CN205688461U - Pipe gallery section structure - Google Patents

Pipe gallery section structure Download PDF

Info

Publication number
CN205688461U
CN205688461U CN201620624892.7U CN201620624892U CN205688461U CN 205688461 U CN205688461 U CN 205688461U CN 201620624892 U CN201620624892 U CN 201620624892U CN 205688461 U CN205688461 U CN 205688461U
Authority
CN
China
Prior art keywords
storehouse
clear water
rainwater
pipe
early
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620624892.7U
Other languages
Chinese (zh)
Inventor
汪胜
王家华
葛华飞
许云骅
毛峰
念兴宇
徐飞飞
张杨
庞传民
张赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Co ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CN201620624892.7U priority Critical patent/CN205688461U/en
Application granted granted Critical
Publication of CN205688461U publication Critical patent/CN205688461U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of pipe gallery section structure, it relates to pipe gallery technical field.It includes comprehensive storehouse, combustion gas storehouse, rainwater storehouse, early-stage rainwater storehouse and clear water storehouse, comprehensive side, storehouse is provided with combustion gas storehouse, clear water storehouse, combustion gas storehouse is arranged on above clear water storehouse, the upper strata in clear water storehouse is additionally provided with early-stage rainwater storehouse, the upper strata in early-stage rainwater storehouse is provided with rainwater storehouse, rainwater storehouse end is provided with river course connected entrance and purifying processing device connected entrance, rainwater storehouse is connected with clear water storehouse by purifying processing device, internal clear water can be promoted to ground and water the clear water elevator pump spilt by being internally provided with of clear water storehouse, it is disposed with soil pipe inside comprehensive storehouse, communication tube, power pipe, feed pipe and provided pipe, the soil pipe that comprehensive side, storehouse is arranged is connected with the sewage pump being arranged in early-stage rainwater storehouse by pipeline.This utility model is powerful, clears up easy to maintenance, it is ensured that pipeline is properly functioning, and has the storage in sponge city, clean, use, row function.

Description

Pipe gallery section structure
Technical field
This utility model relates to pipe gallery technical field, particularly relates to a kind of pipe gallery section structure.
Background technology
For implementing unified planning, designing, construct and safeguard, it is built in Urban Underground for laying the municipal administration of municipal public use pipeline Public utility is referred to as pipe gallery, and rain pipe soil pipe is a kind of pipeline that must take in pipe gallery design, existing comprehensive Close in piping lane engineering, the most do not consider to include in pipe gallery rainwater, soil pipe in, though enter in pipe gallery also with Pipe gallery bottom space, arranges rain gutter, overlying cover plate, during rainy season, is saturated with water bottom pipe gallery, and rainwater can be stained Other pipelines, cleaning maintenance difficulties is big, and piping lane humidity is big, affects other pipelines properly functioning.
Sponge city overview is got up six words: ooze, stagnant, store, clean, with, row, piping lane is entered for rainwater, generally uses pipe The body of corridor replaces storm sewer, and the rainwater storehouse in usual pipe gallery arranges size and only considers the size of direct-burried rainwater pipeline, See once in a while rainwater storehouse do big after, there is the function of part storage, other function of sponge city does not embodies.
Therefore, those skilled in the art is devoted to develop a kind of pipe gallery section structure.
Utility model content
Because the drawbacks described above of prior art, technical problem to be solved in the utility model is to provide a kind of integrated pipe Corridor section structure, simple in construction, reasonable in design, powerful, clear up easy to maintenance, it is ensured that pipeline is properly functioning, and there is sea Storage in continuous city, clean, use, row function, practical, it is easy to promote the use of.
For achieving the above object, this utility model provides pipe gallery section structure, including comprehensive storehouse, combustion gas storehouse, rain Sump, early-stage rainwater storehouse and clear water storehouse, side, comprehensive storehouse is provided with combustion gas storehouse, clear water storehouse, and combustion gas storehouse is arranged on above clear water storehouse, The upper strata in clear water storehouse is additionally provided with early-stage rainwater storehouse, and the upper strata in early-stage rainwater storehouse is provided with rainwater storehouse, and rainwater storehouse end is provided with River course connected entrance and purifying processing device connected entrance, rainwater storehouse is connected with clear water storehouse by purifying processing device, clear water storehouse It is internally provided with and internal clear water can be promoted to ground and water the clear water elevator pump spilt, inside comprehensive storehouse, be disposed with soil pipe, communication Pipe, power pipe, feed pipe and provided pipe, the soil pipe that side, comprehensive storehouse is arranged passes through pipeline and is arranged in early-stage rainwater storehouse Sewage pump connects.
As preferably, described rainwater storehouse is connected with early-stage rainwater storehouse by multiple intercommunicating pores, and intercommunicating pore is arranged on rainwater On dividing plate between storehouse and early-stage rainwater storehouse, the distance between adjacent intercommunicating pore is 20m;It is additionally provided with bottom rainwater storehouse and avoids mud The chute of husky deposition.
As preferably, the dividing plate between described combustion gas storehouse and clear water storehouse is provided with inspection chamber.
As preferably, the width in described comprehensive storehouse is 3400mm, height is 4500mm, and the height in combustion gas storehouse is 3000mm, The height in rainwater storehouse is 1900mm, and the height in early-stage rainwater storehouse is 900mm, and the width in clear water storehouse is 3300mm, height is 1200mm。
The beneficial effects of the utility model are: optimize the arrangement space of piping lane further, and internal each chamber structure layout is closed Reason, has certain practicality and promotional value, has the storage in sponge city, clean, use, row function.
Below with reference to accompanying drawing, the technique effect of design of the present utility model, concrete structure and generation is made furtherly Bright, to be fully understood from the purpose of this utility model, feature and effect.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
With reference to Fig. 1, this detailed description of the invention by the following technical solutions: pipe gallery section structure, including comprehensive storehouse 1, Combustion gas storehouse 2, rainwater storehouse 3, early-stage rainwater storehouse 4 and clear water storehouse 5, side, comprehensive storehouse 1 is provided with combustion gas storehouse 2, clear water storehouse 5, combustion gas storehouse 2 Being arranged on above clear water storehouse 5, the upper strata in clear water storehouse 5 is additionally provided with early-stage rainwater storehouse 4, and the upper strata in early-stage rainwater storehouse 4 arranges rainy Sump 3, rainwater storehouse 3 end is provided with river course connected entrance and purifying processing device connected entrance, and rainwater storehouse 3 is filled by purified treatment Putting and be connected with clear water storehouse 5, comprehensive storehouse 1 is internal is disposed with soil pipe 101, communication tube 102, power pipe 103, feed pipe 104 and pre- Pipe 105, soil pipe 101 is stayed to be connected with the sewage pump being located in early-stage rainwater storehouse 4 by pipeline.
It should be noted that described rainwater storehouse 3 is connected with early-stage rainwater storehouse 4 by multiple intercommunicating pores 6, intercommunicating pore 6 sets Putting on the dividing plate between rainwater storehouse 2 and early-stage rainwater storehouse 4, the distance between adjacent intercommunicating pore 6 is 20m, it is ensured that the ditch in two storehouses Logical;It is additionally provided with chute 7, it is to avoid sedimentation bottom described rainwater storehouse 3.
It should be noted that and be provided with inspection chamber 8 on the dividing plate between described combustion gas storehouse 2 and clear water storehouse 5.
Additionally, the width in described comprehensive storehouse 1 be 3400mm, height for 4500mm, the height in combustion gas storehouse 2 is 3000mm, rain The height of sump 3 is 1900mm, and the height in early-stage rainwater storehouse 4 is 900mm, and the width in clear water storehouse 5 is 3300mm, height is 1200mm。
The comprehensive storehouse of this detailed description of the invention 1 is received electric power, communicate, feed water, the various pipeline of sewage, wherein soil pipe 101 Side is arranged, soil pipe 101 is gravity stream, and the gradient can be adjusted realizing by the piping lane gradient and height spatially, solves The problem that certainly soil pipe enters corridor;Combustion gas storehouse 2 individually becomes storehouse, highly meets People's Bank of China's headroom requirement, and unnecessary height space is used Rainwater storehouse is set.Rain water collecting system divides three storehouses to arrange, each cabin has different functions, and wherein, rainwater storehouse 3 is first Layer, is used as to discharge rainwater, and top is provided with inspection hole;The second layer is early-stage rainwater storehouse 4, and when rainwater is less, rainwater initially enters Early-stage rainwater storehouse 4, the soil pipe 101 that early-stage rainwater is promoted in comprehensive storehouse 1 by early-stage rainwater storehouse 4 by sewage pump;Clearly Sump 5 is as third layer cabin, and the rainwater after purified processing means processes enters clear water storehouse 5, and the internal clear water in clear water storehouse 5 promotes Clear water is promoted to ground and waters and spill greening and road by pump, and clear water storehouse 5 is before very heavy rains, can carry out pre-emptying, if outlet surpasses Mark heavy rain, can enter clear water storehouse 5 by unnecessary rainwater, improves standard of controlling flood and draining flooded fields.
This detailed description of the invention, by municipal all pipelines storage pipe gallery, meets wanting of gravity stream rain sewer line Ask, and rainwater storehouse is divided into some cabins, embody the storage in sponge city, clean, use, row function respectively, there is wide market Application prospect.
Preferred embodiment of the present utility model described in detail above.Should be appreciated that the ordinary skill people of this area Member just can make many modifications and variations according to design of the present utility model without creative work.Therefore, all technology neck In territory, technical staff passes through logical analysis, reasoning or limited reality on the basis of existing technology according to design of the present utility model Test available technical scheme, all should be in the protection domain being defined in the patent claims.

Claims (6)

1. a pipe gallery section structure, it is characterised in that: include comprehensive storehouse (1), combustion gas storehouse (2), rainwater storehouse (3), initial stage Rainwater storehouse (4) and clear water storehouse (5), comprehensive storehouse (1) side is provided with combustion gas storehouse (2), clear water storehouse (5), and combustion gas storehouse (2) are arranged on clearly Sump (5) top, the upper strata of clear water storehouse (5) is additionally provided with early-stage rainwater storehouse (4), and the upper strata of early-stage rainwater storehouse (4) arranges rainy Sump (3), rainwater storehouse (3) end is provided with river course connected entrance and purifying processing device connected entrance, and rainwater storehouse (3) are by purifying Processing means is connected with clear water storehouse (5), and comprehensive storehouse (1) is internal is disposed with soil pipe (101), communication tube (102), power pipe (103), feed pipe (104) and provided pipe (105), the soil pipe (101) that comprehensive storehouse (1) side is arranged is by pipeline and is arranged on Sewage pump in early-stage rainwater storehouse (4) connects.
2. pipe gallery section structure as claimed in claim 1, it is characterised in that: multiple companies are passed through in described rainwater storehouse (3) Through hole (6) is connected with early-stage rainwater storehouse (4), and intercommunicating pore (6) is arranged on the dividing plate between rainwater storehouse (3) and early-stage rainwater storehouse (4) On, the distance between adjacent intercommunicating pore (6) is 20m.
3. pipe gallery section structure as claimed in claim 1, it is characterised in that: described bottom, rainwater storehouse (3) is provided with Avoid the chute (7) of sedimentation.
4. pipe gallery section structure as claimed in claim 1, it is characterised in that: described combustion gas storehouse (2) and clear water storehouse (5) Between dividing plate on be provided with inspection chamber (8).
5. pipe gallery section structure as claimed in claim 1, it is characterised in that: being internally provided with of described clear water storehouse (5) Internal clear water can be promoted to ground and water the clear water elevator pump spilt.
6. pipe gallery section structure as claimed in claim 1, it is characterised in that: the width of described comprehensive storehouse (1) is 3400mm, height are 4500mm, and the height of combustion gas storehouse (2) is 3000mm, and the height of rainwater storehouse (3) is 1900mm, early-stage rainwater The height in storehouse (4) is 900mm, and the width of clear water storehouse (5) is 3300mm, height is 1200mm.
CN201620624892.7U 2016-06-23 2016-06-23 Pipe gallery section structure Active CN205688461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620624892.7U CN205688461U (en) 2016-06-23 2016-06-23 Pipe gallery section structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620624892.7U CN205688461U (en) 2016-06-23 2016-06-23 Pipe gallery section structure

Publications (1)

Publication Number Publication Date
CN205688461U true CN205688461U (en) 2016-11-16

Family

ID=57416558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620624892.7U Active CN205688461U (en) 2016-06-23 2016-06-23 Pipe gallery section structure

Country Status (1)

Country Link
CN (1) CN205688461U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592625A (en) * 2016-12-12 2017-04-26 珠海市规划设计研究院 Urban road comprehensive pipe gallery wire-outgoing connection structure
CN106761806A (en) * 2016-12-16 2017-05-31 中国建筑第六工程局有限公司 For the tunneling boring pushing tow system and pushing method of tunneling pipe gallery point chamber structure
CN106759770A (en) * 2016-12-28 2017-05-31 上海市政工程设计研究总院(集团)有限公司 One kind is applied to that pipe gallery rainwater separating regulates and stores device and its sub-prime is regulated and stored technique
CN106906846A (en) * 2017-04-27 2017-06-30 中冶京诚工程技术有限公司 prefabricated comprehensive pipe gallery
CN107761763A (en) * 2017-10-18 2018-03-06 西安交通大学 A kind of pipe gallery and its application method
CN107806111A (en) * 2017-11-24 2018-03-16 中冶京诚工程技术有限公司 Water collection type comprehensive pipe gallery ventilation shaft
CN108265616A (en) * 2018-03-26 2018-07-10 上海市城市建设设计研究总院(集团)有限公司 Piping lane builds structure jointly with overhead
CN108914964A (en) * 2018-08-10 2018-11-30 深圳市清华苑建筑与规划设计研究有限公司 A kind of city branch line underground pipe gallery construction system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592625A (en) * 2016-12-12 2017-04-26 珠海市规划设计研究院 Urban road comprehensive pipe gallery wire-outgoing connection structure
CN106761806A (en) * 2016-12-16 2017-05-31 中国建筑第六工程局有限公司 For the tunneling boring pushing tow system and pushing method of tunneling pipe gallery point chamber structure
CN106761806B (en) * 2016-12-16 2019-05-28 中国建筑第六工程局有限公司 Divide the tunneling boring pushing tow system and pushing method of chamber structure for tunneling pipe gallery
CN106759770A (en) * 2016-12-28 2017-05-31 上海市政工程设计研究总院(集团)有限公司 One kind is applied to that pipe gallery rainwater separating regulates and stores device and its sub-prime is regulated and stored technique
CN106906846A (en) * 2017-04-27 2017-06-30 中冶京诚工程技术有限公司 prefabricated comprehensive pipe gallery
CN106906846B (en) * 2017-04-27 2022-08-02 中冶京诚工程技术有限公司 Prefabricated comprehensive pipe gallery
CN107761763A (en) * 2017-10-18 2018-03-06 西安交通大学 A kind of pipe gallery and its application method
CN107806111A (en) * 2017-11-24 2018-03-16 中冶京诚工程技术有限公司 Water collection type comprehensive pipe gallery ventilation shaft
CN107806111B (en) * 2017-11-24 2023-01-24 中冶京诚工程技术有限公司 Water collection type comprehensive pipe gallery ventilation shaft
CN108265616A (en) * 2018-03-26 2018-07-10 上海市城市建设设计研究总院(集团)有限公司 Piping lane builds structure jointly with overhead
CN108914964A (en) * 2018-08-10 2018-11-30 深圳市清华苑建筑与规划设计研究有限公司 A kind of city branch line underground pipe gallery construction system

Similar Documents

Publication Publication Date Title
CN205688461U (en) Pipe gallery section structure
CN105926676B (en) Pipe gallery system with sponge city function
CN105130055B (en) Rainwater-collecting purified treatment reclaiming system
CN106638681B (en) A kind of pipe gallery
CN205688460U (en) Pipe gallery system with sponge city function
CN103739167A (en) Rain and sewage dual-purpose landscape type ecological purification system
CN106638917B (en) Split type rainwater recycling, storing and adjusting system and construction method thereof
CN201972229U (en) Residential rainwater comprehensive utilization system device
CN106320429A (en) Rainwater collection device with purifying function
CN107761763A (en) A kind of pipe gallery and its application method
CN206368389U (en) One kind backwash and sewage sucking system
CN203938558U (en) Rain, dirty dual-purpose landscape type ecological purification system
CN202401516U (en) Rainwater collection and utilization unit according to water quality
CN207760989U (en) A kind of pump discharges into water system
CN103741782A (en) Roadway rainwater collection system
CN205776495U (en) Sponge type solid rainwater reuse for sponge urban construction is regulated and stored system
CN205063000U (en) Novel inlet for stom water reposition of redundant personnel funnel
CN205369374U (en) Rainwater cyclic utilization system
CN109440573A (en) A kind of system for reclaiming rainwater suitable for road construction
CN205442832U (en) Urban rainwater sewage water purification system
CN104975644B (en) Special pipe storage system for road initial rainwater
CN108532711B (en) Building system based on sponge city construction
CN209024299U (en) Bury formula rainwater processing system
CN206396790U (en) A kind of comprehensive pipe gallery structure for being easy to rainwater to discharge
CN102535579A (en) Ecological storing system for road rainwater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant