CN209429170U - Underground pipe gallery system and super-huge burning power plant - Google Patents

Underground pipe gallery system and super-huge burning power plant Download PDF

Info

Publication number
CN209429170U
CN209429170U CN201822178527.XU CN201822178527U CN209429170U CN 209429170 U CN209429170 U CN 209429170U CN 201822178527 U CN201822178527 U CN 201822178527U CN 209429170 U CN209429170 U CN 209429170U
Authority
CN
China
Prior art keywords
cable
piping lane
power plant
super
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822178527.XU
Other languages
Chinese (zh)
Inventor
张浩浩
胡文杰
聂永俊
彭伟
操纪巍
刘文元
姚明志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China City Environment Protection Engineering Ltd
Original Assignee
China City Environment Protection Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China City Environment Protection Engineering Ltd filed Critical China City Environment Protection Engineering Ltd
Priority to CN201822178527.XU priority Critical patent/CN209429170U/en
Application granted granted Critical
Publication of CN209429170U publication Critical patent/CN209429170U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides a kind of underground pipe gallery system based on super-huge burning power plant, including cable basement, it is opened in below each working region of power plant and runs through the piping lane of each working region of power plant and the cable shaft for exporting the piping lane inner cable, the gantry for being used to support the cable drawn by the cable basement is provided in the piping lane, the cable shaft be it is multiple, each cable shaft is successively spaced apart along the length direction of the piping lane.The utility model also provides a kind of super-huge burning power plant, including discharging platform region, dump pit region, incinerator region, high and low voltage electric distribution chamber region and fume treatment region, the super-huge burning power plant further includes above-mentioned underground pipe gallery system, the piping lane is opened in below each working region and through each working region, each working region is corresponding at least one described cable shaft, and the cable basement is located at below the high and low voltage electric distribution room.

Description

Underground pipe gallery system and super-huge burning power plant
Technical field
The utility model relates to municipal pipeline field of engineering technology more particularly to a kind of underground pipe gallery system and super-huge rubbish Rubbish burns power plant.
Background technique
With the continuous expansion of city size, municipal refuse yield increases year by year, each equal planning construction in large- and-medium size cities Super-huge garbage incinerating power plant.The factors such as comprehensive garbage transportation cost, burning power plant is built in surrounding city, but is examined Consider power plant neighbour and keep away effect, power plant's land use index is extremely nervous, while being continuously increased with municipal refuse yield, waste incineration Power plant's processing capacity constantly expands, and burning power plant scale constantly expands, and interior construction one meets city in a limited space The super-huge burning power plant of demand tests rubbish construction industry design level.In burning power plant process of construction, by More close in equipment arrangement, synergic system pipeline and number of cables are larger, and full factory's system is extremely complex, full factory's pipeline and cable Burning power plant construction land is seriously limited.
Utility model content
The purpose of the utility model is to overcome the defect of the prior art, a kind of underground pipe gallery system and super-huge is provided Burning power plant is got through between each working region by the synergic system pipeline and cable arrangements of full power plant in underground pipe gallery Contact, reduce construction land, Shi Quan factory pipeline is more succinct, reduces project construction pipe network and cable initial cost, while after being Phase operation and maintenance are laid a good foundation.
The utility model is realized in this way:
The utility model provides a kind of underground pipe gallery system based on super-huge burning power plant, including buried cable Room is opened in below each working region of power plant and through the piping lane of each working region of power plant and for exporting the piping lane inner cable Cable shaft, be provided with the gantry for being used to support the cable drawn by the cable basement, the cable in the piping lane Vertical shaft be it is multiple, each cable shaft is successively spaced apart along the length direction of the piping lane.
Preferably, the underground pipe gallery system further includes the pipe for connecting the supplying drainage of each working region of power plant Road, the pipeline are located in the piping lane and extend along the length direction of piping lane.
Preferably, the pipeline is located at piping lane bottom, and the gantry is arranged close to the top of the piping lane.
Preferably, the interface channel passed through between the cable shaft and the piping lane with current supply cable.
Preferably, the gantry be it is multiple, each gantry is successively spaced apart along the length direction of the piping lane.
Preferably, the gantry includes the oblique branch that horizontally disposed support rod and one end are connect with the support rod Support, the other end of the bearing diagonal are installed on the inner wall of the piping lane and have folder between the bearing diagonal and the support rod Angle.
Preferably, to be distributed with the cable perpendicular for the two sides of cable basement described in length direction along the piping lane Well.
The utility model also provides a kind of super-huge burning power plant, including discharging platform region, dump pit region, burns Burning furnace region, high and low voltage electric distribution chamber region and fume treatment region, the super-huge burning power plant further includes above-mentioned ground Lower piping lane system, the piping lane are opened in below each working region and through each working region, and each working region is right There should be at least one described cable shaft, the cable basement is located at below the high and low voltage electric distribution room.
The utility model has the following beneficial effects:
The underground pipe gallery system that the utility model provides introduces buried pipe in the construction of super-huge garbage incinerating power plant Corridor concept gets through the contact between each working region by full factory's synergic system pipeline and cable arrangements in underground pipe gallery, reduces Construction land, Shi Quan factory pipeline is more succinct, reduces project construction pipe network and cable initial cost, while beating for later period operation and maintenance Under good basis.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the top view of super-huge burning power plant provided by the embodiment of the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work All other embodiment obtained, fall within the protection scope of the utility model.
Such as Fig. 1, the utility model embodiment one provides a kind of underground pipe gallery system based on super-huge burning power plant, Including cable basement 4, it is opened in below each working region of power plant and through the piping lane of each working region of power plant and several is used for It exports the cable shaft 3 of the piping lane inner cable, is provided with to be used to support in the piping lane and be drawn by the cable basement The gantry 2 of cable, the cable shaft 3 be it is multiple, each cable shaft 3 along the piping lane length direction successively be spaced divides Cloth.Preferably, the underground pipe gallery system further includes the pipeline 1 for connecting the supplying drainage of each working region of power plant, institute Pipeline 1 is stated to be located in the piping lane and extend along the length direction of piping lane.Piping lane is offered in the underground of the intermediate region Fig. 1, institute Stating can be with mule carriage, the interior pipeline being equipped with for converging each working region waste liquid of the piping lane and each working region of convergence above piping lane The gantry of cable, the supplying drainage of each working region are connected with the pipeline.
The utility model embodiment is directed to super-huge burning power plant, in the present embodiment dump pit there are two construction, Clear height is arranged in two dump pit middle positions not less than 3m, clear span is not less than 3.5m underground pipe gallery, on piping lane Portion considers normal vehicle operation.
Such as Fig. 1, preferably, pipeline 1 and gantry 2 a point two sides in the piping lane are arranged, 2 edge of the pipeline 1 and gantry The length direction of piping lane extends, and the pipeline 1 is parallel with gantry 2 not to intersect.
In giving for discharging platform region, the leachate collection pool area of dump pit, incinerator region and fume treatment region Drainpipe is connected to the pipeline in underground pipe gallery, then transports municipal wastewater pipeline to by the pipeline in underground pipe gallery, which has Effect reduces number of tubes, and is laid out simply, easy for construction, has practical value.
Cable basement 4, the cable basement 4 are offered below the high and low voltage electric distribution room of super-huge burning power plant The cable of Liao Quan factory is converged, the cable basement 4 is connected to underground pipe gallery, extends cable by the gantry in underground pipe gallery To each working region, since cable also needs to cable is connected to the electrical equipment on ground using electricity in underground at this time Cable vertical shaft 3 imports cable on ground from underground, and the cable shaft 3 plays a protective role to cable.
In the present embodiment, the discharging platform region, dump pit region, incinerator region and fume treatment region are examined Consider setting cable shaft 3, the cable shaft 3 is used to the cable of underground guiding to ground, then gives each electricity consumption on ground Equipment.
As another embodiment, the pipeline 1 is located at piping lane bottom, and the gantry 2 is close to the top of the piping lane Portion's setting.The gantry and pipeline are arranged apart one on the other, are more advantageous to protection gantry and cable.
As another embodiment, the gantry be it is multiple, each gantry along the piping lane length direction successively It is spaced apart.
As another embodiment, the gantry includes that horizontally disposed support rod and one end and the support rod connect The bearing diagonal connect, the other end of the bearing diagonal be installed on the inner wall of the piping lane and the bearing diagonal and the support rod it Between have angle.
Preferably, the interface channel passed through between the cable shaft 3 and the piping lane with current supply cable, to cable Protecting effect is more preferable.
Preferably, the two sides of cable basement described in length direction along the piping lane are distributed with the cable shaft 3。
The utility model embodiment two provides a kind of super-huge burning power plant, including discharging platform region, dump pit Region, incinerator region, high and low voltage electric distribution chamber region and fume treatment region, on the super-huge burning power plant further includes The underground pipe gallery system stated, the piping lane are opened in below each working region and through each working region, each workspace Domain is corresponding at least one described cable shaft 3, and the cable basement 4 is located at below the high and low voltage electric distribution room.
High and low voltage electric distribution room is connected to underground pipe gallery, guarantees that buried cable can be connect with height switchgear house, meanwhile, full factory Control system cable can be connected from underground pipe gallery, be connected to cabinet room by cable shaft.
Cable basement is arranged in high and low voltage electric distribution room lower part, guarantees that buried cable can be connect with height switchgear house, full factory The equal underground of cable reduces the influence to upper space.
The underground pipe gallery system that the utility model provides introduces buried pipe in the construction of super-huge garbage incinerating power plant Corridor concept gets through the contact between each working region by full factory's synergic system pipeline and cable arrangements in underground pipe gallery, reduces Construction land, Shi Quan factory pipeline is more succinct, reduces project construction pipe network and cable initial cost, while beating for later period operation and maintenance Under good basis.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (8)

1. the underground pipe gallery system based on super-huge burning power plant, it is characterised in that: including cable basement, be opened in electricity Each working region lower section of factory and the cable shaft through the piping lane of each working region of power plant and for exporting the piping lane inner cable, Be provided with the gantry for being used to support the cable drawn by the cable basement in the piping lane, the cable shaft be it is multiple, Each cable shaft is successively spaced apart along the length direction of the piping lane.
2. as described in claim 1 based on the underground pipe gallery system of super-huge burning power plant, it is characterised in that: further include For connecting the pipeline of the supplying drainage of each working region of power plant, the pipeline is located in the piping lane and along the length side of piping lane To extension.
3. as claimed in claim 2 based on the underground pipe gallery system of super-huge burning power plant, it is characterised in that: the pipe Road is located at piping lane bottom, and the gantry is arranged close to the top of the piping lane.
4. as described in claim 1 based on the underground pipe gallery system of super-huge burning power plant, it is characterised in that: the electricity The interface channel passed through between cable vertical shaft and the piping lane with current supply cable.
5. as described in claim 1 based on the underground pipe gallery system of super-huge burning power plant, it is characterised in that: the bridge Frame be it is multiple, each gantry is successively spaced apart along the length direction of the piping lane.
6. as described in claim 1 based on the underground pipe gallery system of super-huge burning power plant, it is characterised in that: the bridge Frame includes the bearing diagonal that horizontally disposed support rod and one end are connect with the support rod, the other end installation of the bearing diagonal In having angle on the inner wall of the piping lane and between the bearing diagonal and the support rod.
7. as described in claim 1 based on the underground pipe gallery system of super-huge burning power plant, it is characterised in that: along described The two sides of cable basement described in the length direction of piping lane are distributed with the cable shaft.
8. a kind of super-huge burning power plant, including discharging platform region, dump pit region, incinerator region, high-low pressure are matched Electric chamber region and fume treatment region, it is characterised in that: further include such as the described in any item underground pipe gallery systems of claim 1-7 System, the piping lane are opened in below each working region and through each working region, and each working region is corresponding at least One cable shaft, the cable basement are located at below the high and low voltage electric distribution room.
CN201822178527.XU 2018-12-21 2018-12-21 Underground pipe gallery system and super-huge burning power plant Active CN209429170U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822178527.XU CN209429170U (en) 2018-12-21 2018-12-21 Underground pipe gallery system and super-huge burning power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822178527.XU CN209429170U (en) 2018-12-21 2018-12-21 Underground pipe gallery system and super-huge burning power plant

Publications (1)

Publication Number Publication Date
CN209429170U true CN209429170U (en) 2019-09-24

Family

ID=67973306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822178527.XU Active CN209429170U (en) 2018-12-21 2018-12-21 Underground pipe gallery system and super-huge burning power plant

Country Status (1)

Country Link
CN (1) CN209429170U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042589A (en) * 2019-07-24 2020-04-21 中国市政工程华北设计研究总院有限公司 Construction method of underground water plant with sunken open space

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042589A (en) * 2019-07-24 2020-04-21 中国市政工程华北设计研究总院有限公司 Construction method of underground water plant with sunken open space

Similar Documents

Publication Publication Date Title
CN205062838U (en) Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN105113543A (en) Assembled and combined cabin concrete structure of shallow-buried 0815-type underground comprehensive pipe gallery
CN103775099B (en) 3+X city main pipeline network system
CN205639870U (en) A pipeline gallows is synthesized in heavy construction
CN209429170U (en) Underground pipe gallery system and super-huge burning power plant
CN205762931U (en) Inclined in the aerobic repair system of a kind of landfill yard takes out/gas injection well and system thereof
AU2009284018B2 (en) Hydroelectric power generation system
CN104322378A (en) Septic tank for pig farms
CN203746978U (en) Flow battery system suitable for outdoor placement
CN204753538U (en) Arrangement structure of ecological flow small unit of underground workshop
CN204781253U (en) Insert deep tunnel drainage system's inflow shaft system
CN105155488A (en) Arrangement mode and structure of small ecological flow unit of underground powerhouse of hydropower station
CN204304374U (en) For laying the cable passage of transformer station's outlet high-tension cable
CN103361262B (en) Collection method and collection system for landfill biogas
CN201541073U (en) Environment-friendly nonmetal buried flood protection prefabricated box-type substation
CN207620450U (en) A kind of double-deck covering semi-underground type sewage plant arrangement
CN206467688U (en) Include the pipe gallery of sewage pipe and rain pipe
CN106869236B (en) Horizontal storage tank for sponge urban rainwater collection system and construction method of horizontal storage tank
CN107964972A (en) A kind of drainage system of household refuse landfill sites
CN201183990Y (en) Rubbish dewatering leachate system of rubbish burning power plant
CN205445024U (en) Integrated main plant layout structure for domestic garbage incineration power generation
CN204411885U (en) A kind of residential quarter sewage grid setting pot
CN206887797U (en) Multifunctional road rhone
CN206522147U (en) A kind of ventilation unit
CN102562153A (en) Setting method for auxiliary system of electric power tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant