CN205445024U - Integrated main plant layout structure for domestic garbage incineration power generation - Google Patents
Integrated main plant layout structure for domestic garbage incineration power generation Download PDFInfo
- Publication number
- CN205445024U CN205445024U CN201620244322.5U CN201620244322U CN205445024U CN 205445024 U CN205445024 U CN 205445024U CN 201620244322 U CN201620244322 U CN 201620244322U CN 205445024 U CN205445024 U CN 205445024U
- Authority
- CN
- China
- Prior art keywords
- electricity generation
- domestic garbage
- main building
- arrangement structure
- chimney
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a domestic waste burns electricity generation and synthesizes main plants layout structure, including between unload hall, garbage storehouse, boiler, gas cleaning, steam turbine room and chimney, the hall of unloading, garbage storehouse and boiler are laid on low step, lay on high step with the chimney between gas cleaning, it is reinforced concrete frame bent structure to synthesize the main building, the framed bent part be the individual layer factory building, there is 1~2 layer of intermediate layer the part, the room covers and adopts steel space frame, roof boarding adoption composite sheet. The problem of traditional domestic waste burn the electricity generation and synthesize main plants layout when the steeper slope of the great hills of topographic relief or relief, need carry out the height to the place and dig the deep fill, cubic meter, ground and side slope processing engineering volume be big etc is solved, can reduce the engineering volume that the cubic metre of earth and stone, ground and side slope were handled, can also be convenient for with waste gas row to the high altitude, reduce the pollution in low latitude and make things convenient for equipment maintenance and management.
Description
Technical field
This utility model relates to the arrangement of a kind of Factory Building, particularly relates to one way of life waste incineration and generating electricity comprehensive main building arrangement structure.
Background technology
In the design of traditional life waste incineration and generating electricity comprehensive main building general layout structure, each construction of structures in main building district, apparatus (including (cleaner unit, air-introduced machine), steam turbine building and chimney etc. between discharging hall, trash repository, boiler, gas cleaning) are arranged on same absolute altitude.Its advantage is that design is simple, construction and installation are convenient;Shortcoming is when domestic garbage burning electricity generation is positioned at the bigger hills of hypsography or the steeper slope of physical features, and there is levelling of the land needs height to dig deep fill, the problems such as the cubic metre of earth and stone, ground and Slope Treatment quantities are big.
Utility model content
The purpose of this utility model is to provide a kind of quantities that can reduce the cubic metre of earth and stone, ground and Slope Treatment, moreover it is possible to is easy to arrange to high-altitude waste gas, reduces the domestic garbage burning electricity generation comprehensive main building arrangement structure to the pollution in low latitude.
The purpose of this utility model is achieved through the following technical solutions:
Domestic garbage burning electricity generation of the present utility model comprehensive main building arrangement structure, including between discharging hall, trash repository, boiler, gas cleaning, steam turbine building and chimney, described discharging hall, trash repository and boiler is laid on low step, and between described gas cleaning, steam turbine building and chimney be laid on high step.
The technical scheme provided by above-mentioned this utility model can be seen that, the domestic garbage burning electricity generation comprehensive main building arrangement structure that this utility model embodiment provides, the quantities of the cubic metre of earth and stone, ground and Slope Treatment can be reduced, moreover it is possible to be easy to arrange to high-altitude waste gas, reduce the pollution to low latitude.
Accompanying drawing explanation
Fig. 1 is that in this utility model embodiment, comprehensive main building district ladder arranges sectional schematic diagram;
Fig. 2 is comprehensive main building district horizontal layout schematic diagram in this utility model embodiment.
In figure:
1 be discharging hall, 2 be trash repository, 3 be boiler, 4 between gas cleaning, 5 be steam turbine building, 6 be chimney, 7 be low step, 8 be high step, 9 be pressure fan and flue, 10 be retaining wall, 11 be horizontal line naturally, 12 be low stepped annular road, 13 be high step circumferential highway.
Detailed description of the invention
This utility model embodiment will be described in further detail below.
Domestic garbage burning electricity generation of the present utility model comprehensive main building arrangement structure, its preferably detailed description of the invention is:
Including between discharging hall, trash repository, boiler, gas cleaning, steam turbine building and chimney, described discharging hall, trash repository and boiler is laid on low step, and between described gas cleaning, steam turbine building and chimney be laid on high step.
A gear retaining wall it is provided with between described low step and high step.
Vertical dimension between described low step and high step is 1m~8m.
When vertical dimension between described low step and high step is 1m~3m, a described gear retaining wall is gravity retaining wall.
When vertical dimension between described low step and high step is 3m~8m, a described gear retaining wall is reinforced concrete retaining wall.
Described discharging hall, trash repository and boiler periphery are provided with low stepped annular road, between described gas cleaning, steam turbine building and chimney periphery be provided with high step circumferential highway, described low stepped annular road communicates with high step circumferential highway.
This comprehensive main building is armored concrete Box linear programming, and framed bent part is single-storey factory building, and there are 1~2 layer interlayers local, and roof system uses Elements of Space Grid Truss, and roof boarding uses composite plate.
Domestic garbage burning electricity generation of the present utility model comprehensive main building arrangement structure, including (cleaner unit, air-introduced machine), steam turbine building and chimney between discharging hall, trash repository, boiler, gas cleaning, described discharging hall, trash repository and boiler is laid on low step, it is laid on high step with chimney between described gas cleaning, comprehensive main building is armored concrete Box linear programming, framed bent part is single-storey factory building, there are 1~2 layer interlayers local, roof system uses Elements of Space Grid Truss, and roof boarding uses composite plate.Solve the comprehensive main building arrangement of traditional life waste incineration and generating electricity when the slope that the bigger hills of hypsography or physical features are steeper, need that place is carried out height and dig deep fill, the problem that the cubic metre of earth and stone, ground and Slope Treatment quantities are big etc., this structure has the quantities that can reduce the cubic metre of earth and stone, ground and Slope Treatment, can also be easy to arrange to high-altitude waste gas, reduce the pollution to low latitude and facilitate the outstanding advantages of plant maintenance and management.
Compared with prior art, this utility model has the advantage that
1, by discharging hall bigger for load, trash repository and layout of boiler on low step, such as, can be located at excavation zone, it is thus possible to reduce the quantities of basement process.
2, by between gas cleaning less for load, steam turbine building, chimney etc. be arranged on high step, such as can be located at embankment district.It is thus possible to reduce the cubic metre of earth and stone and Slope Treatment quantities.
3, using retaining wall to carry out gear between high and low step, can prevent collapses collapses the generation of phenomenon.
4, it is provided with circumferential highway respectively on the high and low step in power plant, and each circumferential highway communicates, and can conveniently keep in repair, construct and follow-up equipment control.
5, between gas cleaning and chimney is laid in high step, moreover it is possible to be easy to arrange to high-altitude waste gas, reduce the pollution to low latitude.
The above; it is only this utility model preferably detailed description of the invention; but protection domain of the present utility model is not limited thereto; any those familiar with the art is in the technical scope that this utility model discloses; the change that can readily occur in or replacement, all should contain within protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claims.
Claims (7)
1. one way of life waste incineration and generating electricity comprehensive main building arrangement structure, it is characterized in that, including between discharging hall, trash repository, boiler, gas cleaning, steam turbine building and chimney, described discharging hall, trash repository and boiler is laid on low step, and between described gas cleaning, steam turbine building and chimney be laid on high step.
Domestic garbage burning electricity generation the most according to claim 1 comprehensive main building arrangement structure, it is characterised in that be provided with a gear retaining wall between described low step and high step.
Domestic garbage burning electricity generation the most according to claim 2 comprehensive main building arrangement structure, it is characterised in that the vertical dimension between described low step and high step is 1m~8m.
Domestic garbage burning electricity generation the most according to claim 3 comprehensive main building arrangement structure, it is characterised in that when the vertical dimension between described low step and high step is 1m~3m, a described gear retaining wall is gravity retaining wall.
Domestic garbage burning electricity generation the most according to claim 3 comprehensive main building arrangement structure, it is characterised in that when the vertical dimension between described low step and high step is 3m~8m, a described gear retaining wall is reinforced concrete retaining wall.
6. according to the domestic garbage burning electricity generation comprehensive main building arrangement structure described in any one of claim 1 to 5, it is characterized in that, described discharging hall, trash repository and boiler periphery are provided with low stepped annular road, between described gas cleaning, steam turbine building and chimney periphery be provided with high step circumferential highway, described low stepped annular road communicates with high step circumferential highway.
7. according to the domestic garbage burning electricity generation comprehensive main building arrangement structure described in any one of claim 1 to 5, it is characterised in that this comprehensive main building is armored concrete Box linear programming, framed bent part is single-storey factory building, there are 1~2 layer interlayers local, and roof system uses Elements of Space Grid Truss, and roof boarding uses composite plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620244322.5U CN205445024U (en) | 2016-03-28 | 2016-03-28 | Integrated main plant layout structure for domestic garbage incineration power generation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620244322.5U CN205445024U (en) | 2016-03-28 | 2016-03-28 | Integrated main plant layout structure for domestic garbage incineration power generation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205445024U true CN205445024U (en) | 2016-08-10 |
Family
ID=56607846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620244322.5U Expired - Fee Related CN205445024U (en) | 2016-03-28 | 2016-03-28 | Integrated main plant layout structure for domestic garbage incineration power generation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205445024U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116122640A (en) * | 2023-02-07 | 2023-05-16 | 襄阳云威机械有限公司 | Casting plant building method and building structure based on mountain slope topography |
-
2016
- 2016-03-28 CN CN201620244322.5U patent/CN205445024U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116122640A (en) * | 2023-02-07 | 2023-05-16 | 襄阳云威机械有限公司 | Casting plant building method and building structure based on mountain slope topography |
CN116122640B (en) * | 2023-02-07 | 2023-08-29 | 襄阳云威机械有限公司 | Casting plant building method and building structure based on mountain slope topography |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7318315B2 (en) | Method of combining wastewater treatment and power generation technologies | |
CN201334723Y (en) | Garbage landfill leachate draining and landfill gas collection system | |
US9988317B2 (en) | Structures constructed using coal combustion materials | |
CN102943521B (en) | Modified trash storing pit landfill leachate collecting system | |
Radzi | The 100% renewable energy metropolis: governing the design of cities for renewable energy infrastructures | |
CN205445024U (en) | Integrated main plant layout structure for domestic garbage incineration power generation | |
CN204849807U (en) | Fill novel wind -powered electricity generation pylon basis of building rubbish | |
CN203160761U (en) | Arrangement structure of thermal power plant | |
CN115288495A (en) | Treatment method for transforming refuse landfill into combination of photovoltaic power generation and hydroelectric power generation | |
CN204928659U (en) | Construction is at fly ash field photovoltaic power plant on ground | |
CN208200944U (en) | A kind of refuse landfill gas gathering system | |
CN103361262A (en) | Collection method and collection system for landfill biogas | |
CN203722538U (en) | Building photovoltaic power station of pumped storage type | |
CN203307785U (en) | Buried pressure pipe exterior drainage structure of hydropower station | |
CN205259207U (en) | Foundation structure of box transformer | |
CN103230927B (en) | On-site ectopic enhanced aerobic stabilization method for household garbage landfill | |
CN110303022A (en) | A kind of consumer waste filling and embedding system and method for impermeable pollution | |
CN104963507A (en) | Method used for manufacturing intelligent energy-saving building | |
CN102359100B (en) | Marsh gas treatment technology for large garbage landfill with complex geology | |
CN219863289U (en) | Energy-saving environment-friendly gate-type grid structure stock ground | |
CN213637584U (en) | Energy storage system matched with wind energy and solar electric field | |
CN218935492U (en) | Anti-sedimentation gas pipeline installation structure | |
CN203308129U (en) | Arrangement structure of boiler acid cleaning wastewater pool of indirect air cooling unit | |
Jiachen et al. | Science mining and clean coal technology in China | |
CN214168803U (en) | Ventilation structure of high-slag-filling-body drainage box culvert |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||