CN206888134U - Sewage pipe picks out the underground pipe gallery structure outside corridor in corridor - Google Patents

Sewage pipe picks out the underground pipe gallery structure outside corridor in corridor Download PDF

Info

Publication number
CN206888134U
CN206888134U CN201720828408.7U CN201720828408U CN206888134U CN 206888134 U CN206888134 U CN 206888134U CN 201720828408 U CN201720828408 U CN 201720828408U CN 206888134 U CN206888134 U CN 206888134U
Authority
CN
China
Prior art keywords
pipe
gallery
sewage
main
corridor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720828408.7U
Other languages
Chinese (zh)
Inventor
毛峰
张赟
王家华
胡清源
徐飞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN201720828408.7U priority Critical patent/CN206888134U/en
Application granted granted Critical
Publication of CN206888134U publication Critical patent/CN206888134U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

本实用新型公开了廊内污水管接出廊外的地下综合管廊结构,包括管廊主体,管廊主体的上方设有廊顶污水井,两侧设有廊外污水井,廊顶污水井、廊外污水井籍由设置在管廊主体底部的廊底污水干管连通,廊底污水干管设置在污水敷管箱涵内,污水敷管箱涵设置在管廊主体的底部,污水敷管箱涵内腔横截面的宽度和高度均大于廊底污水干管的直径,污水敷管箱涵内腔与廊底污水干管之间的间隙内填充粗砂,廊底污水干管位于管廊主体的管体上籍由廊内竖直干管与廊顶污水井连接,廊内竖直干管上设有四通,并籍由四通与廊内污水支管连接。本实用新型实现廊底污水干管与管廊结构的柔性接触,降低廊底污水干管弯曲甚至断裂的风险,更便于廊内污水管的排气冲於。

The utility model discloses an underground comprehensive pipe gallery structure in which the sewage pipes in the corridor are connected to the outside of the corridor. . The sewage wells outside the corridor are connected by the main sewage pipe at the bottom of the main body of the corridor. The width and height of the cross-section of the inner chamber of the box culvert are greater than the diameter of the main sewage pipe at the bottom of the gallery. The gap between the inner cavity of the box culvert and the main sewage main pipe at the bottom of the gallery is filled with coarse sand. The pipe body of the main body of the gallery is connected to the sewage well on the top of the gallery by the vertical main pipe in the gallery. The utility model realizes flexible contact between the main sewage pipe at the bottom of the gallery and the structure of the pipe gallery, reduces the risk of bending or even breaking the main sewage main pipe at the bottom of the gallery, and is more convenient for the exhaust of the sewage pipe in the gallery.

Description

廊内污水管接出廊外的地下综合管廊结构The structure of the underground comprehensive pipe corridor where the sewage pipes in the corridor are connected to the outside of the corridor

技术领域technical field

本实用新型涉及地下管廊建造技术领域,特别涉及廊内污水管接出廊外的地下综合管廊结构。The utility model relates to the technical field of underground pipe gallery construction, in particular to an underground comprehensive pipe gallery structure in which sewage pipes in the gallery are connected to the outside of the gallery.

背景技术Background technique

在现有技术的地下管廊建造工程中,廊底污水干管通常用素砼包管且做好预留污水立管后再做管廊主体,管廊主体完成后,再安装廊内污水支管与廊底污水支管连接。但是在实际应用中,现有技术存在以下缺陷:In the construction project of the existing underground pipe gallery, the main sewage pipe at the bottom of the gallery is usually guaranteed by plain concrete and the main body of the pipe gallery is made after the sewage riser is reserved. After the main body of the pipe gallery is completed, the sewage branch pipes and Bottom sewage branch pipe connection. But in actual application, there are following defects in prior art:

(1)廊底污水干管用素砼包管,与管廊结构属于刚性接触,管廊与廊底污水干管的不均匀沉降容易导致廊底污水干管弯曲甚至断裂;(1) The main sewage pipe at the bottom of the corridor is covered with plain concrete, which is in rigid contact with the structure of the pipe gallery. The uneven settlement of the main sewage pipe at the bottom of the gallery and the main sewage pipe at the bottom of the gallery will easily lead to bending or even breaking of the main sewage pipe at the bottom of the gallery;

(2)廊底污水干管与廊内污水支管用三通管节封闭连接,不利于污水汇流处的排气冲於。(2) The main sewage pipe at the bottom of the gallery and the sewage branch pipe in the gallery are closed and connected with a three-way pipe joint, which is not conducive to the exhaust gas at the confluence of sewage.

因此,需要对现有的地下管廊中关于污水管的结构进行改进,以克服现有技术的缺陷。Therefore, it is necessary to improve the structure of the sewage pipes in the existing underground pipe gallery to overcome the defects of the prior art.

实用新型内容Utility model content

有鉴于现有技术的上述缺陷,本实用新型提供廊内污水管接出廊外的地下综合管廊结构,实现的目的之一是能实现廊底污水干管与管廊结构的柔性接触,可降低廊底污水干管弯曲甚至断裂的风险,更便于廊内污水管的排气冲於。In view of the above-mentioned defects of the prior art, the utility model provides an underground comprehensive pipe gallery structure in which the sewage pipes in the gallery are connected to the outside of the gallery. One of the purposes achieved is to realize the flexible contact between the main sewage pipe at the bottom of the gallery and the pipe gallery structure, which can Reduce the risk of bending or even breaking the main sewage pipe at the bottom of the gallery, and make it easier to flush the exhaust of the sewage pipe in the gallery.

为实现上述目的,本实用新型公开了廊内污水管接出廊外的地下综合管廊结构,包括管廊主体,所述管廊主体的上方的地面设有廊顶污水井,所述管廊主体的两侧的所述地面设有廊外污水井,所述廊顶污水井、所述廊外污水井籍由设置在所述管廊主体底部的廊底污水干管连通。In order to achieve the above purpose, the utility model discloses an underground comprehensive pipe gallery structure in which the sewage pipes in the gallery are connected to the outside of the gallery, including the main body of the pipe gallery. The ground above the main body of the pipe gallery is provided with a sewage well on the top of the gallery. The pipe gallery The ground on both sides of the main body is provided with sewage wells outside the corridor, and the sewage wells on the top of the corridor and the sewage wells outside the corridor are connected by the main sewage main pipe at the bottom of the corridor installed at the bottom of the main body of the pipe gallery.

其中,所述廊底污水干管设置在污水敷管箱涵内,所述污水敷管箱涵设置在所述管廊主体的底部,所述污水敷管箱涵内腔横截面的宽度和高度均大于所述廊底污水干管的直径,所述污水敷管箱涵内腔与所述廊底污水干管之间的间隙内填充粗砂;Wherein, the main sewage main pipe at the bottom of the corridor is arranged in the sewage pipe laying box culvert, and the sewage pipe laying box culvert is arranged at the bottom of the main body of the pipe gallery, and the width and height of the inner cavity cross section of the sewage pipe laying box culvert are larger than the diameter of the main sewage pipe at the bottom of the gallery, and the gap between the inner cavity of the sewage pipe-laying box culvert and the main sewage main pipe at the bottom of the gallery is filled with coarse sand;

所述廊底污水干管位于所述管廊主体的管体上籍由廊内竖直干管与所述廊顶污水井连接,所述廊内竖直干管上设有四通,所述廊内竖直干管籍由所述四通与廊内污水支管连接。The main sewage main pipe at the bottom of the corridor is located on the pipe body of the main body of the pipe gallery. The vertical main pipe in the corridor is connected with the sewage well on the top of the corridor. The vertical main pipe in the corridor is provided with a four-way connection. The vertical main pipe in the gallery is connected with the sewage branch pipe in the gallery by the cross.

优选的,所述管廊主体包括燃气舱、综合舱、电力舱;所述廊顶污水井设置在所述综合舱上方的地面。Preferably, the main body of the pipe gallery includes a gas cabin, a comprehensive cabin, and an electric cabin; the corridor top sewage well is arranged on the ground above the comprehensive cabin.

优选的,所述廊底污水干管的标高低于所述管廊主体的外顶标高。Preferably, the elevation of the main sewage pipe at the bottom of the gallery is lower than the elevation of the outer roof of the main body of the utility gallery.

本实用新型的有益效果:The beneficial effects of the utility model:

本实用新型籍由将现有的廊底污水干管设置在一个填充了粗砂的污水敷管箱涵内实现廊底污水干管与管廊结构的柔性接触,可降低廊底污水干管弯曲甚至断裂的风险。The utility model realizes the flexible contact between the main sewage pipe at the bottom of the gallery and the structure of the pipe gallery by arranging the existing main sewage main pipe at the bottom of the gallery in a sewage pipe-laying box culvert filled with coarse sand, which can reduce the bending of the main sewage main pipe at the bottom of the gallery even the risk of breaking.

并且,籍由四通来连接廊内污水支管更便于廊内污水管的排气冲於。Moreover, it is more convenient for the exhaust of the sewage pipes in the corridor to be connected to the sewage branch pipes in the corridor through the four-way connection.

以下将结合附图对本实用新型的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本实用新型的目的、特征和效果。The conception, specific structure and technical effects of the present utility model will be further described below in conjunction with the accompanying drawings, so as to fully understand the purpose, characteristics and effects of the present utility model.

附图说明Description of drawings

图1示出本实用新型一实施例的结构示意图。Fig. 1 shows a schematic structural view of an embodiment of the present invention.

图2示出本实用新型图1中AA处剖面结构示意图。Fig. 2 shows a schematic diagram of the cross-sectional structure at AA in Fig. 1 of the utility model.

图3示出本实用新型图1中BB处剖面结构示意图。Fig. 3 shows a schematic diagram of the section structure at BB in Fig. 1 of the present utility model.

具体实施方式detailed description

实施例Example

如图1至图3所示,廊内污水管接出廊外的地下综合管廊结构,包括管廊主体1,管廊主体1的上方的地面2设有廊顶污水井8,管廊主体1的两侧的地面2设有廊外污水井9,廊顶污水井8、廊外污水井9籍由设置在管廊主体1底部的廊底污水干管3连通。As shown in Figures 1 to 3, the sewage pipes in the gallery are connected to the underground comprehensive pipe gallery structure outside the gallery, including the main body of the pipe gallery 1, the ground 2 above the main body of the pipe gallery 1 is provided with a sewage well 8 on the top of the gallery, and the main body of the pipe gallery The ground 2 on both sides of 1 is provided with the sewage well 9 outside the gallery, and the sewage well 8 on the top of the gallery and the sewage well 9 outside the gallery are connected by the main sewage main pipe 3 at the bottom of the gallery main body 1 arranged at the bottom of the gallery.

其中,廊底污水干管3设置在污水敷管箱涵6内,污水敷管箱涵6设置在管廊主体1的底部,污水敷管箱涵6内腔横截面的宽度和高度均大于廊底污水干管3的直径,污水敷管箱涵6内腔与廊底污水干管3之间的间隙内填充粗砂7;Among them, the main sewage pipe 3 at the bottom of the corridor is arranged in the sewage pipe laying box culvert 6, and the sewage pipe laying box culvert 6 is arranged at the bottom of the main body 1 of the pipe gallery. The diameter of the bottom sewage main pipe 3, the gap between the inner cavity of the sewage pipe laying box culvert 6 and the gallery bottom sewage main pipe 3 is filled with coarse sand 7;

廊底污水干管3位于管廊主体1的管体上籍由廊内竖直干管31与廊顶污水井8连接,廊内竖直干管31上设有四通5,廊内竖直干管31籍由四通5与廊内污水支管4连接。The main sewage pipe 3 at the bottom of the corridor is located on the pipe body of the main body 1 of the pipe gallery. The vertical main pipe 31 in the corridor is connected with the sewage well 8 on the top of the corridor. The main pipe 31 is connected with the sewage branch pipe 4 in the gallery by the cross 5.

本实用新型的原理在于,籍由将现有的廊底污水干管3设置在一个填充了粗砂7的污水敷管箱涵6内实现廊底污水干管与管廊结构的柔性接触,可降低廊底污水干管弯曲甚至断裂的风险。The principle of the utility model is that the flexible contact between the main sewage main pipe at the bottom of the gallery and the structure of the pipe gallery is realized by setting the existing main sewage main pipe 3 at the bottom of the gallery in a sewage pipe culvert 6 filled with coarse sand 7 . Reduce the risk of bent or even broken gallery bottom sewer mains.

并且,籍由四通5来连接廊内污水支管4更便于廊内污水管的排气冲於。And, it is more convenient for the exhaust of the sewage pipe in the corridor to be flushed by connecting the sewage branch pipe 4 in the corridor by means of the four-way 5 .

在某些实施例中,管廊主体1包括燃气舱11、综合舱12、电力舱13;廊顶污水井8设置在综合舱12上方的地面2。In some embodiments, the main body 1 of the pipe gallery includes a gas cabin 11 , an integrated cabin 12 , and an electric cabin 13 ;

在某些实施例中,廊底污水干管3的标高低于管廊主体1的外顶标高。In some embodiments, the elevation of the main sewage pipe 3 at the bottom of the gallery is lower than the elevation of the outer top of the main body 1 of the utility gallery.

以上详细描述了本实用新型的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本实用新型的构思做出诸多修改和变化。因此,凡本技术领域中技术人员依本实用新型的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。The preferred specific embodiments of the present utility model have been described in detail above. It should be understood that those skilled in the art can make many modifications and changes according to the concept of the present utility model without creative efforts. Therefore, all technical solutions that can be obtained by those skilled in the art based on the concept of the utility model through logical analysis, reasoning or limited experiments on the basis of the prior art should be within the scope of protection defined by the claims .

Claims (3)

1.廊内污水管接出廊外的地下综合管廊结构,包括管廊主体(1),所述管廊主体(1)的上方的地面(2)设有廊顶污水井(8),所述管廊主体(1)的两侧的所述地面(2)设有廊外污水井(9),所述廊顶污水井(8)、所述廊外污水井(9)籍由设置在所述管廊主体(1)底部的廊底污水干管(3)连通;其特征在于,所述廊底污水干管(3)设置在污水敷管箱涵(6)内,所述污水敷管箱涵(6)设置在所述管廊主体(1)的底部,所述污水敷管箱涵(6)内腔横截面的宽度和高度均大于所述廊底污水干管(3)的直径,所述污水敷管箱涵(6)内腔与所述廊底污水干管(3)之间的间隙内填充粗砂(7);1. The sewage pipe in the gallery is connected to the underground comprehensive pipe gallery structure outside the gallery, including the main body of the pipe gallery (1), and the ground (2) above the main body of the pipe gallery (1) is provided with a sewage well (8) on the top of the gallery, The ground (2) on both sides of the main body (1) of the pipe corridor is provided with a sewage well (9) outside the corridor, and the sewage well (8) on the top of the corridor and the sewage well (9) outside the corridor are arranged by means of The corridor bottom sewage main pipe (3) at the bottom of the pipe gallery main body (1) is connected; it is characterized in that the gallery bottom sewage main pipe (3) is arranged in the sewage pipe laying box culvert (6), and the sewage The pipe-laying box culvert (6) is arranged at the bottom of the main body (1) of the pipe gallery, and the width and height of the inner cavity cross section of the sewage pipe-laying box culvert (6) are larger than the main sewage pipe (3) at the bottom of the gallery. The diameter of the sewage pipe laying box culvert (6) is filled with coarse sand (7) in the gap between the inner cavity of the sewage pipe (6) and the main sewage main pipe (3) at the bottom of the corridor; 所述廊底污水干管(3)位于所述管廊主体(1)的管体上籍由廊内竖直干管(31)与所述廊顶污水井(8)连接,所述廊内竖直干管(31)上设有四通(5),所述廊内竖直干管(31)籍由所述四通(5)与廊内污水支管(4)连接。The main sewage main pipe (3) at the bottom of the gallery (3) is located on the pipe body of the main body (1) of the gallery. The vertical main pipe (31) is provided with a cross (5), and the vertical main pipe (31) in the gallery is connected with the sewage branch pipe (4) in the gallery by the cross (5). 2.根据权利要求1所述的廊内污水管接出廊外的地下综合管廊结构,其特征在于,所述管廊主体(1)包括燃气舱(11)、综合舱(12)、电力舱(13);所述廊顶污水井(8)设置在所述综合舱(12)上方的地面(2)。2. The underground comprehensive pipe gallery structure in which the sewage pipes in the gallery are connected to the outside of the gallery according to claim 1, wherein the main body (1) of the pipe gallery includes a gas cabin (11), a comprehensive cabin (12), an electric power cabin (13); the corridor roof sewage well (8) is arranged on the ground (2) above the integrated cabin (12). 3.根据权利要求1所述的廊内污水管接出廊外的地下综合管廊结构,其特征在于,所述廊底污水干管(3)的标高低于所述管廊主体(1)的外顶标高。3. The underground comprehensive pipe gallery structure in which the sewage pipes in the gallery are connected to the outside of the gallery according to claim 1, wherein the elevation of the main sewage main pipe (3) at the bottom of the gallery is lower than the main body (1) of the gallery The elevation of the outer roof.
CN201720828408.7U 2017-07-10 2017-07-10 Sewage pipe picks out the underground pipe gallery structure outside corridor in corridor Expired - Fee Related CN206888134U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720828408.7U CN206888134U (en) 2017-07-10 2017-07-10 Sewage pipe picks out the underground pipe gallery structure outside corridor in corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720828408.7U CN206888134U (en) 2017-07-10 2017-07-10 Sewage pipe picks out the underground pipe gallery structure outside corridor in corridor

Publications (1)

Publication Number Publication Date
CN206888134U true CN206888134U (en) 2018-01-16

Family

ID=61296205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720828408.7U Expired - Fee Related CN206888134U (en) 2017-07-10 2017-07-10 Sewage pipe picks out the underground pipe gallery structure outside corridor in corridor

Country Status (1)

Country Link
CN (1) CN206888134U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842907A (en) * 2018-07-25 2018-11-20 中国十七冶集团有限公司 A kind of rain sewage lifter that taking into account piping lane and implementation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842907A (en) * 2018-07-25 2018-11-20 中国十七冶集团有限公司 A kind of rain sewage lifter that taking into account piping lane and implementation method

Similar Documents

Publication Publication Date Title
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN205894103U (en) Prefabricated parabola type utility tunnel
CN206143899U (en) Crossover node structure suitable for sewer line incorporates utility tunnel in
CN206888134U (en) Sewage pipe picks out the underground pipe gallery structure outside corridor in corridor
CN201535392U (en) Top pipe slurry injection structure
CN217053673U (en) Connecting structure for plastic pipeline and concrete prefabricated inspection well
CN104180077B (en) Pipeline runs through concrete floor waterproof construction
CN204511457U (en) Class oval top tube method tube coupling
CN206752632U (en) Plastic-reinforced composite structure municipal drainage inspection well
CN204959890U (en) A prefabricated installation structure of indoor U-PVC drainage riser for high-rise buildings
CN207062989U (en) Underground pipe gallery node structure outside corridor in sewage pipe access corridor
CN105971016A (en) Utility tunnel internode connection structure
CN202073170U (en) Convenient-to-replace floor drain system
CN205618199U (en) Prefabricated cable pipe and prefabricated drain pipe structure in tunnel
CN205503183U (en) Formula of covering delivery port structure in tunnel heat preservation escape canal
CN204491810U (en) A kind of embedded floor drain
CN209977458U (en) A rigid waterproof casing with anti-slip structure
CN208251175U (en) A kind of waterproof construction of construction joint
CN206128123U (en) Integral type cable check well
CN204703957U (en) A kind of tunnel underdrainage tubular structure with maintenance hand hole
CN205171554U (en) Chute inspection shaft is inlayed to socket joint formula
CN205907716U (en) Device for connecting be used for inspection shaft
CN218762013U (en) Corrugated pipe
CN205212392U (en) Cable duct structure
CN201972164U (en) Reinforced concrete soil corridor with small section

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

CF01 Termination of patent right due to non-payment of annual fee