CN206467688U - Include the pipe gallery of sewage pipe and rain pipe - Google Patents

Include the pipe gallery of sewage pipe and rain pipe Download PDF

Info

Publication number
CN206467688U
CN206467688U CN201720142716.4U CN201720142716U CN206467688U CN 206467688 U CN206467688 U CN 206467688U CN 201720142716 U CN201720142716 U CN 201720142716U CN 206467688 U CN206467688 U CN 206467688U
Authority
CN
China
Prior art keywords
storehouse
pipe
sewage
rainwater
rain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720142716.4U
Other languages
Chinese (zh)
Inventor
汪胜
王家华
常剑锋
葛华飞
叶之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN201720142716.4U priority Critical patent/CN206467688U/en
Application granted granted Critical
Publication of CN206467688U publication Critical patent/CN206467688U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pipe gallery for including sewage pipe and rain pipe, including combustion gas storehouse, comprehensive storehouse, it is additionally provided with independent sewage storehouse and independent rainwater storehouse, sewage storehouse and rainwater storehouse are arranged at B1, combustion gas storehouse and comprehensive storehouse are arranged at two layers of underground, and sewage storehouse and rainwater storehouse are arranged at the top in comprehensive storehouse;Sewage pipe is laid in sewage storehouse, sewage is accessed by branch sewer and inspection shaft is set in sewage pipe, sewage storehouse, and inspection shaft is communicated with ground, rainwater storehouse is rainwater box culvert, rainwater accesses rainwater storehouse by rain pipe.The utility model is according to the characteristics of rain, sewage elevation, rainwater storehouse and sewage storehouse are arranged on B1, and the bin of other non-gravity pipelines is arranged on two layers of underground, rain, branch sewer can be easy to be directly accessed, without being avoided using the processing of falling rainbow, difficulty of construction and construction costs are reduced, pollution and other influences that rain, sewage is likely to result in other pipelines are avoided that again.

Description

Include the pipe gallery of sewage pipe and rain pipe
Technical field
The utility model is related to municipal works technical field, more particularly to a kind of integrated pipe for including sewage pipe and rain pipe Corridor.
Background technology
To implement unified planning, design, construction and safeguarding, the municipal administration that Urban Underground is used to lay municipal public use pipeline is built in Public utility is referred to as pipe gallery.In pipe gallery engineering of the prior art, rainwater, sewage pipe synthesis is not included into generally In piping lane.Even if there is part design to include rain pipe and sewage pipe in pipe gallery, there are two kinds of designs at present:One is utilizing Pipe gallery bottom space, setting rain gutter, upper cover plate, during rainy season, pipe gallery bottom is saturated with water, and rainwater can be stained Other pipelines, cleaning maintenance difficulties are big, and high humidity in piping lane, influence other pipelines normally to run;Although the second is setting only Vertical rainwater storehouse and sewage storehouse, but it is in same height with other bins.Because the rainfall and sewage pipes line being introduced into is used mostly Gravity stream is designed, and rain sewer line will intersect when accessing with other bins, and the piping lane with other pipelines will be in longitudinal direction On have conflict, it is necessary to fall rainbow using rainfall and sewage pipes or the piping lane progress of falling rainbow avoided, construction processing difficulty is larger.
Utility model content
In view of the drawbacks described above of prior art, technical purpose of the present utility model be provide one kind include sewage pipe and The pipe gallery of rain pipe, improves that existing pipe gallery lacks sewage pipe and rain pipe or to design unreasonable difficulty of construction big etc. Defect.
To achieve the above object, the utility model provides a kind of pipe gallery for including sewage pipe and rain pipe, including Combustion gas storehouse, comprehensive storehouse, it is characterised in that be additionally provided with independent sewage storehouse and independent rainwater storehouse, the sewage storehouse and the rain Sump is arranged at B1, and the combustion gas storehouse and the comprehensive storehouse are arranged at two layers of underground, the sewage storehouse and the rainwater Storehouse is arranged at the top in the comprehensive storehouse;Sewage pipe is laid in the sewage storehouse, sewage accesses the sewage by branch sewer Inspection shaft is set, and the inspection shaft is communicated with ground, the rainwater storehouse is rainwater box culvert in pipe, the sewage storehouse, rainwater passes through Rain pipe accesses the rainwater storehouse.
Further, gas pipeline is laid in the combustion gas storehouse, laying communication cable in the comprehensive storehouse, power cable and Feedwater piping.
Sewage is isolated with other bins, sets independent sewage storehouse, and sewage is received into sewage storehouse, gravity by sewage pipe The sewage pipe height fall of stream can be vertically adjusted in sewage storehouse.Rainwater storehouse uses rainwater box culvert pattern, tight with sewage storehouse Neighbour's arrangement, according to the characteristics of rain, sewage elevation, B1 is arranged on by rainwater storehouse and sewage storehouse.So it is easy to rain, sewage branch Pipe is directly accessed.For example during the sewage pipe in branch sewer access sewage storehouse, branch sewer can directly pass through rainwater storehouse, enter Inspection shaft is set to lead directly to ground in sewage storehouse, sewage storehouse.It is also that can directly pass through sewage storehouse when rain pipe accesses rainwater storehouse. The requirement of gravity stream pipeline can be met on elevation, and influence will not be produced on other pipeline bins.
The bin of other pipelines such as non-gravity pipeline such as Gas Pipe, feed pipe, power cable, communication cable is arranged on underground Two layers.Combustion gas storehouse is independent into a storehouse, in the case that power pipeline is less can with feedwater, a bin can be shared by communicating.Power pipe In the case that line is more, independent electric power storehouse can be designed.For security consideration, although combustion gas storehouse is arranged at two layers of underground, But its top is not provided with other bins.
Further, the pipe gallery also includes electric power storehouse, and the electric power storehouse is arranged at two layers of underground, the sewage storehouse The top in the comprehensive storehouse and the electric power storehouse is arranged at the rainwater storehouse.
Further, laid in the combustion gas storehouse and communication cable and feedwater piping laid in gas pipeline, the comprehensive storehouse, Power cable is laid in the electric power storehouse.
Further, the rainwater orlop portion is provided with chute.Chute is set in rainwater orlop portion to reduce rainwater orlop The generation of portion's alluvial.
Further, the top in the combustion gas storehouse is provided with the fan house of local nodes.For security consideration, combustion gas storehouse Although being arranged at two layers of underground, its top is not provided with other bins, and its superjacent air space can be by the use of being used as the logical of local nodes Ventilator Room use, so at local nodes without change tapered elevation location with regard to can meet various pipelines, equipment demand.
The beneficial effects of the utility model:
The utility model has the advantages that as a result of said structure design:According to the spy of rain, sewage elevation Point, B1 is arranged on by rainwater storehouse and sewage storehouse, and the bin of other non-gravity pipelines is arranged on two layers of underground, Ji Nengbian Yu Yu, branch sewer are directly accessed, and without being avoided using fall rainbow processing, reduce difficulty of construction and construction costs, and energy Avoid pollution and other influences that rain, sewage are likely to result in other pipelines.
The technique effect of design of the present utility model, concrete structure and generation is made furtherly below with reference to accompanying drawing It is bright, to be fully understood from the purpose of this utility model, feature and effect.
Brief description of the drawings
Fig. 1 is the structural representation of a preferred embodiment of the present utility model.
In figure, 1 sewage storehouse;11 sewage pipes;12 branch sewers;13 inspection shafts;2 rainwater storehouses;21 chutes;3 combustion gas Storehouse;4 integrate storehouse;5 electric power storehouses;6 fan houses.
Embodiment
As shown in figure 1, a specific embodiment of the present utility model, including combustion gas storehouse 3, comprehensive storehouse 4 and electric power storehouse 5, also set There are independent sewage storehouse 1 and independent rainwater storehouse 2, sewage storehouse 1 and rainwater storehouse 2 are arranged at B1, combustion gas storehouse 3, comprehensive storehouse 4 Two layers of underground is arranged at electric power storehouse 5, sewage storehouse 1 and rainwater storehouse 2 are arranged at the top in comprehensive storehouse 4 and electric power storehouse 5.Sewage storehouse 1 Interior laying sewage pipe 11, sewage is accessed by branch sewer 12 and inspection shaft 13, inspection shaft 13 is set in sewage pipe 11, sewage storehouse 1 Rainwater storehouse 2 is communicated with ground for rainwater box culvert, rainwater passes through (not shown) the access rainwater storehouse 2 of rain pipe.The bottom of rainwater storehouse 2 Provided with chute 21.Generation of the chute to reduce the alluvial of rainwater orlop portion is set in rainwater orlop portion.
Lay to lay in gas pipeline, comprehensive storehouse 4 in combustion gas storehouse 3 and electricity is laid in communication cable and feedwater piping, electric power storehouse 5 Power cable.
For security consideration, although combustion gas storehouse 3 is arranged at two layers of underground, its top is not provided with other bins, thereon Side space can utilize the fan house 6 for setting local nodes.Without changing tapered elevation location so at local nodes With regard to can meet various pipelines, equipment demand.
The utility model isolates sewage with other bins, sets independent sewage storehouse, and sewage is accommodated into by sewage pipe Enter sewage storehouse, the sewage pipe height fall of gravity stream can be vertically adjusted in sewage storehouse.Rainwater uses rainwater box culvert pattern, With sewage storehouse close to arrangement, according to the characteristics of rain, sewage elevation, rainwater storehouse and sewage storehouse are arranged on B1.So just Yu Yu, branch sewer are directly accessed.For example during the sewage pipe in branch sewer access sewage storehouse, branch sewer can be passed through directly Rainwater storehouse, into sewage storehouse, sets inspection shaft to lead directly to ground in sewage storehouse.When rain pipe accesses rainwater storehouse, being also can be direct Pass through sewage storehouse.The requirement of gravity stream pipeline can be met on elevation, and influence will not be produced on other pipeline bins.
The bin of other pipelines such as non-gravity pipeline such as Gas Pipe, feed pipe, power cable, communication cable is arranged on underground Two layers.Wherein, combustion gas storehouse is independent into a storehouse, for security consideration, and although combustion gas storehouse is arranged at two layers of underground, but its top is not Other bins are set.In the present embodiment, power pipeline is more, therefore the independent electric power storehouse of design.Certainly, implement some other It is also feasible with feedwater, the shared bin that communicates in the case that power pipeline is less in example.
Preferred embodiment of the present utility model described in detail above.It should be appreciated that the ordinary skill people of this area Member just can make many modifications and variations without creative work according to design of the present utility model.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality on the basis of existing technology according to design of the present utility model in domain Available technical scheme is tested, all should be in the protection domain being defined in the patent claims.

Claims (7)

1. a kind of pipe gallery for including sewage pipe and rain pipe, including combustion gas storehouse, comprehensive storehouse, it is characterised in that be additionally provided with solely Vertical sewage storehouse and independent rainwater storehouse, the sewage storehouse and the rainwater storehouse are arranged at B1, the combustion gas storehouse and institute State comprehensive storehouse and be arranged at two layers of underground, the sewage storehouse and the rainwater storehouse are arranged at the top in the comprehensive storehouse;The sewage Sewage pipe is laid in storehouse, sewage accesses setting inspection shaft, the inspection in the sewage pipe, the sewage storehouse by branch sewer Well is communicated with ground, and the rainwater storehouse is rainwater box culvert, and rainwater accesses the rainwater storehouse by rain pipe.
2. the pipe gallery according to claim 1 for including sewage pipe and rain pipe, it is characterised in that in the combustion gas storehouse Lay and communication cable, power cable and feedwater piping are laid in gas pipeline, the comprehensive storehouse.
3. the pipe gallery according to claim 1 for including sewage pipe and rain pipe, it is characterised in that the pipe gallery Also include electric power storehouse, the electric power storehouse is arranged at two layers of underground, and the sewage storehouse and the rainwater storehouse are arranged at the comprehensive storehouse With the top in the electric power storehouse.
4. the pipe gallery according to claim 3 for including sewage pipe and rain pipe, it is characterised in that in the combustion gas storehouse Lay to lay in gas pipeline, the comprehensive storehouse and power cable is laid in communication cable and feedwater piping, the electric power storehouse.
5. according to any described pipe galleries for including sewage pipe and rain pipe of claim 1-4, it is characterised in that the rain Sump bottom is provided with chute.
6. according to any described pipe galleries for including sewage pipe and rain pipe of claim 1-4, it is characterised in that the combustion The top of gas storehouse is provided with the fan house of local nodes.
7. the pipe gallery according to claim 5 for including sewage pipe and rain pipe, it is characterised in that the combustion gas storehouse Top is provided with the fan house of local nodes.
CN201720142716.4U 2017-02-17 2017-02-17 Include the pipe gallery of sewage pipe and rain pipe Active CN206467688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720142716.4U CN206467688U (en) 2017-02-17 2017-02-17 Include the pipe gallery of sewage pipe and rain pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720142716.4U CN206467688U (en) 2017-02-17 2017-02-17 Include the pipe gallery of sewage pipe and rain pipe

Publications (1)

Publication Number Publication Date
CN206467688U true CN206467688U (en) 2017-09-05

Family

ID=59708729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720142716.4U Active CN206467688U (en) 2017-02-17 2017-02-17 Include the pipe gallery of sewage pipe and rain pipe

Country Status (1)

Country Link
CN (1) CN206467688U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137980A (en) * 2018-10-08 2019-01-04 上海市政工程设计研究总院(集团)有限公司 A kind of underground pipe gallery pipeline arrangement and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137980A (en) * 2018-10-08 2019-01-04 上海市政工程设计研究总院(集团)有限公司 A kind of underground pipe gallery pipeline arrangement and construction method

Similar Documents

Publication Publication Date Title
CN206467686U (en) Pipe gallery with Regulation Function
CN205688461U (en) Pipe gallery section structure
CN104947780A (en) Inflow vertical shaft system connected into deep tunnel drainage system
CN105926676A (en) Comprehensive pipe rack system with sponge urban function
CN205688460U (en) Pipe gallery system with sponge city function
CN206189462U (en) Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line
CN202810263U (en) Arrangement structure of comprehensive auxiliary plant of thermal power plant
CN205557584U (en) Steel pipe corridor and large -scale utility tunnel system
CN206467688U (en) Include the pipe gallery of sewage pipe and rain pipe
CN206396785U (en) The common cabin pattern synthesis piping lane section structure of the rain sewage of easy access
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN211229222U (en) High-density built-up area utilizes three-dimensional space's distribution of rain and sewage transformation system
CN206888009U (en) Realize sewage pipe in corridor without the underground pipe gallery sewage branch mouth structure for falling damage and picking out
CN204781253U (en) Insert deep tunnel drainage system's inflow shaft system
CN204551523U (en) A kind of stainless steel composite pipe gallery
CN201162227Y (en) Underground pipe canal
CN206396789U (en) A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge
CN206418520U (en) A kind of comprehensive pipe gallery structure for accessing storm sewer
CN214144450U (en) Building balcony waste water rainwater reposition of redundant personnel structure
CN210766884U (en) Underground cover plate ditch suitable for pipeline collection
CN209429170U (en) Underground pipe gallery system and super-huge burning power plant
CN209194585U (en) It is a kind of with waterproof, the underground pipe gallery structure of drain function
CN102562153A (en) Setting method for auxiliary system of electric power tunnel
CN206143900U (en) Sewer manhole structure suitable for in utility tunnel
CN208718060U (en) The pretreated drop energy dissipating drilled shaft of sand setting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant