CN105350572A - Assembled type underground pipe gallery - Google Patents

Assembled type underground pipe gallery Download PDF

Info

Publication number
CN105350572A
CN105350572A CN201510716851.0A CN201510716851A CN105350572A CN 105350572 A CN105350572 A CN 105350572A CN 201510716851 A CN201510716851 A CN 201510716851A CN 105350572 A CN105350572 A CN 105350572A
Authority
CN
China
Prior art keywords
pipe gallery
connector
underground pipe
adapter sleeve
piping lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510716851.0A
Other languages
Chinese (zh)
Other versions
CN105350572B (en
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhaodi Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510716851.0A priority Critical patent/CN105350572B/en
Publication of CN105350572A publication Critical patent/CN105350572A/en
Priority to PCT/CN2016/000490 priority patent/WO2017071110A1/en
Application granted granted Critical
Publication of CN105350572B publication Critical patent/CN105350572B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明属于建筑技术领域,涉及一种装配式地下管廊。包括中空的管廊本体,所述的管廊本体包括至少两块相互连接的预制件,所述的预制件相互连接后形成周向封闭的管廊本体。本发明采用装配式结构,将地下管廊分成若干预制件,方便了运输,在安装时,预制件的体型较小、重量较轻,安装方便,尤其采用连接件连接的方式,使预制件之间的连接方便快捷,从而能极大的提高施工效率,实现地下管廊的快速安装。

The invention belongs to the technical field of buildings and relates to an assembled underground pipe gallery. It includes a hollow pipe gallery body. The pipe gallery body includes at least two interconnected prefabricated parts, and the prefabricated parts are connected to each other to form a circumferentially closed pipe gallery body. The present invention adopts an assembled structure and divides the underground pipe gallery into several prefabricated parts, which facilitates transportation. During installation, the prefabricated parts are smaller in size and lighter in weight, and are easy to install. The connection between them is convenient and fast, which can greatly improve the construction efficiency and realize the rapid installation of the underground pipe gallery.

Description

装配式地下管廊Prefabricated underground pipe gallery

技术领域technical field

本发明属于建筑技术领域,涉及一种装配式地下管廊。The invention belongs to the technical field of buildings and relates to an assembled underground pipe gallery.

背景技术Background technique

地下管廊又称共同沟,它是实施统一规划、设计、施工和维护,建于城市地下用于敷设市政公用管线的市政公用设施。是指在城市地下用于集中敷设电力、通信、广播电视、给水、排水、热力、燃气等市政管线的公共隧道。The underground pipe corridor, also known as the common ditch, is a municipal public facility that implements unified planning, design, construction and maintenance, and is built underground in the city for laying municipal public pipelines. Refers to the public tunnels that are used to centrally lay municipal pipelines such as electricity, communications, radio and television, water supply, drainage, heat, and gas underground in cities.

早在上世纪二十年代,日本首都东京市政机构就在市中心九段地区的干线道路下,将电力、电话、供水和煤气等管线集中铺设,形成了东京第一条地下综合管廊。此后,1963年制定的《关于建设共同沟的特别措施法》,从法律层面规定了日本相关部门需在交通量大及未来可能拥堵的主要干道地下建设“共同沟”。国土交通省下属的东京国道事务所负责东京地区主干线地下综合管廊的建设和管理,次干线的地下综合管廊则由东京都建设局负责。As early as the 1920s, the municipal government of Tokyo, the capital of Japan, laid power, telephone, water and gas pipelines under the main roads in the Kudan area of the city center, forming the first underground comprehensive utility corridor in Tokyo. Since then, the "Law on Special Measures Concerning the Construction of Common Ditches" enacted in 1963 has stipulated from the legal level that relevant Japanese departments need to build "common ditches" underground on major arterial roads with heavy traffic volume and potential congestion in the future. The Tokyo National Highway Office under the Ministry of Land, Infrastructure, Transport and Tourism is responsible for the construction and management of the underground comprehensive utility corridor of the main line in the Tokyo area, while the underground comprehensive utility corridor of the secondary trunk line is in charge of the Tokyo Metropolitan Construction Bureau.

北京早在1958年就在天安门广场下铺设了1000多米的综合管廊。2006年在中关村西区建成了我国大陆地区第二条现代化的综合管廊。该综合管廊主线长2公里,支线长1公里,包括水、电、冷、热、燃气、通讯等市政管线。1994年,上海市政府规划建设了大陆第一条规模最大、距离最长的综合管廊——浦东新区张杨路综合管廊。该综合管廊全长11.125公里,收容了给水、电力、信息与煤气等四种城市管线。上海还建成了松江新城示范性地下综合管廊工程一期和“一环加一线”总长约6公里的嘉定区安亭新镇综合管廊系统。中国与新加坡联合开发的苏州工业园基础设施建设,经过10年的开发,地下管线走廊也已初具规模。As early as 1958, Beijing had laid a comprehensive pipe corridor of more than 1,000 meters under Tiananmen Square. In 2006, the second modern comprehensive utility corridor in mainland my country was built in the west area of Zhongguancun. The main line of the comprehensive pipe gallery is 2 kilometers long, and the branch line is 1 kilometer long, including municipal pipelines such as water, electricity, cold, heat, gas, and communications. In 1994, the Shanghai Municipal Government planned and built the first comprehensive utility corridor with the largest scale and the longest distance in the mainland—the comprehensive utility corridor on Zhangyang Road, Pudong New Area. The comprehensive utility corridor has a total length of 11.125 kilometers and accommodates four urban pipelines including water supply, electricity, information and gas. Shanghai has also completed the first phase of the Songjiang New Town Demonstration Underground Comprehensive Pipe Gallery Project and the comprehensive pipe gallery system in Anting New Town, Jiading District, with a total length of about 6 kilometers. The infrastructure construction of Suzhou Industrial Park jointly developed by China and Singapore, after 10 years of development, the underground pipeline corridor has also begun to take shape.

国务院高度重视推进城市地下综合管廊建设,2013年以来先后印发了《国务院关于加强城市基础设施建设的意见》、《国务院办公厅关于加强城市地下管线建设管理的指导意见》,部署开展城市地下综合管廊建设试点工作。The State Council attaches great importance to promoting the construction of urban underground comprehensive pipeline corridors. Since 2013, it has successively issued the "Opinions of the State Council on Strengthening Urban Infrastructure Construction" and "Guiding Opinions of the General Office of the State Council on Strengthening the Construction and Management of Urban Underground Pipelines" to deploy and carry out urban underground comprehensive Pipe gallery construction pilot work.

中国专利文献公开了一种带补偿装置的集成式地下管廊[申请号:201410559745.1],包含若干管节密封条和若干首尾相接的管节单元,所述管节密封条设于相邻所述管节单元之间,所述管节单元包括管节和若干平行设置的管道,所述管道通过固定座设于所述管节内部的底面上,所述管节两端分别设有与所述管节形状相适配的管节伸缩连接管,所述管道两端分别设有管道伸缩连接管,所述管节伸缩连接管远离所述管节的一端设有法兰一,所述管道伸缩连接管远离所述管道的一端设有法兰二。上述方案有效降低了施工安装的难度,提高了管廊和管道的安装效率,节省大量施工时间和费用,同时预制成型的管节承载能力大,抗压效果好。但是,预制成型的管节重量大,体型大,不便于运输,在安装时,需要用负荷量较大的起重器械,施工成本高。Chinese patent literature discloses an integrated underground pipe gallery with a compensation device [application number: 201410559745.1], which includes several pipe joint sealing strips and several pipe joint units connected end to end. Between the pipe joint units, the pipe joint unit includes pipe joints and several pipes arranged in parallel. A pipe joint telescopic connection pipe matching the shape of the pipe joint, two ends of the pipe are respectively provided with a pipe telescopic connection pipe, the end of the pipe joint telescopic connection pipe far away from the pipe joint is provided with a flange 1, and the pipe joint The end of the telescopic connecting pipe away from the pipeline is provided with a flange two. The above scheme effectively reduces the difficulty of construction and installation, improves the installation efficiency of pipe racks and pipes, saves a lot of construction time and costs, and at the same time, the prefabricated pipe joints have large bearing capacity and good compression resistance. However, the prefabricated pipe joints are heavy and bulky, and are not convenient for transportation. During installation, lifting equipment with a large load is required, and the construction cost is high.

发明内容Contents of the invention

本发明的目的是针对上述问题,提供一种运输、安装方便,能提高施工效率的装配式地下管廊。The object of the present invention is to solve the above problems and provide a prefabricated underground pipe gallery which is convenient for transportation and installation and can improve construction efficiency.

为达到上述目的,本发明采用了下列技术方案:一种装配式地下管廊,包括中空的管廊本体,所述的管廊本体包括至少两块相互连接的预制件,所述的预制件相互连接后形成周向封闭的管廊本体。In order to achieve the above object, the present invention adopts the following technical solutions: an assembled underground pipe gallery, which includes a hollow pipe gallery body, and the pipe gallery body includes at least two interconnected prefabricated parts, and the prefabricated parts are connected to each other. After the connection, a circumferentially closed pipe gallery body is formed.

在上述的装配式地下管廊中,所述的管廊本体内固定有若干预制件,所述的预制件把管廊本体内部分隔成若干相互独立的工作间。In the above-mentioned prefabricated underground pipe gallery, several prefabricated parts are fixed inside the pipe gallery body, and the prefabricated parts divide the interior of the pipe gallery body into several mutually independent working rooms.

在上述的装配式地下管廊中,每两块相邻的预制件用连接件相互连接。In the above-mentioned prefabricated underground pipe gallery, every two adjacent prefabricated parts are connected with each other by connecting pieces.

在上述的装配式地下管廊中,所述的管廊本体内部并呈水平方向设置有若干块隔板。In the above-mentioned prefabricated underground pipe gallery, several partitions are arranged horizontally inside the main body of the pipe gallery.

在上述的装配式地下管廊中,所述的连接件包括连接在其中一块预制件上的连接套和连接在另一块预制件上的连接头,所述的连接套和连接头相互配适并能形成固定连接,当连接套和连接头固定连接时,两块相邻的预制件固定连接。In the above-mentioned prefabricated underground pipe gallery, the connecting piece includes a connecting sleeve connected to one of the prefabricated parts and a connecting head connected to the other prefabricated part, and the connecting sleeve and the connecting head are matched with each other and A fixed connection can be formed, and when the connection sleeve and the connection head are fixedly connected, two adjacent prefabricated parts are fixedly connected.

在上述的装配式地下管廊中,所述的连接套和连接头分别连接在两块相邻的预制件上,所述的连接套连接在其中一块预制件内部,所述的连接头突出在另一块预制件外部,连接头与连接套插接配合。In the above-mentioned prefabricated underground pipe gallery, the connecting sleeve and the connecting head are respectively connected to two adjacent prefabricated parts, the connecting sleeve is connected inside one of the prefabricated parts, and the connecting head protrudes from the On the outside of the other prefabricated part, the connector is mated with the connector sleeve.

在上述的装配式地下管廊中,所述的连接套和连接头分别连接在两块相邻的预制件上,且连接套和连接头分别突出在预制件外部,所述的连接套和连接头螺接配合。In the above-mentioned prefabricated underground pipe gallery, the connecting sleeve and the connecting head are respectively connected to two adjacent prefabricated parts, and the connecting sleeve and the connecting head respectively protrude from the outside of the prefabricated parts. The connecting sleeve and the connecting head Head screw fit.

在上述的装配式地下管廊中,所述的预制件内部固定有若干连接筋,所述的连接套和连接头分别与连接筋固定连接,所述的呈水平方向设置的连接筋靠近管廊本体外壁的一端设有能与管廊本体外部的连接机构进行固定连接的外联机构。In the above-mentioned prefabricated underground pipe gallery, several connecting ribs are fixed inside the prefabricated part, the connecting sleeve and the connecting head are respectively fixedly connected with the connecting ribs, and the connecting ribs arranged in the horizontal direction are close to the pipe gallery One end of the outer wall of the main body is provided with an external connection mechanism that can be fixedly connected with the connecting mechanism outside the main body of the pipe gallery.

在上述的装配式地下管廊中,每两块相邻的预制件的连接处设有密封机构。In the above-mentioned prefabricated underground pipe gallery, a sealing mechanism is provided at the junction of every two adjacent prefabricated parts.

在上述的装配式地下管廊中,所述的密封机构包括在两块相邻的预制件的连接处填设的环氧乙烷树脂、止水带或混凝土凝固物。In the above-mentioned prefabricated underground pipe gallery, the sealing mechanism includes ethylene oxide resin, water stop strips or concrete solidification materials filled in the joints of two adjacent prefabricated parts.

与现有的技术相比,本发明的优点在于:采用装配式结构,将地下管廊分成若干预制件,方便了运输,在安装时,预制件的体型较小、重量较轻,安装方便,尤其采用连接件连接的方式,使预制件之间的连接方便快捷,从而能极大的提高施工效率,实现地下管廊的快速安装。Compared with the existing technology, the present invention has the advantages of adopting an assembled structure and dividing the underground pipe gallery into several prefabricated parts, which facilitates transportation. During installation, the prefabricated parts are smaller in size, lighter in weight, and easy to install. In particular, the way of connecting parts is used to make the connection between prefabricated parts convenient and fast, which can greatly improve the construction efficiency and realize the rapid installation of underground pipe corridors.

附图说明Description of drawings

图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2是本发明的工作原理图;Fig. 2 is a working principle diagram of the present invention;

图3是本发明的另一种结构示意图;Fig. 3 is another kind of structural representation of the present invention;

图4是图1的A处放大图;Figure 4 is an enlarged view of A in Figure 1;

图5是图2的B处放大图;Fig. 5 is an enlarged view at B of Fig. 2;

图6是预制件的形状示意图;Fig. 6 is the shape schematic diagram of preform;

图7是连接件的结构示意图。Fig. 7 is a structural schematic diagram of the connector.

图中:管廊本体1、预制件2、工作间3、连接件4、连接套41、连接头42、螺套43、螺套连接端44、卡片45、卡台46、定位螺母47、卡片挡环48、凸台49、隔板5、连接筋6、外联机构7、加固机构100。In the figure: pipe gallery body 1, prefabricated part 2, work room 3, connector 4, connection sleeve 41, connector 42, screw sleeve 43, screw sleeve connection end 44, card 45, card table 46, positioning nut 47, card Blocking ring 48, boss 49, partition 5, connecting rib 6, outreach mechanism 7, reinforcement mechanism 100.

具体实施方式detailed description

下面结合附图和具体实施方式对本发明做进一步详细的说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

如图1所示,一种装配式地下管廊,包括中空的管廊本体1,所述的管廊本体1包括至少两块相互连接的预制件2,所述的预制件2相互连接后形成周向封闭的管廊本体1。也即管廊本体1是装配式的,在装配后能形成封闭的管道结构。管廊本体1的横截面形状不做限定,可以是矩形、圆形或其他形状,当然,优选为正方形。预制件2可以是如图6所示的形状,也可以是其他形状如“Z”字型,“U”字型等等。每两块相邻的预制件2的连接处设有密封机构。密封机构包括在两块相邻的预制件2的连接处填设的密封胶如环氧乙烷树脂或止水带或混凝土凝固物,其中混凝土可以在在接缝处现浇,固化后即成为混凝土凝固物,具有防水效果。As shown in Figure 1, an assembled underground pipe gallery includes a hollow pipe gallery body 1. The pipe gallery body 1 includes at least two interconnected prefabricated parts 2, and the prefabricated parts 2 are connected to each other to form Circumferentially closed pipe gallery body 1 . That is to say, the pipe gallery body 1 is assembled, and can form a closed pipe structure after assembly. The cross-sectional shape of the pipe gallery body 1 is not limited, it can be rectangular, circular or other shapes, of course, it is preferably square. The preform 2 can be in the shape shown in Figure 6, or in other shapes such as "Z" shape, "U" shape and so on. A sealing mechanism is provided at the junction of every two adjacent prefabricated parts 2 . The sealing mechanism includes a sealant such as ethylene oxide resin or waterstop or concrete solidified at the joint of two adjacent prefabricated parts 2, wherein the concrete can be cast in-situ at the joint and becomes Concrete solidification, with waterproof effect.

结合图1和图3所示,管廊本体1内固定有若干预制件2,所述的预制件2把管廊本体1内部分隔成若干相互独立的工作间3,各个工作间3各自独立,相互不干扰,方便检修和线路铺设。如图2所示,管廊本体1内部并呈水平方向设置有若干块隔板5,隔板5上可以放置小管道或线路,为管廊本体1内部的铺线提供方便。As shown in Figure 1 and Figure 3, there are several prefabricated parts 2 fixed in the pipe gallery body 1, and the said prefabricated parts 2 divide the interior of the pipe gallery body 1 into a number of mutually independent work rooms 3, each work room 3 is independent, Do not interfere with each other, convenient maintenance and line laying. As shown in FIG. 2 , several partitions 5 are arranged horizontally inside the pipe gallery body 1 , and small pipes or lines can be placed on the partitions 5 to provide convenience for laying lines inside the pipe gallery body 1 .

预制件2之间可以现浇连接,作为一种优选的方案,如图1所示,每两块相邻的预制件2用连接件4相互连接。The prefabricated parts 2 can be connected by cast-in-place. As a preferred solution, as shown in FIG. 1 , every two adjacent prefabricated parts 2 are connected to each other by a connecting piece 4 .

如图1和图4所示,连接件4包括固定在其中一块预制件2上的连接套41和固定在另一块预制件2上的连接头42,所述的连接套41和连接头42相互配适并能形成固定连接,当连接套41和连接头42固定连接时,两块相邻的预制件2固定连接。As shown in Figures 1 and 4, the connector 4 includes a connecting sleeve 41 fixed on one of the prefabricated parts 2 and a connecting head 42 fixed on the other prefabricated part 2, and the connecting sleeve 41 and the connecting head 42 are mutually Fit and can form a fixed connection, when the connection sleeve 41 and the connection head 42 are fixedly connected, two adjacent prefabricated parts 2 are fixedly connected.

如图1所示,连接套41和连接头42分别固定在两块相邻的预制件2上,所述的连接套41固定在其中一块预制件2内部,所述的连接头42突出在另一块预制件2外部,连接头42与连接套41插接配合。As shown in Figure 1, the connecting sleeve 41 and the connecting head 42 are respectively fixed on two adjacent prefabricated parts 2, the described connecting sleeve 41 is fixed inside one of the prefabricated parts 2, and the described connecting head 42 protrudes from the other On the outside of a prefabricated part 2 , the connector 42 is plugged with the connector sleeve 41 .

如图4所示,连接套41和连接头42分别固定在两块相邻的预制件2上,且连接套41和连接头42分别突出在预制件2外部,所述的连接套41和连接头42螺接配合。As shown in Figure 4, the connecting sleeve 41 and the connecting head 42 are respectively fixed on two adjacent prefabricated parts 2, and the connecting sleeve 41 and the connecting head 42 respectively protrude from the outside of the prefabricated part 2, and the connecting sleeve 41 and connecting The head 42 is screwed together.

连接件的具体结构和工作原理见本申请人之前申请的专利。如申请号为201510314380.0;200810060180.7;200810060181.1的专利。由于连接件是现有技术,此处不再赘述。For the specific structure and working principle of the connector, please refer to the patents previously applied by the applicant. For example, patents with application numbers 201510314380.0; 200810060180.7; 200810060181.1. Since the connector is a prior art, it will not be described in detail here.

本实施例提供了一种优选的连接件4,如图4和图7所示,所示,包括分别连接两个相邻的预制件2上的连接套41和连接头42,连接套41和连接头42分别与连接筋6固定连接,其中连接头42可以直接与连接筋6固接,也可以通过螺母等于连接筋6可拆卸的固接,连接套41内螺接有一个螺套43,螺套43一端呈圆柱形的螺套连接端44,另一端分叉后形成若干个卡片45,每两片相邻的卡片45之间具有间隙,卡片45中部向远离螺套43轴心线的方向突出从而使卡片45的外表面形成弧面,使卡片45具有弹性,易于收拢。卡片45的数量在2片以上即可,优选地可以是3片或大于3片。所述的螺套43内具有能让插杆连接头42插入的通道,连接头42的端部具有与卡片45端部相配适的卡台46,当连接头42插入到螺套43内时,卡片45卡咋卡台46上从而阻止连接头42脱离连接套41,所述的连接头42上螺接有一个能沿着连接头42轴向上下移动的定位螺母47,当定位螺母47向连接套41方向移动时,卡片45与卡台46卡紧,卡台46的外边缘有一个卡片挡环48,能阻止卡片45脱离卡台46。This embodiment provides a preferred connector 4, as shown in Figure 4 and Figure 7, as shown, including connecting sleeves 41 and connecting heads 42 respectively connected to two adjacent prefabricated parts 2, the connecting sleeves 41 and The connectors 42 are fixedly connected to the connecting ribs 6 respectively, wherein the connectors 42 can be fixedly connected to the connecting ribs 6 directly, or can be detachably connected by nuts equal to the connecting ribs 6, and the connecting sleeve 41 is internally screwed with a screw sleeve 43, One end of the screw sleeve 43 is a cylindrical screw sleeve connecting end 44, and the other end is bifurcated to form several cards 45. There is a gap between every two adjacent cards 45, and the middle part of the card 45 is far away from the screw sleeve 43 axis The direction protrudes so that the outer surface of the card 45 forms an arc surface, making the card 45 elastic and easy to fold. The number of cards 45 can be more than 2, preferably 3 or more. The threaded sleeve 43 has a passage for inserting the insert rod connector 42, and the end of the connector 42 has a card platform 46 that is compatible with the end of the card 45. When the connector 42 is inserted into the screwed sleeve 43, The card 45 is stuck on the card table 46 so as to prevent the connector 42 from breaking away from the connector sleeve 41. A positioning nut 47 that can move up and down along the axial direction of the connector 42 is screwed on the connector 42. When the positioning nut 47 is connected to the When cover 41 direction moves, card 45 and card platform 46 clamp tightly, and the outer edge of card platform 46 has a card stop ring 48, can stop card 45 from breaking away from card platform 46.

本实施例还提供了另一种连接件4,如图4所示,包括分别连接两个相邻的预制件2上的连接套41和连接头42,其中连接套41卡设在连接筋6上,连接筋6延伸出预制件2的端部膨大呈凸台49,连接套41被凸台49卡住后不能脱离连接筋6但能沿着连接筋6周向旋转,连接头42上具有外螺纹,连接套41具有内螺纹,当两个预制件2靠近时,转动连接套41使连接套41与连接头42螺接,实现两个预制件2的快速连接。两个预制件2之间具有缝隙,可在缝隙处填上上述的密封机构,从而使缝隙达到防水效果。This embodiment also provides another connecting piece 4, as shown in FIG. 4 , including a connecting sleeve 41 and a connecting head 42 respectively connecting two adjacent prefabricated parts 2, wherein the connecting sleeve 41 is clamped on the connecting rib 6 Above, the end of the connecting rib 6 extending out of the prefabricated part 2 expands to form a boss 49. After the connecting sleeve 41 is stuck by the boss 49, it cannot break away from the connecting rib 6 but can rotate along the circumferential direction of the connecting rib 6. The connecting head 42 has External thread, the connecting sleeve 41 has an internal thread, when the two prefabricated parts 2 are close, the connecting sleeve 41 is rotated to make the connecting sleeve 41 and the connecting head 42 screwed together, so as to realize the quick connection of the two prefabricated parts 2 . There is a gap between the two prefabricated parts 2, and the above-mentioned sealing mechanism can be filled in the gap, so that the gap can achieve a waterproof effect.

如图1和图2所示,预制件2内部固定有若干连接筋6,连接筋6为钢棒、钢筋、钢绞线、化工型材如碳纤维棒等,所述的连接套41和连接头42分别与连接筋6固定连接,如图2所示,所述的呈水平方向设置的连接筋6靠近管廊本体1外壁的一端设有能与管廊本体1外部的连接机构进行固定连接的外联机构7,外联机构7通常为连接套41,也可以是其他的连接螺母等,固定在预制件2内部,当预制件2外部具有其他加固机构100时,加固机构100可通过外联机构7与管廊本体1实现固定连接,从而提高管廊本体1在土层中的固定效果,防止发生沉降或变位,加固机构100可以是水泥土搅拌桩或预制桩等。As shown in Figures 1 and 2, there are several connecting ribs 6 fixed inside the prefabricated part 2, and the connecting ribs 6 are steel rods, steel bars, steel strands, chemical profiles such as carbon fiber rods, etc., the connecting sleeve 41 and the connecting head 42 They are respectively fixedly connected with the connecting ribs 6, as shown in Figure 2, the end of the connecting ribs 6 arranged in the horizontal direction close to the outer wall of the pipe gallery body 1 is provided with an outer wall that can be fixedly connected with the connecting mechanism outside the pipe gallery body 1. The connection mechanism 7 and the external connection mechanism 7 are usually the connection sleeve 41, or other connection nuts, etc., which are fixed inside the prefabricated part 2. When there are other reinforcement mechanisms 100 outside the prefabricated part 2, the reinforcement mechanism 100 can be connected through the external connection mechanism. 7 is fixedly connected with the pipe gallery body 1, thereby improving the fixing effect of the pipe gallery body 1 in the soil layer and preventing settlement or displacement. The reinforcement mechanism 100 can be a cement-soil mixing pile or a prefabricated pile.

本发明的管廊本体1采用装配式形成,便于运输、安装,提高了施工效率,降低了施工成本。The pipe gallery body 1 of the present invention is formed by assembly, which is convenient for transportation and installation, improves construction efficiency, and reduces construction cost.

本文中所描述的具体实施例仅仅是对本发明精神作举例说明。本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本发明的精神或者超越所附权利要求书所定义的范围。The specific embodiments described herein are merely illustrative of the spirit of the invention. Those skilled in the art to which the present invention belongs can make various modifications or supplements to the described specific embodiments or adopt similar methods to replace them, but they will not deviate from the spirit of the present invention or go beyond the definition of the appended claims range.

Claims (10)

1. an assembling underground pipe gallery, comprise the piping lane body (1) of hollow, it is characterized in that, described piping lane body (1) comprises at least two pieces of interconnective prefabricated components (2), and described prefabricated component (2) is interconnected the rear piping lane body (1) forming circumference and close.
2. assembling underground pipe gallery according to claim 1, it is characterized in that, described piping lane body (1) internal fixtion has some prefabricated components (2), and described prefabricated component (2) becomes some separate workplaces (3) piping lane body (1) interior separation.
3. assembling underground pipe gallery according to claim 1 and 2, is characterized in that, every two blocks of adjacent prefabricated components (2) are interconnected with connector (4).
4. assembling underground pipe gallery according to claim 1, is characterized in that, described piping lane body (1) is inner is also provided with some pieces of dividing plates (5) in horizontal direction.
5. assembling underground pipe gallery according to claim 3, it is characterized in that, described connector (4) comprises the adapter sleeve (41) be connected on wherein one piece of prefabricated component (2) and the connector (42) be connected on another block prefabricated component (2), described adapter sleeve (41) and connector (42) phase interworking are fitted and can form a fixed connection, when adapter sleeve (41) is fixedly connected with connector (42), two blocks of adjacent prefabricated components (2) are fixedly connected with.
6. assembling underground pipe gallery according to claim 5, it is characterized in that, described adapter sleeve (41) and connector (42) are connected on two blocks of adjacent prefabricated components (2), it is inner that described adapter sleeve (41) is connected to wherein one piece of prefabricated component (2), described connector (42) is given prominence at another block prefabricated component (2) outside, and connector (42) coordinates with adapter sleeve (41) grafting.
7. assembling underground pipe gallery according to claim 5, it is characterized in that, described adapter sleeve (41) and connector (42) are connected on two blocks of adjacent prefabricated components (2), and adapter sleeve (41) and connector (42) are given prominence at prefabricated component (2) outside respectively, described adapter sleeve (41) and connector (42) threaded.
8. assembling underground pipe gallery according to claim 5, it is characterized in that, described prefabricated component (2) inside is fixed with some dowels (6), described adapter sleeve (41) is fixedly connected with dowel (6) respectively with connector (42), and the described dowel (6) arranged in horizontal direction is provided with near one end of piping lane body (1) outer wall and the bindiny mechanism outside with piping lane body (1) can be fixed the outer linkage (7) be connected.
9. assembling underground pipe gallery according to claim 1, is characterized in that, the junction of every two blocks of adjacent prefabricated components (2) is provided with sealing mechanism.
10. assembling underground pipe gallery according to claim 9, is characterized in that, ethylene oxide resin, waterstop or the concrete setting thing established are filled out in the junction that described sealing mechanism is included in two pieces of adjacent prefabricated components (2).
CN201510716851.0A 2015-10-29 2015-10-29 Assembled underground pipe gallery Active CN105350572B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510716851.0A CN105350572B (en) 2015-10-29 2015-10-29 Assembled underground pipe gallery
PCT/CN2016/000490 WO2017071110A1 (en) 2015-10-29 2016-08-29 Assembled-type underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510716851.0A CN105350572B (en) 2015-10-29 2015-10-29 Assembled underground pipe gallery

Publications (2)

Publication Number Publication Date
CN105350572A true CN105350572A (en) 2016-02-24
CN105350572B CN105350572B (en) 2017-11-24

Family

ID=55326624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510716851.0A Active CN105350572B (en) 2015-10-29 2015-10-29 Assembled underground pipe gallery

Country Status (2)

Country Link
CN (1) CN105350572B (en)
WO (1) WO2017071110A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569676A (en) * 2016-03-02 2016-05-11 袁江 Slide type inserting part, prefabricated concrete pipe gallery and shield segment
CN106545343A (en) * 2016-10-28 2017-03-29 江西中恒地下空间科技有限公司 A kind of construction method of tunneling underground pipe gallery and storage well
CN106592628A (en) * 2016-11-24 2017-04-26 中铁上海设计院集团有限公司 Splicing method of honeycomb type underground engineering structure system
WO2017071110A1 (en) * 2015-10-29 2017-05-04 周兆弟 Assembled-type underground pipe gallery
CN106677209A (en) * 2017-01-18 2017-05-17 河南国隆实业有限公司 Intelligent comprehensive pre-fabricating pipe gallery and construction technique thereof
CN113047338A (en) * 2021-03-26 2021-06-29 上海浦东混凝土制品有限公司 Comparatively firm prefabricated utility tunnel of concatenation

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107747319A (en) * 2017-11-16 2018-03-02 中冶京诚工程技术有限公司 Underground comprehensive pipe rack and comprehensive pipe rack system
CN108533150A (en) * 2018-03-30 2018-09-14 国家电网公司 A kind of pipe gallery electric compartment fire resistant doorsets
CN109137968A (en) * 2018-07-27 2019-01-04 浙江鑫宙竹基复合材料科技有限公司 A kind of compound piping lane of bamboo with support component anti-rotating function
CN109098208B (en) * 2018-08-31 2024-04-26 郭毅轩 A subsea tunnel and construction method thereof
CN109083196B (en) * 2018-09-30 2024-04-02 广西壮族自治区城乡规划设计院 Utility tunnel composite node structure
CN110318420B (en) * 2019-06-28 2024-04-09 中国五冶集团有限公司 Prefabricated assembled underground utility tunnel
CN111456089A (en) * 2020-05-21 2020-07-28 中国电建集团成都勘测设计研究院有限公司 Double-bin comprehensive pipe gallery
CN112112193B (en) * 2020-09-25 2022-06-03 福州市城乡建总集团有限公司 Double-sided superposed pipe gallery side wall with concealed columns and manufacturing method thereof
CN112459112A (en) * 2020-11-02 2021-03-09 上海市政工程设计研究总院(集团)有限公司 Prefabricated and cast-in-place cable utility tunnel that combines
CN113438690A (en) * 2021-05-08 2021-09-24 陕西墨斗星智能科技有限公司 Long-distance signal transmission method of latticed pipe gallery early warning system
CN114575385B (en) * 2022-03-25 2023-10-31 四川仟坤建设集团有限责任公司 Municipal utility tunnel and construction method thereof
CN114892721B (en) * 2022-04-23 2024-02-02 湖南华纬水电工程有限公司 Soft soil stratum piping lane movement joint waterproof construction
CN114718114B (en) * 2022-05-18 2025-03-07 王博 A prefabricated pipe gallery
CN115680020A (en) * 2022-11-07 2023-02-03 李晓明 An underground street corridor
CN116290817B (en) * 2023-02-13 2025-07-11 中国化学工程第三建设有限公司 A method for transporting and placing pipe gallery modules and an auxiliary detection mechanism
CN116145726B (en) * 2023-03-03 2025-05-16 北京市政建设集团有限责任公司 Underground comprehensive pipe rack prefabrication and assembly equipment and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519876A (en) * 2008-03-17 2009-09-02 周兆弟 Cutting-free fast tearing butt coupler and butt joint piece
CN101519877A (en) * 2008-03-17 2009-09-02 周兆弟 Multi-headed fast tearing butt coupler and fabricated part
CN201934812U (en) * 2010-12-08 2011-08-17 南京联众机电制造有限公司 Urban underground pipeline shared pipeline corridor
JP2012214970A (en) * 2011-03-31 2012-11-08 Nippon Steel & Sumikin Metal Products Co Ltd Connection structure and connection technique for steel pipe for pipe roof technique
CN104455889A (en) * 2014-10-20 2015-03-25 杨帆 Integrated underground pipe gallery with compensation device
CN104878758A (en) * 2015-06-09 2015-09-02 周兆弟 Insertion connecting component with tension connection function
CN205224087U (en) * 2015-10-29 2016-05-11 周兆弟 Assembled underground pipe gallery

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350572B (en) * 2015-10-29 2017-11-24 周兆弟 Assembled underground pipe gallery

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519876A (en) * 2008-03-17 2009-09-02 周兆弟 Cutting-free fast tearing butt coupler and butt joint piece
CN101519877A (en) * 2008-03-17 2009-09-02 周兆弟 Multi-headed fast tearing butt coupler and fabricated part
CN201934812U (en) * 2010-12-08 2011-08-17 南京联众机电制造有限公司 Urban underground pipeline shared pipeline corridor
JP2012214970A (en) * 2011-03-31 2012-11-08 Nippon Steel & Sumikin Metal Products Co Ltd Connection structure and connection technique for steel pipe for pipe roof technique
CN104455889A (en) * 2014-10-20 2015-03-25 杨帆 Integrated underground pipe gallery with compensation device
CN104878758A (en) * 2015-06-09 2015-09-02 周兆弟 Insertion connecting component with tension connection function
CN205224087U (en) * 2015-10-29 2016-05-11 周兆弟 Assembled underground pipe gallery

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017071110A1 (en) * 2015-10-29 2017-05-04 周兆弟 Assembled-type underground pipe gallery
CN105569676A (en) * 2016-03-02 2016-05-11 袁江 Slide type inserting part, prefabricated concrete pipe gallery and shield segment
CN106545343A (en) * 2016-10-28 2017-03-29 江西中恒地下空间科技有限公司 A kind of construction method of tunneling underground pipe gallery and storage well
CN106545343B (en) * 2016-10-28 2020-08-04 江西中恒地下空间科技有限公司 A construction method for digging underground pipe gallery and storage well
CN106592628A (en) * 2016-11-24 2017-04-26 中铁上海设计院集团有限公司 Splicing method of honeycomb type underground engineering structure system
CN106677209A (en) * 2017-01-18 2017-05-17 河南国隆实业有限公司 Intelligent comprehensive pre-fabricating pipe gallery and construction technique thereof
CN113047338A (en) * 2021-03-26 2021-06-29 上海浦东混凝土制品有限公司 Comparatively firm prefabricated utility tunnel of concatenation
CN113047338B (en) * 2021-03-26 2024-04-26 上海浦东混凝土制品有限公司 Comparatively firm prefabricated utility tunnel of concatenation

Also Published As

Publication number Publication date
WO2017071110A1 (en) 2017-05-04
CN105350572B (en) 2017-11-24

Similar Documents

Publication Publication Date Title
CN105350572B (en) Assembled underground pipe gallery
CN204477493U (en) A kind of waterproof jacking pipe joints bellmouth jointing structure
WO2017071113A1 (en) Cement-soil mixing pile protected underground pipe gallery
CN202247950U (en) Square culvert component
CN106337436A (en) Rectangular concrete comprehensive pipe gallery prefabricated pipe sections and machining method
CN109944273A (en) A kind of city tunnel, track traffic regional tunnel and pipe gallery build structure jointly
CN105350570B (en) Assembled underground pipe gallery multiple-pass joint
CN205530344U (en) Utility tunnel is pour to split type no mould
CN102237578A (en) Electric single-pole point type grounding device for urban area
CN103362517A (en) Assembled jacking pipe
CN205604290U (en) Frame energy dissipation formula utility tunnel structure turns up
CN205224088U (en) Cement mixing method protection underground pipe gallery
WO2017071111A1 (en) Underground pipe gallery protection structure
CN205224087U (en) Assembled underground pipe gallery
CN205134385U (en) Underground pipe gallery protective structure
CN204312088U (en) A kind of pin-connected panel push pipe tunnel segment structure
CN104455889A (en) Integrated underground pipe gallery with compensation device
CN205134362U (en) Underground pipe gallery bi -pass connects
CN105350571B (en) The pass joint of underground pipe gallery two
CN105065040A (en) Top-plate-prefabricated underground space underground excavation building method
CN205617425U (en) Prefabricated structure of assembling of utility tunnel
CN204530722U (en) For the novel steel tube of pattern foundation pit supporting structure
CN205134361U (en) Assembled underground pipe gallery connects lead to more
CN210315654U (en) Urban tunnel, rail transit interval tunnel and utility tunnel co-construction structure
CN206956775U (en) A kind of cabin pipe gallery of plain type underground three

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210422

Address after: No.1 Workshop of Huzhou Wantuo metal products Co., Ltd., rujiadian Road, Lianshi Town, Nanxun District, Huzhou City, Zhejiang Province

Patentee after: Zhejiang Zhaodi Technology Co.,Ltd.

Address before: Kaohsiung streets Pu Beilun District 315800 in Zhejiang province Ningbo City No. 18

Patentee before: Zhou Zhaodi

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Fabricated underground pipe gallery

Effective date of registration: 20211227

Granted publication date: 20171124

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2021330002677

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220617

Granted publication date: 20171124

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2021330002677

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Prefabricated underground pipe gallery

Effective date of registration: 20230707

Granted publication date: 20171124

Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd.

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2023330001414

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20171124

Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd.

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2023330001414

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20160224

Assignee: Zhejiang Hejian building materials Co.,Ltd.

Assignor: Zhejiang Zhaodi Technology Co.,Ltd.

Contract record no.: X2024980033208

Denomination of invention: Prefabricated underground pipe gallery

Granted publication date: 20171124

License type: Common License

Record date: 20241209