Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line Download PDF

Info

Publication number
CN206189462U
CN206189462U CN201621230406.XU CN201621230406U CN206189462U CN 206189462 U CN206189462 U CN 206189462U CN 201621230406 U CN201621230406 U CN 201621230406U CN 206189462 U CN206189462 U CN 206189462U
Authority
CN
China
Prior art keywords
cabin
comprehensive
combustion gas
corridor
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621230406.XU
Other languages
Chinese (zh)
Inventor
段晓东
钱玮
周帅
糜晓东
丁茗
陈雯婧
丁韶华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Group PLC Is Established In Jiangsu
Original Assignee
Group PLC Is Established In Jiangsu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Group PLC Is Established In Jiangsu filed Critical Group PLC Is Established In Jiangsu
Priority to CN201621230406.XU priority Critical patent/CN206189462U/en
Application granted granted Critical
Publication of CN206189462U publication Critical patent/CN206189462U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line, including firing air cabin and synthesizing the cabin, fire air cabin and be provided with the partition wall between the cabin with synthesizing, be provided with a plurality of pipeline bracket respectively on synthesizing two lateral walls in cabin, to synthesize the cabin and be close to the lateral wall upper berth of firing air cabin one side and be equipped with the power line opposite side and lay to communication cable, the bottom of synthesizing the cabin is close to power line and has laid the water feeding pipe opposite side and laid sewer line to be provided with corresponding access path respectively. The utility model discloses simple structure, the design is compact, through reasonable layout in the double -cabin section, the maximum efficiency utilize the section space, concentrate and lay electric power, information, feedwater and sewer line in synthesizing the cabin, the gas pipeline sets up alone in firing air cabin, the section space is utilized to the biggest validity, has reduced the engineering scale of utility tunnel civil engineering.

Description

A kind of combustion gas and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor
Technical field
The utility model is related to a kind of combustion gas and gravity stream sewer line to enter double cabin comprehensive pipe gallery structures of corridor, belongs to municipal administration Construction technique field.
Background technology
Pipe gallery(Common trench or common pipe trench)Be built in Urban Underground for accommodate two classes and above municipal engineering pipeline Structures and affiliated facility.Underground pipe gallery system facilitates the municipal administrations such as electric power, communication, combustion gas, water supply and sewage to set because it has The maintenance and service work applied, while avoiding frequently excavating road and going out traffic and resident due to laying and repairing underground utilities Row is impacted and disturbed, and the features such as keeping the appearance of a street completely and be attractive in appearance, and is at home and abroad widely applied.
Pipe gallery research and construction abroad has had the history of more than 100 years, and 1833, Paris, FRA built the world The pipelines such as upper first pipe gallery, creative coal gas, electric power in the large-scale Sewer Line Distribution in underground.At home, it is comprehensive Piping lane is studied and built also the history of nearly 60 years, but in double cabin pipe galleries how by the city such as combustion gas and gravity stream sewage The problem that political affairs pipeline enters corridor simultaneously is still a great problem, so as to have impact on the application and development of pipe gallery, especially in 2016 Firmly build portion's latest requirement pipeline must enter under the Policy Background of corridor entirely in addition to rainwater, this problem just more aobvious protrusion, it would be highly desirable to solve.
Enter the problem of corridor simultaneously for the municipal pipeline such as combustion gas and gravity stream sewage in double cabin pipe galleries, it is multiplex at present Settling mode is three cabin section comprehensive pipe gallery structures, and combustion gas and sewage respectively put a cabin, and remaining pipeline is placed in a cabin, but this kind is tied Conformational space utilization rate is not high, and cross dimensions is larger, and civil engineering and corollary system investment are big, later stage fortune inspection management trouble;And use this Double cabin comprehensive pipe gallery structures of utility model patent, can effectively solve the municipal pipeline such as combustion gas and gravity stream sewage while entering corridor Problem, while the section structure has a save space compared to three cabin sections, investment reduction, the advantages of convenient management.
The content of the invention
The purpose of this utility model is big in order to solve three cabin section pipe gallery low space utilizations, cross dimensions, is thrown Money is higher and fortune inspection manages troublesome problem, there is provided a kind of simple structure, combustion gas compact to design and gravity stream sewer line Enter double cabin comprehensive pipe gallery structures of corridor.
The utility model is adopted the following technical scheme that:A kind of combustion gas and gravity stream sewer line enter double cabin pipe galleries of corridor Structure, including combustion gas cabin and comprehensive cabin, are provided with partition wall, on two side walls in the comprehensive cabin between the combustion gas cabin and comprehensive cabin Several supports of pipelines are respectively arranged with, the comprehensive cabin is equipped with power pipeline on the side wall of combustion gas cabin side, described Communication cable is laid on the side wall of comprehensive cabin opposite side, the bottom in the comprehensive cabin is equipped with feed pipe near power pipeline Road, the bottom in the comprehensive cabin is equipped with sewage conduct near communication cable, is provided between the power pipeline and feedwater piping First access path, is provided with the second access path between the feedwater piping and sewage conduct.
Further, the bottom in the combustion gas cabin is provided with gas pipeline.
Further, the side of the gas pipeline is provided with gas pipeline access path.
Further, the feedwater piping lower end is provided with the buttress for supporting feedwater piping.
Further, the sewage conduct lower end is provided with adjusting the bearing of height.
The utility model simple structure, compact to design, by the rational deployment in double cabin sections, the utilization of maximal efficiency is broken Space of planes, concentrates and lays electric power, information, feedwater and sewage conduct in comprehensive cabin, and gas pipeline is separately set in combustion gas cabin, maximum Validity utilizes sectional space, reduces the project scale of pipe gallery civil engineering, while double cabin sections are reduced compared with three cabin sections matching somebody with somebody The quantity of set system, so as to reduce the investment of engineering;Double cabin sections are compared with three bay section faces simultaneously, by other in addition to burning line Cable is placed in a cabin, so as to the fortune for facilitating the later stage examines management work.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Reference:Combustion gas cabin 1, comprehensive cabin 2, partition wall 3, support of pipelines 4, power pipeline 5, communication cable 6, feedwater piping 7th, sewage conduct 8, the first access path 9, the second access path 10, gas pipeline 11, gas pipeline access path 12, buttress 13rd, bearing 14.
Specific embodiment
Below in conjunction with accompanying drawing, the utility model will be further described.
As shown in figure 1, a kind of combustion gas and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, including combustion gas cabin 1 With comprehensive cabin 2, partition wall 3 is provided between combustion gas cabin 1 and comprehensive cabin 2, the bottom in combustion gas cabin 1 is provided with gas pipeline 11, Gas Pipe The side in road 11 is provided with gas pipeline access path 12, and several pipeline branch are respectively arranged with two side walls in comprehensive cabin 2 Frame 4, comprehensive cabin 2 is equipped with power pipeline 5 on the side wall of the side of combustion gas cabin 1, is laid on the side wall of the opposite side of comprehensive cabin 2 Communication cable 6, the bottom in comprehensive cabin 2 is equipped with feedwater piping 7 near power pipeline 5, and the bottom in comprehensive cabin 2 is near communication cable 6 are equipped with sewage conduct 8, and the first access path 9, feedwater piping 7 and sewage pipe are provided between power pipeline 5 and feedwater piping 7 The second access path 10 is provided between road 8, the lower end of feedwater piping 7 is provided with the buttress 13 for supporting feedwater piping, sewage pipe The lower end of road 8 is provided with adjusting the bearing 14 of height.
The utility model meeting the pipelines such as combustion gas, gravity stream sewage, feedwater, electric power and communication while while entering corridor, The characteristics of with save space, investment reduction and convenient management.Mainly solve following problem:
1)Enter corridor while the municipal pipeline such as combustion gas and gravity stream sewage is realized in the middle of double cabin section pipe galleries;
2)Solve that full pipeline enters that pipe gallery cross dimensions in corridor is big, civil engineering structure takes up an area that big, investment is high, final-period management fiber crops Tired problem.

Claims (5)

1. a kind of combustion gas and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that:Including combustion gas cabin(1) With comprehensive cabin(2), the combustion gas cabin(1)With comprehensive cabin(2)Between be provided with partition wall(3), the comprehensive cabin(2)Two side walls on It is respectively arranged with several supports of pipelines(4), the comprehensive cabin(2)Near combustion gas cabin(1)Electric power is equipped with the side wall of side Pipeline(5), the comprehensive cabin(2)Communication cable is laid on the side wall of opposite side(6), the comprehensive cabin(2)Bottom be close to Power pipeline(5)It is equipped with feedwater piping(7), the comprehensive cabin(2)Bottom near communication cable(6)It is equipped with sewage conduct (8), the power pipeline(5)And feedwater piping(7)Between be provided with the first access path(9), the feedwater piping(7)And sewage Pipeline(8)Between be provided with the second access path(10).
2. combustion gas as claimed in claim 1 and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that: The combustion gas cabin(1)Bottom be provided with gas pipeline(11).
3. combustion gas as claimed in claim 2 and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that: The gas pipeline(11)Side be provided with gas pipeline access path(12).
4. combustion gas as claimed in claim 1 and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that: The feedwater piping(7)Lower end is provided with the buttress for supporting feedwater piping(13).
5. combustion gas as claimed in claim 1 and gravity stream sewer line enter double cabin comprehensive pipe gallery structures of corridor, it is characterised in that: The sewage conduct(8)Lower end is provided with adjusting the bearing of height(14).
CN201621230406.XU 2016-11-16 2016-11-16 Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line Active CN206189462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621230406.XU CN206189462U (en) 2016-11-16 2016-11-16 Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621230406.XU CN206189462U (en) 2016-11-16 2016-11-16 Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line

Publications (1)

Publication Number Publication Date
CN206189462U true CN206189462U (en) 2017-05-24

Family

ID=58726798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621230406.XU Active CN206189462U (en) 2016-11-16 2016-11-16 Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line

Country Status (1)

Country Link
CN (1) CN206189462U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130635A (en) * 2017-07-10 2017-09-05 上海市城市建设设计研究总院(集团)有限公司 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130635A (en) * 2017-07-10 2017-09-05 上海市城市建设设计研究总院(集团)有限公司 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station

Similar Documents

Publication Publication Date Title
CN205954798U (en) Large -traffic, height falls poor drainage drop well
CN106013221A (en) Four-layer rectangle-like urban underground complex
CN106013215A (en) Three-layer rectangle-like urban underground complex
CN206189462U (en) Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN205557584U (en) Steel pipe corridor and large -scale utility tunnel system
CN201437729U (en) Cross-shaped intersection for comprehensive pipe canals
CN205894100U (en) Underground transfer passage
CN105484291A (en) Unilaterally-expanded comprehensive pipe gallery joint structure
CN109296006A (en) The double-deck assembly concrete pipe gallery
CN209145605U (en) The round more cabin pipe galleries of shield-tunneling construction
CN109695256A (en) Three circular shields build pipe gallery
CN208605197U (en) A kind of building structure that subway driving section is built together with Urban Underground pipe gallery
CN207700219U (en) A kind of pipe gallery in more cabins
CN206110182U (en) Three large -scale arcading city utility tunnel
CN204875853U (en) Assembled underground piping lane
CN206467688U (en) Include the pipe gallery of sewage pipe and rain pipe
CN205557569U (en) Prestressing force divides and adds special formula underground pipe gallery in serial limit storehouse
CN210369045U (en) Underground comprehensive pipe gallery structure
CN205557563U (en) Prestressing force list adds series pipe storehouse and share formula underground pipe gallery
CN211200451U (en) Extensible utility tunnel
CN209227605U (en) Assembly concrete bilayer pipe gallery shell and media layer damage plate connecting node
CN209227608U (en) Wall construction plate and media layer damage plate connecting node in concrete pipe gallery
CN217711024U (en) Three-way connecting pipe fitting for rural sewage discharge system
CN209227601U (en) Wall construction plate in the double-deck assembly concrete pipe gallery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant