CN109137980A - A kind of underground pipe gallery pipeline arrangement and construction method - Google Patents

A kind of underground pipe gallery pipeline arrangement and construction method Download PDF

Info

Publication number
CN109137980A
CN109137980A CN201811168327.4A CN201811168327A CN109137980A CN 109137980 A CN109137980 A CN 109137980A CN 201811168327 A CN201811168327 A CN 201811168327A CN 109137980 A CN109137980 A CN 109137980A
Authority
CN
China
Prior art keywords
pipeline
cabin
pipe gallery
underground pipe
upper layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811168327.4A
Other languages
Chinese (zh)
Inventor
彭涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201811168327.4A priority Critical patent/CN109137980A/en
Publication of CN109137980A publication Critical patent/CN109137980A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Abstract

The present invention provides a kind of underground pipe gallery pipeline arrangement and construction methods, belong to city integrated piping lane field of engineering technology, for the problem that underground pipe gallery rain, bilge tank and other cabins are arranged in juxtaposition, rain, sewage collecting branch pipe interfere other municipal pipelines when accessing piping lane.The pipeline arrangement is set on pipe gallery ontology, it is characterized in that, the pipeline arrangement includes the upper and lower folded cabin of upper layer cabin and lower layer's cabin composition, rainwater pipeline and sewage pipeline are arranged in juxtaposition in the upper layer cabin, other municipal pipelines are laid in lower layer's cabin, wherein, piping lane node is arranged on the left of the cabin of upper layer.The construction method of underground pipe gallery pipeline arrangement of the invention is easy to operate, not only solve the access problem that branch pipe is collected after being included in rainwater pipeline, sewage pipeline, again pipe gallery special joint can be arranged in conjunction with the upper space in folded cabin, construction cost is reduced, and intensive the underground space is utilized.

Description

A kind of underground pipe gallery pipeline arrangement and construction method
Technical field
The present invention relates to city integrated piping lane field of engineering technology, in particular to a kind of underground pipe gallery pipeline arrangement knot Structure and construction method.
Background technique
Pipe gallery is to be built in Urban Underground for accommodating the structures of two classes and the above municipal engineering pipeline and attached setting It applies.For the intensive utilization underground space, usually require that all municipal pipelines under road including rainfall and sewage pipes line are included in pipe In corridor, pipe gallery pipeline arrangement mode such as Fig. 1 common in the art, in figure: 10- rainwater pipeline, 20- sewage pipeline, 30- natural gas line, 40- power pipeline, 50- communication line, 60- water-supply line.As it can be seen that common pipe gallery pipeline is arranged Structure is single layer arrangement form arranged side by side, is generally used for the pressure lines such as storage electric power, communication and water supply, by using on piping lane Portion earthing space carries out the access of branch line and picks out, and does not influence other pipelines in lower layer's corridor body.However, being included in when in piping lane After the rainfall and sewage pipes line of gravity stream form, the access for collecting branch pipe must satisfy the absolute altitude requirement of supervisor, therefore can be to other The indoor pipeline in cabin generates interference, has an adverse effect.
Therefore, pipe gallery pipeline arrangement mode common in the art exists following insufficient: first is that rain, bilge tank with Other cabins are arranged in juxtaposition, and are unfavorable for the access of side rain, sewage collecting pipeline;Second is that meet rain, sewage gravity stream pipeline Absolute altitude requirement, piping lane buried depth is sometimes shallower, is unfavorable for the arrangement of piping lane node.
Summary of the invention
It is arranged in juxtaposition for underground pipe gallery rain, bilge tank and other cabins, when rain, sewage collecting branch pipe access piping lane The problem of interfering to other municipal pipelines, the present invention provide a kind of underground pipe gallery pipeline arrangement and construction party Method not only can solve the access problem for collecting branch pipe after being included in rainfall and sewage pipes line, but also can arrange synthesis in conjunction with the upper space in folded cabin Piping lane special joint, the simultaneously intensive utilization underground space of reducining the construction costs, embodies the theory of environmental protection and energy saving.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of underground pipe gallery pipeline arrangement, the pipeline arrangement are set on pipe gallery ontology, institute The upper and lower folded cabin that pipeline arrangement includes upper layer cabin and lower layer's cabin composition is stated, is arranged in juxtaposition rainwater in the upper layer cabin Pipeline and sewage pipeline lay other municipal pipelines in lower layer's cabin, wherein piping lane node is arranged on the left of the cabin of upper layer.
Further, other described municipal pipelines include power pipeline, communication line, natural gas line and feed pipe Line.
Further the piping lane node includes ventilation opening and bifurcations.
Further the natural gas line is set on the left of lower layer's cabin.
Further the sewage pipeline connects branch sewer, and the absolute altitude of the branch sewer is greater than the sewage pipeline Absolute altitude.
It further further include feeding port, the feeding port is set to upper layer cabin bottom.
The present invention also provides a kind of construction method of underground pipe gallery pipeline arrangement, which includes such as Lower step:
Step 1: construct the underground pipe gallery ontology when, construct respectively upper layer cabin and lower layer's cabin, in upperdeck Rainwater pipeline and sewage pipeline are arranged in juxtaposition in body, in lower layer's cabin arrange power pipeline, communication line, natural gas line with And water-supply line;
Step 2: piping lane node is arranged on the left of the cabin of upper layer.
Further, the sewage pipeline connects branch sewer., the absolute altitude of the branch sewer is greater than the sewage pipeline Absolute altitude.
Compared with prior art, the beneficial effects of the present invention are:
Underground pipe gallery pipeline arrangement provided by the invention include upper layer cabin and lower layer's cabin composition up and down Folded cabin, wherein rainwater pipeline and sewage pipeline with gravity stream pipeline mark high request etc. are arranged in juxtaposition in the cabin of upper layer, electricity Solenoid line, communication line, natural gas line and water-supply line etc. are set in lower layer's cabin, the ventilation opening of pipe gallery and point The piping lanes node such as branch mouth is also disposed in the cabin of upper layer, to realize gravity stream using adjusting of the pipeline in cabin altitude range Requirement of the pipeline to absolute altitude, while solving when rainfall and sewage pipes line collects branch pipe access underground pipe gallery and other municipal administrations are managed The interference of line reduces interfering with each other between pipeline and influences, moreover, using upperdeck interlayer body the underground space reasonably It arranges the piping lanes nodes such as ventilation opening, feeding port and the bifurcations of pipe gallery, reduces complicated design of node, saved work Cheng Chengben has preferably promotional value.
Detailed description of the invention
Fig. 1 is underground pipe gallery pipeline arrangement schematic diagram in the prior art;
Fig. 2 is the underground pipe gallery pipeline arrangement schematic diagram in one embodiment of the invention;
Fig. 3 is the schematic diagram that branch sewer accesses underground pipe gallery;
Fig. 4 is the schematic diagram of the underground pipe gallery feeding port in one embodiment of the invention.
In figure: 10- rainwater pipeline;20- sewage pipeline;30- natural gas line;40- power pipeline;50- communication line; 60- water-supply line;70- feeding port.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to a kind of underground pipe gallery pipeline arrangement proposed by the present invention and Construction method is described in further detail.According to following explanation, advantages and features of the invention will be become apparent from.It below will be by institute The embodiment combination attached drawing enumerated, the technology contents and feature that the present invention will be described in detail.Need in addition it illustrate, attached drawing is all made of Very simplified form and use non-accurate ratio, only to it is convenient, lucidly aid in illustrating the mesh of the embodiment of the present invention 's.For sake of convenience, "upper" described below, "lower" are consistent with the upper and lower direction of attached drawing, but this can't be the present invention The limitation of technical solution.
Below with reference to Fig. 1 to Fig. 4, the composition for the underground pipe gallery pipeline arrangement that the present invention will be described in detail.
Embodiment one
Underground pipe gallery pipeline arrangement is placed in pipe gallery ontology in the embodiment of the present invention referring to FIG. 1 to FIG. 4, On, pipeline arrangement includes the upper and lower folded cabin of upper layer cabin (not shown) and lower layer's cabin composition (not shown), upper layer cabin In be arranged in juxtaposition rainwater pipeline 10 and sewage pipeline 20, power pipeline 40, communication line 50, natural gas tube are laid in lower layer's cabin Other municipal pipelines such as line 30 and water-supply line 50, wherein arrange pipe gallery ventilation opening (not shown) on the left of the cabin of upper layer With the piping lanes node such as bifurcations (not shown).
Specifically, the embodiment of the present invention is by the characteristics of reasonably arranging, making full use of various pipelines, using folded up and down The underground pipe gallery pipeline arrangement in cabin come solve the problems, such as rainwater pipeline 10, sewage pipeline 20 access pipe gallery, will Rainwater pipeline 10, sewage pipeline 20 are arranged in parallel at upper layer, will not interfere and influence the row of other municipal pipelines pipe gallery Nei Cloth, and requirement of the gravity stream pipeline to absolute altitude is realized using adjusting of the pipeline in cabin altitude range.And utilize left side cabin The piping lanes nodes such as space layout ventilation opening, feeding port and bifurcations above body (being natural gas line 30 in the present embodiment), Reduce complicated design of node, saves construction investment.Therefore, underground pipe gallery pipeline arrangement of the invention, no The access problem that branch pipe is collected after being included in rainwater pipeline, sewage pipeline is addressed only, and can be in conjunction with the upper space arrangement in folded cabin Pipe gallery special joint, reduce construction cost and it is intensive the underground space is utilized, embody the theory of environmental protection and energy saving.
Preferably, with continued reference to FIG. 3, in order to meet absolute altitude requirement of the sewage pipeline 20 as gravity stream pipeline, it will be dirty For water branch pipe 21 smoothly in access underground pipe gallery, sewage pipeline 20 connects branch sewer 21, and the absolute altitude of branch sewer 21 is greater than The absolute altitude of sewage pipeline 20.
Preferably, with continued reference to FIG. 4, in order to reduce the influence caused by various municipal pipelines as far as possible, underground is comprehensive Piping lane feeding port 70 is set to upper layer cabin bottom.
Embodiment two
Please continue to refer to Fig. 1 to Fig. 4, present embodiment discloses a kind of applying for underground pipe gallery pipeline arrangement Work method, includes the following steps:
When step S1 construction underground pipe gallery ontology, construct respectively upper layer cabin and lower layer's cabin, in the cabin of upper layer It is arranged in juxtaposition rainwater pipeline 10 and sewage pipeline 20, power pipeline 40, communication line 50, natural gas tube are arranged in lower layer's cabin Line 30 and water-supply line 60, wherein natural gas line 30 is independent arranges, and natural gas line 30 is arranged on the left of lower layer's cabin.
Step S2 arranges the piping lanes nodes such as ventilation opening, bifurcations on the left of the cabin of upper layer.
In conclusion underground pipe gallery pipeline arrangement provided by the invention includes upper layer cabin and lower layer's cabin group At upper and lower folded cabin, wherein rainwater pipeline and sewage pipeline etc. with gravity stream pipeline mark high request are arranged in juxtaposition in upper layer In cabin, power pipeline, communication line, natural gas line and water-supply line etc. are set in lower layer's cabin, pipe gallery The piping lanes node such as ventilation opening and bifurcations is also disposed in the cabin of upper layer, thus the adjusting using pipeline in cabin altitude range It realizes requirement of the gravity stream pipeline to absolute altitude, while solving when rainfall and sewage pipes line collects branch pipe access underground pipe gallery pair The interference of other municipal pipelines reduces interfering with each other between pipeline and influences, moreover, utilizing the underground of upperdeck interlayer body The piping lanes node such as ventilation opening, feeding port and bifurcations of pipe gallery is reasonably arranged in space, reduces complicated design of node, Engineering cost has been saved, there is preferably promotional value.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (8)

1. a kind of underground pipe gallery pipeline arrangement, the pipeline arrangement is set on pipe gallery ontology, special Sign is, the pipeline arrangement includes the upper and lower folded cabin of upper layer cabin and lower layer's cabin composition, in the upper layer cabin simultaneously Column arrange rainwater pipeline and sewage pipeline, lay other municipal pipelines in lower layer's cabin, wherein arrangement on the left of the cabin of upper layer Piping lane node.
2. underground pipe gallery pipeline arrangement according to claim 1, which is characterized in that other described municipal pipelines Including power pipeline, communication line, natural gas line and water-supply line.
3. underground pipe gallery pipeline arrangement according to claim 1, which is characterized in that the piping lane node includes Ventilation opening and bifurcations.
4. underground pipe gallery pipeline arrangement according to claim 1, which is characterized in that the natural gas line is set It is placed on the left of lower layer's cabin.
5. underground pipe gallery pipeline arrangement according to claim 1, which is characterized in that the sewage pipeline connection Branch sewer, the absolute altitude of the branch sewer are greater than the absolute altitude of the sewage pipeline.
6. underground pipe gallery pipeline arrangement according to claim 3, which is characterized in that it further include feeding port, institute It states feeding port and is set to upper layer cabin bottom.
7. a kind of construction method of underground pipe gallery pipeline arrangement according to claim 1 to 6, It is characterized in that, includes the following steps:
Step 1: construct the underground pipe gallery ontology when, construct respectively upper layer cabin and lower layer's cabin, in the cabin of upper layer It is arranged in juxtaposition rainwater pipeline and sewage pipeline, power pipeline, communication line, natural gas line are arranged in lower layer's cabin and is given Water pipeline;
Step 2: piping lane node is arranged on the left of the cabin of upper layer.
8. construction method according to claim 7, which is characterized in that the sewage pipeline connects branch sewer, the dirt The absolute altitude of water branch pipe is greater than the absolute altitude of the sewage pipeline.
CN201811168327.4A 2018-10-08 2018-10-08 A kind of underground pipe gallery pipeline arrangement and construction method Pending CN109137980A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811168327.4A CN109137980A (en) 2018-10-08 2018-10-08 A kind of underground pipe gallery pipeline arrangement and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811168327.4A CN109137980A (en) 2018-10-08 2018-10-08 A kind of underground pipe gallery pipeline arrangement and construction method

Publications (1)

Publication Number Publication Date
CN109137980A true CN109137980A (en) 2019-01-04

Family

ID=64810486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811168327.4A Pending CN109137980A (en) 2018-10-08 2018-10-08 A kind of underground pipe gallery pipeline arrangement and construction method

Country Status (1)

Country Link
CN (1) CN109137980A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120163919A1 (en) * 2009-05-08 2012-06-28 Ilja Irmscher Method for erecting an underground construction
CN105113543A (en) * 2015-09-22 2015-12-02 赵洪志 Assembled and combined cabin concrete structure of shallow-buried 0815-type underground comprehensive pipe gallery
CN206467688U (en) * 2017-02-17 2017-09-05 上海市城市建设设计研究总院(集团)有限公司 Include the pipe gallery of sewage pipe and rain pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120163919A1 (en) * 2009-05-08 2012-06-28 Ilja Irmscher Method for erecting an underground construction
CN105113543A (en) * 2015-09-22 2015-12-02 赵洪志 Assembled and combined cabin concrete structure of shallow-buried 0815-type underground comprehensive pipe gallery
CN206467688U (en) * 2017-02-17 2017-09-05 上海市城市建设设计研究总院(集团)有限公司 Include the pipe gallery of sewage pipe and rain pipe

Similar Documents

Publication Publication Date Title
CN206189462U (en) Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line
CN202247950U (en) Quadrate culvert member
CN206143899U (en) Crossover node structure suitable for sewer line incorporates utility tunnel in
CN205839797U (en) There is the underground pipe gallery of water storage function
CN106978820A (en) A kind of pipe gallery reveals water utilization system
CN208309634U (en) A kind of fuel gas conduit is in the pipe gallery of top level structure
CN205024802U (en) Energy -saving rainwater recycling system
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN206319337U (en) Large-scale square tube type Urban Underground comprehensive tunnel
CN109137980A (en) A kind of underground pipe gallery pipeline arrangement and construction method
CN206752575U (en) A kind of municipal water supply part flow arrangement
CN105484291A (en) Unilaterally-expanded comprehensive pipe gallery joint structure
CN201162227Y (en) Underground pipe canal
CN207582572U (en) A kind of convenient buried fire plant
CN205894090U (en) Job site fire water cyclic utilization device
CN206844150U (en) A kind of shallow embedding formula pipe gallery
CN205296221U (en) Many function synthesis piping lane
CN209482352U (en) Upper straddle type pipe gallery flowing line confluence node structure
CN211816399U (en) Prefabricated assembled city utility tunnel
CN212613999U (en) Reduce interior equipment tuber pipe of underground garage layer height and lay structure
CN206467688U (en) Include the pipe gallery of sewage pipe and rain pipe
CN208518017U (en) Two-way water system for clean operating room in hospital
CN206233332U (en) A kind of drought and waterlogging racing equipment based on sponge city
CN207469298U (en) Double Circle underground traffic and pipe gallery combined system
CN206888134U (en) Sewage pipe picks out the underground pipe gallery structure outside corridor in corridor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104

RJ01 Rejection of invention patent application after publication