintenance and maintenance of the urban operating mechanisms such as letter, combustion gas, water supply and sewage, while also can avoid frequently digging due to laying and repairing underground utilities Pick road and traffic and resident trip are impacted and are interfered, it is complete and beautiful to maintain the appearance of a street, reduces road surface and repeatedly turns over The maintenance cost of the expense and utilities pipeline repaired maintains the integrality on road surface and the durability of all kinds of pipelines.Convenient for various pipes Laying, increase and decrease, maintenance and the daily management of line, and pipeline compact and reasonable arrangement are effectively utilized the space under road, save Urban land, reduces the roofbolt of road and inspection shaft, the room of various pipelines etc., the graceful landscape in city, to meeting the people's livelihood Primary demand and the city integrated bearing capacity of raising play an important role.
The country is with the continuous promotion of living standard, and car is more more and more universal, and urban population is more and more intensive, hands over to city Logical to bring very big pressure, especially some big key cities, this traffic jam issue is particularly acute.And subway is as one It plants the City Rail Transit System based on mainly running in underground and can then play and alleviate road traffic congestion problems well, thus Subway is just built to alleviate traffic congestion in major cities on a large scale.
But Urban Underground pipe gallery is same as subway to be used as underground engineering, between inevitable during building How the phenomenon that will appear intersection or being overlapped meets in the limited underground space while build Urban Underground pipe gallery and ground Iron, and non-interference the problem of becoming current urgent need to resolve each other.
Utility model content
To solve technical problem present in above-mentioned background, the purpose of this utility model is to provide a kind of subway driving areas Between build together with Urban Underground pipe gallery, i.e., be arranged by subway driving section and pipe gallery and tied in same circular cross section space Structure, and all spaces in circular cross section are fully and rationally used, so that it is again non-interference each other between the two, while again Energy synchronous construction operation, can not only reduce the excavated volume of underground cubic metre of earth, can also reduce subway and Urban Underground pipe gallery Lateral occupied space, while can be shortened construction period again, reduced construction risk, reduced and surrounding enviroment are disturbed.
To achieve the above object, the technical solution that the utility model is taken are as follows: a kind of subway driving section and Urban Underground The building structure that pipe gallery is built together, the section shield designed comprising subway driving section and Urban Underground pipe gallery with section circle Structure tunnel, one is equipped in the Shield will radially be divided into the area Liang Ge up and down in the Shield Between middle partition, the middle partition top be equipped with one by section on the Shield be divided into left and right two sections Upper partition wall, be equipped with one in described middle the lower partition and section under the Shield be divided into two sections in left and right Lower partition wall;
Wherein, the section on the right side of the upper partition wall is subway driving cabin or the comprehensive cabin of water power or communication cable cabin;
Wherein, the section on the left of the upper partition wall is communication cable cabin or the comprehensive cabin of water power or subway driving cabin;
Wherein, the section at left and right sides of the lower partition wall is high-tension cable cabin or is respectively originally water tank and low Voltage cable cabin.
Further, the middle partition and the upper partition wall and lower partition wall are all made of cast-in-situ steel reinforced concrete and pour one simultaneously It is body formed.
Further, the cross sectional shape of the Shield is round and a diameter of 8.2m~8.4m.
Further, the height in the communication cable cabin is 4.0m~4.4m, and width is 1.86m~2.0m, logical for placing Communication cable.
Further, the height in the comprehensive cabin of the water power is 4.0m~4.4m, and width is 1.56m~2.0m, for placing 10kv cable and regeneration water pipe.
Further, the height in each high-tension cable cabin is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times 220kv high-tension cables.
Further, the height of the originally water tank is 2.2m~2.4m, and width is 1.1m~3.5m, for placing DN400 Feed pipe.
Further, the height in the low-voltage cable cabin is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times 110kv high-tension cable.
Further, equal in the comprehensive cabin of the water power, communication cable cabin, high-tension cable cabin, originally water tank and low-voltage cable cabin Also it is laid with several personal cables.
Further, two sections at left and right sides of the upper partition wall interconnect, and are located at described lower partition wall or so two Two sections of side interconnect.
Compared with prior art, the utility model has the beneficial effects that
(1) comprehensive pipe gallery structure is set to around subway driving cabin, and be located in same circular cross section space structure, and All spaces in circular cross section are subjected to rationalization partition utilization and non-interference, the electric power laid, communication has been effectively ensured, The various pipelines such as combustion gas, heat supply, plumbing and the current route of subway are not interfere with each other;
(2) pipe gallery can construct simultaneously with subway, can effectively shorten construction period, reduce and disturb to surrounding enviroment;
(3) earthwork excavated volume is few, and lateral occupied space is few, and relatively far away from apart from existing building, construction risk is low.
Detailed description of the invention
Fig. 1 is that the building structure section structure that the utility model subway driving section is built together with Urban Underground pipe gallery shows It is intended to;
Fig. 2 is the schematic cross-section of the first Application Example of Shield;
Fig. 3 is the schematic cross-section of second of Application Example of Shield;
In figure: 1, Shield;2, middle partition;3, upper partition wall;4, lower partition wall;5, subway driving cabin;6, communication electricity Cable cabin;7, the comprehensive cabin of water power;8, high-tension cable cabin;9, originally water tank;10, low-voltage cable cabin;11, communication cable;12,10kv electricity Cable;13, water pipe is regenerated;14,220kv high-tension cable;15, DN400 feed pipe;16,110kv high-tension cable;17, personal cable; 18, subway;19, evacuation platform;
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with the drawings and specific embodiments, it is further described how the utility model is implemented.
As shown in Figure 1, a kind of subway driving section provided by the utility model is built with what Urban Underground pipe gallery was built together Building structure, comprising the Shield 1 that subway driving section and Urban Underground pipe gallery are designed with section circle, in the section The middle partition 2 that upper and lower two sections will be radially divided into Shield 1 is equipped in shield tunnel 1, in interval 2 top of plate is equipped with the upper partition wall 3 that section on Shield 1 is divided into two sections in left and right, in middle 2 lower part of partition The lower section of Shield 1 is divided into the lower partition wall 4 in two sections in left and right equipped with one.
In practical applications, since subway 18 is way traffic, so it includes left and right that subway driving section, which usually has, Two kinds of Shield structures, as shown in Figures 2 and 3.
As shown in Fig. 2, when above-mentioned Shield 1 is for running situation on the left of subway 18:
Wherein, 2 top of middle partition in shield tunnel 1 and the section being located on the right side of upper partition wall 3 are subway driving Cabin 5;And it is located at middle 2 top of partition and is located at 3 left side of upper partition wall and the section parallel with subway driving cabin 5 is communication cable cabin 6 or the comprehensive cabin 7 of water power;It is high-tension cable cabin positioned at middle 2 lower part of partition and positioned at two sections of lower 4 left and right sides of partition wall 8 or be respectively originally water tank 9 and low-voltage cable cabin 10;And in the present embodiment, it is located at middle 2 top of partition and is located at upper partition wall The section in 3 left sides is communication cable cabin 6, is height positioned at middle 4 lower part of partition and positioned at two sections of lower 4 left and right sides of partition wall Voltage cable cabin 8.
As shown in figure 3, when above-mentioned Shield 1 is for 18 race running situation of subway:
Wherein, 2 top of middle partition in shield tunnel 1 and the section being located on the left of upper partition wall 3 are subway driving Cabin 5;And it is located at middle 2 top of partition and is located at upper 3 right side of partition wall and the section parallel with subway driving cabin 5 for the comprehensive cabin of water power 7 or communication cable cabin 6;Positioned at middle 2 lower part of partition and two sections being located at 4 left and right sides of lower partition wall are respectively originally water tank 9 and low-voltage cable cabin 10 or be high-tension cable cabin 8;And in the present embodiment, it is located at middle 2 top of partition and is located at upper partition wall The section on 3 right sides is the comprehensive cabin 7 of water power, is distinguished positioned at middle 4 lower part of partition and positioned at two sections of lower 4 left and right sides of partition wall For originally water tank 9 and low-voltage cable cabin 10.
The upkeep operation of each pipeline, the Shield 1 in left side are carried out positioned at artificial disengaging pipe gallery convenient to overhaul The interior subway driving cabin 5 comprehensive cabin 7 in communication cable cabin 6 or water power in parallel interconnects, and is located under subway driving cabin 5 Two high-tension cable cabins 8 in portion or originally water tank 9 and low-voltage cable cabin 10 interconnect;The Shield 1 on right side The interior subway driving cabin 5 comprehensive cabin 7 of water power in parallel or communication cable cabin 6 interconnect, and are located under subway driving cabin 5 The originally water tank 9 in portion and low-voltage cable cabin 10 or two high-tension cable cabins 8 interconnect.
Wherein, middle partition 2 is all made of cast-in-situ steel reinforced concrete and pours integrated molding simultaneously with upper partition wall 3 and lower partition wall 4.
Wherein, the cross sectional shape of shield tunnel 1 is round and a diameter of 8.2m~8.4m.
Wherein, the height in communication cable cabin 6 is 4.0m~4.4m, and width is 1.86m~2.0m, for placing communication cable 11。
Wherein, the height in the comprehensive cabin 7 of water power is 4.0m~4.4m, and width is 1.56m~2.0m, for placing 10kv cable 12 and regeneration water pipe 13.
Wherein, the height in each high-tension cable cabin 8 is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times 220kv high-tension cable 14.
Wherein, originally the height of water tank 9 is 2.2m~2.4m, and width is 1.1m~3.5m, for placing DN400 feed pipe 15;
Wherein, the height in low-voltage cable cabin 10 is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times 110kv High-tension cable 16.
In addition, in communication cable cabin 6, the comprehensive cabin 7 of water power, high-tension cable cabin 8, originally water tank 9 and low-voltage cable cabin 10 It is additionally provided with several personal cables 17;The evacuation that one passes in and out subway 18 for passenger is additionally provided in subway driving cabin 5 to put down Platform 19.
Finally illustrate, the above description is only the embodiments of the present invention, is not intended to limit the patent of the utility model Range, equivalent structure or equivalent flow shift made by using the description of the utility model and the drawings, or directly or Other related technical areas are used in indirectly, are also included in the patent protection scope of the utility model.

Claims (10)

1. the building structure that a kind of subway driving section and Urban Underground pipe gallery are built together includes subway driving section and city Shield (1) of the underground pipe gallery with section circle design, it is characterised in that: in the Shield (1) The middle partition (2) in upper and lower two sections will be radially divided into the Shield (1) equipped with one, in the interval Plate (2) top is equipped with the upper partition wall (3) that section on the Shield (1) is divided into two sections in left and right, Middle partition (2) lower part be equipped with one by section under the Shield (1) be divided into left and right two sections under every Wall (4);
Wherein, being located at the section on the right side of the upper partition wall (3) is subway driving cabin (5) or water power comprehensive cabin (6) or communication cable Cabin (7);
Wherein, it is located at the section on the left of the upper partition wall (3) for communication cable cabin (7) or water power comprehensive cabin (6) or subway driving Cabin (5);
Wherein, it is located at the section at left and right sides of the lower partition wall (4) to be high-tension cable cabin (8) or be respectively originally water tank (9) and low-voltage cable cabin (10).
2. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature Be: the middle partition (2) and the upper partition wall (3) and lower partition wall (4) are all made of cast-in-situ steel reinforced concrete and pour one simultaneously It is body formed.
3. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature Be: the cross sectional shape of the Shield (1) is round and a diameter of 8.2m~8.4m.
4. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature Be: the height of the communication cable cabin (7) is 4.0m~4.4m, and width is 1.86m~2.0m, for placing communication cable (11)。
5. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature Be: the height of the water power comprehensive cabin (6) is 4.0m~4.4m, and width is 1.56m~2.0m, for placing 10kv cable (12) and water pipe (13) are regenerated.
6. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature Be: the height of each high-tension cable cabin (8) is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times 220kv high-tension cable (14).
7. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature Be: the height of the originally water tank (9) is 2.2m~2.4m, and width is 1.1m~3.5m, for placing DN400 feed pipe (15)。
8. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature Be: the height of the low-voltage cable cabin (10) is 2.2m~2.4m, and width is 1.1m~3.5m, for placing 3 times 110kv high Voltage cable (16).
9. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature It is: in the water power comprehensive cabin (6), communication cable cabin (7), high-tension cable cabin (8), originally water tank (9) and low-voltage cable cabin (10) several personal cables (17) are also laid with.
10. the building structure that subway driving section according to claim 1 and Urban Underground pipe gallery are built together, feature It is: is located at two sections at left and right sides of the upper partition wall (3) and interconnects, be located at left and right sides of the lower partition wall (4) Two sections interconnect.
CN201821269217.2U 2018-08-08 2018-08-08 A kind of building structure that subway driving section is built together with Urban Underground pipe gallery Expired - Fee Related CN208605197U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821269217.2U CN208605197U (en) 2018-08-08 2018-08-08 A kind of building structure that subway driving section is built together with Urban Underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821269217.2U CN208605197U (en) 2018-08-08 2018-08-08 A kind of building structure that subway driving section is built together with Urban Underground pipe gallery

Publications (1)

Publication Number Publication Date
CN208605197U true CN208605197U (en) 2019-03-15

Family

ID=65670562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821269217.2U Expired - Fee Related CN208605197U (en) 2018-08-08 2018-08-08 A kind of building structure that subway driving section is built together with Urban Underground pipe gallery

Country Status (1)

Country Link
CN (1) CN208605197U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617079A (en) * 2019-10-28 2019-12-27 中铁二院工程集团有限责任公司 Shield comprehensive pipe gallery pipeline installation shed frame system
CN111271090A (en) * 2020-03-17 2020-06-12 中铁二局集团有限公司 Construction method for partition plate in urban underground comprehensive pipe gallery
CN112878361A (en) * 2019-11-29 2021-06-01 中国电建集团华东勘测设计研究院有限公司 Multifunctional urban underground space fire-resistant structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617079A (en) * 2019-10-28 2019-12-27 中铁二院工程集团有限责任公司 Shield comprehensive pipe gallery pipeline installation shed frame system
CN112878361A (en) * 2019-11-29 2021-06-01 中国电建集团华东勘测设计研究院有限公司 Multifunctional urban underground space fire-resistant structure
CN111271090A (en) * 2020-03-17 2020-06-12 中铁二局集团有限公司 Construction method for partition plate in urban underground comprehensive pipe gallery

Similar Documents

Publication Publication Date Title
CN105113543B (en) 0815 type underground pipe gallery assembling combination cabin concrete structure of shallow embedding
CN208605197U (en) A kind of building structure that subway driving section is built together with Urban Underground pipe gallery
CN205062838U (en) Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN106013225B (en) Six layers of circular traffic, pipe gallery and sponge Urban Underground Complex
CN207348091U (en) A kind of assembled pipe gallery
CN205954798U (en) Large -traffic, height falls poor drainage drop well
CN106013221B (en) Four layers of class rectangle Urban Underground Complex
CN106013215A (en) Three-layer rectangle-like urban underground complex
CN106013223B (en) Elliptical section Urban Underground Complex
CN106351254A (en) Multilayer urban underground comprehensive pipe gallery
CN109944273A (en) A kind of city tunnel, track traffic regional tunnel and pipe gallery build structure jointly
CN105971009A (en) Five-layer circular urban underground complex
CN106436755A (en) Four-layer stair-like city underground comprehensive body
CN104410031B (en) A kind of pre-fabricated electric cables comb
CN208605198U (en) A kind of building structure that subway station is built together with Urban Underground pipe gallery
CN210315654U (en) Urban tunnel, rail transit interval tunnel and utility tunnel co-construction structure
CN206189448U (en) Elliptical section city underground complex
CN106013222A (en) Urban underground complex with three-circle cross section
CN106638682A (en) Efficient-seismic-reduction quasi-rectangular city underground architecture complex
CN207672609U (en) A kind of foundation pit supporting construction also serves as the pipe gallery of main body
CN106837348B (en) The interflow of shape of a hoof shield machine construction is regulated and stored moldeed depth layer tunnel
CN106013226B (en) Double Circle section Urban Underground Complex
CN206090613U (en) Ungulate city of span underground complex
CN106013224A (en) Double-horseshoe-shaped urban underground complex
CN210509196U (en) Large-section tunnel structure of hard rock stratum underground excavation single-layer lining subway parking line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190315

CF01 Termination of patent right due to non-payment of annual fee