CN206189462U - Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line - Google Patents
Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line Download PDFInfo
- Publication number
- CN206189462U CN206189462U CN201621230406.XU CN201621230406U CN206189462U CN 206189462 U CN206189462 U CN 206189462U CN 201621230406 U CN201621230406 U CN 201621230406U CN 206189462 U CN206189462 U CN 206189462U
- Authority
- CN
- China
- Prior art keywords
- cabin
- comprehensive
- combustion gas
- corridor
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005484 gravity Effects 0.000 title claims abstract description 17
- 238000004891 communication Methods 0.000 claims abstract description 10
- 238000005192 partition Methods 0.000 claims abstract description 5
- 239000000567 combustion gas Substances 0.000 claims description 31
- 239000010865 sewage Substances 0.000 claims description 18
- 239000007789 gas Substances 0.000 claims description 12
- 239000012141 concentrate Substances 0.000 abstract description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 230000002194 synthesizing Effects 0.000 abstract 5
- 238000010304 firing Methods 0.000 abstract 3
- 230000000875 corresponding Effects 0.000 abstract 1
- 108010066114 cabin-2 Proteins 0.000 description 8
- 230000035492 administration Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 239000003034 coal gas Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Abstract
The utility model relates to a double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line, including firing air cabin and synthesizing the cabin, fire air cabin and be provided with the partition wall between the cabin with synthesizing, be provided with a plurality of pipeline bracket respectively on synthesizing two lateral walls in cabin, to synthesize the cabin and be close to the lateral wall upper berth of firing air cabin one side and be equipped with the power line opposite side and lay to communication cable, the bottom of synthesizing the cabin is close to power line and has laid the water feeding pipe opposite side and laid sewer line to be provided with corresponding access path respectively. The utility model discloses simple structure, the design is compact, through reasonable layout in the double -cabin section, the maximum efficiency utilize the section space, concentrate and lay electric power, information, feedwater and sewer line in synthesizing the cabin, the gas pipeline sets up alone in firing air cabin, the section space is utilized to the biggest validity, has reduced the engineering scale of utility tunnel civil engineering.
Description
Technical field
The utility model is related to a kind of combustion gas and gravity stream sewer line to enter double cabin comprehensive pipe gallery structures of corridor, belongs to municipal administration
Construction technique field.
Background technology
Pipe gallery(Common trench or common pipe trench)Be built in Urban Underground for accommodate two classes and above municipal engineering pipeline
Structures and affiliated facility.Underground pipe gallery system facilitates the municipal administrations such as electric power, communication, combustion gas, water supply and sewage to set because it has
The maintenance and service work applied, while avoiding frequently excavating road and going out traffic and resident due to laying and repairing underground utilities
Row is impacted and disturbed, and the features such as keeping the appearance of a street completely and be attractive in appearance, and is at home and abroad widely applied.
Pipe gallery research and construction abroad has had the history of more than 100 years, and 1833, Paris, FRA built the world
The pipelines such as upper first pipe gallery, creative coal gas, electric power in the large-scale Sewer Line Distribution in underground.At home, it is comprehensive
Piping lane is studied and built also the history of nearly 60 years, but in double cabin pipe galleries how by the city such as combustion gas and gravity stream sewage
The problem that political affairs pipeline enters corridor simultaneously is still a great problem, so as to have impact on the application and development of pipe gallery, especially in 2016
Firmly build portion's latest requirement pipeline must enter under the Policy Background of corridor entirely in addition to rainwater, this problem just more aobvious protrusion, it would be highly desirable to solve.
Enter the problem of corridor simultaneously for the municipal pipeline such as combustion gas and gravity stream sewage in double cabin pipe galleries, it is multiplex at present
Settling mode is three cabin section comprehensive pipe gallery structures, and combustion gas and sewage respectively put a cabin, and remaining pipeline is placed in a cabin, but this kind is tied
Conformational space utilization rate is not high, and cross dimensions is larger, and civil engineering and corollary system investment are big, later stage fortune inspection management trouble;And use this
Double cabin comprehensive pipe gallery structures of utility model patent, can effectively solve the municipal pipeline such as combustion gas and gravity stream sewage while entering corridor
Problem, while the section structure has a save space compared to three cabin sections, investment reduction, the advantages of convenient management.
The content of the invention
The purpose of this utility model is big in order to solve three cabin section pipe gallery low space utilizations, cross dimensions, is thrown
Money is higher and fortune inspection manages troublesome problem, there is provided a kind of simple structure, combustion gas compact to design and gravity stream sewer line
Enter double cabin comprehensive pipe gallery structures of corridor.
The utility model is adopted the following technical scheme that:A kind of combustion gas and gravity stream sewer line enter double cabin pipe galleries of corridor
Structure, including combustion gas cabin and comprehensive cabin, are provided with partition wall, on two side walls in the comprehensive cabin between the combustion gas cabin and comprehensive cabin
Several supports of pipelines are respectively arranged with, the comprehensive cabin is equipped with power pipeline on the side wall of combustion gas cabin side, described
Communication cable is laid on the side wall of comprehensive cabin opposite side, the bottom in the comprehensive cabin is equipped with feed pipe near power pipeline
Road, the bottom in the comprehensive cabin is equipped with sewage conduct near communication cable, is provided between the power pipeline and feedwater piping
First access path, is provided with the second access path between the feedwater piping and sewage conduct.
Further, the bottom in the combustion gas cabin is provided with gas pipeline.
Further, the side of the gas pipeline is provided with gas pipeline access path.
Further, the feedwater piping lower end is provided with the buttress for supporting feedwater piping.
Further, the sewage conduct lower end is provided with adjusting the bearing of height.
The utility model simple structure, compact to design, by the rational deployment in double cabin sections, the utilization of maximal efficiency is broken
Space of planes, concentrates and lays electric power, information, feedwater and sewage conduct in comprehensive cabin, and gas pipeline is separately set in combustion gas cabin, maximum
Validity utilizes sectional space, reduces the project scale of pipe gallery civil engineering, while double cabin sections are reduced compared with three cabin sections matching somebody with somebody
The quantity of set system, so as to reduce the investment of engineering;Double cabin sections are compared with three bay section faces simultaneously, by other in addition to burning line
Cable is placed in a cabin, so as to the fortune for facilitating the later stage examines management work.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Reference:Combustion gas cabin 1, comprehensive cabin 2, partition wall 3, support of pipelines 4, power pipeline 5, communication cable 6, feedwater piping
7th, sewage conduct 8, the first access path 9, the second access path 10, gas pipeline 11, gas pipeline access path 12, buttress
13rd, bearing 14.
Specific embodiment
Below in conjunction with accompanying drawing, the utility model will be further described.
As shown in figure 1, a kind of combustion gas and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, including combustion gas cabin 1
With comprehensive cabin 2, partition wall 3 is provided between combustion gas cabin 1 and comprehensive cabin 2, the bottom in combustion gas cabin 1 is provided with gas pipeline 11, Gas Pipe
The side in road 11 is provided with gas pipeline access path 12, and several pipeline branch are respectively arranged with two side walls in comprehensive cabin 2
Frame 4, comprehensive cabin 2 is equipped with power pipeline 5 on the side wall of the side of combustion gas cabin 1, is laid on the side wall of the opposite side of comprehensive cabin 2
Communication cable 6, the bottom in comprehensive cabin 2 is equipped with feedwater piping 7 near power pipeline 5, and the bottom in comprehensive cabin 2 is near communication cable
6 are equipped with sewage conduct 8, and the first access path 9, feedwater piping 7 and sewage pipe are provided between power pipeline 5 and feedwater piping 7
The second access path 10 is provided between road 8, the lower end of feedwater piping 7 is provided with the buttress 13 for supporting feedwater piping, sewage pipe
The lower end of road 8 is provided with adjusting the bearing 14 of height.
The utility model meeting the pipelines such as combustion gas, gravity stream sewage, feedwater, electric power and communication while while entering corridor,
The characteristics of with save space, investment reduction and convenient management.Mainly solve following problem:
1)Enter corridor while the municipal pipeline such as combustion gas and gravity stream sewage is realized in the middle of double cabin section pipe galleries;
2)Solve that full pipeline enters that pipe gallery cross dimensions in corridor is big, civil engineering structure takes up an area that big, investment is high, final-period management fiber crops
Tired problem.
Claims (5)
1. a kind of combustion gas and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that:Including combustion gas cabin(1)
With comprehensive cabin(2), the combustion gas cabin(1)With comprehensive cabin(2)Between be provided with partition wall(3), the comprehensive cabin(2)Two side walls on
It is respectively arranged with several supports of pipelines(4), the comprehensive cabin(2)Near combustion gas cabin(1)Electric power is equipped with the side wall of side
Pipeline(5), the comprehensive cabin(2)Communication cable is laid on the side wall of opposite side(6), the comprehensive cabin(2)Bottom be close to
Power pipeline(5)It is equipped with feedwater piping(7), the comprehensive cabin(2)Bottom near communication cable(6)It is equipped with sewage conduct
(8), the power pipeline(5)And feedwater piping(7)Between be provided with the first access path(9), the feedwater piping(7)And sewage
Pipeline(8)Between be provided with the second access path(10).
2. combustion gas as claimed in claim 1 and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that:
The combustion gas cabin(1)Bottom be provided with gas pipeline(11).
3. combustion gas as claimed in claim 2 and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that:
The gas pipeline(11)Side be provided with gas pipeline access path(12).
4. combustion gas as claimed in claim 1 and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that:
The feedwater piping(7)Lower end is provided with the buttress for supporting feedwater piping(13).
5. combustion gas as claimed in claim 1 and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that:
The sewage conduct(8)Lower end is provided with adjusting the bearing of height(14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621230406.XU CN206189462U (en) | 2016-11-16 | 2016-11-16 | Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621230406.XU CN206189462U (en) | 2016-11-16 | 2016-11-16 | Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206189462U true CN206189462U (en) | 2017-05-24 |
Family
ID=58726798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621230406.XU Active CN206189462U (en) | 2016-11-16 | 2016-11-16 | Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206189462U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130635A (en) * | 2017-07-10 | 2017-09-05 | 上海市城市建设设计研究总院(集团)有限公司 | Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station |
-
2016
- 2016-11-16 CN CN201621230406.XU patent/CN206189462U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130635A (en) * | 2017-07-10 | 2017-09-05 | 上海市城市建设设计研究总院(集团)有限公司 | Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205954798U (en) | Large -traffic, height falls poor drainage drop well | |
CN106013221A (en) | Four-layer rectangle-like urban underground complex | |
CN106013215A (en) | Three-layer rectangle-like urban underground complex | |
CN206189462U (en) | Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line | |
CN205296347U (en) | Arrangement structure that utility tunnel internal drain pipe said | |
CN205557584U (en) | Steel pipe corridor and large -scale utility tunnel system | |
CN201437729U (en) | Cross-shaped intersection for comprehensive pipe canals | |
CN205894100U (en) | Underground transfer passage | |
CN105484291A (en) | Unilaterally-expanded comprehensive pipe gallery joint structure | |
CN109296006A (en) | The double-deck assembly concrete pipe gallery | |
CN209145605U (en) | The round more cabin pipe galleries of shield-tunneling construction | |
CN109695256A (en) | Three circular shields build pipe gallery | |
CN208605197U (en) | A kind of building structure that subway driving section is built together with Urban Underground pipe gallery | |
CN207700219U (en) | A kind of pipe gallery in more cabins | |
CN206110182U (en) | Three large -scale arcading city utility tunnel | |
CN204875853U (en) | Assembled underground piping lane | |
CN206467688U (en) | Include the pipe gallery of sewage pipe and rain pipe | |
CN205557569U (en) | Prestressing force divides and adds special formula underground pipe gallery in serial limit storehouse | |
CN210369045U (en) | Underground comprehensive pipe gallery structure | |
CN205557563U (en) | Prestressing force list adds series pipe storehouse and share formula underground pipe gallery | |
CN211200451U (en) | Extensible utility tunnel | |
CN209227605U (en) | Assembly concrete bilayer pipe gallery shell and media layer damage plate connecting node | |
CN209227608U (en) | Wall construction plate and media layer damage plate connecting node in concrete pipe gallery | |
CN217711024U (en) | Three-way connecting pipe fitting for rural sewage discharge system | |
CN209227601U (en) | Wall construction plate in the double-deck assembly concrete pipe gallery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |