The prefabricated piping lane of intelligent comprehensive and its construction technology
Technical field
The present invention relates to civilian infrastructure construction technique field, more particularly, to a kind of prefabricated piping lane of intelligent comprehensive and its
Construction technology.
Background technology
City Buried Pipeline is the important infrastructure and " life line " for ensureing city operations.In recent years, as city is fast
Speed development, underground utilities are increasingly complicated or even deep-rooted, formed " underground noodles problem ", and pipe network facilities increase or keep in repair,
The pipe first-aids such as communication, water supply, coal gas cause urban pavement constantly to excavate and fill as slide fastener, have had a strong impact on the people
The daily life and city operations order of the masses.
Now someone have developed cast-type underground pipe gallery, by municipal administration, electric power, communication, combustion gas, water supply, middle water, draining, heat
The various pipelines such as power are integrated in one, and solve the situation that the old pipe of maintenance, the row of applying newly manage continuous excavated pavement, but cast-type underground
Piping lane is limited by conditions such as job site natural environment and climates, and construction quality is difficult to control to.
In view of this, it is special to propose the present invention.
The content of the invention
An object of the present invention is to provide a kind of intelligent comprehensive prefabricated piping lane, to solve prior art in using cast-in-place
Formula underground pipe gallery, is limited by conditions such as job site natural environment and climates, the unmanageable technical problem of construction quality.
The prefabricated piping lane of intelligent comprehensive that the present invention is provided, it is characterised in that described including multiple prefabricating square culverts in a tubular form
The inwall of prefabricating square culvert is provided with connecting hole, and the connecting hole is axially arranged along the prefabricating square culvert, multiple prefabricated sides
Culvert is sequentially connected, and the connecting hole is corresponded, and connector is equipped with the connecting hole, and the connector makes multiple described
Prefabricating square culvert is brought into close contact successively.
Further, it is provided with sealing rod between the adjacent prefabricating square culvert.
Further, the end of one end of the prefabricating square culvert is provided with positioning convex, the other end of the prefabricating square culvert
End be provided with detent, the positioning convex matches with the detent.
Further, installing hole is provided with the inwall of the prefabricating square culvert, on the installing hole cable bearer is provided with.
Further, the connector is PC rods.
The second object of the present invention there are provided a kind of construction technology of the prefabricated piping lane of intelligent comprehensive, to solve existing skill
Cast-type underground pipe gallery is adopted in art, is limited by conditions such as job site natural environment and climates, the unmanageable skill of construction quality
Art problem.
The construction technology of the prefabricated piping lane of intelligent comprehensive that the present invention is provided comprises the steps:By multiple prefabricating square culverts successively
Connection, and the connecting hole of multiple prefabricating square culverts is corresponded, connector is arranged in successively the connecting hole of multiple prefabricating square culverts
In, tensioning connector makes multiple prefabricating square culverts be brought into close contact successively, that is, make the prefabricated piping lane of intelligent comprehensive.
Further, the construction technology of the prefabricated piping lane of the intelligent comprehensive also includes water-proof treatment technology, at the waterproof
Science and engineering skill is arranged at before multiple prefabricating square culverts are sequentially connected, and the water-proof treatment technology is to arrange sealing in the end of prefabricating square culvert
Bar.
Further, the construction technology of the prefabricated piping lane of the intelligent comprehensive also includes construction pre-treating technology, the construction
Pre-treating technology is to carry out sanding process at the construction field (site).
Further, the construction technology of the prefabricated piping lane of the intelligent comprehensive also includes joint filling handling process, at the joint filling
Science and engineering skill is arranged at after being brought into close contact successively between the prefabricating square culvert, to prevent the seam crossing between contiguous prefabricated Fang Han from oozing
Water.
Further, the construction technology of the prefabricated piping lane of the intelligent comprehensive also includes joint treatment technique, the seam crossing
Science and engineering skill is arranged at after joint treatment technique, so that construction road surface recovers current.
The prefabricated piping lane of intelligent comprehensive that the present invention is provided, by being sequentially connected using prefabricating square culvert in a tubular form, by electricity
Various municipal pipelines such as power, communication, water supply, combustion gas are concentrated in together, and accomplish the comprehensive utilization and resource-sharing of the underground space, are kept away
Exempt from urban pavement constantly to excavate and fill;Connecting hole is respectively provided with by the inwall in multiple prefabricating square culverts, and it is multiple prefabricated
The connecting hole of Fang Han is corresponded so that connector can sequentially pass through the connecting hole of multiple prefabricating square culverts, to be connected by tensioning
Multiple prefabricating square culverts that make of fitting are brought into close contact successively, effectively prevent the seepage of rainwater, it is ensured that construction quality, improve and apply
The construction environment of workman person, shortens the construction period, reduces the impact to construct road pavement traffic and nearby residents life.
The construction technology of the prefabricated piping lane of intelligent comprehensive that the present invention is provided, at the construction field (site), only need to be by multiple prefabricating square culverts
It is sequentially connected, and is tensioned successively to be brought into close contact multiple prefabricating square culverts by connector, you can complete construction, saves a large amount of
Engineering time and expense, and effectively reduce construction noise, the impact to nearby residents life is reduced, simultaneously because prefabricated
Fang Han is completed in factory, without the need for cast in situs, for the weather and environment of job site is without particular/special requirement, and its construction
Quality is more reliable.In addition, the construction technology of the prefabricated piping lane of intelligent comprehensive of present invention offer, improves the work of workmen
Environment, its difficulty of construction is lower, and safety coefficient is higher, can be prevented effectively from the generation of construction safety accident.
Description of the drawings
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, below will be to concrete
The accompanying drawing to be used needed for embodiment or description of the prior art is briefly described, it should be apparent that, in describing below
Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid
Put, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is the structural representation of the prefabricated piping lane of intelligent comprehensive that the embodiment of the present invention 1 is provided;
Fig. 2 is the structural representation of the single storehouse prefabricating square culvert shown in Fig. 1;
Fig. 3 is the structural representation of another angle in single storehouse prefabricating square culvert shown in Fig. 1;
The structure of double storehouse prefabricating square culverts that Fig. 4 is adopted by the prefabricated piping lane of intelligent comprehensive that the embodiment of the present invention 2 is provided is shown
It is intended to;
Fig. 5 is the structural representation of double storehouse prefabricating square culverts another angle shown in Fig. 4;
Fig. 6 is the flow chart of the construction method of the prefabricated piping lane of intelligent comprehensive that the embodiment of the present invention 3 is provided.
Icon:The mono- storehouse prefabricating square culverts of 100-;The mono- storehouse connecting holes of 101-;The mono- storehouse positioning convex of 102-;The mono- storehouse positioning of 103- is recessed
Groove;The mono- storehouse cable beareves of 104-;The double storehouse prefabricating square culverts of 200-;The double storehouse connecting holes of 201-;The double storehouse positioning convex of 202-;The double storehouses of 203-
Detent;The double storehouse cable beareves of 204-.
Specific embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described enforcement
Example is a part of embodiment of the invention, rather than the embodiment of whole.Based on the embodiment in the present invention, ordinary skill
The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
In describing the invention, it should be noted that term " " center ", " on ", D score, "left", "right", " vertical ",
The orientation or position relationship of the instruction such as " level ", " interior ", " outward " be based on orientation shown in the drawings or position relationship, merely to
Be easy to description the present invention and simplify description, rather than indicate or imply indication device or element must have specific orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.Additionally, term " first ", " second ",
" the 3rd " is only used for describing purpose, and it is not intended that indicating or implying relative importance.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can
Being to be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in invention.
City Buried Pipeline is the important infrastructure and " life line " for ensureing city operations, with rapid urban,
Underground pipeline construction scale is not enough, highlights the problems such as management level are not high, and some cities occur heavy rain waterlogging, pipeline leakage in succession
Blast, road surface such as are subsided at the event, life property safety of people and city operations order have been had a strong impact on, for this reason, it may be necessary to unite
Underground pipeline construction is raised, under urban pavement pipe gallery is built, to ensure life property safety of people, safeguard city
Running order.
Cast-type being adopted the pipe gallery under urban pavement now, i.e. one-time cast-forming at the construction field (site), due to existing more
The restriction of construction environment and weather so that vibrating for pouring type pipe gallery or conserves not good at leakiness, causes to seep water and leaks
Water phenomenon is serious.In addition, cast-type pipe gallery also needs to formwork cast at the construction field (site), fluting area is big, and required operation is more,
Construction period is long, and field management difficulty is big, has had a strong impact on the orthobiosiss of urban transportation and surrounding resident.
Therefore, the technology that developing a kind of prefabricated piping lane of novel intelligent composite becomes those skilled in the art's urgent need to resolve is asked
Topic.
The prefabricated piping lane of intelligent comprehensive provided by the present invention is described further with reference to embodiment.
Embodiment 1
Fig. 1 is the structural representation of the prefabricated piping lane of intelligent comprehensive that the embodiment of the present invention 1 is provided;Fig. 2 is the list shown in Fig. 1
The structural representation of storehouse prefabricating square culvert;Fig. 3 is the structural representation of another angle in single storehouse prefabricating square culvert shown in Fig. 1;As schemed
Shown in 1-3, the prefabricated piping lane of intelligent comprehensive that the embodiment of the present invention 1 is provided, including multiple single storehouse prefabricating square culverts 100 in a tubular form,
Single storehouse connecting hole 101, axle of single storehouse connecting hole 101 along single storehouse prefabricating square culvert 100 are provided with the inwall of single storehouse prefabricating square culvert 100
To setting, multiple single storehouse prefabricating square culverts 100 are sequentially connected, and single storehouse connecting hole 101 is corresponded, and is worn in single storehouse connecting hole 101
Connector (not shown) is provided with, connector makes multiple single storehouse prefabricating square culverts 100 be brought into close contact successively.
The prefabricated piping lane of intelligent comprehensive that the present invention is provided, by being sequentially connected using single storehouse prefabricating square culvert 100 in a tubular form,
So that various municipal pipelines such as electric power, communication, water supply, combustion gas to be concentrated in together, accomplish comprehensive utilization and the resource of the underground space
It is shared, it is to avoid urban pavement is constantly excavated and filled;Single storehouse connection is arranged by the inwall in multiple single storehouse prefabricating square culverts 100
Hole 101, and single storehouse connecting hole 101 of multiple single storehouse prefabricating square culverts 100 corresponds so that connector can be arranged in successively many
In single storehouse connecting hole 101 of individual single storehouse prefabricating square culvert 100, it is logical can cross tensioning connector make multiple single storehouse prefabricating square culverts 100 according to
It is secondary to be brought into close contact, effectively prevent the seepage of rainwater, it is ensured that construction quality, the construction environment of workmen is improved, shorten
Construction period, reduce the impact to construct road pavement traffic and nearby residents life.
It should be noted that the single storehouse prefabricating square culvert 100 provided in the present invention can respectively set in the diverse location of inwall
Multiple single storehouse connecting holes 101 are put, so that the inwall of single storehouse prefabricating square culvert 100 can wear multiple connectors, to increase connection
The tensile force of part so that the connection between multiple single storehouse prefabricating square culverts 100 is more closely more stable.
In order to further enhance the percolation-proof effect of the prefabricated piping lane of intelligent comprehensive provided in an embodiment of the present invention, in the present invention
A kind of preferred implementation in, be provided with sealing rod between adjacent single storehouse prefabricating square culvert 100.
In embodiments of the present invention, sealing rod is a kind of adhesive tape of water-swellable, and it can utilize the viscosity of itself, directly
It is pasted onto the end of single storehouse prefabricating square culvert 100, meets after water volumetric expansion to block the sky between adjacent single storehouse prefabricating square culvert 100
Gap, so as to Seepage occurs in the seam crossing for avoiding the quality inspection of adjacent single storehouse prefabricating square culvert 100, so that the embodiment of the present invention is provided
The prefabricated piping lane of intelligent comprehensive antiseep it is better.
As shown in Figures 2 and 3, the end of one end of single storehouse prefabricating square culvert 100 provided in an embodiment of the present invention is provided with list
Storehouse positioning convex 102, the end of the other end is provided with single storehouse detent 103, single storehouse positioning convex 102 and single storehouse detent
103 match.
In order that the even closer laminating of adjacent single storehouse prefabricating square culvert 100 connection, the embodiment of the present invention is prefabricated in single storehouse
Contain 100 two ends and be respectively provided with single storehouse positioning convex 102 (bellmouth) and single storehouse detent 103 (interface) in side so that be adjacent
What is connected between single storehouse prefabricating square culvert 100 more consolidates, it is to avoid event of subsiding, and affects traffic and the running order in city.
As Figure 1-3, the inwall of single storehouse prefabricating square culvert 100 provided in an embodiment of the present invention is provided with single storehouse installing hole
(not shown), is provided with single storehouse cable bearer 104 on single storehouse installing hole.
The prefabricated piping lane of intelligent comprehensive provided in an embodiment of the present invention is used to accommodating various underground utilities, including electric power, communication,
Water supply, combustion gas etc., various pipelines are concentrated in together and are easily caused maintenance difficulty, and the embodiment of the present invention is in single storehouse prefabricating square culvert 100
Inwall single storehouse installing hole is set, single storehouse cable bearer 104 is provided with single storehouse installing hole, so that different pipelines can
By different single held separates of storehouse cable bearer 104, it is easy to engineering staff to overhaul, in the side of being preferable to carry out of the embodiment of the present invention
In formula, the quantity of single storehouse installing hole and single storehouse cable bearer 104 is multiple, still there is corresponding after increasing in order to later stage pipeline
Single storehouse cable bearer 104 carries out the erection of newly-increased pipeline.
In embodiments of the present invention, connector is PC rods.
PC rods are that, with Merlon as main component, the one kind being prepared from using coextrusion techniques CO-EXTRUSION is high
Quality bar.Because its surface covers a floor height concentration UV absorbent, in addition to having anti-ultraviolet characteristic and can keep
It is permanent weather-proof, it is will never fade.PC rods can effectively prevent water seepage;PC rods also have good mechanical performance, shock resistance
And weather resistance, it can keep physical properties index to stablize in the range of -40 DEG C to 120 DEG C, and when being heated
Remain dimensionally-stable.
The embodiment of the present invention using PC rods by being used as connector so that the antiseep effect of the prefabricated piping lane of intelligent comprehensive is more
It is good.
Embodiment 2
The embodiment of the present invention is the improvement on the basis of embodiment 1, and the technical scheme of the description of embodiment 1 falls within this enforcement
Example, will not be described here.The present embodiment is with the difference of embodiment 1, the prefabricated piping lane of intelligent comprehensive that embodiment 1 is provided
It is made up of single storehouse prefabricating square culvert, the prefabricated piping lane of intelligent comprehensive that the present embodiment is provided is made up of double storehouse prefabricating square culverts, and Fig. 4 is this
The structural representation of double storehouse prefabricating square culverts that the prefabricated piping lane of intelligent comprehensive that bright embodiment 2 is provided is adopted;Fig. 5 is Fig. 4
The structural representation of shown pair of storehouse prefabricating square culvert another angle;As shown in Figure 4 and Figure 5, double storehouse prefabricating square culverts 200 are by two lists
Storehouse prefabricating square culvert 100 is formed by connecting side by side, in order to save construction technology, contains the double storehouses of mould preparation by double storehouse sides in factory prefabricated
Side contains 200, to reduce the difficulty of construction of job site.
By arranging double storehouses prefabricating square culverts 200 so that the prefabricated piping lane of intelligent comprehensive provided in an embodiment of the present invention can hold
Receive more underground utilities, make the layout of underground utilities more reasonable.
As shown in Figure 4 and Figure 5, the embodiment of the present invention provides intelligent comprehensive double storehouse prefabricating square culverts that prefabricated piping lane is adopted
The diverse location of 200 inwall is evenly equipped with multiple pairs of storehouse connecting holes 201, in order to multiple connectors are arranged in respectively into multiple setting
In being placed in double storehouse connecting holes 201 of diverse location, to cause multiple pairs of storehouse prefabricating square culverts 200 tight successively by being tensioned connector
Laminating.
As shown in Figure 4 and Figure 5, the end of one end of double storehouse prefabricating square culverts 200 is provided with double storehouses positioning convex 202, another
The end at end is provided with double storehouses detent 203, and double storehouse positioning convex 202 match with double storehouse detents 203, in order to phase
The even closer laminating of connection between adjacent double storehouses prefabricating square culvert 200.
In embodiments of the present invention, double storehouses installing hole is provided with the inwall of double storehouse prefabricating square culverts 200, on double storehouse installing holes
Double storehouses cable bearer 204 is provided with, the effect of double storehouse cable beareves 204 will not be described here with list storehouse cable bearer 104.
In embodiments of the present invention, double storehouse prefabricating square culverts 200 are when being sequentially connected, between adjacent pair of storehouse prefabricating square culvert 200
Sealing rod is also equipped with, to avoid rain leakage from entering inside prefabricating square culvert, underground utilities is caused to damage.In the present embodiment
The sealing rod that sealing rod is provided with embodiment 1, will not be described here.
It should be noted that for the ease of transport and hoisting large-size prefabricating square culvert, can also be by prefabricating square culvert prepared composition
The first prefabricating square culvert body and the second prefabricating square culvert body of body formula structure, it is again that the first prefabricating square culvert body and second is pre- at the construction field (site)
Fang Hanti assemblings processed are made after prefabricating square culvert, then prepare the prefabricated piping lane of intelligent comprehensive by being sequentially connected large scale prefabricated Fang Han.
In addition, according to the requirement of job site environment and underground utilities, can also be many using three storehouse prefabricating square culverts, four storehouse prefabricating square culverts etc.
Storehouse prefabricating square culvert prepares the prefabricated piping lane of intelligent comprehensive, to meet the needs of urban transportation and running order.
Embodiment 3
Fig. 6 is the flow chart of the construction method of the prefabricated piping lane of intelligent comprehensive that the embodiment of the present invention 3 is provided, as shown in fig. 6,
The construction technology of the prefabricated anti-piping lane of Urban Underground that above-described embodiment 1 and embodiment 2 are provided is present embodiments provided, including it is as follows
Step:Multiple prefabricating square culverts are sequentially connected, and correspond the connecting hole of multiple prefabricating square culverts, connector is worn successively
In multiple connecting holes, tensioning connector makes multiple prefabricating square culverts be brought into close contact successively, that is, make the prefabricated piping lane of intelligent comprehensive.
The construction technology of the prefabricated piping lane of intelligent comprehensive that the present invention is provided, at the construction field (site), only need to be by multiple prefabricating square culverts
It is sequentially connected, and multiple prefabricating square culverts is brought into close contact successively by being tensioned connector, you can completes construction, save substantial amounts of
Engineering time and expense, and construction noise is effectively reduced, the impact to nearby residents life is reduced, simultaneously because prefabricated side
Culvert is completed in factory, without the need for cast in situs, for the weather and environment of job site is without particular/special requirement, and its construction matter
Amount is more reliable.In addition, the construction technology of the prefabricated piping lane of intelligent comprehensive of present invention offer, improves the building ring of workmen
Border, its difficulty of construction is lower, and safety coefficient is higher, can be prevented effectively from the generation of construction safety accident.
In the construction technology of the prefabricated piping lane of intelligent comprehensive provided in an embodiment of the present invention, prefabricating square culvert is being put into into construction
Before scene, scene needs to carry out sanding process, so that construction site is more smooth clean and tidy, it is to avoid collapse phenomenon occur, protect
The construction quality of the prefabricated piping lane of card intelligent comprehensive.
After sanding, after by hoisting machine are placed on construction ground multiple prefabricating square culverts, paste in the end of prefabricating square culvert
If sealing rod, then the end of multiple prefabricating square culverts is sequentially connected, and is tensioned connector so that be tight successively to individual prefabricating square culvert
Closely connected conjunction, to avoid the occurrence of water-impervious phenomenon.
After again multiple prefabricating square culverts are closely connected, in addition it is also necessary to carry out joint filling handling process, will be adjacent by grouting method
Seam crossing between prefabricating square culvert is filled and led up, to further enhance percolation-proof effect.
After joint treatment, also need to carry out backfill handling process, the state to construction is recovered in job site, it is ensured that road
What face traffic and nearby residents were lived is normally carried out.
The construction technology of the prefabricated piping lane of intelligent comprehensive provided in an embodiment of the present invention, construction quality is more reliable, construction method
It is more simple and convenient, can shorten construction period, reduce the impact to nearby residents life of constructing, recover faster urban transportation and
Running order.
Finally it should be noted that:Various embodiments above only to illustrate technical scheme, rather than a limitation;To the greatest extent
Pipe has been described in detail with reference to foregoing embodiments to the present invention, it will be understood by those within the art that:Its according to
So the technical scheme described in foregoing embodiments can be modified, either which part or all technical characteristic are entered
Row equivalent;And these modifications or replacement, do not make the essence disengaging various embodiments of the present invention technology of appropriate technical solution
The scope of scheme.