CN207672609U - A kind of foundation pit supporting construction also serves as the pipe gallery of main body - Google Patents

A kind of foundation pit supporting construction also serves as the pipe gallery of main body Download PDF

Info

Publication number
CN207672609U
CN207672609U CN201721446591.0U CN201721446591U CN207672609U CN 207672609 U CN207672609 U CN 207672609U CN 201721446591 U CN201721446591 U CN 201721446591U CN 207672609 U CN207672609 U CN 207672609U
Authority
CN
China
Prior art keywords
foundation pit
plate
side plate
pit supporting
supporting construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721446591.0U
Other languages
Chinese (zh)
Inventor
马鸿敏
马建勋
李宗文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Jiaotong University
Original Assignee
Xian Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Jiaotong University filed Critical Xian Jiaotong University
Priority to CN201721446591.0U priority Critical patent/CN207672609U/en
Application granted granted Critical
Publication of CN207672609U publication Critical patent/CN207672609U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of foundation pit supporting construction of the utility model also serves as the pipe gallery of main body, including side plate, top plate and bottom plate, and the piping lane cabin surrounded by side plate, top plate and bottom plate;Side plate includes the diaphram wall of side plate inner ring and foundation pit supporting construction, and side plate inner ring is fixed on the inside of diaphram wall;Top plate is the top cross-brace plate in reinforced concrete member in foundation pit supporting construction, and the both ends of top cross-brace plate are fixedly connected with diaphram wall respectively;Bottom plate is armoured concrete slab, is arranged in bottom of foundation ditch, both ends are fixedly connected with diaphram wall and side plate inner ring.The utility model is using diaphram wall in foundation pit supporting construction as side plate external structure, pass through the top cross-brace plate of reinforced concrete member, so that top cross-brace plate has the double action of support pattern foundation pit supporting structure and structural body portion, when lower part soil mass of foundation pit is excavated, top cross-brace plate is not necessarily to as cross-brace, foundation pit cross-brace in the cross-brace for setting up other forms.

Description

A kind of foundation pit supporting construction also serves as the pipe gallery of main body
Technical field
The utility model is related to the technical field of civilian infrastructure construction, specially a kind of foundation pit supporting construction also serves as master The pipe gallery of body.
Background technology
Pipe gallery is to be built in Urban Underground for accommodating the urban pipelines such as water supply, draining, natural gas, electric power, communication Among two kinds and its more than box culvert tunnel.Unified planning and the pipe of city planting ductwork may be implemented by the construction of pipe gallery Reason.With the needs of urban development, it is extremely urgent to build this intensive municipal pipeline cabin of pipe gallery.From 2013 It rises, State Council lives to build the departments such as portion, the Ministry of Finance and continuously issues multinomial policy, opinion, actively develops pipe gallery and builds pilot city City carries forward vigorously the development & construction of pipe gallery.Portion, Ministry of Finance's development pipe gallery pilot work are firmly built from 2015, in the first batch 10 experimental cities, the 2nd batch of 15 experimental cities, have thus started the curtain that domestic pipe gallery is built energetically.
Existing pipe gallery construction is mainly two kinds of excavation and cast-in-place formula and precast splice type.The step of excavation and cast-in-place formula master It is:On ground excavation pit-pattern foundation pit supporting structure-pipe gallery formwork, pour.Pattern foundation pit supporting structure mainly uses in this fashion Campshed supporting or suspension roof support, suspension roof support cannot play the purpose that intercepts water for underground water, can only be on piping lane foundation pit ground It is used in the case of on water level located underground, simultaneously because anchor pole cannot generally be removed after the completion of pipe gallery construction, meeting For pipe gallery both sides the underground space pollution, also for the later stage for the underground space around piping lane utilization very not Profit.Campshed supporting is intercepted generally for underground water, has the function of preferably to intercept water, but it is equally existed in integrated pipe The drawbacks of cannot generally being removed after the completion of corridor construction.Precast splice type uses the prefabricated component that standard is made in factory, transports and applies Lifted to workshop.This form of construction work is also required to carry out foundation pit excavation and bracing, exists and excavation and cast-in-place formula pattern foundation pit supporting structure Identical problem, meanwhile, such pipe gallery assembly seam is more, and water-proof treatment technology is complicated, and waterproof reliability is not high.
Utility model content
For problems of the prior art, the utility model provides the synthesis that a kind of foundation pit supporting construction also serves as main body Piping lane, simple in structure, reasonable design, technology requirement is less, easy for construction.
The utility model is to be achieved through the following technical solutions:
A kind of foundation pit supporting construction also serves as the pipe gallery of main body, including side plate, top plate and bottom plate, and by side plate, top The piping lane cabin that plate and bottom plate surround;
The side plate includes the diaphram wall of side plate inner ring and foundation pit supporting construction, and side plate inner ring is fixed on underground company The inside of continuous wall;
The top plate is the top cross-brace plate in reinforced concrete member in foundation pit supporting construction, and top is laterally propped up The both ends of fagging are fixedly connected with diaphram wall respectively;
The bottom plate is armoured concrete slab, setting in bottom of foundation ditch, both ends with diaphram wall and side plate inner ring It is fixedly connected.
Preferably, if the inner wall of diaphram wall is provided with dry hole;Side plate inner ring is in reinforced concrete member, in side plate Steel tie corresponding with drilling is provided on the steel reinforcement cage of circle, steel tie is fixed in drilling implantation diaphram wall to be connected It connects.
Further, the inner wall of diaphram wall is serrated, and is fixedly connected for the cast concrete with side plate inner ring.
Preferably, the steel reinforcement cage of the steel reinforcement cage of top cross-brace plate and diaphram wall is fixed in roof intersection region and is connected Composition inverted U is connect, and formed by integrally casting is molded.
Preferably, bottom plate is fixedly connected by the steel tie of implantation with diaphram wall and side plate inner ring.
Preferably, horizontally disposed in piping lane cabin to have intermediate lateral support plate, for piping lane cabin to be carried out Lower separation;The side wall that intermediate lateral support plate both ends correspond to the compartment with piping lane cabin respectively is fixedly connected.
Preferably, it is vertically provided with middle partition board in piping lane cabin, for piping lane cabin to be carried out left and right separation;In Partition board both ends are fixedly connected at the top and bottom of the compartment with being corresponded in piping lane cabin respectively.
Preferably, the both ends of the bottom plate are fixedly connected on the middle part of diaphram wall.
Compared with prior art, the utility model has technique effect beneficial below:
The utility model passes through armored concrete using the diaphram wall in foundation pit supporting construction as side plate external structure The top cross-brace plate of component, so that top cross-brace plate has pair of support pattern foundation pit supporting structure and structural body portion Recast is used, and when lower part soil mass of foundation pit is excavated, top cross-brace plate is all higher than tradition as cross-brace, intensity with rigidity Beams of concrete and girder steel, foundation pit cross-brace is safe and reliable, without set up other forms cross-brace.Also, due to The overall stiffness that diaphram wall has and the preferable advantage of intensity, make full use of diaphram wall, make in the present invention Its double action with the vertical earth-retaining of foundation pit and comprehensive pipe gallery structure side plate.In this way not only so that pattern foundation pit supporting structure It is more preferable compared to traditional campshed mode water blocking, and since diaphram wall is directly as the external knot of pipe gallery side plate Structure so that excavation of foundation pit size is reduced, while solving the dirt of the underground space caused by can not being removed due to foundation pit supporting construction The problem of dye is with waste.Foundation pit supporting construction is poured first in construction, after foundation pit supporting construction intensity is met the requirements, so that it may With the top cross-brace plate of backfill covering pattern foundation pit supporting structure, greatly reduced in this way since pipe gallery open-cut is for ground The influence of road etc..
Further, due to still having a part of diaphram wall below the bottom plate of pipe gallery, therefore consider in the later stage When pipe gallery dilatation directly soil body casting concrete plate, concrete slab and diaphram wall can be excavated in existing bottom plate lower part Closed internal piping lane cabin is connected and composed, this extending capacity reformation method is convenient, and transformation process is underground job, for On the ground influence it is less, or even do not influence on the ground.
Description of the drawings
Fig. 1 is the cross-sectional view of embodiment 1 in the utility model.
Fig. 2 is the cross-sectional view of embodiment 2 in the utility model.
In figure:1, piping lane cabin;2, diaphram wall;3, top cross-brace plate;4, side plate inner ring;5, intermediate lateral branch Fagging;6, armoured concrete slab;7, middle partition board.
Specific implementation mode
The following describes the utility model in further detail with reference to the accompanying drawings, it is described be the explanation to the utility model and It is not to limit.
A kind of foundation pit supporting construction of the utility model also serves as the pipe gallery of main body, can be by diaphram wall 2 as pipe Corridor side plate outer ring, by pipe gallery of the top cross-brace plate 3 as top plate in pattern foundation pit supporting structure.The utility model includes top Plate, bottom plate and side plate, the outer ring and the side plate inner ring being connect with its inside that latus inframedium is made of the diaphram wall 2 of both sides 4 collectively constitute, and top plate is made of the top cross-brace plate 3 connect with the top of diaphram wall 2, bottom plate by bottom of foundation ditch and The armoured concrete slab 6 that side plate is connected forms.
Vertical diaphram wall 2 is simultaneously the side plate of a pipe gallery part, underground at this time in foundation pit supporting construction Diaphragm wall 2 has the double action of pattern foundation pit supporting structure and main structure body.The top cross-brace plate 3 of foundation pit supporting construction is comprehensive simultaneously The top plate of piping lane is closed, double action of the top cross-brace plate 3 with pattern foundation pit supporting structure and main structure body at this time.
Wherein, the steel reinforcement cage of the top cross-brace plate 3 of pattern foundation pit supporting structure and the steel reinforcement cage binding of diaphram wall 2 are connected to Together, and top cross-brace plate 3 is shaped and is conserved with 2 formed by integrally casting of diaphram wall.
The construction that the bottom plate of foundation pit support construction completion rear lower earth excavation and pipe gallery passes through cover and cut method It is made.
Side plate includes the side plate inner ring 4 that the side plate outer ring that diaphram wall 2 is constituted and 2 inside of diaphram wall pour.It is interior The mode of outer panel connection is to dig the inner wall of diaphram wall 2 at zigzag, while in 2 drilling on inner side of diaphram wall, Steel tie corresponding thereto is set on the steel reinforcement cage of side plate inner ring 4, steel tie is implanted into diaphram wall 2.
Pattern foundation pit supporting structure in the utility model can pass through intermediate lateral support plate 5 according to the design needs of the piping lane number of plies It is set as single layer, bilayer or multilayer these types different form.Middle partition board can be passed through according to the design needs of piping lane horizontal space 7 are set as the different form in double cabins or more cabins.
Embodiment 1
As shown in Figure 1, the utility model embodiment 1 provides single cabin integrated pipe that a kind of foundation pit supporting construction also serves as main body Corridor, the pipe gallery include side plate, top plate and bottom plate, the side plate include the side plate outer ring that diaphram wall 2 is constituted and The side plate inner ring 4 poured afterwards, the connection type of the diaphram wall 2 and side plate inner ring 4 be by the inner wall chisel of diaphram wall 2 at Zigzag, while in 2 drilling on inner side of diaphram wall, drawknot steel corresponding thereto is set on the steel reinforcement cage of side plate inner ring 4 Steel tie is implanted into diaphram wall 2 by muscle, and the top plate is the top cross-brace plate 3 of foundation pit supporting construction, the top The steel reinforcement cage of cross-brace plate 3 is connect with the steel reinforcement cage of the diaphram wall of pattern foundation pit supporting structure 2 in roof intersection region in construction, Inverse u shape is constituted, and when pouring while being poured, is integrally formed, bottom plate is after the completion of excavation of foundation pit and lower part basement process The armoured concrete slab poured, bottom plate are connected with side plate by way of being implanted into steel tie.
Specific construction procedure is as follows:
A. foundation pit construction measurement and unwrapping wire;
B. guide wall of underground continuous wall makes, fluting, and wall is led on the inside of fluting is removed after the completion;
C. it the making of diaphram wall steel reinforcement cage and hangs into underground continuous wall groove segment;
D. by excavation of foundation pit to pipe gallery top plate bottom elevation location, and leveling processing is carried out for bottom soil body, the bottom of at Portion is laid with template;
E. the making and lifting of pipe gallery roof steel bar cage, by itself and ground after roof steel bar cage hangs onto design position Lower diaphragm wall steel reinforcement cage binding is connected as one;
F., top plate upper mould is set, while pouring diaphram wall and pipe gallery concrete roof, one conserves;
G. after diaphram wall and piping lane strength of roof reach 28d intensity, the above soil body of top plate is backfilled;
H. the following soil body of top plate is excavated to piping lane back-plane design bottom absolute altitude, performs side plate inner ring, and when construction first connects underground Dabbing is at zigzag on the inside of continuous wall and piping lane top plate, and drills, after inner ring steel reinforcement cage passed through to the steel tie of setting be implanted into Then diaphram wall and bottom plate pour side plate inner ring, are conserved;
I. bottom plate is performed after side plate inner ring intensity reaches 7d intensity, when construction of bottom plates pays attention to the connection for it with side plate Still in such a way that setting drawknot connects;
J. for 2 embeddings of each construction joint and water-proofing treatment;
K. above step is repeated, the construction of next section of pipe gallery is carried out.
Embodiment 2
As shown in Fig. 2, the utility model embodiment provides a kind of double cabin synthesis of the bilayer that foundation pit supporting construction also serves as main body Piping lane, this kind of piping lane is identical as single cabin piping lane Construction Principle in embodiment 1, is that the underground in foundation pit supporting construction is continuous Outer ring of the wall as side plate, using top cross-brace plate as top plate, only because the pipe gallery of this form is using double-deck Double cabins, pattern foundation pit supporting structure includes top cross-brace plate and intermediate lateral support plate when construction, to be set as upper layer and lower layer, and The partition board 7 in centre increases, specific construction procedure is similar to Example 1, repeats no more.

Claims (8)

1. a kind of foundation pit supporting construction also serves as the pipe gallery of main body, which is characterized in that including side plate, top plate and bottom plate, and By side plate, piping lane cabin (1) that top plate and bottom plate surround;
The side plate includes the diaphram wall (2) of side plate inner ring (4) and foundation pit supporting construction, and side plate inner ring (4) is fixed on The inside of diaphram wall (2);
The top plate is the top cross-brace plate (3) in reinforced concrete member in foundation pit supporting construction, and top is laterally propped up The both ends of fagging (3) are fixedly connected with diaphram wall (2) respectively;
The bottom plate is armoured concrete slab (6), setting in bottom of foundation ditch, both ends in diaphram wall (2) and side plate Circle (4) is fixedly connected.
2. a kind of foundation pit supporting construction according to claim 1 also serves as the pipe gallery of main body, which is characterized in that underground connects Continuous wall (2) if inner wall be provided with dry hole;Side plate inner ring (4) is in reinforced concrete member, on the steel reinforcement cage of side plate inner ring (4) It is provided with steel tie corresponding with drilling, steel tie is fixedly connected in drilling implantation diaphram wall (2).
3. a kind of foundation pit supporting construction according to claim 2 also serves as the pipe gallery of main body, which is characterized in that underground connects The inner wall of continuous wall (2) is serrated, for being fixedly connected with the cast concrete of side plate inner ring (4).
4. a kind of foundation pit supporting construction according to claim 1 also serves as the pipe gallery of main body, which is characterized in that top is horizontal It is fixedly connected with composition inverted U in roof intersection region with the steel reinforcement cage of diaphram wall (2) to the steel reinforcement cage of support plate (3), and Formed by integrally casting is molded.
5. a kind of foundation pit supporting construction according to claim 1 also serves as the pipe gallery of main body, which is characterized in that bottom plate with Diaphram wall (2) is fixedly connected by the steel tie of implantation with side plate inner ring (4).
6. a kind of foundation pit supporting construction according to claim 1 also serves as the pipe gallery of main body, which is characterized in that piping lane cabin Interior is horizontally disposed intermediate lateral support plate (5), for separate up and down piping lane cabin;Intermediate lateral supports The side wall that plate (5) both ends correspond to the compartment with piping lane cabin respectively is fixedly connected.
7. a kind of foundation pit supporting construction according to claim 1 also serves as the pipe gallery of main body, which is characterized in that piping lane cabin Interior is vertically provided with middle partition board (7), for piping lane cabin to be carried out left and right separation;Middle partition board (7) both ends respectively with It corresponds at the top and bottom of the compartment and is fixedly connected in piping lane cabin.
8. a kind of foundation pit supporting construction according to claim 1 also serves as the pipe gallery of main body, which is characterized in that the bottom The both ends of plate are fixedly connected on the middle part of diaphram wall (2).
CN201721446591.0U 2017-11-02 2017-11-02 A kind of foundation pit supporting construction also serves as the pipe gallery of main body Active CN207672609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721446591.0U CN207672609U (en) 2017-11-02 2017-11-02 A kind of foundation pit supporting construction also serves as the pipe gallery of main body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721446591.0U CN207672609U (en) 2017-11-02 2017-11-02 A kind of foundation pit supporting construction also serves as the pipe gallery of main body

Publications (1)

Publication Number Publication Date
CN207672609U true CN207672609U (en) 2018-07-31

Family

ID=62964687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721446591.0U Active CN207672609U (en) 2017-11-02 2017-11-02 A kind of foundation pit supporting construction also serves as the pipe gallery of main body

Country Status (1)

Country Link
CN (1) CN207672609U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914472A (en) * 2019-03-06 2019-06-21 重庆大学 A kind of soft clay area assembled pipe gallery and its construction method
CN110130398A (en) * 2019-05-15 2019-08-16 天津大学 A kind of piping lane system and its construction method that multistage support is combined with main structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914472A (en) * 2019-03-06 2019-06-21 重庆大学 A kind of soft clay area assembled pipe gallery and its construction method
CN109914472B (en) * 2019-03-06 2020-07-07 重庆大学 Soft soil area assembled comprehensive pipe gallery and construction method thereof
CN110130398A (en) * 2019-05-15 2019-08-16 天津大学 A kind of piping lane system and its construction method that multistage support is combined with main structure

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN106049530B (en) City integrated piping lane and construction method
CN108487252A (en) A kind of deep foundation pit open cutting is suitable to make construction method
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN103195085B (en) Downward story-adding basement and construction method thereof
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN206376276U (en) A kind of prefabricated pipe gallery
CN106703828A (en) The construction method of building subway station with fabricated lining combination PBA
CN107218046A (en) Mechanical assistance sealing Station structure and construction method in a kind of pilot tunnel
CN106555408A (en) The structure and construction method of underground pipe gallery
CN103741714A (en) Construction method for full cover-excavation reverse method of underground engineering
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN107794946B (en) Underground comprehensive pipe rack structure deeply buried in soft soil and construction method thereof
CN207063982U (en) Mechanical assistance sealing Station structure in a kind of pilot tunnel
CN106284412A (en) A kind of prefabricated pipe gallery and construction method
CN108571321A (en) A kind of construction method of the subway station of combined highway and metro
CN109555112A (en) A kind of structure superposition formula diaphram wall and construction method
CN102777065A (en) Reverse building method for lifting-type bucket-shaped underground garage
CN106013053A (en) Steel sheet pile support construction method for building underground garage open caisson
CN103628503A (en) Construction method for using underground second-layer station enclosure to make underground third-layer transfer joint
CN106013223A (en) Oval-cross-section urban underground complex
CN110424454A (en) Build together method and the structure of building together of pipe gallery and subway station
CN207998860U (en) A kind of assembled pipe gallery
CN207672609U (en) A kind of foundation pit supporting construction also serves as the pipe gallery of main body